REQUEST FOR APPROVAL

SHOP DRAWING / MATERIAL / EQUIPMENT / BROCHURE / SPECIFICATION / CALCULATION / TEST DATA / METHODOLOGY / WARRANTY

Project: NARA RESIDENCES BY ROCKWELL Submittal Type : For Comments & Approval For Inspection REFERENCE NUMBER: 91-AC-RFA-STP-ME-002 NO. OF PAGES: 43 PAGES
GM CORDOVA AVE., BURI ROAD,
Location: √ New Submittal √ For The Record / Information Proposed Equivalent/Alternative LOCATION: STP AREA TRADE: ADROITECH CORPORATION
BACOLOD CITY
Owner: ROCKWELL LAND CORPORATION Additional Submittal For Reconfirmation Others DATE SUBMITTED: May 20, 2023 RESPONSE REQUIRED:

Resubmittal For Review & Comments


REFERENCE DATA
ITEM
NO.
DESCRIPTION SUBMITTAL TYPE ACTION TAKEN REMARKS
1. EQUIPMENT LIST & BROCHURE Cutting List Application / Installation DATE RECEIVED: DATE RELEASED:
A
Drawing / Details Company Profile
√ Brochure / Catalogue Calculations/Analysis

GA
B
Technical / Product Data Maintenance SIGNATURE
Test Results Guarantee
C
Sample/s Photographs
Mock-up Sequence of Operation DATE RECEIVED: DATE RELEASED:
A
Method Statement Testing Procedure
Specifications Site Inspection Photographs

SY2
B
Testing & Commissioning Warranty SIGNATURE
Comparative Analysis
C
Prepared by:
DATE RECEIVED: DATE RELEASED:
A
Jeck Manchete /

MEP
Date
B
Checked and reviewed by: SIGNATURE

C
Jason Villamor
RLC - Structural Date DATE RECEIVED: DATE RELEASED:
A

AMH
Donnie Empeño
B
RLC - Electrical Date SIGNATURE
*******NOTHNG FOLLOWS*******
C
NOTE: Tito Supang
ATTACHED HEREWITH IS RLC - MPF Date DATE RECEIVED: DATE RELEASED:
A

Ryan Obciana EAP


B
RLC - Architectural Date SIGNATURE

C
Jayson Balaqui
COMMERCIAL: RLC - Design Supervisor Date DATE RECEIVED: DATE RELEASED:
A
RLC - DPT

No Cost Implication
Louie Sacdalan
B
With Cost Implication RLC - Construction Manager Date SIGNATURE

C
For Further Study
Legend (Design Consultant's Action): Noted by: DATE RECEIVED: DATE RELEASED:
A
RLC -PMT

A > Work may proceed

B > Work may proceed subject to correction indicated B SIGNATURE


Vergel Rape
C > Revise and resubmit, work shall not proceed RLC - Project Manager Date
C
Adroitech corporation
BILL OF MATERIALS
SEWAGE TREATMENT PLANT PROJECT
Item Materials/Specification/Work Description Qty

1 Blower, 2 sets (1D,1S), for aeration tank, complete with main body, common base, 2
suction silencer, T joint, relief valve, pressure gauge, check valve, discharge silencer,
and flexible joint. Coupled with a motor, squirrel cage induction motor, IEC standard,
Class F insulation, tropicalized windings, IP 55, TEFC. 6000 mm Aq, 13.84 m3/min,
22.0 kW motor, 1200 rpm.
2 Diffusers, fine bubble tube diffusers to be distributed over aeration tank (26 tube), 1.0
meter length and coarse bubble diffuser for the anoxic tank 58 pcs.
2.a Submersible pump, from lift station to anoxic tank, 0.38 m3/min, 8.0 mTDH, 2.2 kW 2
motor, 4” diameter.
3 Submersible pump, from anoxic tank to aeration tank, 0.78 m3/min, 4.0 mTDH, 2.2 kW 3
motor, 4” diameter.
4 Submersible pump, from aeration tank to clean water tank and discharge pipe, free 3
standing, 0.78 m3/min, 4.0 mTDH, 3.7 kW motor, 4” diameter.
5 Chlorinator, one set with chemical feeder, 200GPD, 50PSI, with foot valve strainer 1
assembly, back check valve assembly, bleed valve, 4 ft suction tubing each – clear
PVC, 8 ft discharge tubing PE each. Set
6 Glycerine feeder, one set with chemical feeder, 200GPD, 50PSI, with foot valve 1
strainer assembly, back check valve assembly, bleed valve, 4 ft suction tubing each –
clear PVC, 8 ft discharge tubing PE each. Set
7 Phosphate removal, with dosing tank and mixer, chemical feeder, one set with 1
chemical feeder, 200GPD, 50PSI, with foot valve strainer assembly, back check valve
assembly, bleed valve, 4 ft suction tubing each – clear PVC, 8 ft discharge tubing PE Set
each.
7.a Tertiary Treatment , Multimedia and Activated Carbon Filter, 15 Tons Per Hour, 36x72,
one set for polishing traces of phosphate, ammonia, and nitrate.
8 Electrical supply of power lines, conduits, other supports, MCC, installation and Lot
commissioning. Electrical feeder line not included. With Programmable Logic
Controller
9 Mechanical supply of pipes, valves, unions, elbows, bar screen at the equalization Lot
inlet, installation and commissioning.
10 Design, Drawings, Insurance, DENR application fee.
11 Activated Carbon Treatment: Fume Adsorption System, made of mild steel 1
materials painted finish with epoxy primer and top coat enamel. Complete with: set
- 2 to 3 Hp, 3 phase continuous duty motor
- Activated carbon granules
- Washable type primary synthetic media
- Easy access and maintenance of filters
- Fan diameter – 15”, B. curve blade

21Q Tower 1, Robinsons Adriatico Bldg., Ermita, Manila


Mobile: 0917-886-8832 | 0999-9000009 | 0933-3335550
Landline: (02) 216-1874 | (02) 897-0963
E-Mail: dads168@yahoo.com
GOLDENTECH ROOTS
BLOWER
&
TECO MOTORS
GOLDENTECH
TUBE & COARSE
DIFFUSER
SHOWFOU
SUBMERSIBLE PUMP
ECODOSE
CHEMICAL FEEDER
EMERALD PIPE