Professional Documents
Culture Documents
289-SH16
SAFE BEHAVIOUR/GOOD
UNSAFE ACT UNSAFE CONDITION
PRACTICE
Date: Time: 9:20am Site/Location: PRECAST Project: JETTY 3,
LAYDOWN, AREA F PROJECT
Mr. Pepple Donald a worker slumped at about 9:20am on the 22 nd of
June, 2023, while he was waiting for concrete supply from batching plant
Describe the for precast slab work at the precast laydown area and was immediately
anomaly: rushed to the site clinic unconscious, after administering CPR BP check
which was 140/89mmhg, his oxygen rate was low he was transferred to
the Saipem clinic at about 9:36am. for further medical attention at
Saipem clinic.
Possible
Injury Environmental Damage/Spill Property Material Damage
consequences:
At 9:27am site ambulance left site clinic whereby he was transferred to
Immediate the Saipem clinic at 9:36am. For further medical attention at Saipem H
Action Taken: block clinic.
Notes:
Responsible for
close out:
SAFE BEHAVIOUR/GOOD
UNSAFE ACT UNSAFE CONDITION
PRACTICE
Date: Time: Site/Location: Project:
Describe the
anomaly:
Possible
Injury Environmental Damage/Spill Property Material Damage
consequences:
Immediate
Action Taken:
Suggestion for
improvement:
Reported by
(Optional):
Reported By /
Department
THANK YOU FOR YOUR CONTRIBUTION
BELOW SECTION RESERVED FOR HSE DEPARTMENT
Notes:
Responsible for
close out: