DO NOT SCALE

THE USER IS RESPONSIBLE FOR CHECKING ALL


DIMENSIONS WHICH ARE IN MILLIMETRES UNLESS
OTHERWISE STATED.

Above Ground Drainage Installation : Legend :


Refer to architects drawings for above ground drainage layouts. Waste pipe at low level
Waste pipe at high level
All sanitary pipework systems shall be designed, supplied, installed, tested,
commissioned and set to work with BS EN 12056:2000 (Parts 1-5), Building Waste pipe within floor void
Regulations, and all other relevant standards and codes of practice. SVP Soil and vent pipe
DFA Drop from above
Non-combustible Fire protection sleeves / Fire collars to be fitted to all
RTA Rise to above
penetrations 50mm and above through floor slabs and fire barriers. Seal
around fire sleeves with fire stop compound. Penetrations smaller than RFB Rise from below
50mm through fire barriers to be sealed around pipework.

All soil and waste pipework is generally to be boxed in by the main


contractor as directed by the architect or run in service voids as provided by
the Architect and Main Contractor. Boxings and service voids to be complete
with access doors for maintenance etc where required.

WC's to incorporate internal overflows.

Above ground drainage installation to be complete with all fittings and


brackets as required to provide a complete and fully operational installation.

All above ground drainage materials and fittings are to be suitable for the
application and manufactured by Wavin or Marley or equal and approved.
Where utilised, PVC-U pipework and fittings must comply with BS4514 and
BS EN 1329. With the exception of pipework in the Basement which shall be
HDPE, all soil and vent pipework shall be manufactured from Polypropylene
pipework complying with BS EN 1451-1.

The following soil and waste pipework sizes are to be used from each
individual appliance.
WHB-Wash hand basin - 40mm (32mm trap)
Sink - 40mm
Bath - 40mm
WC - 110mm
Shw - Shower - 40mm
D/W - Dishwasher - 40mm
W/M - Washing Machine - 40mm
W/H - Water Heater - 32mm (sealed trap)

All sanitary fittings are to have 75mm deep seal traps. Anti-vacuum traps to
be fitted to wash hand basins and sinks where waste pipes to stacks exceed
1.7m in length.

AAV's to be fitted at a minimum of 500mm above overflow level of all


sanitary items on stack.

SVP's to terminate a minimum of 900mm above any opening within 3.0


metres.

SVP's are to terminate with durable plastic cowls.

All soil pipes and above ground drainage pipework to be installed having a
constant fall towards the connection point to underground drainage.

Rodding eyes shall be provided throughout the system as required. As a


minimum they shall be provided at each floor level and at all changes of
direction. Rodding eyes shall also be provided at the bottom of all svp stacks
where they turn through 90 degrees.

Rodding eyes should be fitted at the end of discharge pipes, unless trap
removal provides access to the full pipe length.

1 23
All connections to main stacks shall be arranged in such a manner to

45

11
10
prevent crossflow in full accordance with manufacturer's instructions.

6
7
9
8
Bends at the base of vertical stacks should be of long radius and have a
minimum centre line radius of 200mm on a 100mm nominal size stack. Two
45 degree radius bends may also be used as an alternative. The same
principle should also be adopted where offsets occur in stacks of one or
more storey height.

Stack pipe support brackets are to be provided at the base of each stack.

Prior to installation the designer of the below ground drainage system must
first approve the proposed above ground drainage layout to confirm they are
satisfied with stack and vent positions.

Pipework routes and drops are indicative and final positions are to be
agreed on site subject to floor void heights, joist spans and confirmation
routes being conformed by the Architect

TESTING AND COMMISSIONING

SAFETY INFORMATION / All new Above Ground Drainage Services shall be fully tested and commissioned
RESIDUAL RISKS including:

In addition to the hazards/risks typically associated with the types of work All Above Ground Drainage Systems
detailed on this drawing, the following should be noted:
The commissioning shall generally be in accordance with the relevant CIBSE
commissioning codes, the contractor shall include for all test instruments, equipment
CONSTRUCTION and supervision / labour required.

