You are on page 1of 3

 

 
 
 
 

ELSEWEDY ELECTRIC
 
 
 
 
 
 
POWER SYSTEM PROJECTS

ED
 
 

INSPECTION AND TEST PLAN

L
PY L
O 1017/ITP 105

BUILDING WORKS
CO R
T

Project : MAHMOUDIA 330 MW SIMPLE CYCLE POWER PLANT


ON

Owner : MIDDLE DELTA ELECTRICITY PRODUCTION COMPANY

Contractor : ELSEWEDY ELECTRIC - PSP


-C
UN

EPC-Eng.
01 15 Sept. 2015 QA Auditor QA&C Manager PM
Manager
Rev Date Prepared by Reviewed by Reviewed by Approved by

1017/ITP105 Rev.01 15 Sept.2015 Page 1 of 3

 
 

ELESEWEDY ELECTRIC - PSP  

REVISION RECORD SHEET

Note

i. Revisions after Rev. 0 are denoted by a vertical line in the left hand margin against the revised text,
1
with the revision number displayed next to the revision line as shown by the example on the left.
 

ED
 

Rev. Approved
Date Description of Revision Prepared by Reviewed by Reviewed by
No. by

L
Issued for Approval &
0 15 Dec. 2014 WM HB MM AO
Implementation.
01 15 Sept. 2015 PY L
Changing the Company
Logo 
O MT HB MM AO
CO R
T
ON
-C
UN

1017/ITP105 Rev.01 15 Sept.2015 Page 2 of 3


 
OWNER / CLIENT MIDDLE DELTA ELECTRICITY PRODUCTION COMPANY

CONSULTANT MAHMOUDIA 330 MW SIMPLE CYCLE POWER PLANT


INSPECTION AND TEST PLAN ELSEWEDY ELECTRIC - PSP
CONTRACTOR

PROJECT NO. 1017

INSPECTION & TEST PLAN FOR BUILDING WORK ITP No. 105 DATE : 15-Sep-15 Rev. 1

Inspection Status
Reference
No. Activity Description Acceptance Criteria Inspection Record Responsible Person Remarks
Document
SUBCONT THIRD PARTY PSP QC OWNER

D
Check list for Masonry and
Technical Technical specification Project Manager/QC
1.0 Masonry and metal sheet wall metal sheet wall FP 106 P W W R
specification & FP 106 Engineer

LE
Att.01

Check list for Masonry and


Technical Technical specification Project Manager/QC
2.0 Roof works metal sheet wall FP 106 P W W R
specification & FP 106 Engineer
Att.02

PY L
Check list for Masonry and
Technical Technical specification Project Manager/QC
3.0 Floor Screed metal sheet wall FP 106 P W W R

O
specification & FP 106 Engineer
Att.03

Check list for Masonry and

CO TR
Technical Technical specification Project Manager/QC
4.0 Plastering metal sheet wall FP 106 P W W R
specification & FP 106 Engineer
Att.04

Check list for Masonry and


Technical Technical specification Project Manager/QC
5.0 Doors & windows installation metal sheet wall FP 106 P W W R
specification & FP 106 Engineer

ON
Att.05

Check list for Masonry and


Technical Technical specification Project Manager/QC
6.0 Floor and wall finishing metal sheet wall FP 106 P W W R
specification & FP 106 Engineer
Att.06
-C
Check list for Masonry and
Technical Technical specification Project Manager/QC
7.0 Suspended Ceiling Works metal sheet wall FP 106 P W W R
specification & FP 106 Engineer
Att.07
UN

Check list for Masonry and


Technical Technical specification Project Manager/QC
8.0 Painting works metal sheet wall FP 106 P W W R
specification & FP 106 Engineer
Att.08

Check list for Masonry and


Technical Technical specification Project Manager / QC
9.0 Plumbing and Drainage piping metal sheet wall FP 106 P W W R
specification & FP 106 Engineer
Att.10

Check list for Masonry and


Technical Technical specification Project Manager / QC
10.0 Plumbing Fixture Installation metal sheet wall FP 106 P W W R
specification & FP 106 Engineer
Att.11

Check list for Masonry and


Technical Technical specification Project Manager/QC
11.0 Raised Floor Works metal sheet wall FP 106 P W W R
specification & FP 106 Engineer
Att.12

Legend : I : Initiate / Perform, S : Surveillance Inspection, W : Witness Inspection Point, H : Mandatory Hold Point for Inspection, R/A : Review / Approval, IFCD : Issued for construction drawing, FP : Field Procedure

1017/ITP105 Rev.01 15 Sept 2015 Page 3 of 3 .

You might also like