TABLE OF CONTENTS
1 INTRODUCTION
3 MATERIAL PROPERTIES
4 LOADS APPLIED
_________________________________________________________________________________________________________________________
3 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document No. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Gaurav Singh
Transverse Design of Segment (Box Depth=6.25m) Checked by Nilesh Thaker
1 INTRODUCTION
The Bridge is across river Alaknanda and has a central span of 100 m. The bridge is constructed using balanced cantilever approach.
______________________________________________________________________________________________________________________
4 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
________________________________________________________________________________________________________________________
5 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
3 MATERIAL PROPERTIES
2
Conc. Grade 50 N/mm
2
Ec 35000 N/mm
2
Fct 2.5 N/mm
Reinforcement
Fy 500 N/mm2
Es 200000 N/mm2
Clear Cover Top 45 mm
Clear Cover Bot 45 mm
4 LOADS APPLIED
Dead Loads
The dead weight of the deck is applied.
SIDL
The loads applied on the deck are based on the DBR.
1. The Wearing Course is applied based on the thickness of 50 mm wearing thickness.
2. Crash Barrier load is applied as 1 t/m.
Live Loads
The live load analysis is done considering there is no median as it would lead to more forces in the deck.
The following load combinations are considered as per Table 6A of IRC 6 for 4 Lane Bridges
1. 3 Lanes of Class A
2. 1 Lanes of Class A + 1 Lane of Class 70R
3. SV Loading
________________________________________________________________________________________________________________________
6 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
________________________________________________________________________________________________________________________
7 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
________________________________________________________________________________________________________________________
8 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
________________________________________________________________________________________________________________________
9 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
________________________________________________________________________________________________________________________
10 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
________________________________________________________________________________________________________________________
11 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
________________________________________________________________________________________________________________________
12 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
________________________________________________________________________________________________________________________
13 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
Class 70R -
CLASS 70R ONLY Units
Wheel 1 Wheel 2 Wheel 1 Wheel 2
Wheel Load mm 10 10 0 0
Wheel Width mm 860 860 860 860
Wheel Length mm 220 220 220 220
Distance Between Axles mm 1220 1220 1220 1220
(In Long Direction)
Dispersion Through WC mm 320 320 320 320
(Assuming a Minimum 65 mm wearing course)
On Cantilever No No Yes Yes
"a" from nearest support mm 1710 1710 680 795
Center to Center of Webs mm 5675 5675 5675 5675
Web Width mm 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075
Dispersion Width mm 3268 3268 1136 1274
P (After Dispersion) t 4.46 4.46 0.00 0.00
CDA 1.41 1.41 1.41 1.41
P (After CDA) t 6.27 6.27 0.00 0.00
________________________________________________________________________________________________________________________
14 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
SV LOADING ARRANGEMENT 1
SV LOADING SV Loading
Units
ARRANGEMENT 1 Wheel 1 Wheel 2 Wheel 3 Wheel 4 Wheel 5 Wheel 6
Wheel Load mm 2.25 2.25 2.25 2.25 2.25 2.25
Wheel Width mm 156 156 156 156 156 156
Wheel Length mm 274 274 274 274 274 274
Distance Between Axles mm 1500 1500 1500 1500 1500 1500
(In Long Direction)
Dispersion Through WC mm 374 374 374 374 374 374
(Assuming a Minimum 65 mm wearing course)
On Cantilever No No No No No No
"a" from nearest support mm 1278 1522 2028 2272 1278 1522