1. The Contractor shall familiarise themselves with the Asbestos register BUILDERS WORK
and act accordingly should they encounter any potential ACM on site.
The Contractor shall make full provision off all builders work associated with the
2. The Contractor shall prepare safe systems of work and produce method mechanical services installation.
statements and risk assessments for all works .
The Contractor shall allow for making good redecorating of walls / ceilings / doors and
3. Full checking procedures via visual, electronic cable detector and frames after the installation of the mechanical services.
P1 22.06.2023 PRELIMINARY ISSUE MK SJV
otherwise shall be adopted to verify building fabric for any embedded
cables / pipework prior to breaking out / chasing of building fabric.
SUMMARY OF TENDER REV DATE DETAILS OF REVISION DRAWN CHK
The Contractor will be required to fully complete and return with the tender the
4. All positions of flush accessories when fixed to / cut into building fabric
"Summary of tender" for the mechanical services included in the scheme.
shall not not cause instability to existing structure and building fabric.
INSTRUCTION IN THE USE OF INSTALLATIONS
5. Complete awareness at all times of other trades working within the
vicinity of electrical works. On completion of the installation of the mechanical services the Contractor shall give to OFFICE 4, OUSEBURN GATEWAY
the employees designated representatives in charge together with key staff, detailed 163 CITY ROAD
6. The production of dust, dirt and noise will be minimised and relevant instructions and training in the operation and control of the entire services installation . NEWCASTLE UPON TYNE
extraction procedures adopted. NE1 2BE
The Contractor shall complete training records and have them signed by the trainers Email:info@t2oengineers.com
7. Noise and vibration will be eliminated where practical. and the personnel receiving the training. Web:www.t2oengineers.com
8. Safe systems of work and operations will be carried out and safe
isolation procedures adopted at all times.
DRAWINGS

The tender drawings are indicative only, and are representative of the work to be done.
Project Name
9. ALL site operatives must be informed when electrical and gas services it should be noted that the drawings are essentially diagrammatic and are not intended
are to be isolated and subsequently re-energised. to indicate the precise location of the services relating to the building structure or other SOMERSET SQUARE
building services.
10. Safe working practices shall be adopted when working at height,
particular care should be given to safe access around scaffolding. Therefore following the issue of the design package, the Contractor shall make
provision to provide fully co-oridinated installation drawings as defined within BSRIA
Client
guide 'BG6/2014' - a design framework for building services.
MAINTENANCE
OPERATING AND MAINTENANCE MANUALS AND AS
1. The Contractor must adopt safe working procedures and practices INSTALLED DRAWINGS
during isolation of existing electrical and gas supplies.
2. The Contractor must advise site operatives of any circuit isolation work
The Contractor shall be responsible for providing operating and maintenance manuals
and as installed drawings for the installation. The documentation shall be provided at
Drawing Title
(s) when required. least 14 days before practical completion.
PROPOSED FIRST FLOOR ABOVE
The operating and maintenance manuals shall be provided in accordance with CIBSE /
DECOMMISSIONING / DEMOLITION BSRIA guidance.
GROUND DRAINAGE LAYOUT
1. The Contractor must adopt safe working procedures and practices
PROVISIONAL SUMS
during isolation of existing electrical supplies.
Refer to main contract document for details of Provisional Sums. Status
It is assumed that all works will be carried out by a competent contractor working,
where appropriate, to a method statement approved by the Client.
PRELIMINARY ISSUE
Scale Date
1:50@A1 JUNE 2023
C Copyright T2O Engineers
COPYRIGHT IN THIS DRAWINGS BELONGS TO T2O ENGINEERS THIS DRAWING MAY NOT BE USED, SOLD,
LICENSED, TRANSFERRED, COPIED OR REPRODUCED IN WHOLE OR IN PART OR IN ANY MANNER OR
Drawing No. Revision
FORM OTHER THAN WITH THE PRIOR WRITTEN CONSENT OF T2O ENGINEERS. 23-037-L01-52-311 P1