NH-107 TO NH-07

CONSTRUCTION OF RUDRAPRAYAG TUNNEL OF LENGTH 900.30M


INCLUDING APPROACHES WITH 200M LENGTH MAJOR BRIDGE ON
ALAKNANDA RIVER CONNECTING NH-107 (OLD NH-109) TO NH-07 (OLD
NH-58) ON EPC MODE IN THE STATE OF UTTRAKHAND

CLIENT Public Works Department, Uttrakhand

AUTHORITY
NH Public Works Department Uttrakhand
ENGINEER

PROOF
HighRaise Construction and Consultant Private Limited
CONSULTANT

EPC
M/s Bharat-Doon Infra (JV),9 PPCL Colony, Uday Vihar,
CONTRACTOR
Haridwar bypass, Dehradun
DESIGN
M/s. Civil Mantra Infracon Private Limited
CONSULTANT

TRANSVERSE DESIGN OF SEGMENT (BOX


DEPTH=6.25M)
DOCUMENT No. CIPL-MJB-1+055.734-DGN-008
28 July 2023
Revision - R0
Designed by Shubham Garg
Checked by Nithil Malguri
Approved by Sumit Magotra
NH-107 TO NH-07

CONSTRUCTION OF RUDRAPRAYAG TUNNEL OF LENGTH


900.30M INCLUDING APPROACHES WITH 200M LENGTH MAJOR
BRIDGE ON ALAKNANDA RIVER CONNECTING NH-107 (OLD NH-
109) TO NH-07 (OLD NH-58) ON EPC MODE IN THE STATE OF
UTTRAKHAND

TRANSVERSE DESIGN OF SEGMENT (BOX


DEPTH=6.25M)
DOCUMENT No. CIPL-MJB-1+055.734-DGN-008

Revision Schedule

28-Jul-23 0 First Submission for Approval


Date Revision Description
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD. MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches 50+100+50
with 200m length major bridge on Alaknanda river connecting NH-107 (old NH- Document No.CIPL-MJB-1+055.734-DGN-008
109) to NH-07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

TABLE OF CONTENTS

1 INTRODUCTION

2 SCOPE OF THIS DOCUMENT

3 MATERIAL PROPERTIES

4 LOADS APPLIED

5 TRANSVERSE DESIGN OF DECK - TOP FLANGE

_________________________________________________________________________________________________________________________
3 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document No. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Gaurav Singh
Transverse Design of Segment (Box Depth=6.25m) Checked by Nilesh Thaker

1 INTRODUCTION
The Bridge is across river Alaknanda and has a central span of 100 m. The bridge is constructed using balanced cantilever approach.

______________________________________________________________________________________________________________________
4 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

2 SCOPE OF THIS DOCUMENT


This document contains the transverse design of the 12 m wide Superstructure. The Superstructure consists of RCC/Post Tensioned I
Girders and Cast in Situ RCC Slab.
The transverse design is done using the simplified 2D approach in which the live loads are applied for unit width of the member in the
transverse direction. The dispersion of the live load to calculate the intensity is done using annexure B3 of IRC 112.
The number of design lanes on the bridge is based on the clear width available between the crash barriers on
the either side.
The paved shoulder is also considered in the width for the determination of the number of lanes.
Minimum Clear Width between the Crash Barriers is taken for the determination of the number of the lanes.
Width available = 11.0 m
The following live load configurations are considered as per Table 6A of IRC 6 for 3 Lane Bridges
1. 4 Lanes of Class A
2. 2 Lanes of Class A + 2 Lane of Class 70R
The bridge shall be designed for 3 number of design lanes as per Table 6 of IRC 6.

________________________________________________________________________________________________________________________
5 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

3 MATERIAL PROPERTIES
2
Conc. Grade 50 N/mm
2
Ec 35000 N/mm
2
Fct 2.5 N/mm

Reinforcement
Fy 500 N/mm2
Es 200000 N/mm2
Clear Cover Top 45 mm
Clear Cover Bot 45 mm

4 LOADS APPLIED
Dead Loads
The dead weight of the deck is applied.

SIDL
The loads applied on the deck are based on the DBR.
1. The Wearing Course is applied based on the thickness of 50 mm wearing thickness.
2. Crash Barrier load is applied as 1 t/m.

Live Loads
The live load analysis is done considering there is no median as it would lead to more forces in the deck.
The following load combinations are considered as per Table 6A of IRC 6 for 4 Lane Bridges
1. 3 Lanes of Class A
2. 1 Lanes of Class A + 1 Lane of Class 70R
3. SV Loading

________________________________________________________________________________________________________________________
6 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

CLASS A ONLY ARRANGEMENT 1

CLASS A ONLY CLASS A VEHICLE 1 CLASS A VEHICLE 2 CLASS A VEHICLE 3


Units
ARRANGEMENT 1 Wheel 1 Wheel 2 Wheel 1 Wheel 2 Wheel 1 Wheel 2
Wheel Load mm 5.7 5.7 5.7 5.7 5.7 5.7
Wheel Width mm 500 500 500 500 500 500
Wheel Length mm 250 250 250 250 250 250
Distance Between Axles mm 1200 1200 1200 1200 1200 1200
(In Long Direction)
Dispersion Through WC mm 380 380 380 380 380 380
(Assuming a Minimum 65 mm wearing course)
On Cantilever Yes Yes No No Yes Yes
"a" from nearest support mm 2140 340 1035 2515 340 2140
Center to Center of Webs mm 5675 5675 5675 5675 5675 5675
Web Width mm 600 600 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075 5075 5075
Dispersion Width mm 2948 788 2522 3678 788 2948
P (After Dispersion) t 2.75 7.23 3.06 2.34 7.23 2.75
CDA 1.41 1.41 1.41 1.41 1.41 1.41
P (After CDA) t 3.87 10.17 4.31 3.29 10.17 3.87

________________________________________________________________________________________________________________________
7 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

CLASS A ONLY ARRANGEMENT 2

CLASS A ONLY Class A Vehicle 1 Class A Vehicle 2 Class A Vehicle 3


Units
ARRANGEMENT 2 Wheel 1 Wheel 2 Wheel 1 Wheel 2 Wheel 1 Wheel 2
Wheel Load mm 5.7 5.7 5.7 5.7 5.7 5.7
Wheel Width mm 500 500 500 500 500 500
Wheel Length mm 250 250 250 250 250 250
Distance Between Axles mm 1200 1200 1200 1200 1200 1200
(In Long Direction)
Dispersion Through WC mm 350 350 350 350 350 350
(Assuming a Minimum 65 mm wearing course)
On Cantilever Yes Yes No No Yes Yes
"a" from nearest support mm 2140 340 1775 1775 340 2140
Center to Center of Webs mm 5675 5675 5675 5675 5675 5675
Web Width mm 600 600 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075 5075 5075
Dispersion Width mm 2918 758 3351 3351 758 2918
P (After Dispersion) t 2.77 7.52 2.51 2.51 7.52 2.77
CDA 1.41 1.41 1.41 1.41 1.41 1.41
P (After CDA) t 3.89 10.58 3.52 3.52 10.58 3.89

________________________________________________________________________________________________________________________
8 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

CLASS A ONLY ARRANGEMENT 3

CLASS A ONLY Class A Vehicle 1 Class A Vehicle 2 -


Units
ARRANGEMENT 3 Wheel 1 Wheel 2 Wheel 1 Wheel 2 Wheel 1 Wheel 2
Wheel Load mm 5.7 5.7 5.7 5.7 0 0
Wheel Width mm 500 500 500 500 500 500
Wheel Length mm 250 250 250 250 250 250
Distance Between Axles mm 1200 1200 1200 1200 1200 1200
(In Long Direction)
Dispersion Through WC mm 350 350 350 350 350 350
(Assuming a Minimum 65 mm wearing course)
On Cantilever No No No No No No
"a" from nearest support mm 25 1825 1825 25 111 1210
Center to Center of Webs mm 5675 5675 5675 5675 5675 5675
Web Width mm 600 600 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075 5075 5075
Dispersion Width mm 415 3389 3389 415 632 2746
P (After Dispersion) t 13.75 2.48 2.48 13.75 0.00 0.00
CDA 1.41 1.41 1.41 1.41 1.41 1.41
P (After CDA) t 19.33 3.49 3.49 19.33 0.00 0.00

________________________________________________________________________________________________________________________
9 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

CLASS A ONLY ARRANGEMENT 4

CLASS A ONLY - Class A Vehicle 1 Class A Vehicle 2


Units
ARRANGEMENT 4 Wheel 1 Wheel 2 Wheel 1 Wheel 2 Wheel 1 Wheel 2
Wheel Load mm 0 0 5.7 5.7 5.7 5.7
Wheel Width mm 860 860 500 500 500 500
Wheel Length mm 220 220 250 250 250 250
Distance Between Axles mm 1220 1220 1220 1220 1220 1220
(In Long Direction)
Dispersion Through WC mm 320 320 350 350 350 350
(Assuming a Minimum 65 mm wearing course)
On Cantilever Yes No Yes No No No
"a" from nearest support mm 521 174 500 975 2675 875
Center to Center of Webs mm 5675 5675 5675 5675 5675 5675
Web Width mm 600 600 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075 5075 5075
Dispersion Width mm 945 757 950 2398 3639 2233
P (After Dispersion) t 0.00 0.00 6.00 3.15 2.35 3.30
CDA 1.41 1.41 1.41 1.41 1.41 1.41
P (After CDA) t 0.00 0.00 8.44 4.43 3.30 4.64

________________________________________________________________________________________________________________________
10 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

CLASS A+70R ARRANGEMENT 1

CLASS A+70R Class 70R Class A Vehicle 1 -


Units
ARRANGEMENT 1 Wheel 1 Wheel 2 Wheel 1 Wheel 2 Wheel 1 Wheel 2
Wheel Load mm 10 10 5.7 5.7 0 0
Wheel Width mm 860 860 500 500 500 500
Wheel Length mm 220 220 250 250 250 250
Distance Between Axles mm 1220 1220 1220 1220 1220 1220
(In Long Direction)
Dispersion Through WC mm 320 320 350 350 350 350
(Assuming a Minimum 65 mm wearing course)
On Cantilever Yes Yes No No No Yes
"a" from nearest support mm 1710 1710 2140 340 1191 91
Center to Center of Webs mm 5675 5675 5675 5675 5675 5675
Web Width mm 600 600 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075 5075 5075
Dispersion Width mm 2372 2372 3568 1175 2720 459
P (After Dispersion) t 5.57 5.57 2.38 4.85 0.00 0.00
CDA 1.41 1.41 1.41 1.41 1.41 1.41
P (After CDA) t 7.83 7.83 3.35 6.82 0.00 0.00

________________________________________________________________________________________________________________________
11 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

CLASS A+70R ARRANGEMENT 2

CLASS A+70R Class 70R Class A


Units
ARRANGEMENT 2 Wheel 1 Wheel 2 Wheel 1 Wheel 2
Wheel Load mm 10 10 5.7 5.7
Wheel Width mm 860 860 860 860
Wheel Length mm 220 220 220 220
Distance Between Axles mm 1220 1220 1220 1220
(In Long Direction)
Dispersion Through WC mm 320 320 320 320
(Assuming a Minimum 65 mm wearing course)
On Cantilever No No Yes Yes
"a" from nearest support mm 2675 745 2140 340
Center to Center of Webs mm 5675 5675 5675 5675
Web Width mm 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075
Dispersion Width mm 3609 1973 2888 728
P (After Dispersion) t 4.14 6.26 2.78 7.83
CDA 1.41 1.41 1.41 1.41
P (After CDA) t 5.82 8.81 3.90 11.01

________________________________________________________________________________________________________________________
12 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

CLASS A+70R ARRANGEMENT 3

CLASS A+70R Class 70R Class A


Units
ARRANGEMENT 3 Wheel 1 Wheel 2 Wheel 1 Wheel 2
Wheel Load mm 10 10 5.7 5.7
Wheel Width mm 860 860 860 860
Wheel Length mm 220 220 220 220
Distance Between Axles mm 1220 1220 1220 1220
(In Long Direction)
Dispersion Through WC mm 320 320 320 320
(Assuming a Minimum 65 mm wearing course)
On Cantilever No No Yes No
"a" from nearest support mm 2675 745 680 795
Center to Center of Webs mm 5675 5675 5675 5675
Web Width mm 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075
Dispersion Width mm 3609 1973 1136 2063
P (After Dispersion) t 4.14 6.26 5.02 3.47
CDA 1.41 1.41 1.41 1.41
P (After CDA) t 5.82 8.81 7.06 4.88

________________________________________________________________________________________________________________________
13 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

CLASS 70R ONLY

Class 70R -
CLASS 70R ONLY Units
Wheel 1 Wheel 2 Wheel 1 Wheel 2
Wheel Load mm 10 10 0 0
Wheel Width mm 860 860 860 860
Wheel Length mm 220 220 220 220
Distance Between Axles mm 1220 1220 1220 1220
(In Long Direction)
Dispersion Through WC mm 320 320 320 320
(Assuming a Minimum 65 mm wearing course)
On Cantilever No No Yes Yes
"a" from nearest support mm 1710 1710 680 795
Center to Center of Webs mm 5675 5675 5675 5675
Web Width mm 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075
Dispersion Width mm 3268 3268 1136 1274
P (After Dispersion) t 4.46 4.46 0.00 0.00
CDA 1.41 1.41 1.41 1.41
P (After CDA) t 6.27 6.27 0.00 0.00

________________________________________________________________________________________________________________________
14 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SV LOADING ARRANGEMENT 1

SV LOADING SV Loading
Units
ARRANGEMENT 1 Wheel 1 Wheel 2 Wheel 3 Wheel 4 Wheel 5 Wheel 6
Wheel Load mm 2.25 2.25 2.25 2.25 2.25 2.25
Wheel Width mm 156 156 156 156 156 156
Wheel Length mm 274 274 274 274 274 274
Distance Between Axles mm 1500 1500 1500 1500 1500 1500
(In Long Direction)
Dispersion Through WC mm 374 374 374 374 374 374
(Assuming a Minimum 65 mm wearing course)
On Cantilever No No No No No No
"a" from nearest support mm 1278 1522 2028 2272 1278 1522
Center to Center of Webs mm 5675 5675 5675 5675 5675 5675
Web Width mm 600 600 600 600 600 600
Effective Span (Lo) mm 5075 5075 5075 5075 5075 5075
Dispersion Width mm 2860 3144 3540 3637 2860 3144
P (After Dispersion) t 1.03 0.97 0.89 0.88 1.03 0.97
CDA 1.00 1.00 1.00 1.00 1.00 1.00
P (After CDA) t 1.03 0.97 0.89 0.88 1.03 0.97

________________________________________________________________________________________________________________________
15 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old NH- Document no. CIPL-MJB-1+055.734-DGN-008
58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SV LOADING SV Loading
Units
ARRANGEMENT 1 Wheel 7 Wheel 8
Wheel Load mm 2.25 2.25
Wheel Width mm 156 156
Wheel Length mm 274 274
Distance Between Axles mm 1500 1500
(In Long Direction)
Dispersion Through WC mm 374 374
(Assuming a Minimum 65 mm wearing course)
On Cantilever No No
"a" from nearest support mm 2028 2272
Center to Center of Webs mm 5675 5675
Web Width mm 600 600
Effective Span (Lo) mm 5075 5075
Dispersion Width mm 3540 3637
P (After Dispersion) t 0.89 0.88
CDA 1.00 1.00
P (After CDA) t 0.89 0.88

________________________________________________________________________________________________________________________
16 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5 TRANSVERSE DESIGN OF DECK - TOP FLANGE

5.1 MATERIAL PROPERTIES


2
Concrete Grade 50 N/mm
2
Ec 35000 N/mm
2
Fct 2.5 N/mm

Reinforcement
2
Fy 500 N/mm
2
Es 200000 N/mm

Clear Cover Top 45 mm


Clear Cover Bot 45 mm

5.2 SECTIONS FOR DESIGN


The following are the locations of Section Design

______________________________________________________________________________________________________________________
17 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.3 DESIGN FORCES


The followng design forces are obtained from the Analysis Model.
Wearing
Dead Load Crash Barrier 3CA A1 3CA A2 3CA A3 3CA A4
Section ID Course
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -0.35 -1.11 -0.12 -0.82 -0.82 0.00 0.00
2 -3.53 -3.00 -0.90 -11.18 -11.35 -0.01 -4.22
3 -2.32 -0.50 -0.53 -5.04 -5.48 -3.38 -7.03
4 -1.26 -0.47 -0.30 -2.33 -3.64 -1.61 -3.30
5 -0.87 -0.45 -0.20 -1.01 -2.72 -0.72 -1.92
6 -0.56 -0.43 -0.12 -0.82 -1.79 0.16 -1.26
7 -0.31 -0.41 -0.06 -0.63 -0.87 1.05 -0.59
8 -0.13 -0.41 -0.01 -0.50 -0.29 1.73 0.08
9 0.01 -0.41 0.03 -0.38 -0.38 1.71 0.75
10 0.08 -0.41 0.05 -0.25 -0.47 1.69 1.42
11 0.11 -0.41 0.06 -0.13 -0.56 1.67 2.09
12 0.08 -0.41 0.05 -0.21 -0.65 1.65 1.90
13 0.01 -0.41 0.03 -0.94 -0.75 1.63 1.70
14 -0.13 -0.41 -0.01 -1.68 -0.84 1.61 1.51
15 -0.31 -0.41 -0.06 -2.42 -1.31 0.89 1.31
16 -0.56 -0.43 -0.12 -3.24 -2.42 -0.04 1.13
17 -0.87 -0.45 -0.20 -4.06 -3.53 -0.96 0.95
18 -1.26 -0.47 -0.30 -4.88 -4.64 -1.89 0.49
19 -2.32 -0.50 -0.53 -6.52 -6.85 -3.75 -2.38
20 -3.53 -3.00 -0.90 -13.13 -13.37 0.00 0.00
21 -0.85 -1.65 -0.27 -3.44 -3.46 0.00 0.00

CA + C70R A1 CA + C70R A2 CA + C70R A3 70R A1 SV A1


Section ID
tm/m tm/m tm/m tm/m tm/m
1 -0.71 -0.82 0.00 0.00 0.00
2 -9.08 -11.50 -4.80 -0.01 0.00
3 -12.83 -12.10 -9.06 -6.24 -3.73
4 -7.81 -8.76 -4.28 -2.97 -1.73
5 -5.31 -7.10 -3.16 -1.33 -0.73
6 -2.80 -5.43 -2.03 0.31 0.19
7 -0.29 -3.76 -0.91 1.95 0.81
8 1.10 -2.14 0.22 2.48 1.29
9 1.52 -0.51 1.35 2.48 1.65
10 1.93 1.11 2.48 2.48 1.76
11 2.35 2.74 3.61 2.48 1.78
12 2.77 2.83 3.21 2.48 1.79
13 3.18 2.93 2.81 2.48 1.67
14 3.60 3.03 2.41 2.48 1.26
15 3.66 3.12 2.01 1.95 0.75
16 2.01 3.22 1.64 0.31 0.09
17 0.35 3.33 1.27 -1.33 -0.83
18 -1.30 3.43 0.90 -2.96 -1.80
19 -4.60 -0.51 -3.98 -6.24 -3.74
20 0.00 0.00 0.00 0.00 0.00
21 0.00 0.00 0.00 0.00 0.00

______________________________________________________________________________________________________________________
18 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SORTING OF RESULTS BASED ON HOGGING AND SAGGING BENDING MOMENT


HOGGING MOMENTS ONLY
CRASH WEARING
DEAD LOAD 3CA A1 3CA A2 3CA A3 3CA A4
SECTION ID BARRIER COURSE
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -0.35 -1.11 -0.12 -0.82 -0.82 0.00 0.00
2 -3.53 -3.00 -0.90 -11.18 -11.35 -0.01 -4.22
3 -2.32 -0.50 -0.53 -5.04 -5.48 -3.38 -7.03
4 -1.26 -0.47 -0.30 -2.33 -3.64 -1.61 -3.30
5 -0.87 -0.45 -0.20 -1.01 -2.72 -0.72 -1.92
6 -0.56 -0.43 -0.12 -0.82 -1.79 0.00 -1.26
7 -0.31 -0.41 -0.06 -0.63 -0.87 0.00 -0.59
8 -0.13 -0.41 -0.01 -0.50 -0.29 0.00 0.00
9 0.01 -0.41 0.03 -0.38 -0.38 0.00 0.00
10 0.08 -0.41 0.05 -0.25 -0.47 0.00 0.00
11 0.11 -0.41 0.06 -0.13 -0.56 0.00 0.00
12 0.08 -0.41 0.05 -0.21 -0.65 0.00 0.00
13 0.01 -0.41 0.03 -0.94 -0.75 0.00 0.00
14 -0.13 -0.41 -0.01 -1.68 -0.84 0.00 0.00
15 -0.31 -0.41 -0.06 -2.42 -1.31 0.00 0.00
16 -0.56 -0.43 -0.12 -3.24 -2.42 -0.04 0.00
17 -0.87 -0.45 -0.20 -4.06 -3.53 -0.96 0.00
18 -1.26 -0.47 -0.30 -4.88 -4.64 -1.89 0.00
19 -2.32 -0.50 -0.53 -6.52 -6.85 -3.75 -2.38
20 -3.53 -3.00 -0.90 -13.13 -13.37 0.00 0.00
21 -0.85 -1.65 -0.27 -3.44 -3.46 0.00 0.00
HOGGING MOMENTS ONLY
CA + C70R A1 CA + C70R A2 CA + C70R A3 70R A1 SV A1
SECTION ID
tm/m tm/m tm/m tm/m tm/m
1 -0.71 -0.82 0.00 0.00 0.00
2 -9.08 -11.50 -4.80 -0.01 0.00
3 -12.83 -12.10 -9.06 -6.24 -3.73
4 -7.81 -8.76 -4.28 -2.97 -1.73
5 -5.31 -7.10 -3.16 -1.33 -0.73
6 -2.80 -5.43 -2.03 0.00 0.00
7 -0.29 -3.76 -0.91 0.00 0.00
8 0.00 -2.14 0.00 0.00 0.00
9 0.00 -0.51 0.00 0.00 0.00
10 0.00 0.00 0.00 0.00 0.00
11 0.00 0.00 0.00 0.00 0.00
12 0.00 0.00 0.00 0.00 0.00
13 0.00 0.00 0.00 0.00 0.00
14 0.00 0.00 0.00 0.00 0.00
15 0.00 0.00 0.00 0.00 0.00
16 0.00 0.00 0.00 0.00 0.00
17 0.00 0.00 0.00 -1.33 -0.83
18 -1.30 0.00 0.00 -2.96 -1.80
19 -4.60 -0.51 -3.98 -6.24 -3.74
20 0.00 0.00 0.00 0.00 0.00
21 0.00 0.00 0.00 0.00 0.00

______________________________________________________________________________________________________________________
19 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SAGGING MOMENTS ONLY


CRASH WEARING
DEAD LOAD 3CA A1 3CA A2 3CA A3 3CA A4
SECTION ID BARRIER COURSE
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -0.35 -1.11 -0.12 0.00 0.00 0.00 0.00
2 -3.53 -3.00 -0.90 0.00 0.00 0.00 0.00
3 -2.32 -0.50 -0.53 0.00 0.00 0.00 0.00
4 -1.26 -0.47 -0.30 0.00 0.00 0.00 0.00
5 -0.87 -0.45 -0.20 0.00 0.00 0.00 0.00
6 -0.56 -0.43 -0.12 0.00 0.00 0.16 0.00
7 -0.31 -0.41 -0.06 0.00 0.00 1.05 0.00
8 -0.13 -0.41 -0.01 0.00 0.00 1.73 0.08
9 0.01 -0.41 0.03 0.00 0.00 1.71 0.75
10 0.08 -0.41 0.05 0.00 0.00 1.69 1.42
11 0.11 -0.41 0.06 0.00 0.00 1.67 2.09
12 0.08 -0.41 0.05 0.00 0.00 1.65 1.90
13 0.01 -0.41 0.03 0.00 0.00 1.63 1.70
14 -0.13 -0.41 -0.01 0.00 0.00 1.61 1.51
15 -0.31 -0.41 -0.06 0.00 0.00 0.89 1.31
16 -0.56 -0.43 -0.12 0.00 0.00 0.00 1.13
17 -0.87 -0.45 -0.20 0.00 0.00 0.00 0.95
18 -1.26 -0.47 -0.30 0.00 0.00 0.00 0.49
19 -2.32 -0.50 -0.53 0.00 0.00 0.00 0.00
20 -3.53 -3.00 -0.90 0.00 0.00 0.00 0.00
21 -0.85 -1.65 -0.27 0.00 0.00 0.00 0.00

______________________________________________________________________________________________________________________
20 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SAGGING MOMENTS ONLY


CA + C70R A1 CA + C70R A2 CA + C70R A3 70R A1 SV A1
SECTION ID
tm/m tm/m tm/m tm/m tm/m
1 0.00 0.00 0.00 0.00 0.00
2 0.00 0.00 0.00 0.00 0.00
3 0.00 0.00 0.00 0.00 0.00
4 0.00 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.31 0.19
7 0.00 0.00 0.00 1.95 0.81
8 1.10 0.00 0.22 2.48 1.29
9 1.52 0.00 1.35 2.48 1.65
10 1.93 1.11 2.48 2.48 1.76
11 2.35 2.74 3.61 2.48 1.78
12 2.77 2.83 3.21 2.48 1.79
13 3.18 2.93 2.81 2.48 1.67
14 3.60 3.03 2.41 2.48 1.26
15 3.66 3.12 2.01 1.95 0.75
16 2.01 3.22 1.64 0.31 0.09
17 0.35 3.33 1.27 0.00 0.00
18 0.00 3.43 0.90 0.00 0.00
19 0.00 0.00 0.00 0.00 0.00
20 0.00 0.00 0.00 0.00 0.00
21 0.00 0.00 0.00 0.00 0.00

______________________________________________________________________________________________________________________
21 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SUMMARY OF MOMENTS
CRASH WEARING LL HOGGING LL SAGGING SV HOGGING SV SAGGING
DEAD LOAD
SECTION ID BARRIER COURSE MOMENTS MOMENTS MOMENTS MOMENTS
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -0.35 -1.11 -0.12 -0.82 0.00 0.00 0.00
2 -3.53 -3.00 -0.90 -11.50 0.00 0.00 0.00
3 -2.32 -0.50 -0.53 -12.83 0.00 -3.73 0.00
4 -1.26 -0.47 -0.30 -8.76 0.00 -1.73 0.00
5 -0.87 -0.45 -0.20 -7.10 0.00 -0.73 0.00
6 -0.56 -0.43 -0.12 -5.43 0.31 0.00 0.19
7 -0.31 -0.41 -0.06 -3.76 1.95 0.00 0.81
8 -0.13 -0.41 -0.01 -2.14 2.48 0.00 1.29
9 0.01 -0.41 0.03 -0.51 2.48 0.00 1.65
10 0.08 -0.41 0.05 -0.47 2.48 0.00 1.76
11 0.11 -0.41 0.06 -0.56 3.61 0.00 1.78
12 0.08 -0.41 0.05 -0.65 3.21 0.00 1.79
13 0.01 -0.41 0.03 -0.94 3.18 0.00 1.67
14 -0.13 -0.41 -0.01 -1.68 3.60 0.00 1.26
15 -0.31 -0.41 -0.06 -2.42 3.66 0.00 0.75
16 -0.56 -0.43 -0.12 -3.24 3.22 0.00 0.09
17 -0.87 -0.45 -0.20 -4.06 3.33 -0.83 0.00
18 -1.26 -0.47 -0.30 -4.88 3.43 -1.80 0.00
19 -2.32 -0.50 -0.53 -6.85 0.00 -3.74 0.00
20 -3.53 -3.00 -0.90 -13.37 0.00 0.00 0.00
21 -0.85 -1.65 -0.27 -3.46 0.00 0.00 0.00

______________________________________________________________________________________________________________________
22 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SUMMARY OF HOGGING MOMENTS


SLS STRESS SLS CRACK RATIO OF LIVE
ULS
SECTION ID CHECK WIDTH LOAD / DEAD +
SIDL
tm/m tm/m tm/m
1 -3.36 -2.42 -1.60 0.52
2 -27.28 -19.11 -7.61 1.55
3 -23.77 -16.29 -3.46 3.83
4 -15.88 -10.85 -2.09 4.32
5 -12.70 -8.66 -1.56 4.67
6 -9.64 -6.56 -1.13 4.89
7 -6.69 -4.55 -0.79 4.82
8 -3.95 -2.69 -0.55 3.89
9 -1.28 -0.88 -0.37 1.38
10 -1.13 -0.75 -0.28 1.68
11 -1.22 -0.80 -0.24 2.33
12 -1.40 -0.93 -0.28 2.32
13 -1.92 -1.31 -0.37 2.54
14 -3.26 -2.23 -0.55 3.05
15 -4.68 -3.21 -0.79 3.10
16 -6.36 -4.37 -1.13 2.92
17 -8.14 -5.62 -1.56 2.67
18 -10.06 -6.97 -2.09 2.40
19 -14.80 -10.31 -3.46 2.04
20 -30.09 -20.98 -7.61 1.80
21 -8.93 -6.28 -2.82 1.25

______________________________________________________________________________________________________________________
23 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SUMMARY OF SAGGING MOMENTS


SLS STRESS SLS CRACK RATIO OF LIVE
ULS
SECTION ID CHECK WIDTH LOAD / DEAD +
tm/m tm/m tm/m SIDL
1 -1.58 -1.58 -1.58 0.00
2 -7.43 -7.43 -7.43 0.00
3 -3.35 -3.35 -3.35 0.00
4 -2.03 -2.03 -2.03 0.00
5 -1.52 -1.52 -1.52 0.00
6 -0.65 -0.80 -1.11 0.28
7 2.15 1.17 -0.78 2.50
8 3.17 1.93 -0.55 4.51
9 3.36 2.12 -0.36 6.70
10 3.49 2.21 -0.27 8.86
11 5.23 3.38 -0.23 15.04
12 4.58 2.94 -0.27 11.46
13 4.41 2.82 -0.36 8.59
14 4.85 3.05 -0.55 6.55
15 4.71 2.88 -0.78 4.69
16 3.72 2.11 -1.11 2.90
17 3.48 1.81 -1.52 2.19
18 3.12 1.40 -2.03 1.69
19 -3.35 -3.35 -3.35 0.00
20 -7.43 -7.43 -7.43 0.00
21 -2.77 -2.77 -2.77 0.00

______________________________________________________________________________________________________________________
24 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.4 PROVIDED REINFORCEMENT


REINFORCEMENT FOR HOGGING MOMENT
DIAMETER SPACING OF DIAMETER SPACING OF REINFORCE
DEPTH CLEAR COVER
SECTION ID (BAR 1) BAR 1 (BAR 2) BAR 2 MENT
(mm) (mm) (mm) (mm) (mm) mm2 mm
1 320 12 150 12 150 1507 45
2 600 12 150 12 150 1507 45
3 600 12 150 12 150 1507 45
4 480 12 150 12 150 1507 45
5 360 12 150 12 150 1507 45
6 300 12 150 12 150 1507 45
7 300 12 150 12 150 1507 45
8 300 12 150 150 754 45
9 300 12 150 150 754 45
10 300 12 150 150 754 45
11 300 12 150 150 754 45
12 300 12 150 150 754 45
13 300 12 150 150 754 45
14 300 12 150 150 754 45
15 300 12 150 12 150 1507 45
16 300 12 150 12 150 1507 45
17 360 12 150 12 150 1507 45
18 480 12 150 12 150 1507 45
19 600 12 150 12 150 1507 45
20 600 12 150 12 150 1507 45
21 320 12 150 12 150 1507 45

______________________________________________________________________________________________________________________
25 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

REINFORCEMENT FOR SAGGING MOMENT


DIAMETER SPACING OF DIAMETER SPACING OF REINFORCE
DEPTH CLEAR COVER
SECTION ID (BAR 1) BAR 1 (BAR 2) BAR 2 MENT

(mm) (mm) (mm) (mm) (mm) mm2 mm


1 320 12 150 175 754 45
2 600 12 150 175 754 45
3 600 12 150 175 754 45
4 480 12 150 175 754 45
5 360 12 150 175 754 45
6 300 12 150 175 754 45
7 300 12 150 175 754 45
8 300 12 150 175 754 45
9 300 12 150 175 754 45
10 300 12 150 175 754 45
11 300 12 150 175 754 45
12 300 12 150 175 754 45
13 300 12 150 175 754 45
14 300 12 150 175 754 45
15 300 12 150 175 754 45
16 300 12 150 175 754 45
17 360 12 150 175 754 45
18 480 12 150 175 754 45
19 600 12 150 175 754 45
20 600 12 150 175 754 45
21 320 12 150 175 754 45

______________________________________________________________________________________________________________________
26 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.5 ULS CHECK


The ULS check for flexure is done as per IRC 112.
The following formulations are used.

DEPTH OF NEUTRAL AXIS (ULTIMATE LIMIT STATE) AND STRAIN/STRESS DIAGRAM

Compression Force = .36 x Fck x Width x Depth of Neutral Axis


Tension Force = .87 x Fy x Ast
where
Fck = Characteristic Compressive Strength of Concrete
Fy = Yield Strength of Reinforcement
x (Depth of NA) = .87 x Fy x Ast / ( .36 x Fck x b )
where,
Fy = Yield Strength of Reinforcement
Ast = Area of Tension Steel
Fck = Compressive strength of Concrete
b = Width of Section

Moment of Resistance is calculated as Tension Force x Level Arm.

______________________________________________________________________________________________________________________
27 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

HOGGING MOMENT ULS CHECK


REINFORCEMEN DEPTH OF MOMENT
MULS WIDTH DEPTH
SECTION ID T NA CAPACITY
tm/m mm mm mm2 mm tm/m
1 3.4 1000 320 1507 36.4 17.36
2 27.3 1000 600 1507 36.4 36.07
3 23.8 1000 600 1507 36.4 36.07
4 15.9 1000 480 1507 36.4 28.05
5 12.7 1000 360 1507 36.4 20.03
6 9.6 1000 300 1507 36.4 16.02
7 6.7 1000 300 1507 36.4 16.02
8 4.0 1000 300 754 18.2 8.27
9 1.3 1000 300 754 18.2 8.27
10 1.1 1000 300 754 18.2 8.27
11 1.2 1000 300 754 18.2 8.27
12 1.4 1000 300 754 18.2 8.27
13 1.9 1000 300 754 18.2 8.27
14 3.3 1000 300 754 18.2 8.27
15 4.7 1000 300 1507 36.4 16.02
16 6.4 1000 300 1507 36.4 16.02
17 8.1 1000 360 1507 36.4 20.03
18 10.1 1000 480 1507 36.4 28.05
19 14.8 1000 600 1507 36.4 36.07
20 30.1 1000 600 1507 36.4 36.07
21 8.9 1001 320 1507 36.4 17.36

SAGGING MOMENT ULS CHECK


REINFORCEMEN DEPTH OF MOMENT
MULS WIDTH DEPTH
SECTION ID T NA CAPACITY
tm/m mm mm mm2 mm tm/m
1 0.0 1000 320 754 18.2 8.93
2 0.0 1000 600 754 18.2 18.29
3 0.0 1000 600 754 18.2 18.29
4 0.0 1000 480 754 18.2 14.28
5 0.0 1000 360 754 18.2 10.27
6 0.0 1000 300 754 18.2 8.27
7 2.1 1000 300 754 18.2 8.27
8 3.2 1000 300 754 18.2 8.27
9 3.4 1000 300 754 18.2 8.27
10 3.5 1000 300 754 18.2 8.27
11 5.2 1000 300 754 18.2 8.27
12 4.6 1000 300 754 18.2 8.27
13 4.4 1000 300 754 18.2 8.27
14 4.9 1000 300 754 18.2 8.27
15 4.7 1000 300 754 18.2 8.27
16 3.7 1000 300 754 18.2 8.27
17 3.5 1000 360 754 18.2 10.27
18 3.1 1000 480 754 18.2 14.28
19 0.0 1000 600 754 18.2 18.29
20 0.0 1000 600 754 18.2 18.29
21 0.0 1001 320 754 18.2 8.93

______________________________________________________________________________________________________________________
28 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.6 STRESS CHECK


The Stress check of Concrete is done with short term modular ratio and the stress check in steel is done with long term modular ratio.

m(Es/Ec) Short Term 5.714


Creep Factor (Phi) 1.5
m(Es/Ec) Long Term 14.29

The following formulations are used.

