HSE-RA-047 Distribution Board - Rev 0
HSE-RA-047 Distribution Board - Rev 0
PAGE
1 of 11
AL SHAFAR GENERAL CONTRACTING LLC. No
REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 047
Job Description: Distribution Boards
Index:
Form 1 Task Analysis Initiation
Form 2 Risk Assessment Process As per Risk Assessment Procedure.
Form 3 Written Safe Work Procedure Result
Impact
SEQUENCE OF TASK STEPS POTENTIAL INJURIES OR HAZARDS RECOMMENDED CONTROLS
H, S, E
1. Pre-use inspection and use of all equipment. Failure of equipment, will cause injuries to Faulty equipment to be repaired/maintained or replaced.
persons and / or property damage. Guards to be on all Machinery and appropriate PPE to be
Fuel/oil leaks could cause environmental worn.
concerns. H, S, E Engine ran machinery to have fire extinguishers available
locally.
Drip trays/heavy gauge plastic to be insitu in case of leaks
and spill kit to be within the project for accidental spills.
2. Wear appropriate Personal Protective Failure to use Personal Protective
Equipment. Equipment will cause injuries to employees.
Gloves.
Safety boots. Enforce the use of Personal Protective Equipment AT ALL
H
Overalls. times
Hard hat.
Hearing protection.
Eye protection
3. Use trained employees only Failure may result in injuries to persons and Enforce the use of competent persons only throughout the
H, S
property damage. project.
4. Fabricating DB wooden stand / frame Faulty hand tools/machinery may result in Wooden stand or frame must be properly fabricated and
injuries to persons and property damage. strong.
Ensure that no protruding nails on the wooden or plywood.
H,S,E Consider the required height of the DB.
Provide roof protection for any falling water or rain.
Use the correct hand tools and proper usage to be ensure.
Use appropriate PPE.
Unwanted Fuel/Oil Contamination of the soil, atmospheric Care to be taken refuelling and
Spillages pollution, risk of fire. drip trays/heavy gauge plastic to
be in place as required.
2 Injury to project Potential Death, Major/Minor Skeletal Following PPE to be worn Supervisor Before &
employees damage, cuts and bruises to all parts of appropriately to the task – during work
the body. Gloves.
Safety boots.
H,S 10 5
Overalls.
Hard hat.
Hearing protection.
Eye protection
3 Un trained employees Poor quality of work, chance for Provided trained/competent PE/FM Always
accident /incident or property lost/damage worker and supervision
H,S 7 5
4 Faulty Hand Tools and Potential Death, Major/Minor Skeletal H,S,E 9 Proper hand tool & machinery PE/FM/ Before work 6
Machinery damage, cuts and bruises to all parts of and daily checking/ check list. supervisor
the body. Competent operator and
supervision and safe working
procedures to be adopted.
Safe temporary electric supply.
Environmental concern Excessive Noise & Dust Noise levels to be monitored and
restricted to social able timings
where ever practicably possible.
Dampening down of work areas
and used of water cutting
machinery to be adopted where
ever possible.
5 Improper Installation of Potential Death, Major/Minor Skeletal Fixed the DB properly to the PE/FM Always
DB damage, cuts and bruises to all parts of stands or frame ensure that it is
the body. rigid and stable.
Use competent and certified
electrician.
Locate the DB’s on the required
H,S 8 6
area not obstructing passage
ways and not disturbing any fit-
out activities.
Provide signage to the DB,s
showing electrical hazard.
6 Faulty of electrical cabling Potential Death, Major/Minor injuries Proper electrical wiring and PE/FM/ Before work
and connections caused by electricity connection must be ensure. supervisor
Machinery to be check and not
H,S,E 9 6
defective. Welding cables should
be completely insulated, flexible
and capable of handling the
HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE
7 of 11
AL SHAFAR GENERAL CONTRACTING LLC. No
REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 047
Job Description: Distribution Boards
7 Unsafe Electrical Potential Death, Major/Minor Skeletal Ensure the proper and safe FM/ Always
damage, cuts and bruises to all parts of connection to the generator or Supervisor
connection
the body. DEWA power supply. Operative
Cable explode / Electrocution causing H,S 8 Cables laying to the ground must 5
potential death or severe burns. be protected avoid touching to
the ground.
Proper cable management to be
HSE/QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE
8 of 11
AL SHAFAR GENERAL CONTRACTING LLC. No
REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 047
Job Description: Distribution Boards
2. PROCEDURE
1. Do pre-use inspection of all equipment to be used and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
3.1. Hardhat.
3.2. Safety boots.
3.3. Overalls.
3.4. Eye protection.
1. Must have PPE – safety footwear, gloves, hardhat, goggles, foul weather clothing etc.
2. Must have appropriate tools and equipment in good condition.
3. Must have weatherproof covers for materials and equipment, waste containers, warning tape.
4. Consider risks and hazards in work area. Refer any concerns to supervisor. Are relevant permits in place?
5. Check if it is necessary to secure area adjacent to work. Refer to supervisor if appropriate.
6. Arrange for transport of materials and equipment to site via supervisor.
7. Ensure materials and equipment are secure or removed when site unattended, eg overnight or during breaks.
Hazards
Harm
Potential Death, Minor/major cuts and contusions, loss of limbs, fractures, concussion, to fatality, electric shock.
Persons in danger
Control measures
No lone working
On completion
1. Tidy up, clear site, remove and transport equipment and surplus materials to store. Dispose of waste to Estates skip as appropriate do
not dispose down drains, wash basins etc.
2. Report completion to supervisor and local staff.
3. Sign off any relevant work permit.