Center to Center of Webs mm 5675 5675 5675 5675 5675 5675
Web Width mm 600 600 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075 5075 5075
Dispersion Width mm 2860 3144 3540 3637 2860 3144
P (After Dispersion) t 1.03 0.97 0.89 0.88 1.03 0.97
CDA 1.00 1.00 1.00 1.00 1.00 1.00
P (After CDA) t 1.03 0.97 0.89 0.88 1.03 0.97
________________________________________________________________________________________________________________________
15 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
SV LOADING SV Loading
Units
ARRANGEMENT 1 Wheel 7 Wheel 8
Wheel Load mm 2.25 2.25
Wheel Width mm 156 156
Wheel Length mm 274 274
Distance Between Axles mm 1500 1500
(In Long Direction)
Dispersion Through WC mm 374 374
(Assuming a Minimum 65 mm wearing course)
On Cantilever No No
"a" from nearest support mm 2028 2272
Center to Center of Webs mm 5675 5675
Web Width mm 600 600
Effective Span (Lo) mm 5075 5075
Dispersion Width mm 3540 3637
P (After Dispersion) t 0.89 0.88
CDA 1.00 1.00
P (After CDA) t 0.89 0.88
________________________________________________________________________________________________________________________
16 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
Reinforcement
2
Fy 500 N/mm
2
Es 200000 N/mm
______________________________________________________________________________________________________________________
17 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
18 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
19 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
20 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
21 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
SUMMARY OF MOMENTS
CRASH WEARING LL HOGGING LL SAGGING SV HOGGING SV SAGGING
DEAD LOAD
SECTION ID BARRIER COURSE MOMENTS MOMENTS MOMENTS MOMENTS
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -0.35 -1.11 -0.12 -0.82 0.00 0.00 0.00
2 -3.53 -3.00 -0.90 -11.50 0.00 0.00 0.00
3 -2.32 -0.50 -0.53 -12.83 0.00 -3.73 0.00
4 -1.26 -0.47 -0.30 -8.76 0.00 -1.73 0.00
5 -0.87 -0.45 -0.20 -7.10 0.00 -0.73 0.00
6 -0.56 -0.43 -0.12 -5.43 0.31 0.00 0.19
7 -0.31 -0.41 -0.06 -3.76 1.95 0.00 0.81
8 -0.13 -0.41 -0.01 -2.14 2.48 0.00 1.29
9 0.01 -0.41 0.03 -0.51 2.48 0.00 1.65
10 0.08 -0.41 0.05 -0.47 2.48 0.00 1.76
11 0.11 -0.41 0.06 -0.56 3.61 0.00 1.78
12 0.08 -0.41 0.05 -0.65 3.21 0.00 1.79
13 0.01 -0.41 0.03 -0.94 3.18 0.00 1.67
14 -0.13 -0.41 -0.01 -1.68 3.60 0.00 1.26
15 -0.31 -0.41 -0.06 -2.42 3.66 0.00 0.75
16 -0.56 -0.43 -0.12 -3.24 3.22 0.00 0.09
17 -0.87 -0.45 -0.20 -4.06 3.33 -0.83 0.00
18 -1.26 -0.47 -0.30 -4.88 3.43 -1.80 0.00
19 -2.32 -0.50 -0.53 -6.85 0.00 -3.74 0.00
20 -3.53 -3.00 -0.90 -13.37 0.00 0.00 0.00
21 -0.85 -1.65 -0.27 -3.46 0.00 0.00 0.00
______________________________________________________________________________________________________________________
22 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
23 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
24 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
25 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
26 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
27 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
28 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
DEPTH OF NEUTRAL AXIS (SERVICE LIMIT STATE) AND STRAIN/STRESS DIAGRAM Compression
Ec εc
Ccg
Depth of Neutral
Axis
Tcg
εs Es εs
Tension
Strain Profile Stress Profile
εc = Maximum Compression Strain
εs = Maximum Tension Strain
Ec εc = Maximum Compression Stress
Es εs = Maximum Tension Stress
where,
Mqp is the Moment due to the sustained Loads
Mst is the Moment due to the Live Load
φ is the creep factor
The stress in concrete would be critical in short term and the stress in steel would be critical in long term.
______________________________________________________________________________________________________________________
29 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
30 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS + LIVE LOAD (RARE COMBINATION)
HOGGING MOMENT CHECK SHORT TERM WITH LONG TERM EFFECTIVE Ec
______________________________________________________________________________________________________________________
31 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS + LIVE LOAD (RARE COMBINATION)
