Manpower requirement for WTPs Operation in URM

Chargeman Operator Assistant


Shift Shift
Sr Operation /Master Cum Cum
Manager Incharge
Technician Technician Technician
1 WTP 1 Scale pit pump house 1 1
2 WTP 2 Scale pit pump house 1 1
WTP 3 Direct cooling pump
3 1 1
house
1
WTP 4 Indirect cooling pump
4 1
house
5 Furnace pump house 1 1 1
Side stream filter, Scale removal
6 Filters, Soft water plant & Chemical
dozing
1
Fire Fighting Pump House Type 1 1
7
‘A’
Scrapper & Grab Crane
8
operation
9 Manpower per shift 1 2 6 5
10 Total Manpower per day 1 3 6 18 15 43

One Shift In charge in each shift: B.Tech./B.E. in Electrical / Mechanical / Civil / Chemical

Charge man/Master Technician: Qualification – Diploma in Electrical / Mechanical / Civil / Chemical

Operator cum Technician: Qualification – Diploma in Electrical / Mechanical / Civil / Chemical

Assistant Cum Technician: Qualification – ITI

Manpower requirement for WTPs Mechanical Maintenance in URM


Gas
Chargeman Assistant
Shift Shift cutter /
Sr Mechanical Maintenance /Master Cum
Manager Incharge welder /
Technician Technician
fitter
Mechanical Maintenance in each
1 3 0
shift
Mechanical Maintenance in ‘G’
2 1 0 2 3 4
shift
Total Manpower / day 1 0 2 6 4 13

One Executive overall Incharge: B.Tech./B.E. in Mechanical

Charge man/Master Technician: Qualification – Diploma in Mechanical with 3 years experience

Gas cutter / welder / fitter: Qualification – ITI in Mechanical

Assistant Cum Technician: Qualification – ITI


Manpower requirement for WTPs Electrical, Instrumentation, Automation,
HMI Maintenance in URM
Chargeman Assistant
Electrical, Instrumentation, Shift Shift
Sr /Master Electrician Cum
Automation, HMI Maintenance Manager Incharge
Technician Technician
Electrical, Instrumentation,
1 Automation, HMI Maintenance 3 0
in each shift
Electrical, Instrumentation,
2 Automation, HMI Maintenance 1 0 1 1 1
in ‘G’ shift
Total Manpower / day 1 0 1 4 1 7

One Executive overall Incharge: B.Tech./B.E. in Electrical


Charge man/Master Technician: Qualification – Diploma in Electrical / Instrumentation with 3 years
experience
Electrician: Qualification – ITI in Electrical / Instrumentation
Assistant Cum Technician: Qualification – ITI
Manpower for cleaning of WTPs : 2 per day (No Qualification)
Total Manpower per day

Operation : 43

Mechanical : 13

Electrical & IA : 7

General Cleaning : 2

Manpower for cleaning of WTP & FPH Sumps, Waste Water Tanks and Cooling Tower Basins:
310 Each Capital Repair (No Qualification)