ELSEWEDY ELECTRIC
POWER SYSTEM PROJECTS
ED
L
PY L
O 1017/ITP 105
BUILDING WORKS
CO R
T
EPC-Eng.
01 15 Sept. 2015 QA Auditor QA&C Manager PM
Manager
Rev Date Prepared by Reviewed by Reviewed by Approved by
Note
i. Revisions after Rev. 0 are denoted by a vertical line in the left hand margin against the revised text,
1
with the revision number displayed next to the revision line as shown by the example on the left.
ED
Rev. Approved
Date Description of Revision Prepared by Reviewed by Reviewed by
No. by
L
Issued for Approval &
0 15 Dec. 2014 WM HB MM AO
Implementation.
01 15 Sept. 2015 PY L
Changing the Company
Logo
O MT HB MM AO
CO R
T
ON
-C
UN
INSPECTION & TEST PLAN FOR BUILDING WORK ITP No. 105 DATE : 15-Sep-15 Rev. 1
Inspection Status
Reference
No. Activity Description Acceptance Criteria Inspection Record Responsible Person Remarks
Document
SUBCONT THIRD PARTY PSP QC OWNER
D
Check list for Masonry and
Technical Technical specification Project Manager/QC
1.0 Masonry and metal sheet wall metal sheet wall FP 106 P W W R
specification & FP 106 Engineer
LE
Att.01
PY L
Check list for Masonry and
Technical Technical specification Project Manager/QC
3.0 Floor Screed metal sheet wall FP 106 P W W R
O
specification & FP 106 Engineer
Att.03
CO TR
Technical Technical specification Project Manager/QC
4.0 Plastering metal sheet wall FP 106 P W W R
specification & FP 106 Engineer
Att.04
ON
Att.05
Legend : I : Initiate / Perform, S : Surveillance Inspection, W : Witness Inspection Point, H : Mandatory Hold Point for Inspection, R/A : Review / Approval, IFCD : Issued for construction drawing, FP : Field Procedure