SAGGING MOMENT CHECK SHORT TERM WITH LONG TERM EFFECTIVE Ec
MAX. COMP. RATIO OF LIVE DEPTH OF MAX. TENSILE
MRARE DEPTH OF NA Ec,eff
SECTION ID STRESS LOAD / DL + NA STRESS
tm/m mm N/mm2 SIDL N/mm2 mm N/mm2
1 0.0 44.0 0.00 0.0 14000 66.10 0.0
2 0.0 64.6 0.00 0.0 14000 98.49 0.0
3 0.0 64.6 0.00 0.0 14000 98.49 0.0
4 0.0 56.6 0.00 0.0 14000 85.94 0.0
5 0.0 47.5 0.00 0.0 14000 71.51 0.0
6 0.0 42.2 0.00 0.3 16110 63.24 0.0
7 1.2 42.2 2.04 2.5 24500 63.24 66.8
8 1.9 42.2 3.36 4.5 27510 63.24 110.2
9 2.1 42.2 3.69 6.7 29295 63.24 120.9
10 2.2 42.2 3.85 8.9 30377 63.24 126.2
11 3.4 42.2 5.89 15.0 32007 63.24 193.2
12 2.9 42.2 5.12 11.5 31240 63.24 167.9
13 2.8 42.2 4.91 8.6 30268 63.24 160.8
14 3.1 42.2 5.31 6.5 29196 63.24 174.2
15 2.9 42.2 5.02 4.7 27701 63.24 164.5
16 2.1 42.2 3.68 2.9 25279 63.24 120.5
17 1.8 47.5 2.28 2.2 23808 71.51 82.6
18 1.4 56.6 1.07 1.7 22469 85.94 45.5
19 0.0 64.6 0.00 0.0 14000 98.49 0.0
20 0.0 64.6 0.00 0.0 14000 98.49 0.0
21 0.0 44.0 0.00 0.0 14000 66.10 0.0
** Max Tensile Stress is checked with Effective Long Term Effective Modulus of Elasticity.
______________________________________________________________________________________________________________________
32 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
where,
σsc = Stress in Tension Reinforcement
αe = Es/Ecm Long Term is Adopted
εcm = Mean Strain in the Concrete between Cracks
Es = Modulus of Elasticity of Steel
Ecm = Modulus of Elasticity of Concrete
ρp,eff = As/Ac,eff
Ac,eff = Effective Area of Concrete in Tension Surrounding
Ac,eff the reinforcement of Depth hcef
hcef = Lesser of 2.5(h-d);(h-x)/3;h/2
kt = Factor Dependent on Duration of Load
______________________________________________________________________________________________________________________
33 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
34 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
35 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
36 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
Reinforcement
2
Fy 500 N/mm
2
Es 200000 N/mm
______________________________________________________________________________________________________________________
37 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
38 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
39 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
40 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
41 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
SUMMARY OF MOMENTS
CRASH WEARING LL HOGGING LL SAGGING SV HOGGING SV SAGGING
DEAD LOAD
SECTION ID BARRIER COURSE MOMENTS MOMENTS MOMENTS MOMENTS
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -1.38 -2.80 -0.40 -9.26 8.12 0.00 4.88
2 -1.41 -2.26 -0.32 -7.43 6.54 0.00 3.94
3 -1.44 -1.73 -0.25 -5.64 4.99 0.00 3.01
4 -1.47 -1.20 -0.17 -3.85 3.45 0.00 2.08
5 -1.50 -0.67 -0.10 -2.43 1.90 0.00 1.16
6 -1.54 0.22 0.03 -2.60 1.23 -0.39 0.00
7 1.38 2.80 0.40 -8.12 9.98 -4.85 0.00
8 1.41 2.26 0.32 -6.54 8.16 -3.91 0.00
9 1.44 1.73 0.25 -5.00 6.37 -2.98 0.00
10 1.47 1.20 0.17 -3.63 4.59 -2.06 0.00
11 1.50 0.67 0.10 -2.63 2.80 -1.13 0.00
12 1.54 -0.22 -0.03 -2.46 0.67 0.00 0.42
______________________________________________________________________________________________________________________
42 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
43 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
44 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
45 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
DEPTH OF NEUTRAL AXIS (SERVICE LIMIT STATE) AND STRAIN/STRESS DIAGRAM Compression
Ec εc
Ccg
Depth of Neutral
Axis
Tcg
εs Es εs
Tension
Strain Profile Stress Profile
εc = Maximum Compression Strain
εs = Maximum Tension Strain
Ec εc = Maximum Compression Stress
Es εs = Maximum Tension Stress
where,
Mqp is the Moment due to the sustained Loads
Mst is the Moment due to the Live Load
φ is the creep factor
The stress in concrete would be critical in short term and the stress in steel would be critical in long term.
______________________________________________________________________________________________________________________
46 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
47 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS + LIVE LOAD (RARE COMBINATION)
SAGGING MOMENT CHECK SHORT TERM WITH LONG TERM EFFECTIVE Ec
MAX. COMP. DEPTH OF MAX. TENSILE
MRARE DEPTH OF NA RATIO OF LIVE Ec,eff
SECTION ID STRESS NA STRESS
LOAD / DL + SIDL
tm/m mm N/mm2 N/mm2 mm N/mm2
1 3.5 78.4 1.53 1.8 22713 95.55 58.7
2 2.6 78.4 1.10 1.6 22316 95.55 42.3
3 1.6 78.4 0.68 1.5 21739 95.55 26.0
4 0.6 78.4 0.26 1.2 20867 95.55 10.1
5 0.0 78.4 0.00 0.8 19267 95.55 0.0
6 0.0 78.4 0.00 1.0 19798 95.55 0.0
7 14.6 78.4 6.33 2.2 23780 95.55 242.8
8 12.2 78.4 5.28 2.0 23449 95.55 202.5
9 9.8 78.4 4.25 1.9 22966 95.55 163.2
10 7.5 78.4 3.23 1.6 22246 95.55 123.8
11 5.1 78.4 2.20 1.2 20938 95.55 84.4
12 2.0 78.4 0.85 0.5 17612 95.55 32.5
** Max Tensile Stress is checked with Effective Long Term Effective Modulus of Elasticity.
5.7 CRACK WIDTH CALCULATION
The calculation of crack width is done as per cl. 12.3.4 of IRC 112.
