You are on page 1of 1

Production Analysis Report

Format No.:
Plant Location: Date: Shift

Total working Hours FROM: TO Total Hours

MATERIAL LOADED: Supervisor :


Machine Operator :
SIZE : Crane / Lifting Equipment Opr. :
Technicians :
SPECIFICATIONS : Helpers :
TOTAL MANPOWER

LAST MONTH DATA


Utilization % Qty. Unit / Hrs OEE Rejection % Stoppage Time Avg. Speed

CURRENT MONTH RECORDS


REJECTION TYPE WISE IN-
PRODUCED AVG. QTY FINISHED
SR.NO MATERIAL SIZE AVG.SPEED UNIT RESULT PROCESS MATERIAL
RJ. TYPE-1 RJ. TYPE-2 RJ. TYPE-3 RJ. TYPE-4 REJECTION

SIZE WISE REPORT


Prod. In Units Rejection in Production in Tonnes
SR.NO SIZE KG / UNIT
Total Prime Total % Total Prime Rej. %

Total

PREPARED BY PRODUCTION SHIFT INCHARGE HOD PRODUCTION MANAGER - MANAGER WORKS


SUPERVISOR PRODUCTION