RESUM E M A TERIA L TA KE OFF - BIM

A. MINE 
No. CODE ITEM SPECIFICATION UNIT Note
AREA

Matrix Volume   TOTAL VOLUME  A1. XXX A2. XXX

No. Code Item Specification Unit 0 1


1 SITE PREPARATION, SOIL INVESTIGATION & TOPOGRAPHICAL SURVEY
- EXIST ING ST RUCT URE & HOUSE, ET C.
- EXISIT ING ROAD
1,1 DEMOLIT ION L/S                              ‐ Using Topo from BIM
- EXISIT ING ELEC. POST
- EXISIT ING BRICK WALL
- T OP SOIL ST RIPPING T HK. = VARIOUS
1,2 CLEARING & GRUBBING M2                 113.793,74        113.793,74

- SOIL
1.3a M3                 435.303,88        435.303,88
SIT E CUT T ING
1.3b - RIPPING ROCK M3                              ‐
1.4a - REUSED SOIL AND ROCK M3                 412.686,25        412.686,25 Slope using 1:1
ST RUCT URAL BACKFILL
1.4b - DISPOSAL SOIL AND ROCK M3 ‐                  22.617,63         (22.617,63) Factor Cut:Fill is 1:1
1,5 DISPOSAL - SOIL M3                              ‐ ‐
1,6 OCEANGRAPHY SURVEY L/S                            1,00                   1,00
1,7 T OPOGRAPHICAL SURVEY L/S                            1,00                   1,00
GEOT ECHNICAL
1,8 L/S                            1,00                   1,00
SOIL INVEST IGAT ION
1.9a - FOR SOIL M2                   18.208,27          18.208,27
SLOPE PROT ECT ION
1.9b - FOR ROCK M2                              ‐
1.11a - Soil Replacement M2                              ‐
1.11b - Geotextille M2                              ‐

1.11c SOIL IMPROVEMENT - PVD M2                              ‐

1.11d - Stone Coloumb M2                              ‐

                             ‐