The crack width Wk is computed as
Wk = Sr,max (εsm - εcm)
where,
Wk = Crack Width
εsm = Mean Strain in Reinforcement Under Loads
εcm = Mean Strain in the Concrete between Cracks
where,
σsc = Stress in Tension Reinforcement
αe = Es/Ecm Long Term is Adopted
εcm = Mean Strain in the Concrete between Cracks
Es = Modulus of Elasticity of Steel
Ecm = Modulus of Elasticity of Concrete
ρp,eff = As/Ac,eff
Ac,eff = Effective Area of Concrete in Tension Surrounding
Ac,eff the reinforcement of Depth hcef
hcef = Lesser of 2.5(h-d);(h-x)/3;h/2
kt = Factor Dependent on Duration of Load
______________________________________________________________________________________________________________________
48 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
49 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
50 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
Reinforcement
2
Fy 500 N/mm
2
Es 200000 N/mm
______________________________________________________________________________________________________________________
51 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
52 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
53 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
54 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
55 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
SUMMARY OF MOMENTS
CRASH WEARING LL HOGGING LL SAGGING SV HOGGING SV SAGGING
DEAD LOAD
SECTION ID BARRIER COURSE MOMENTS MOMENTS MOMENTS MOMENTS
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -0.16 0.66 0.09 -2.55 2.67 -1.16 0.00
2 1.60 0.70 0.10 -2.39 2.74 -1.25 0.00
3 3.26 0.70 0.10 -2.12 2.63 -1.25 0.00
4 4.37 0.70 0.10 -2.10 2.52 -1.25 0.00
5 4.92 0.70 0.10 -2.10 2.41 -1.26 0.00
6 4.99 0.70 0.10 -2.10 2.36 -1.26 0.00
7 4.92 0.70 0.10 -2.10 2.33 -1.26 0.00
8 4.37 0.70 0.10 -2.10 2.29 -1.26 0.00
9 3.26 0.70 0.10 -2.10 2.24 -1.26 0.00
10 1.60 0.70 0.10 -2.10 2.20 -1.27 0.00
11 -0.16 0.66 0.09 -1.96 2.09 -1.19 0.00
______________________________________________________________________________________________________________________
56 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
57 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
58 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
DEPTH OF NEUTRAL AXIS (SERVICE LIMIT STATE) AND STRAIN/STRESS DIAGRAM Compression
Ec εc
Ccg
Depth of Neutral
Axis
Tcg
εs Es εs
Tension
Strain Profile Stress Profile
εc = Maximum Compression Strain
εs = Maximum Tension Strain
Ec εc = Maximum Compression Stress
Es εs = Maximum Tension Stress
______________________________________________________________________________________________________________________
59 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
where,
d= Effective Depth of Section
m = Es/Ec
b = Width of Section
A = Reinforcement Area
where,
Mqp is the Moment due to the sustained Loads
Mst is the Moment due to the Live Load
φ is the creep factor
The stress in concrete would be critical in short term and the stress in steel would be critical in long term.
______________________________________________________________________________________________________________________
60 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS + LIVE LOAD (RARE COMBINATION)
HOGGING MOMENT CHECK SHORT TERM WITH LONG TERM EFFECTIVE Ec
______________________________________________________________________________________________________________________
61 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
where,
σsc = Stress in Tension Reinforcement
αe = Es/Ecm Long Term is Adopted
εcm = Mean Strain in the Concrete between Cracks
Es = Modulus of Elasticity of Steel
Ecm = Modulus of Elasticity of Concrete
ρp,eff = As/Ac,eff
Ac,eff = Effective Area of Concrete in Tension Surrounding
Ac,eff the reinforcement of Depth hcef
hcef = Lesser of 2.5(h-d);(h-x)/3;h/2
kt = Factor Dependent on Duration of Load
______________________________________________________________________________________________________________________
62 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
63 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri
______________________________________________________________________________________________________________________
64 CIPL-MJB-1^M055.734-DGN-008