Professional Documents
Culture Documents
38 Pcs LA4 M I Final
38 Pcs LA4 M I Final
(RFI)
Project NORTH FIELD EXPANSION EPC-2 RFI No. NFXP2-DAP-ST-RFI-03305
Check the surface preparation for item:[LOT N3] TBOG COMPRESSOR SHELTER ;
1 [JBOG] PIPERACK - STEEL STRUCTURE ;[LOT N & N3] PIPEWAY (INCL. DO 501, pcs
502);HP CORRIDOR PIPE BRIDGE 1
1 Member list -
2 Approved Drawing -
Designation QC Inspector
Name
Date
Signature
Request for Inspection/Test
(RFI)
Project North Field Expansion EPC-2 RFI No. NFXP2-DAP-ST-RFI-03305
Member list-LA4
No. Item no. Drawing No. Rev Q.ty Unit Inspection Result Remarks
Designation QC Inspector
Name
Date
Signature
Request for Inspection/Test
(RFI)
Project North Field Expansion EPC-2 RFI No. NFXP2-DAP-ST-RFI-03305
Member list-LA4
No. Item no. Drawing No. Rev Q.ty Unit Inspection Result Remarks
Designation QC Inspector
Name
Date
Signature
Request for Inspection/Test
(RFI)
Project North Field Expansion EPC-2 RFI No. NFXP2-DAP-ST-RFI-03305
Member list-LA4
No. Item no. Drawing No. Rev Q.ty Unit Inspection Result Remarks
Designation QC Inspector
Name
Date
Signature
Request for Inspection/Test
(RFI)
Project North Field Expansion EPC-2 RFI No. NFXP2-DAP-ST-RFI-03305
Member list-LA4
No. Item no. Drawing No. Rev Q.ty Unit Inspection Result Remarks
Designation QC Inspector
Name
Date
Signature