You are on page 1of 2

JOB SAFETY ANALYSIS

BANYU URIP EPC 1 PROJECT

WORK ACTIVITY (JOB): LIFTING PANEL


WORK TEAM: JSA PREPARED BY: SUTRISNO

DATE: 12.12.2013
SUPERVISOR APPROVAL: MUHIDIN
CRITICAL QUESTIONS: Everyone Ready/Capable To Work?  Potential Spill/Gas Release Addressed?  Worst Case Discussed? 
BASIC JOB STEPS POTENTIAL INCIDENTS OR HAZARDS WAYS TO ELIMINATE OR CONTROL HAZARDS
Persiapan Ketidakcakapan personel pengangkatan Melakukan rapat sebelum memulai aktifitas
Preparation Lifting personnel not qualified Pre job safety meeting before start activity
Pengangkatan menyalahi prosedur Membacakan prosedur pengangkatan tertulis
Wrong procedure Explain lifting procedure to all personnel
Area dimasuki orang tidak berkepentingan Memasang barricade
Area entered by un authorized person Install barricade
Pembongkaran Pallet Packing tidak bisa terbuka Memeriksa procedure dan peralatan
Unboxing material Packing cannot unboxing Check procedure and hand tools
Tangan terjepit Menggunakan APD standart
Hand pinch Use properly PPE (Leather hand gloves)
Material rusak atau terjatuh Memastikan posisi pijakan material rata
Material broken or fall Make sure ground clearance is flat
Pengangkatan dengan crane Kegagalan Pengangkatan (Gangguan Hydrolic) Memeriksa Beban angkatan aman
Lifting using Telescopic Crane Lifting failed Checking Safe Working Load
Pemeriksaan Sebelum dimulai aktifitas pengangkatan
Pre Inspection
Maintenance Berkala
Periodic maintenance
Sling Putus Pemeriksaaan Sling Secara Berkala
Sling broken Periodic Sling maintenance
Pergantian Sling secara rutin
Periodic sling replacement
Safety Lack Tidak Berfungsi Pemeriksaan Secara Berkala
Safety lack problem Periodic maintenance
Load chat Tidak Berfungsi Pre Inspection Sebelum Digunakan dalam Proyek
Load chat problem Pre Inspection
Lampu Tidak Berfungsi Pre Inspection Sebelum Digunakan dalam Proyek
Lamp broken Pre Inspection
Alarm Tidak Berfungsi Pre Inspection Sebelum Digunakan dalam Proyek
Alarm broken Pre Inspection
Hydrolic Out Rigger Bocor Pre Inspection Sebelum Digunakan dalam Proyek
Hydraulic out rigger leak Pre Inspection
Operator Tidak Kompeten Pemeriksaan Administration
Operator not competent Check administration document

REQUIRED SAFETY EQUIPMENT

Lifting Hazards Short Service Employees Elec. Shock/ Flash (includes utility lines) Dropped/Falling Objects Low Lighting Ionizing
Fall Potential Water/Drowning Hazard Haz. Chemical Exposure (includes H2S) Tripping/Slipping Breathing Hazard Radiation
Skin Irritants Mech. Equip. Hazards Sharp Edges or Hot/Cold surfaces Excavation Hazard Environmental Other:_________
Confined Spaces Fire/Explosion Potential Pinch/Crush/Striking Hazards Confined spaces Extremes ________________
Elev. Load/Work High Noise Levels Potential Release of Energy Elevated load or work Vehicle Operations ________________