cement 5 5 bags
sand 0.197438 10.46419 11 bags
gravel 0.394875 20.92838 20 bags
Amount fittings
amount concreting
TOTAL
LABOR 35%
15
1400 2 PLUMBER
400 1 LABOR
700 1 FOREMAN
2500
SAY 3000
45000
10 meter cluster #
volume 0.03375
cement 0.307125
sand 0.016875
gravel 0.03375
excavation 0.03375
290 1450
100 1100
100 2000
4550
128,955.00
4,550.00
133,505.00
46,726.75
8,900.33
700 @ 18 25200
400 @ 18 7200
700 18 12600
45000
4
total
0.135
6 meter cluster # 5
total
1" dia pe pipe
1"∅ Brass Coupler 2 pcs 10 450.00
3"∅X1"∅ D.I. Single Outlet Saddle Clamp w/ BNG 1 pc 5 600.00
3/4"∅ Brass Ball Valve 1 pc 5 550.00
1"∅x3/4"∅ G.I. Bell Reducer 1 pc 5 60.00
3/4"∅ x 90° G.I. St. Elbow 1 pc 5 55.00
3/4"∅ x 4" G.I. Nipple 4 pcs 20 55.00
3/4"∅ G.I. Tee 5 pcs 25 70.00
3/4"∅ x 90° G.I. Elbow 2 pcs 10 55.00
0
3/4"∅ x 8" G.I. Nipple 1 pcs 5 70.00
3/4"∅ plug cap 6 pcs 30 30.00
3/4" teflon tape 3 pcs 15 30.00
135
total
volume 0.011475 m3
cement 0.104423 bags 0.522113 1
sand 0.005738 m3 0.028688
gravel 0.011475 m3 0.057375
cement 5 bags
sand 11 bags
gravel 20 bags