DEPTH OF NEUTRAL AXIS (SERVICE LIMIT STATE) AND STRAIN/STRESS DIAGRAM Compression
Ec εc

Ccg
Depth of Neutral
Axis
Tcg

εs Es εs

Tension
Strain Profile Stress Profile
εc = Maximum Compression Strain
εs = Maximum Tension Strain
Ec εc = Maximum Compression Stress
Es εs = Maximum Tension Stress

4𝐴2 𝑚2 + 8𝐴𝑚𝑏𝑑 − 2𝐴𝑚𝑏𝑑


𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑁𝑒𝑢𝑡𝑟𝑎𝑙 𝐴𝑥𝑖𝑠 =
2𝑏
where,
d= Effective Depth of Section
m = Es/Ec
b = Width of Section
A = Reinforcement Area

For Load Combinations without live load


For load combinations with live load, the effective E is calculated using the following equation.

where,
Mqp is the Moment due to the sustained Loads
Mst is the Moment due to the Live Load
φ is the creep factor

The stress in concrete would be critical in short term and the stress in steel would be critical in long term.

______________________________________________________________________________________________________________________
29 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS


SUSTAINED LOADS SHORT TERM WITH LONG TERM EFFECTIVE Ec

MAX. COMP. EFFECTIVE DEPTH OF MAX. TENSILE


MSUSTAINED DEPTH OF NA Ec,eff
SECTION ID STRESS MODULAR NA STRESS
2 2
RATIO 2
tm/m mm N/mm N/mm mm N/mm
1 -1.6 60.0 2.11 11667 17.1 94.9 44.0
2 -7.6 89.0 3.23 11667 17.1 144.6 98.9
3 -3.5 89.0 1.47 11667 17.1 144.6 44.9
4 -2.1 77.8 1.31 11667 17.1 125.3 35.1
5 -1.6 64.8 1.64 11667 17.1 103.1 37.0
6 -1.1 57.4 1.69 11667 17.1 90.5 33.7
7 -0.8 57.4 0.98 11667 17.1 90.5 23.6
8 -0.6 42.2 0.96 11667 17.1 68.3 31.8
9 -0.4 42.2 0.63 11667 17.1 68.3 20.9
10 -0.3 42.2 0.47 11667 17.1 68.3 15.5
11 -0.2 42.2 0.40 11667 17.1 68.3 13.1
12 -0.3 42.2 0.47 11667 17.1 68.3 15.5
13 -0.4 42.2 0.63 11667 17.1 68.3 20.9
14 -0.6 42.2 0.96 11667 17.1 68.3 31.8
15 -0.8 57.4 0.98 11667 17.1 90.5 23.6
16 -1.1 57.4 1.40 11667 17.1 90.5 33.7
17 -1.6 64.8 1.40 11667 17.1 103.1 37.0
18 -2.1 77.8 1.14 11667 17.1 125.3 35.1
19 -3.5 89.0 1.30 11667 17.1 144.6 44.9
20 -7.6 89.0 2.86 11667 17.1 144.6 98.9
21 -2.8 60.0 3.11 11667 17.1 94.9 77.4

______________________________________________________________________________________________________________________
30 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS + LIVE LOAD (RARE COMBINATION)
HOGGING MOMENT CHECK SHORT TERM WITH LONG TERM EFFECTIVE Ec

MAX. COMP. RATIO OF LIVE DEPTH OF MAX. TENSILE


MRARE DEPTH OF NA Ec,eff
SECTION ID STRESS LOAD / DL + NA STRESS
SIDL
tm/m mm N/mm2 N/mm2 mm N/mm2
1 -2.4 60.0 3.18 0.5 17610 80.36 65.1
2 -19.1 89.0 8.11 1.5 22030 121.04 244.5
3 -16.3 89.0 6.91 3.8 26706 121.04 208.4
4 -10.9 77.8 6.79 4.3 27297 105.27 179.3
5 -8.7 64.8 9.12 4.7 27679 87.15 201.3
6 -6.6 57.4 9.75 4.9 27898 76.78 191.2
7 -4.6 57.4 6.76 4.8 27828 76.78 132.6
8 -2.7 42.2 5.33 3.9 26785 57.29 152.4
9 -0.9 42.2 1.74 1.4 21463 57.29 49.8
10 -0.8 42.2 1.48 1.7 22436 57.29 42.5
11 -0.8 42.2 1.58 2.3 24138 57.29 45.3
12 -0.9 42.2 1.84 2.3 24111 57.29 52.7
13 -1.3 42.2 2.59 2.5 24584 57.29 74.2
14 -2.2 42.2 4.42 3.1 25548 57.29 126.4
15 -3.2 57.4 4.77 3.1 25629 76.78 93.6
16 -4.4 57.4 6.50 2.9 25312 76.78 127.4
17 -5.6 64.8 5.92 2.7 24847 87.15 130.7
18 -7.0 77.8 4.36 2.4 24294 105.27 115.2
19 -10.3 89.0 4.37 2.0 23448 121.04 131.9
20 -21.0 89.0 8.90 1.8 22789 121.04 268.5
21 -6.3 60.0 8.25 1.2 20997 80.36 168.9
** Max Tensile Stress is checked with Effective Long Term Effective Modulus of Elasticity.

______________________________________________________________________________________________________________________
31 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS + LIVE LOAD (RARE COMBINATION)
SAGGING MOMENT CHECK SHORT TERM WITH LONG TERM EFFECTIVE Ec
MAX. COMP. RATIO OF LIVE DEPTH OF MAX. TENSILE
MRARE DEPTH OF NA Ec,eff
SECTION ID STRESS LOAD / DL + NA STRESS
tm/m mm N/mm2 SIDL N/mm2 mm N/mm2
1 0.0 44.0 0.00 0.0 14000 66.10 0.0
2 0.0 64.6 0.00 0.0 14000 98.49 0.0
3 0.0 64.6 0.00 0.0 14000 98.49 0.0
4 0.0 56.6 0.00 0.0 14000 85.94 0.0
5 0.0 47.5 0.00 0.0 14000 71.51 0.0
6 0.0 42.2 0.00 0.3 16110 63.24 0.0
7 1.2 42.2 2.04 2.5 24500 63.24 66.8
8 1.9 42.2 3.36 4.5 27510 63.24 110.2
9 2.1 42.2 3.69 6.7 29295 63.24 120.9
10 2.2 42.2 3.85 8.9 30377 63.24 126.2
11 3.4 42.2 5.89 15.0 32007 63.24 193.2
12 2.9 42.2 5.12 11.5 31240 63.24 167.9
13 2.8 42.2 4.91 8.6 30268 63.24 160.8
14 3.1 42.2 5.31 6.5 29196 63.24 174.2
15 2.9 42.2 5.02 4.7 27701 63.24 164.5
16 2.1 42.2 3.68 2.9 25279 63.24 120.5
17 1.8 47.5 2.28 2.2 23808 71.51 82.6
18 1.4 56.6 1.07 1.7 22469 85.94 45.5
19 0.0 64.6 0.00 0.0 14000 98.49 0.0
20 0.0 64.6 0.00 0.0 14000 98.49 0.0
21 0.0 44.0 0.00 0.0 14000 66.10 0.0
** Max Tensile Stress is checked with Effective Long Term Effective Modulus of Elasticity.

______________________________________________________________________________________________________________________
32 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.7 CRACK WIDTH CALCULATION


The calculation of crack width is done as per cl. 12.3.4 of IRC 112.
The crack width Wk is computed as
Wk = Sr,max (εsm - εcm)
where,
Wk = Crack Width
εsm = Mean Strain in Reinforcement Under Loads
εcm = Mean Strain in the Concrete between Cracks

where,
σsc = Stress in Tension Reinforcement
αe = Es/Ecm Long Term is Adopted
εcm = Mean Strain in the Concrete between Cracks
Es = Modulus of Elasticity of Steel
Ecm = Modulus of Elasticity of Concrete
ρp,eff = As/Ac,eff
Ac,eff = Effective Area of Concrete in Tension Surrounding
Ac,eff the reinforcement of Depth hcef
hcef = Lesser of 2.5(h-d);(h-x)/3;h/2
kt = Factor Dependent on Duration of Load

k1 = Factor for Bond Properties of the Bonded Reinf.


k1 = 0.8
k2 = Coefficient which takes account of the distribution of
strain
k2 = 0.5 For Bending

4𝐴2 𝑚2 + 8𝐴𝑚𝑏𝑑 − 2𝐴𝑚𝑏𝑑


𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑁𝑒𝑢𝑡𝑟𝑎𝑙 𝐴𝑥𝑖𝑠 =
2𝑏
where,
d= Effective Depth of Section
m = Es/Ec
b = Width of Section
A = Reinforcement Area

______________________________________________________________________________________________________________________
33 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

HOGGING MOMENTS CRACK WIDTH CHECK


H (OVERALL DEPTH OF
MQUASI PERMANENT Ac,eff σsc
SECTION ID DEPTH) NA
tm/m (mm) (mm) (mm2) (N/mm2)
1 -1.60 320 88.2 77257 44
2 -7.61 600 133.7 127500 98
3 -3.46 600 133.7 127500 45
4 -2.09 480 116.1 121306 35
5 -1.56 360 95.8 88062 37
6 -1.13 300 84.2 71922 33
7 -0.79 300 84.2 71922 23
8 -0.55 300 63.2 78919 32
9 -0.37 300 63.2 78919 21
10 -0.28 300 63.2 78919 16
11 -0.24 300 63.2 78919 14
12 -0.28 300 63.2 78919 16
13 -0.37 300 63.2 78919 21
14 -0.55 300 63.2 78919 32
15 -0.79 300 84.2 71922 23
16 -1.13 300 84.2 71922 33
17 -1.56 360 95.8 88062 37
18 -2.09 480 116.1 121306 35
19 -3.46 600 133.7 127500 45
20 -7.61 600 133.7 127500 98
21 -2.82 320 88.2 77257 77

Sr max Crack Width


SECTION ID εs-εm ρeff
(mm) (mm)
1 0.000131 0.0195 257.6 0.034
2 0.000295 0.0118 325.6 0.096
3 0.000134 0.0118 325.6 0.044
4 0.000105 0.0124 317.2 0.033
5 0.000110 0.0171 272.2 0.030
6 0.000100 0.0210 250.3 0.025
7 0.000070 0.0210 250.3 0.018
8 0.000095 0.0095 366.6 0.035
9 0.000063 0.0095 366.6 0.023
10 0.000048 0.0095 366.6 0.018
11 0.000041 0.0095 366.6 0.015
12 0.000048 0.0095 366.6 0.018
13 0.000063 0.0095 366.6 0.023
14 0.000095 0.0095 366.6 0.035
15 0.000070 0.0210 250.3 0.018
16 0.000100 0.0210 250.3 0.025
17 0.000110 0.0171 272.2 0.030
18 0.000105 0.0124 317.2 0.033
19 0.000134 0.0118 325.6 0.044
20 0.000295 0.0118 325.6 0.096
21 0.000230 0.0195 257.6 0.059

______________________________________________________________________________________________________________________
34 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

______________________________________________________________________________________________________________________
35 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SAGGING MOMENTS CRACK WIDTH CHECK


H (OVERALL DEPTH OF
MQUASI PERMANENT Ac,eff σsc
SECTION ID DEPTH) NA
2 2
tm/m (mm) (mm) (mm ) (N/mm )
1 0.00 320 66.1 84634 0
2 0.00 600 98.5 127500 0
3 0.00 600 98.5 127500 0
4 0.00 480 85.9 127500 0
5 0.00 360 71.5 96164 0
6 0.00 300 63.2 78919 0
7 0.00 300 63.2 78919 0
8 0.00 300 63.2 78919 0
9 0.00 300 63.2 78919 0
10 0.00 300 63.2 78919 0
11 0.00 300 63.2 78919 0
12 0.00 300 63.2 78919 0
13 0.00 300 63.2 78919 0
14 0.00 300 63.2 78919 0
15 0.00 300 63.2 78919 0
16 0.00 300 63.2 78919 0
17 0.00 360 71.5 96164 0
18 0.00 480 85.9 127500 0
19 0.00 600 98.5 127500 0
20 0.00 600 98.5 127500 0
21 0.00 320 66.1 84634 0

