Method Statement For Cmu Block Work
Method Statement For Cmu Block Work
DISCIPLINE CIVIL
DOC No HOS-QA-THA-ACWA-010
REV 00
Anwar Mukthar
Mukthar Ahmed Eyad Saffarini Ahmed Ba Harmi
Mohiuddin Ahmed
Prepared by Reviewed Verified by Concurred by Approved by
by
TABLE OF CONTENT
1|Page
100 Bed Isolation
Hospital for COVID-19
1 – Objective
2 – Scope of Work
3 – References
4 – Safety Requirements
5 – Key Personnel Duties and Responsibilities
6 – Job Safety Analysis
7 – Work Procedure
8 – Testing and Acceptance
9 – Equipment
10 – Material
11 – Drawings
1.0 Objective
2|Page
100 Bed Isolation
Hospital for COVID-19
The objective of this method statement is to describe the specific task that are
required to ensure that all concrete masonry works installation are being done
in accordance with the project technical specifications and in a safe and
orderly manner meeting the requirements of the project
References
Project Specifications
ACI - 381
ASTM C 39
3|Page
100 Bed Isolation
Hospital for COVID-19
available and carry out the work as planned without delays and in a safe
manner.
5.2 The Site Manager is responsible in the coordination with site supervisor and
foremen for a safe and proper execution of the works.
5.3 Site Engineer and General F/M are directly reporting to the Site Manager.
They should ensure that the works are carried out in accordance with the
approved drawings, applicable standards and this Method of Statement.
5.4 QC Inspector in close coordination with site personnel shall ensure that the
works are carried out based from the QC project requirements. He is
responsible in conducting and monitoring QC inspection works. Additionally,
he shall ensure that all pertinent QC documentations and records are
prepared and ready for approval.
5.5 Safety Officer is responsible in monitoring the full implementation of all
safety procedures and safety measures at site at all times. Communication
with the Safety Representative is also part of his responsibility.
4|Page
100 Bed Isolation
Hospital for COVID-19
7.1 Store all materials including masonry units above grade, under cover, allowing
free air circulation and preventing damage, intrusion of foreign materials and
moisture absorption.
7.4 Clear & clean the area. The blocks should be stacked in appropriate
areas near to the final placement/location.
7.5 Construct masonry true to line, level, square and plumb with vertical joints
aligned. Lay in running bond unless otherwise indicated. Align horizontal
courses at intersection walls. Provide full watertight joints in exterior work.
7.6 Use modular layout to minimize cutting and use of units less then 1/3 rd the
standard length.
7.7 Lay all other hollow units with full mortar coverage on horizontal and vertical
face shells but not extending across the webs, apply mortar over full
thickness and height of any units with abutting solid end faces.
7.8 Bond all wall masonry units as indicated on the drawings. Build in all work as
required, including anchors, accessories, sleeves and materials furnished by
other trades as shown in noted on drawing solidly fill spaces around build-in
items with mortar.
7.10 Mortar shall be freshly prepared and uniformly mixed and be of spreadable,
workable consistency.
7.11 After all ingredients are in the batch mixer, they shall be mechanically mixed
for not less than 3 minutes nor more than 10 minutes.
5|Page
100 Bed Isolation
Hospital for COVID-19
7.12 Construct mortar joints about 10MM thick, 6MM minimum and 12MM
maximum to maintain 200MM vertical coursing and 400MM horizontal
spacing, unless otherwise indicated in the drawings.
7.13 Joint finish shall be as indicated in the drawings or as specified in the project
specification
7.14 Bond each course at corner, either bond into or anchor at intersections with
metal ties spaced as shown in the drawing
9.0 Equipment
9.1 Task Lights
9.2 Hand Tools
9.3 Trowels
9.4 Mason’s & Mashing Hammer
9.5 Mortar Mixer
9.6 Masonry Cutter level
9.7 Brushes
9.8 Spirit Level
9.9 Survey Equipment
9.10 String Line
9.11 Shovels
9.12 Mud Boards
9.13 Scratch Coat Tool
9.14 Sponges to float wall, Jointing tools & Wheel barrow
10.0 Material
10.1 Cement
10.2 Sand
6|Page
100 Bed Isolation
Hospital for COVID-19
11.0 Drawings
11.1 FHM-AR-001-00
7|Page