Progress Report

Progress Report # WEEK 14


Reporting Period:

Submittal Date

Project Name: AGV FOR CONVEYOR


Project Location: Politeknik Negeri
Batam
Project Manager : Senanjung Prayoga

Summary of Work Completed During This Reporting Period (List all tasks)
% of Work Date
Task Deliverable by Subtask # Due Date Complete Submitted
1 Design 1.2 Quarterly Progress Report (05/05/23) (3 0 %) (06/22/23)
1.5 Contract Summary Form (05/05/23) (3 0 %) (06/22/23)
1.6 MBE/WBE Documentation (05/05/23) (3 0 %) (06/22/23)
(319(h) only)
1.7 Contractor Documentation/ (05/05/23) (3 0 %) (06/22/23)
Solicitation Documentation
1.8 Project Survey Form (05/05/23) (3 0 %) (06/22/23)
2 Mechanical Installation 2.1 CEQA/NEPA Documents (05/05/23) (3 0 %) (06/22/23)
2.2 Permits (05/05/23) (3 0 %) (06/22/23)
(06/22/23)

(Follow with narrative of Progress Report--)


Introduction
Task 1 Design (Cumulative 30 % complete)
(Currently, in our design work, we have started recently and currently we are focused on
competition proposals so we are still focused on that..”)

Task 2 30 (Cumulative % complete)


(“Nowork performed thisperiod.”)
(Continue similarly with all tasks.)

49
Progress Report Instructions
Progress Report #
Week 14 report

Reporting Period
Identify the time period covered by the report (e.g., may. 05, 2023 to june 22, 2023).

Submittal Date
Indicate the date that the report is sent to the RWQCB Contract Manager.

Contract Number
Indicate the SWRCB Contract Number.

Project Name
AGV FOR CONVEYOR SYSTEM REPLACEMENT

Contractor Name
Indicate Contractor’s name.

Project Director
Indicate Project Director by printing and signing name

Summary of Work Completed During Reporting Period


Provide information indicated by table headings.

List of Deliverables
List all deliverables included with this report. Label all deliverables by subtask number.

Progress Report Narrative

Introduction

1. Identify production areas requiring replacement of the conveyor system and ensure they
are suitable for use with AGVs.
2. Choose the type of AGV according to production needs, such as moving on a certain line
in a workbench frame or AGV according to client needs.
3. Prepare the necessary infrastructure for the AGV, such as special lanes or special
markings on the floor to help the AGV move.
4. Install the AGV control and monitoring system so that it can operate optimally and can be
monitored in real-time.

Summary of Activities

1. Based on the results of discussions with Pt.Sumitomo's partners, what they currently want
is to have several AGVs connected to the conveyor and each AGV is capable of
transporting goods weighing 100KG.
2. To drive the AGV requires a motor that can accommodate the overall load of the AGV of
approximately 1 ton.
3. The AGV specification required by PT is AGV which can replace the conveyor system.