Sr max Crack Width


SECTION ID εs-εm ρeff
(mm) (mm)
1 0.000000 0.0089 382.1 0.000
2 0.000000 0.0059 498.1 0.000
3 0.000000 0.0059 498.1 0.000
4 0.000000 0.0059 498.1 0.000
5 0.000000 0.0078 413.3 0.000
6 0.000000 0.0095 366.6 0.000
7 0.000000 0.0095 366.6 0.000
8 0.000000 0.0095 366.6 0.000
9 0.000000 0.0095 366.6 0.000
10 0.000000 0.0095 366.6 0.000
11 0.000000 0.0095 366.6 0.000
12 0.000000 0.0095 366.6 0.000
13 0.000000 0.0095 366.6 0.000
14 0.000000 0.0095 366.6 0.000
15 0.000000 0.0095 366.6 0.000
16 0.000000 0.0095 366.6 0.000
17 0.000000 0.0078 413.3 0.000
18 0.000000 0.0059 498.1 0.000
19 0.000000 0.0059 498.1 0.000
20 0.000000 0.0059 498.1 0.000
21 0.000000 0.0089 382.1 0.000

______________________________________________________________________________________________________________________
36 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5 TRANSVERSE DESIGN OF DECK - WEB

5.1 MATERIAL PROPERTIES


2
Concrete Grade 50 N/mm
2
Ec 35000 N/mm
2
Fct 2.5 N/mm

Reinforcement
2
Fy 500 N/mm
2
Es 200000 N/mm

Clear Cover Top 45 mm


Clear Cover Bot 45 mm

5.2 SECTIONS FOR DESIGN


The following are the locations of Section Design

______________________________________________________________________________________________________________________
37 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.3 DESIGN FORCES


The followng design forces are obtained from the Analysis Model.
Wearing
Dead Load Crash Barrier 3CA A1 3CA A2 3CA A3 3CA A4
Section ID Course
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -1.38 -2.80 -0.40 -8.92 -9.26 5.37 2.37
2 -1.41 -2.26 -0.32 -7.10 -7.43 4.34 1.75
3 -1.44 -1.73 -0.25 -5.31 -5.64 3.33 1.14
4 -1.47 -1.20 -0.17 -3.53 -3.85 2.32 0.54
5 -1.50 -0.67 -0.10 -1.74 -2.06 1.31 -0.07
6 -1.54 0.22 0.03 1.23 0.92 -0.37 -1.08
7 1.38 2.80 0.40 9.98 9.70 -5.25 -3.99
8 1.41 2.26 0.32 8.16 7.87 -4.22 -3.37
9 1.44 1.73 0.25 6.37 6.08 -3.21 -2.77
10 1.47 1.20 0.17 4.59 4.29 -2.20 -2.16
11 1.50 0.67 0.10 2.80 2.50 -1.19 -1.55
12 1.54 -0.22 -0.03 -0.17 -0.48 0.50 -0.54

CA + C70R A1 CA + C70R A2 CA + C70R A3 70R A1 SV A1


Section ID
tm/m tm/m tm/m tm/m tm/m
1 3.52 -2.02 4.90 8.12 4.88
2 2.54 -2.12 3.74 6.54 3.94
3 1.58 -2.23 2.60 4.99 3.01
4 0.63 -2.33 1.45 3.45 2.08
5 -0.33 -2.43 0.31 1.90 1.16
6 -1.92 -2.60 -1.59 -0.67 -0.39
7 -6.48 -3.04 -7.08 -8.12 -4.85
8 -5.50 -2.94 -5.91 -6.54 -3.91
9 -4.55 -2.83 -4.77 -5.00 -2.98
10 -3.59 -2.73 -3.63 -3.45 -2.06
11 -2.63 -2.63 -2.49 -1.91 -1.13
12 -1.04 -2.46 -0.59 0.67 0.42

______________________________________________________________________________________________________________________
38 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SORTING OF RESULTS BASED ON HOGGING AND SAGGING BENDING MOMENT


HOGGING MOMENTS ONLY
CRASH WEARING
DEAD LOAD 3CA A1 3CA A2 3CA A3 3CA A4
SECTION ID BARRIER COURSE
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -1.38 -2.80 -0.40 -8.92 -9.26 0.00 0.00
2 -1.41 -2.26 -0.32 -7.10 -7.43 0.00 0.00
3 -1.44 -1.73 -0.25 -5.31 -5.64 0.00 0.00
4 -1.47 -1.20 -0.17 -3.53 -3.85 0.00 0.00
5 -1.50 -0.67 -0.10 -1.74 -2.06 0.00 -0.07
6 -1.54 0.22 0.03 0.00 0.00 -0.37 -1.08
7 1.38 2.80 0.40 0.00 0.00 -5.25 -3.99
8 1.41 2.26 0.32 0.00 0.00 -4.22 -3.37
9 1.44 1.73 0.25 0.00 0.00 -3.21 -2.77
10 1.47 1.20 0.17 0.00 0.00 -2.20 -2.16
11 1.50 0.67 0.10 0.00 0.00 -1.19 -1.55
12 1.54 -0.22 -0.03 -0.17 -0.48 0.00 -0.54
HOGGING MOMENTS ONLY
CA + C70R A1 CA + C70R A2 CA + C70R A3 70R A1 SV A1
SECTION ID
tm/m tm/m tm/m tm/m tm/m
1 0.00 -2.02 0.00 0.00 0.00
2 0.00 -2.12 0.00 0.00 0.00
3 0.00 -2.23 0.00 0.00 0.00
4 0.00 -2.33 0.00 0.00 0.00
5 -0.33 -2.43 0.00 0.00 0.00
6 -1.92 -2.60 -1.59 -0.67 -0.39
7 -6.48 -3.04 -7.08 -8.12 -4.85
8 -5.50 -2.94 -5.91 -6.54 -3.91
9 -4.55 -2.83 -4.77 -5.00 -2.98
10 -3.59 -2.73 -3.63 -3.45 -2.06
11 -2.63 -2.63 -2.49 -1.91 -1.13
12 -1.04 -2.46 -0.59 0.00 0.00

______________________________________________________________________________________________________________________
39 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

______________________________________________________________________________________________________________________
40 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SAGGING MOMENTS ONLY


CRASH WEARING
DEAD LOAD 3CA A1 3CA A2 3CA A3 3CA A4
SECTION ID BARRIER COURSE
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -1.38 -2.80 -0.40 0.00 0.00 5.37 2.37
2 -1.41 -2.26 -0.32 0.00 0.00 4.34 1.75
3 -1.44 -1.73 -0.25 0.00 0.00 3.33 1.14
4 -1.47 -1.20 -0.17 0.00 0.00 2.32 0.54
5 -1.50 -0.67 -0.10 0.00 0.00 1.31 0.00
6 -1.54 0.22 0.03 1.23 0.92 0.00 0.00
7 1.38 2.80 0.40 9.98 9.70 0.00 0.00
8 1.41 2.26 0.32 8.16 7.87 0.00 0.00
9 1.44 1.73 0.25 6.37 6.08 0.00 0.00
10 1.47 1.20 0.17 4.59 4.29 0.00 0.00
11 1.50 0.67 0.10 2.80 2.50 0.00 0.00
12 1.54 -0.22 -0.03 0.00 0.00 0.50 0.00
SAGGING MOMENTS ONLY
CA + C70R A1 CA + C70R A2 CA + C70R A3 70R A1 SV A1
SECTION ID
tm/m tm/m tm/m tm/m tm/m
1 3.52 0.00 4.90 8.12 4.88
2 2.54 0.00 3.74 6.54 3.94
3 1.58 0.00 2.60 4.99 3.01
4 0.63 0.00 1.45 3.45 2.08
5 0.00 0.00 0.31 1.90 1.16
6 0.00 0.00 0.00 0.00 0.00
7 0.00 0.00 0.00 0.00 0.00
8 0.00 0.00 0.00 0.00 0.00
9 0.00 0.00 0.00 0.00 0.00
10 0.00 0.00 0.00 0.00 0.00
11 0.00 0.00 0.00 0.00 0.00
12 0.00 0.00 0.00 0.67 0.42

______________________________________________________________________________________________________________________
41 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SUMMARY OF MOMENTS
CRASH WEARING LL HOGGING LL SAGGING SV HOGGING SV SAGGING
DEAD LOAD
SECTION ID BARRIER COURSE MOMENTS MOMENTS MOMENTS MOMENTS
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -1.38 -2.80 -0.40 -9.26 8.12 0.00 4.88
2 -1.41 -2.26 -0.32 -7.43 6.54 0.00 3.94
3 -1.44 -1.73 -0.25 -5.64 4.99 0.00 3.01
4 -1.47 -1.20 -0.17 -3.85 3.45 0.00 2.08
5 -1.50 -0.67 -0.10 -2.43 1.90 0.00 1.16
6 -1.54 0.22 0.03 -2.60 1.23 -0.39 0.00
7 1.38 2.80 0.40 -8.12 9.98 -4.85 0.00
8 1.41 2.26 0.32 -6.54 8.16 -3.91 0.00
9 1.44 1.73 0.25 -5.00 6.37 -2.98 0.00
10 1.47 1.20 0.17 -3.63 4.59 -2.06 0.00
11 1.50 0.67 0.10 -2.63 2.80 -1.13 0.00
12 1.54 -0.22 -0.03 -2.46 0.67 0.00 0.42

SUMMARY OF HOGGING MOMENTS


SLS STRESS SLS CRACK RATIO OF LIVE
ULS
SECTION ID CHECK WIDTH LOAD / DEAD +
SIDL
tm/m tm/m tm/m
1 -20.07 -13.92 -4.66 2.02
2 -16.53 -11.48 -4.05 1.86
3 -13.08 -9.11 -3.47 1.65
4 -9.61 -6.72 -2.87 1.36
5 -6.71 -4.72 -2.29 1.07
6 -5.73 -3.89 -1.29 2.02
7 -7.60 -3.54 4.58 1.77
8 -5.82 -2.55 3.99 1.64
9 -4.08 -1.58 3.42 1.46
10 -2.61 -0.79 2.84 1.28
11 -1.68 -0.36 2.27 1.16
12 -2.49 -1.18 1.28 1.91

______________________________________________________________________________________________________________________
42 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SUMMARY OF SAGGING MOMENTS


SLS STRESS SLS CRACK RATIO OF LIVE
ULS
SECTION ID CHECK WIDTH LOAD / DEAD +
tm/m tm/m tm/m SIDL
1 7.60 3.54 -4.58 1.77
2 5.82 2.55 -3.99 1.64
3 4.07 1.57 -3.42 1.46
4 2.34 0.61 -2.84 1.21
5 0.58 -0.37 -2.27 0.84
6 0.64 -0.05 -1.28 0.95
7 21.15 14.64 4.66 2.18
8 17.63 12.21 4.05 2.05
9 14.17 9.84 3.47 1.86
10 10.72 7.46 2.87 1.62
11 7.26 5.09 2.29 1.23
12 2.83 1.96 1.29 0.52

5.4 PROVIDED REINFORCEMENT


REINFORCEMENT FOR HOGGING MOMENT
DIAMETER SPACING OF DIAMETER SPACING OF REINFORCE
DEPTH CLEAR COVER
SECTION ID (BAR 1) BAR 1 (BAR 2) BAR 2 MENT
(mm) (mm) (mm) (mm) (mm) mm2 mm
1 600 16 175 200 1148 45
2 600 16 175 200 1148 45
3 600 16 175 200 1148 45
4 600 16 175 200 1148 45
5 600 16 175 200 1148 45
6 600 16 175 200 1148 45
7 600 16 175 200 1148 45
8 600 16 175 200 1148 45
9 600 16 175 200 1148 45
10 600 16 175 200 1148 45
11 600 16 175 200 1148 45
12 600 16 175 200 1148 45

______________________________________________________________________________________________________________________
43 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

REINFORCEMENT FOR SAGGING MOMENT


DIAMETER SPACING OF DIAMETER SPACING OF REINFORCE
DEPTH CLEAR COVER
SECTION ID (BAR 1) BAR 1 (BAR 2) BAR 2 MENT

(mm) (mm) (mm) (mm) (mm) mm2 mm


1 600 16 175 200 1148 45
2 600 16 175 200 1148 45
3 600 16 175 200 1148 45
4 600 16 175 200 1148 45
5 600 16 175 200 1148 45
6 600 16 175 200 1148 45
7 600 16 175 200 1148 45
8 600 16 175 200 1148 45
9 600 16 175 200 1148 45
10 600 16 175 200 1148 45
11 600 16 175 200 1148 45
12 600 16 175 200 1148 45

5.5 ULS CHECK


The ULS check for flexure is done as per IRC 112.
The following formulations are used.

