SITUATION:
On 400KV Line, at one location, it was observed with damage of the L pad on the
conductor string along with connected jumper also.
Observations:
1. This was 400Kv DC ( Double circuit ) transmission line tower with stringing of TWIN
MOOSE ACSR conductor.
2. At one of the tensionTower, it was found with damage of the L pad at the hardware
portion.
3. This was pointed out during the Binocular vision patrolling of the line.
TASK:
1. It was decided for the actual verification of the issue and rectification the same with
permanent solution.
2. Shut down applied on 400kv SYSTEM to take up the work
3. One gang with 12 persons of the contractor were deployed.