Fahrul H. Baadila conducted several inspections at AR 9 on 20-Jul-23. Inspections included checking the completeness of structural concrete works prior to backfilling for lighting poles, physically verifying prefabricated precast box culverts, inspecting precast installation and grout placement, checking subgrade before laying fill material for V-ditches, and inspecting reinforcement bars for box culverts. Fresh concrete deliveries and placements were also inspected for ongoing works including box culverts and V-ditches/U-ditches. Some items were found to be acceptable while others were still ongoing or not ready.
Original Description:
Original Title
Copy of Leighton's RFI Scheduled Planning July 20 2023
Fahrul H. Baadila conducted several inspections at AR 9 on 20-Jul-23. Inspections included checking the completeness of structural concrete works prior to backfilling for lighting poles, physically verifying prefabricated precast box culverts, inspecting precast installation and grout placement, checking subgrade before laying fill material for V-ditches, and inspecting reinforcement bars for box culverts. Fresh concrete deliveries and placements were also inspected for ongoing works including box culverts and V-ditches/U-ditches. Some items were found to be acceptable while others were still ongoing or not ready.
Fahrul H. Baadila conducted several inspections at AR 9 on 20-Jul-23. Inspections included checking the completeness of structural concrete works prior to backfilling for lighting poles, physically verifying prefabricated precast box culverts, inspecting precast installation and grout placement, checking subgrade before laying fill material for V-ditches, and inspecting reinforcement bars for box culverts. Fresh concrete deliveries and placements were also inspected for ongoing works including box culverts and V-ditches/U-ditches. Some items were found to be acceptable while others were still ongoing or not ready.
NO RFI NO QC INSPECTOR NAME ITEM / WORK TO BE INSPECTED TAG NO REASON INSPECTION INVOLVEMENT INVOLVEMENT STATUS RESULT Finishing inspection: Check completeness of structural concrete works 12 RFI-CIV020307M-LC01670 AR 9 HOLD POINT WITNESS Fahrul H. Baadila prior to proceed with backfilling activities for all item’s foundation : LIGHTING POLE ADD ACC • Lighting Pole at AR 9 Physical verification of prefabricated precast : 13 RFI-CIV021401M-LC00459 AR 9 WITNESS SURVEILLANCE Fahrul H. Baadila X00-AR9-BOX-CUL-STA130 ADD ACC • Box Culvert at AR9 Inspection on Precast Installation • Check Position of Precast: Horizontal, vertical and Elevation 14 RFI-CIV021402M-LC00719 AR 9 WITNESS SURVEILLANCE Fahrul H. Baadila • Check the connection to main structure X00-AR9-BOX-CUL-STA130 ADD ACC • Grout Placement Inspection for: : • Box Culvert at AR9 Inspection during delivering fresh structural concrete : 15 RFI-CIV020305M-LC07346 AR 9 HOLD POINT WITNESS Fahrul H. Baadila X00-AR9-BOX-CUL-STA130 ADD ON GOING NOT READY • Box Culvert at AR9 Inspection of subgrade and grade layer before laying fill material. : 16 RFI-CIV020101M-LC06132 AR 9 WITNESS WITNESS Fahrul H. Baadila X00-AR9-VDIT ADD ACC • V-Ditch at AR-9 Check and verify cutting and bending of reinforce rebar including, X00-AR9-BOX-CUL-STA120-JB 17 RFI-CIV021202M-LC04369 AR 9 WITNESS SURVEILLANCE Fahrul H. Baadila - bending shape ADD ON GOING X00-AR9-BOX-CUL-STA140-JB - Size/length for : • Box Culvert at AR9 NOT READY Field inspection: check before concrete delivery/placement : X00-AR9-BOX-CUL-STA120-JB 18 RFI-CIV020304M-LC06012 AR 9 WITNESS WITNESS Fahrul H. Baadila ADD ON GOING • Box Culvert at AR9 X00-AR9-BOX-CUL-STA140-JB Inspection during delivering fresh structural concrete : X00-AR9-BOX-CUL-STA120-JB 19 RFI-CIV020305M-LC07347 AR 9 HOLD POINT WITNESS Fahrul H. Baadila ADD ON GOING • Box Culvert at AR9 X00-AR9-BOX-CUL-STA140-JB Field inspection: check before concrete delivery/placement : X00-AR9-VDIT 20 RFI-CIV020304M-LC06013 AR 9 WITNESS WITNESS Fahrul H. Baadila • V-Ditch at AR-9 ADD ACC X00-AR9-UDIT • U-Ditch Type 1 at AR-9 Inspection during delivering fresh structural concrete : X00-AR9-VDIT 21 RFI-CIV020305M-LC07348 AR 9 HOLD POINT WITNESS Fahrul H. Baadila • V-Ditch at AR-9 ADD ACC X00-AR9-UDIT • U-Ditch Type 1 at AR-9