DEPTH OF NEUTRAL AXIS (ULTIMATE LIMIT STATE) AND STRAIN/STRESS DIAGRAM

Compression Force = .36 x Fck x Width x Depth of Neutral Axis


Tension Force = .87 x Fy x Ast
where
Fck = Characteristic Compressive Strength of Concrete
Fy = Yield Strength of Reinforcement
x (Depth of NA) = .87 x Fy x Ast / ( .36 x Fck x b )
where,
Fy = Yield Strength of Reinforcement
Ast = Area of Tension Steel
Fck = Compressive strength of Concrete
b = Width of Section

______________________________________________________________________________________________________________________
44 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

Moment of Resistance is calculated as Tension Force x Level Arm.

HOGGING MOMENT ULS CHECK


REINFORCEMEN DEPTH OF MOMENT
MULS WIDTH DEPTH
SECTION ID T NA CAPACITY
tm/m mm mm mm2 mm tm/m
1 20.1 1000 600 1148 27.8 27.67
2 16.5 1000 600 1148 27.8 27.67
3 13.1 1000 600 1148 27.8 27.67
4 9.6 1000 600 1148 27.8 27.67
5 6.7 1000 600 1148 27.8 27.67
6 5.7 1000 600 1148 27.8 27.67
7 7.6 1000 600 1148 27.8 27.67
8 5.8 1000 600 1148 27.8 27.67
9 4.1 1000 600 1148 27.8 27.67
10 2.6 1000 600 1148 27.8 27.67
11 1.7 1000 600 1148 27.8 27.67
12 2.5 1000 600 1148 27.8 27.67

SAGGING MOMENT ULS CHECK


REINFORCEMEN DEPTH OF MOMENT
MULS WIDTH DEPTH
SECTION ID T NA CAPACITY
tm/m mm mm mm2 mm tm/m
1 7.6 1000 600 1148 27.8 27.67
2 5.8 1000 600 1148 27.8 27.67
3 4.1 1000 600 1148 27.8 27.67
4 2.3 1000 600 1148 27.8 27.67
5 0.6 1000 600 1148 27.8 27.67
6 0.6 1000 600 1148 27.8 27.67
7 21.2 1000 600 1148 27.8 27.67
8 17.6 1000 600 1148 27.8 27.67
9 14.2 1000 600 1148 27.8 27.67
10 10.7 1000 600 1148 27.8 27.67
11 7.3 1000 600 1148 27.8 27.67
12 2.8 1000 600 1148 27.8 27.67

______________________________________________________________________________________________________________________
45 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.6 STRESS CHECK


The Stress check of Concrete is done with short term modular ratio and the stress check in steel is done with long term modular ratio.

m(Es/Ec) Short Term 5.714


Creep Factor (Phi) 1.5
m(Es/Ec) Long Term 14.29

The following formulations are used.

DEPTH OF NEUTRAL AXIS (SERVICE LIMIT STATE) AND STRAIN/STRESS DIAGRAM Compression
Ec εc

Ccg
Depth of Neutral
Axis
Tcg

εs Es εs

Tension
Strain Profile Stress Profile
εc = Maximum Compression Strain
εs = Maximum Tension Strain
Ec εc = Maximum Compression Stress
Es εs = Maximum Tension Stress

4𝐴2 𝑚2 + 8𝐴𝑚𝑏𝑑 − 2𝐴𝑚𝑏𝑑


𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑁𝑒𝑢𝑡𝑟𝑎𝑙 𝐴𝑥𝑖𝑠 =
2𝑏
where,
d= Effective Depth of Section
m = Es/Ec
b = Width of Section
A = Reinforcement Area

For Load Combinations without live load


For load combinations with live load, the effective E is calculated using the following equation.

where,
Mqp is the Moment due to the sustained Loads
Mst is the Moment due to the Live Load
φ is the creep factor

The stress in concrete would be critical in short term and the stress in steel would be critical in long term.

______________________________________________________________________________________________________________________
46 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS


SUSTAINED LOADS SHORT TERM WITH LONG TERM EFFECTIVE Ec

MAX. COMP. EFFECTIVE DEPTH OF MAX. TENSILE


MSUSTAINED DEPTH OF NA Ec,eff
SECTION ID STRESS MODULAR NA STRESS
RATIO
tm/m mm N/mm2 N/mm2 mm N/mm2
1 -4.7 78.4 2.24 11667 17.1 128.4 79.0
2 -4.1 78.4 1.95 11667 17.1 128.4 68.7
3 -3.5 78.4 1.67 11667 17.1 128.4 58.8
4 -2.9 78.4 1.38 11667 17.1 128.4 48.7
5 -2.3 78.4 1.10 11667 17.1 128.4 38.8
6 -1.3 78.4 0.62 11667 17.1 128.4 21.8
7 4.7 78.4 2.01 11667 17.1 128.4 79.0
8 4.1 78.4 1.75 11667 17.1 128.4 68.7
9 3.5 78.4 1.50 11667 17.1 128.4 58.8
10 2.9 78.4 1.24 11667 17.1 128.4 48.7
11 2.3 78.4 0.99 11667 17.1 128.4 38.8
12 1.3 78.4 0.55 11667 17.1 128.4 21.8
STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS + LIVE LOAD (RARE COMBINATION)
HOGGING MOMENT CHECK SHORT TERM WITH LONG TERM EFFECTIVE Ec

MAX. COMP. DEPTH OF MAX. TENSILE


MRARE DEPTH OF NA RATIO OF LIVE Ec,eff
SECTION ID STRESS NA STRESS
LOAD / DL + SIDL
tm/m mm N/mm2 N/mm2 mm N/mm2
1 -13.9 78.4 6.69 2.0 23390 94.29 230.6
2 -11.5 78.4 5.52 1.9 22965 94.29 190.3
3 -9.1 78.4 4.38 1.6 22347 94.29 150.9
4 -6.7 78.4 3.23 1.4 21384 94.29 111.4
5 -4.7 78.4 2.27 1.1 20296 94.29 78.2
6 -3.9 78.4 1.87 2.0 23373 94.29 64.5
7 -3.5 78.4 1.70 1.8 22713 94.29 58.7
8 -2.6 78.4 1.22 1.6 22316 94.29 42.3
9 -1.6 78.4 0.76 1.5 21749 94.29 26.2
10 -0.8 78.4 0.38 1.3 21104 94.29 13.1
11 -0.4 78.4 0.17 1.2 20650 94.29 6.0
12 -1.2 78.4 0.56 1.9 23087 94.29 19.5
** Max Tensile Stress is checked with Effective Long Term Effective Modulus of Elasticity.

______________________________________________________________________________________________________________________
47 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS + LIVE LOAD (RARE COMBINATION)
SAGGING MOMENT CHECK SHORT TERM WITH LONG TERM EFFECTIVE Ec
MAX. COMP. DEPTH OF MAX. TENSILE
MRARE DEPTH OF NA RATIO OF LIVE Ec,eff
SECTION ID STRESS NA STRESS
LOAD / DL + SIDL
tm/m mm N/mm2 N/mm2 mm N/mm2
1 3.5 78.4 1.53 1.8 22713 95.55 58.7
2 2.6 78.4 1.10 1.6 22316 95.55 42.3
3 1.6 78.4 0.68 1.5 21739 95.55 26.0
4 0.6 78.4 0.26 1.2 20867 95.55 10.1
5 0.0 78.4 0.00 0.8 19267 95.55 0.0
6 0.0 78.4 0.00 1.0 19798 95.55 0.0
7 14.6 78.4 6.33 2.2 23780 95.55 242.8
8 12.2 78.4 5.28 2.0 23449 95.55 202.5
9 9.8 78.4 4.25 1.9 22966 95.55 163.2
10 7.5 78.4 3.23 1.6 22246 95.55 123.8
11 5.1 78.4 2.20 1.2 20938 95.55 84.4
12 2.0 78.4 0.85 0.5 17612 95.55 32.5
** Max Tensile Stress is checked with Effective Long Term Effective Modulus of Elasticity.
5.7 CRACK WIDTH CALCULATION
The calculation of crack width is done as per cl. 12.3.4 of IRC 112.
The crack width Wk is computed as
Wk = Sr,max (εsm - εcm)
where,
Wk = Crack Width
εsm = Mean Strain in Reinforcement Under Loads
εcm = Mean Strain in the Concrete between Cracks

where,
σsc = Stress in Tension Reinforcement
αe = Es/Ecm Long Term is Adopted
εcm = Mean Strain in the Concrete between Cracks
Es = Modulus of Elasticity of Steel
Ecm = Modulus of Elasticity of Concrete
ρp,eff = As/Ac,eff
Ac,eff = Effective Area of Concrete in Tension Surrounding
Ac,eff the reinforcement of Depth hcef
hcef = Lesser of 2.5(h-d);(h-x)/3;h/2
kt = Factor Dependent on Duration of Load

______________________________________________________________________________________________________________________
48 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

k1 = Factor for Bond Properties of the Bonded Reinf.


k1 = 0.8
k2 = Coefficient which takes account of the distribution of
strain
k2 = 0.5 For Bending

4𝐴2 𝑚2 + 8𝐴𝑚𝑏𝑑 − 2𝐴𝑚𝑏𝑑


𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑁𝑒𝑢𝑡𝑟𝑎𝑙 𝐴𝑥𝑖𝑠 =
2𝑏
where,
d= Effective Depth of Section
m = Es/Ec
b = Width of Section
A = Reinforcement Area

HOGGING MOMENTS CRACK WIDTH CHECK


H (OVERALL DEPTH OF
MQUASI PERMANENT Ac,eff σsc
SECTION ID DEPTH) NA
tm/m (mm) (mm) (mm2) (N/mm2)
1 -4.66 600 118.6 132500 78
2 -4.05 600 118.6 132500 68
3 -3.47 600 118.6 132500 58
4 -2.87 600 118.6 132500 48
5 -2.29 600 118.6 132500 39
6 -1.29 600 118.6 132500 22
7 0.00 600 118.6 132500 0
8 0.00 600 118.6 132500 0
9 0.00 600 118.6 132500 0
10 0.00 600 118.6 132500 0
11 0.00 600 118.6 132500 0
12 0.00 600 118.6 132500 0

Sr max Crack Width


SECTION ID εs-εm ρeff
(mm) (mm)
1 0.000235 0.0087 466.8 0.110
2 0.000205 0.0087 466.8 0.096
3 0.000175 0.0087 466.8 0.082
4 0.000145 0.0087 466.8 0.068
5 0.000116 0.0087 466.8 0.054
6 0.000065 0.0087 466.8 0.030
7 0.000000 0.0087 466.8 0.000
8 0.000000 0.0087 466.8 0.000
9 0.000000 0.0087 466.8 0.000
10 0.000000 0.0087 466.8 0.000
11 0.000000 0.0087 466.8 0.000
12 0.000000 0.0087 466.8 0.000

______________________________________________________________________________________________________________________
49 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 200m 50+100+50
length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH-07 (old Document no. CIPL-MJB-1+055.734-DGN-008
NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SAGGING MOMENTS CRACK WIDTH CHECK


H (OVERALL DEPTH OF
MQUASI PERMANENT Ac,eff σsc
SECTION ID DEPTH) NA
tm/m (mm) (mm) (mm2) (N/mm2)
1 0.00 600 118.6 132500 0
2 0.00 600 118.6 132500 0
3 0.00 600 118.6 132500 0
4 0.00 600 118.6 132500 0
5 0.00 600 118.6 132500 0
6 0.00 600 118.6 132500 0
7 4.66 600 118.6 132500 78
8 4.05 600 118.6 132500 68
9 3.47 600 118.6 132500 58
10 2.87 600 118.6 132500 48
11 2.29 600 118.6 132500 39
12 1.29 600 118.6 132500 22

Sr max Crack Width


SECTION ID εs-εm ρeff
(mm) (mm)
1 0.000000 0.0087 466.8 0.000
2 0.000000 0.0087 466.8 0.000
3 0.000000 0.0087 466.8 0.000
4 0.000000 0.0087 466.8 0.000
5 0.000000 0.0087 466.8 0.000
6 0.000000 0.0087 466.8 0.000
7 0.000235 0.0087 466.8 0.110
8 0.000205 0.0087 466.8 0.096
9 0.000175 0.0087 466.8 0.082
10 0.000145 0.0087 466.8 0.068
11 0.000116 0.0087 466.8 0.054
12 0.000065 0.0087 466.8 0.030

______________________________________________________________________________________________________________________
50 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5 TRANSVERSE DESIGN OF DECK - BOTTOM FLANGE

5.1 MATERIAL PROPERTIES


2
Concrete Grade 50 N/mm
2
Ec 35000 N/mm
2
Fct 2.5 N/mm

Reinforcement
2
Fy 500 N/mm
2
Es 200000 N/mm

Clear Cover Top 45 mm


Clear Cover Bot 45 mm

5.2 SECTIONS FOR DESIGN


The following are the locations of Section Design

______________________________________________________________________________________________________________________
51 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.3 DESIGN FORCES


The followng design forces are obtained from the Analysis Model.
Wearing
Dead Load Crash Barrier 3CA A1 3CA A2 3CA A3 3CA A4
Section ID Course
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -0.16 0.66 0.09 2.67 2.39 -1.23 -1.50
2 1.60 0.70 0.10 2.74 2.52 -1.32 -1.42
3 3.26 0.70 0.10 2.63 2.47 -1.34 -1.25
4 4.37 0.70 0.10 2.52 2.43 -1.35 -1.08
5 4.92 0.70 0.10 2.41 2.38 -1.36 -0.92
6 4.99 0.70 0.10 2.35 2.36 -1.37 -0.83
7 4.92 0.70 0.10 2.30 2.33 -1.37 -0.75
8 4.37 0.70 0.10 2.19 2.29 -1.39 -0.58
9 3.26 0.70 0.10 2.08 2.24 -1.40 -0.41
10 1.60 0.70 0.10 1.97 2.20 -1.41 -0.25
11 -0.16 0.66 0.09 1.72 2.00 -1.33 -0.06

CA + C70R A1 CA + C70R A2 CA + C70R A3 70R A1 SV A1


Section ID
tm/m tm/m tm/m tm/m tm/m
1 -2.55 -2.41 -2.42 -1.96 -1.16
2 -2.39 -2.00 -2.34 -2.10 -1.25
3 -2.09 -1.48 -2.12 -2.10 -1.25
4 -1.78 -0.95 -1.89 -2.10 -1.25
5 -1.48 -0.43 -1.67 -2.10 -1.26
6 -1.32 -0.17 -1.55 -2.10 -1.26
7 -1.17 0.09 -1.44 -2.10 -1.26
8 -0.86 0.61 -1.22 -2.10 -1.26
9 -0.56 1.13 -0.99 -2.10 -1.26
10 -0.25 1.66 -0.77 -2.10 -1.27
11 0.08 2.09 -0.49 -1.96 -1.19

______________________________________________________________________________________________________________________
52 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SORTING OF RESULTS BASED ON HOGGING AND SAGGING BENDING MOMENT


HOGGING MOMENTS ONLY
CRASH WEARING
DEAD LOAD 3CA A1 3CA A2 3CA A3 3CA A4
SECTION ID BARRIER COURSE
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -0.16 0.66 0.09 0.00 0.00 -1.23 -1.50
2 1.60 0.70 0.10 0.00 0.00 -1.32 -1.42
3 3.26 0.70 0.10 0.00 0.00 -1.34 -1.25
4 4.37 0.70 0.10 0.00 0.00 -1.35 -1.08
5 4.92 0.70 0.10 0.00 0.00 -1.36 -0.92
6 4.99 0.70 0.10 0.00 0.00 -1.37 -0.83
7 4.92 0.70 0.10 0.00 0.00 -1.37 -0.75
8 4.37 0.70 0.10 0.00 0.00 -1.39 -0.58
9 3.26 0.70 0.10 0.00 0.00 -1.40 -0.41
10 1.60 0.70 0.10 0.00 0.00 -1.41 -0.25
11 -0.16 0.66 0.09 0.00 0.00 -1.33 -0.06
HOGGING MOMENTS ONLY
CA + C70R A1 CA + C70R A2 CA + C70R A3 70R A1 SV A1
SECTION ID
tm/m tm/m tm/m tm/m tm/m
1 -2.55 -2.41 -2.42 -1.96 -1.16
2 -2.39 -2.00 -2.34 -2.10 -1.25
3 -2.09 -1.48 -2.12 -2.10 -1.25
4 -1.78 -0.95 -1.89 -2.10 -1.25
5 -1.48 -0.43 -1.67 -2.10 -1.26
6 -1.32 -0.17 -1.55 -2.10 -1.26
7 -1.17 0.00 -1.44 -2.10 -1.26
8 -0.86 0.00 -1.22 -2.10 -1.26
9 -0.56 0.00 -0.99 -2.10 -1.26
10 -0.25 0.00 -0.77 -2.10 -1.27
11 0.00 0.00 -0.49 -1.96 -1.19

______________________________________________________________________________________________________________________
53 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

______________________________________________________________________________________________________________________
54 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SAGGING MOMENTS ONLY


CRASH WEARING
DEAD LOAD 3CA A1 3CA A2 3CA A3 3CA A4
SECTION ID BARRIER COURSE
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -0.16 0.66 0.09 2.67 2.39 0.00 0.00
2 1.60 0.70 0.10 2.74 2.52 0.00 0.00
3 3.26 0.70 0.10 2.63 2.47 0.00 0.00
4 4.37 0.70 0.10 2.52 2.43 0.00 0.00
5 4.92 0.70 0.10 2.41 2.38 0.00 0.00
6 4.99 0.70 0.10 2.35 2.36 0.00 0.00
7 4.92 0.70 0.10 2.30 2.33 0.00 0.00
8 4.37 0.70 0.10 2.19 2.29 0.00 0.00
9 3.26 0.70 0.10 2.08 2.24 0.00 0.00
10 1.60 0.70 0.10 1.97 2.20 0.00 0.00
11 -0.16 0.66 0.09 1.72 2.00 0.00 0.00
SAGGING MOMENTS ONLY
CA + C70R A1 CA + C70R A2 CA + C70R A3 70R A1 SV A1
SECTION ID
tm/m tm/m tm/m tm/m tm/m
1 0.00 0.00 0.00 0.00 0.00
2 0.00 0.00 0.00 0.00 0.00
3 0.00 0.00 0.00 0.00 0.00
4 0.00 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00 0.00
7 0.00 0.09 0.00 0.00 0.00
8 0.00 0.61 0.00 0.00 0.00
9 0.00 1.13 0.00 0.00 0.00
10 0.00 1.66 0.00 0.00 0.00
11 0.08 2.09 0.00 0.00 0.00

______________________________________________________________________________________________________________________
55 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SUMMARY OF MOMENTS
CRASH WEARING LL HOGGING LL SAGGING SV HOGGING SV SAGGING
DEAD LOAD
SECTION ID BARRIER COURSE MOMENTS MOMENTS MOMENTS MOMENTS
tm/m tm/m tm/m tm/m tm/m tm/m tm/m
1 -0.16 0.66 0.09 -2.55 2.67 -1.16 0.00
2 1.60 0.70 0.10 -2.39 2.74 -1.25 0.00
3 3.26 0.70 0.10 -2.12 2.63 -1.25 0.00
4 4.37 0.70 0.10 -2.10 2.52 -1.25 0.00
5 4.92 0.70 0.10 -2.10 2.41 -1.26 0.00
6 4.99 0.70 0.10 -2.10 2.36 -1.26 0.00
7 4.92 0.70 0.10 -2.10 2.33 -1.26 0.00
8 4.37 0.70 0.10 -2.10 2.29 -1.26 0.00
9 3.26 0.70 0.10 -2.10 2.24 -1.26 0.00
10 1.60 0.70 0.10 -2.10 2.20 -1.27 0.00
11 -0.16 0.66 0.09 -1.96 2.09 -1.19 0.00

SUMMARY OF HOGGING MOMENTS


SLS STRESS SLS CRACK RATIO OF LIVE
ULS
SECTION ID CHECK WIDTH LOAD / DEAD +
SIDL
tm/m tm/m tm/m
1 -3.29 -1.96 0.59 4.32
2 -1.19 0.01 2.40 1.00
3 0.88 1.94 4.06 0.52
4 2.02 3.07 5.17 0.41
5 2.57 3.62 5.72 0.37
6 2.64 3.69 5.79 0.36
7 2.57 3.62 5.72 0.37
8 2.02 3.07 5.17 0.41
9 0.91 1.96 4.06 0.52
10 -0.75 0.30 2.40 0.88
11 -2.41 -1.37 0.59 3.32

SUMMARY OF SAGGING MOMENTS


SLS STRESS SLS CRACK RATIO OF LIVE
ULS
SECTION ID CHECK WIDTH LOAD / DEAD +
tm/m tm/m tm/m SIDL
1 4.86 3.28 0.61 4.53
2 7.35 5.16 2.42 1.14
3 9.43 6.71 4.08 0.65
4 10.76 7.71 5.19 0.49
5 11.34 8.15 5.74 0.42
6 11.36 8.17 5.81 0.41
7 11.22 8.07 5.74 0.41
8 10.41 7.48 5.19 0.44
9 8.84 6.32 4.08 0.55
10 6.54 4.62 2.42 0.92
11 3.99 2.70 0.61 3.54

______________________________________________________________________________________________________________________
56 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.4 PROVIDED REINFORCEMENT


REINFORCEMENT FOR HOGGING MOMENT
DIAMETER SPACING OF DIAMETER SPACING OF REINFORCE
DEPTH CLEAR COVER
SECTION ID (BAR 1) BAR 1 (BAR 2) BAR 2 MENT
(mm) (mm) (mm) (mm) (mm) mm2 mm
1 700 10 175 200 449 45
2 700 10 175 200 449 45
3 700 10 175 200 449 45
4 700 10 175 200 449 45
5 700 10 175 200 449 45
6 700 10 175 200 449 45
7 700 10 175 200 449 45
8 700 10 175 200 449 45
9 700 10 175 200 449 45
10 700 10 175 200 449 45
11 700 10 175 200 449 45

REINFORCEMENT FOR SAGGING MOMENT


DIAMETER SPACING OF DIAMETER SPACING OF REINFORCE
DEPTH CLEAR COVER
SECTION ID (BAR 1) BAR 1 (BAR 2) BAR 2 MENT
2
(mm) (mm) (mm) (mm) (mm) mm mm
1 700 12 175 200 646 45
2 700 12 175 200 646 45
3 700 12 175 200 646 45
4 700 12 175 200 646 45
5 700 12 175 200 646 45
6 700 12 175 200 646 45
7 700 12 175 200 646 45
8 700 12 175 200 646 45
9 700 12 175 200 646 45
10 700 12 175 200 646 45
11 700 12 175 200 646 45

______________________________________________________________________________________________________________________
57 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.5 ULS CHECK


The ULS check for flexure is done as per IRC 112.
The following formulations are used.

DEPTH OF NEUTRAL AXIS (ULTIMATE LIMIT STATE) AND STRAIN/STRESS DIAGRAM

Compression Force = .36 x Fck x Width x Depth of Neutral Axis


Tension Force = .87 x Fy x Ast
where
Fck = Characteristic Compressive Strength of Concrete
Fy = Yield Strength of Reinforcement
x (Depth of NA)= .87 x Fy x Ast / ( .36 x Fck x b )
where,
Fy = Yield Strength of Reinforcement
Ast = Area of Tension Steel
Fck = Compressive strength of Concrete
b = Width of Section

Moment of Resistance is calculated as Tension Force x Level Arm.

HOGGING MOMENT ULS CHECK


REINFORCEMEN DEPTH OF MOMENT
MULS WIDTH DEPTH
SECTION ID T NA CAPACITY
tm/m mm mm mm2 mm tm/m
1 3.3 1000 700 449 10.8 12.94
2 1.2 1000 700 449 10.8 12.94
3 0.0 1000 700 449 10.8 12.94
4 0.0 1000 700 449 10.8 12.94
5 0.0 1000 700 449 10.8 12.94
6 0.0 1000 700 449 10.8 12.94
7 0.0 1000 700 449 10.8 12.94
8 0.0 1000 700 449 10.8 12.94
9 0.0 1000 700 449 10.8 12.94
10 0.8 1000 700 449 10.8 12.94
11 2.4 1000 700 449 10.8 12.94

______________________________________________________________________________________________________________________
58 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SAGGING MOMENT ULS CHECK


REINFORCEMEN DEPTH OF MOMENT
MULS WIDTH DEPTH
SECTION ID T NA CAPACITY
tm/m mm mm mm2 mm tm/m
1 4.9 1000 700 646 15.6 18.57
2 7.4 1000 700 646 15.6 18.57
3 9.4 1000 700 646 15.6 18.57
4 10.8 1000 700 646 15.6 18.57
5 11.3 1000 700 646 15.6 18.57
6 11.4 1000 700 646 15.6 18.57
7 11.2 1000 700 646 15.6 18.57
8 10.4 1000 700 646 15.6 18.57
9 8.8 1000 700 646 15.6 18.57
10 6.5 1000 700 646 15.6 18.57
11 4.0 1000 700 646 15.6 18.57
5.6 STRESS CHECK
The Stress check of Concrete is done with short term modular ratio and the stress check in steel is done with long term modular ratio.

m(Es/Ec) Short Term 5.714


Creep Factor (Phi) 1.5
m(Es/Ec) Long Term 14.29

The following formulations are used.

DEPTH OF NEUTRAL AXIS (SERVICE LIMIT STATE) AND STRAIN/STRESS DIAGRAM Compression
Ec εc

Ccg
Depth of Neutral
Axis
Tcg

εs Es εs

Tension
Strain Profile Stress Profile
εc = Maximum Compression Strain
εs = Maximum Tension Strain
Ec εc = Maximum Compression Stress
Es εs = Maximum Tension Stress

4𝐴2 𝑚2 + 8𝐴𝑚𝑏𝑑 − 2𝐴𝑚𝑏𝑑


𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑁𝑒𝑢𝑡𝑟𝑎𝑙 𝐴𝑥𝑖𝑠 =
2𝑏

______________________________________________________________________________________________________________________
59 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

where,
d= Effective Depth of Section
m = Es/Ec
b = Width of Section
A = Reinforcement Area

For Load Combinations without live load


For load combinations with live load, the effective E is calculated using the following equation.

where,
Mqp is the Moment due to the sustained Loads
Mst is the Moment due to the Live Load
φ is the creep factor

The stress in concrete would be critical in short term and the stress in steel would be critical in long term.

STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS


SUSTAINED LOADS SHORT TERM WITH LONG TERM EFFECTIVE Ec

MAX. COMP. EFFECTIVE DEPTH OF MAX. TENSILE


MSUSTAINED DEPTH OF NA Ec,eff
SECTION ID STRESS MODULAR NA STRESS
RATIO
tm/m mm N/mm2 N/mm2 mm N/mm2
1 0.6 65.6 0.29 11667 17.1 109.3 15.1
2 2.4 65.6 1.15 11667 17.1 109.3 60.0
3 4.1 65.6 1.95 11667 17.1 109.3 101.2
4 5.2 65.6 2.47 11667 17.1 109.3 128.7
5 5.7 65.6 2.74 11667 17.1 109.3 142.3
6 5.8 65.6 2.77 11667 17.1 109.3 144.0
7 5.7 65.6 2.55 11667 17.1 109.3 142.3
8 5.2 65.6 2.30 11667 17.1 109.3 128.7
9 4.1 65.6 1.81 11667 17.1 109.3 101.2
10 2.4 65.6 1.07 11667 17.1 109.3 60.0
11 0.6 65.6 0.27 11667 17.1 109.3 15.1

______________________________________________________________________________________________________________________
60 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS + LIVE LOAD (RARE COMBINATION)
HOGGING MOMENT CHECK SHORT TERM WITH LONG TERM EFFECTIVE Ec

MAX. COMP. RATIO OF LIVE DEPTH OF MAX. TENSILE


MRARE DEPTH OF NA Ec,eff
SECTION ID STRESS LOAD / DL + NA STRESS
SIDL
tm/m mm N/mm2 N/mm2 mm N/mm2
1 -2.0 55.2 1.10 4.3 27304 62.15 68.1
2 0.0 65.6 0.00 1.0 19982 73.78 0.0
3 0.0 65.6 0.00 0.5 17628 73.78 0.0
4 0.0 65.6 0.00 0.4 16935 73.78 0.0
5 0.0 65.6 0.00 0.4 16689 73.78 0.0
6 0.0 65.6 0.00 0.4 16661 73.78 0.0
7 0.0 65.6 0.00 0.4 16689 73.78 0.0
8 0.0 65.6 0.00 0.4 16935 73.78 0.0
9 0.0 65.6 0.00 0.5 17600 73.78 0.0
10 0.0 65.6 0.00 0.9 19444 73.78 0.0
11 -1.4 55.2 0.77 3.3 25983 62.15 47.6
** Max Tensile Stress is checked with Effective Long Term Effective Modulus of Elasticity.
STRESSES IN CONCRETE AND REINFORCEMENT STEEL FOR ALL SUSTAINED LOADS + LIVE LOAD (RARE COMBINATION)
SAGGING MOMENT CHECK SHORT TERM WITH LONG TERM EFFECTIVE Ec
MAX. COMP. RATIO OF LIVE DEPTH OF MAX. TENSILE
MRARE DEPTH OF NA Ec,eff
SECTION ID STRESS LOAD / DL + NA STRESS
tm/m mm N/mm2 SIDL N/mm2 mm N/mm2
1 3.3 65.6 1.45 4.5 27527 73.50 79.7
2 5.2 65.6 2.29 1.1 20584 73.50 125.5
3 6.7 65.6 2.98 0.6 18322 73.50 163.2
4 7.7 65.6 3.42 0.5 17426 73.50 187.5
5 8.2 65.6 3.61 0.4 17029 73.50 198.2
6 8.2 65.6 3.62 0.4 16944 73.50 198.7
7 8.1 65.6 3.58 0.4 16942 73.50 196.3
8 7.5 65.6 3.32 0.4 17161 73.50 181.9
9 6.3 65.6 2.80 0.6 17797 73.50 153.7
10 4.6 65.6 2.05 0.9 19634 73.50 112.4
11 2.7 65.6 1.20 3.5 26311 73.50 65.6
** Max Tensile Stress is checked with Effective Long Term Effective Modulus of Elasticity.

______________________________________________________________________________________________________________________
61 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

5.7 CRACK WIDTH CALCULATION


The calculation of crack width is done as per cl. 12.3.4 of IRC 112.
The crack width Wk is computed as
Wk = Sr,max (εsm - εcm)
where,
Wk = Crack Width
εsm = Mean Strain in Reinforcement Under Loads
εcm = Mean Strain in the Concrete between Cracks

where,
σsc = Stress in Tension Reinforcement
αe = Es/Ecm Long Term is Adopted
εcm = Mean Strain in the Concrete between Cracks
Es = Modulus of Elasticity of Steel
Ecm = Modulus of Elasticity of Concrete
ρp,eff = As/Ac,eff
Ac,eff = Effective Area of Concrete in Tension Surrounding
Ac,eff the reinforcement of Depth hcef
hcef = Lesser of 2.5(h-d);(h-x)/3;h/2
kt = Factor Dependent on Duration of Load

k1 = Factor for Bond Properties of the Bonded Reinf.


k1 = 0.8
k2 = Coefficient which takes account of the distribution of
strain
k2 = 0.5 For Bending

______________________________________________________________________________________________________________________
62 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

4𝐴2 𝑚2 + 8𝐴𝑚𝑏𝑑 − 2𝐴𝑚𝑏𝑑


𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑁𝑒𝑢𝑡𝑟𝑎𝑙 𝐴𝑥𝑖𝑠 =
2𝑏
where,
d= Effective Depth of Section
m = Es/Ec
b = Width of Section
A = Reinforcement Area

HOGGING MOMENTS CRACK WIDTH CHECK


H (OVERALL DEPTH OF
MQUASI PERMANENT Ac,eff σsc
SECTION ID DEPTH) NA
2 2
tm/m (mm) (mm) (mm ) (N/mm )
1 0.00 700 100.6 125000 0
2 0.00 700 100.6 125000 0
3 0.00 700 100.6 125000 0
4 0.00 700 100.6 125000 0
5 0.00 700 100.6 125000 0
6 0.00 700 100.6 125000 0
7 0.00 700 100.6 125000 0
8 0.00 700 100.6 125000 0
9 0.00 700 100.6 125000 0
10 0.00 700 100.6 125000 0
11 0.00 700 100.6 125000 0

Sr max Crack Width


SECTION ID εs-εm ρeff
(mm) (mm)
1 0.000000 0.0036 626.7 0.000
2 0.000000 0.0036 626.7 0.000
3 0.000000 0.0036 626.7 0.000
4 0.000000 0.0036 626.7 0.000
5 0.000000 0.0036 626.7 0.000
6 0.000000 0.0036 626.7 0.000
7 0.000000 0.0036 626.7 0.000
8 0.000000 0.0036 626.7 0.000
9 0.000000 0.0036 626.7 0.000
10 0.000000 0.0036 626.7 0.000
11 0.000000 0.0036 626.7 0.000

______________________________________________________________________________________________________________________
63 CIPL-MJB-1^M055.734-DGN-008
Project
M/S. BHARAT CONSTRUCTIONS INDIA PVT. LTD.
MJB
Construction of Rudraprayag Tunnel of length 900.30m including approaches with 50+100+50
200m length major bridge on Alaknanda river connecting NH-107 (old NH-109) to NH- Document no. CIPL-MJB-1+055.734-DGN-008
07 (old NH-58) on EPC mode in the State of Uttrakhand Designed by Devwrat Yadav
Transverse Design of Segment (Box Depth=6.25m) Checked by Nithil Malguri

SAGGING MOMENTS CRACK WIDTH CHECK


H (OVERALL DEPTH OF
MQUASI PERMANENT Ac,eff σsc
SECTION ID DEPTH) NA
2 2
tm/m (mm) (mm) (mm ) (N/mm )
1 0.61 700 100.6 127500 15
2 2.42 700 100.6 127500 60
3 4.08 700 100.6 127500 101
4 5.19 700 100.6 127500 128
5 5.74 700 100.6 127500 142
6 5.81 700 100.6 127500 143
7 5.74 700 100.6 127500 142
8 5.19 700 100.6 127500 128
9 4.08 700 100.6 127500 101
10 2.42 700 100.6 127500 60
11 0.61 700 100.6 127500 15

Sr max Crack Width


SECTION ID εs-εm ρeff
(mm) (mm)
1 0.000045 0.0051 555.7 0.025
2 0.000179 0.0051 555.7 0.100
3 0.000302 0.0051 555.7 0.168
4 0.000384 0.0051 555.7 0.213
5 0.000425 0.0051 555.7 0.236
6 0.000430 0.0051 555.7 0.239
7 0.000425 0.0051 555.7 0.236
8 0.000384 0.0051 555.7 0.213
9 0.000302 0.0051 555.7 0.168
10 0.000179 0.0051 555.7 0.100
11 0.000045 0.0051 555.7 0.025

______________________________________________________________________________________________________________________
64 CIPL-MJB-1^M055.734-DGN-008