Agenda for Basic Design Review Meeting

CLIENT: PT. Pertamina Geothermal Energy


LUMUT BALAI 2 GEOTHERMAL FCRS & POWER PLANT PROJECT
DESIGN REVIEW SHEET PROJECT:
Contract Number: 459/PGE000/2022-S0

Logistics Engineering Document Review Meeting

Attendees Employer & ELC & Contractor

Purpose Engineering Document Comment Discussion and Closed & Catch Up for design progress

Date July 24th-28th

Method of conference Off-line and On-line

Agenda As Given Below

Meeting Location TBD

Item Genaral Engineering Document(key issue) Date Required or Note


MEETING POINTS(Engineering Document Comment Review)

Item Civil Engineering Document (room1) Date Required or Note


MEETING POINTS(Engineering Document Comment Review)
1.
2

Page 1 of 6
Agenda for Basic Design Review Meeting
CLIENT: PT. Pertamina Geothermal Energy
LUMUT BALAI 2 GEOTHERMAL FCRS & POWER PLANT PROJECT
DESIGN REVIEW SHEET PROJECT:
Contract Number: 459/PGE000/2022-S0

Item Process Engineering Document(room2) Date Required or Note


MEETING POINTS(Engineering Document Comment Review) July 31st-August 1st

1 LMB2-E-FC-PRO-AEF-MS0-0003 P&ID of Production Well Cluster LMB-A July 31st-August 1st


2 LMB2-E-FC-PRO-AEF-MS0-0004 P&ID Of Production Well Cluster LMB-3 July 31st-August 1st
3 LMB2-E-FC-PRO-AEF-MS0-0005 P&ID Of Steam Separator Cluster LMB-A July 31st-August 1st
4 LMB2-E-FC-PRO-AEF-MS0-0006 P&ID of Steam Separator Cluster LMB-A Rev. 3 July 31st-August 1st
5 LMB2-E-FC-PRO-AEF-MS0-0007 P&ID Of Cold Brine Pump, Silencer And Pond Cluster LMB-A July 31st-August 1st
6 LMB2-E-FC-PRO-AEF-MS0-0008 P&ID Of Cold Brine Pump, Silencer And Pond Cluster LMB-3 July 31st-August 1st
7 LMB2-E-FC-PRO-AEF-MS0-0009 P&ID Of Reinjection Well Cluster LMB-18 July 31st-August 1st
8 LMB2-E-FC-PRO-AEF-MS0-0010 P&ID Of Reinjection Well Cluster LMB-19 July 31st-August 1st
9 LMB2-E-FC-PRO-AEF-MS0-0011 P&ID Of Steam Pipeline For FCRS July 31st-August 1st
10 LMB2-E-FC-PRO-AEF-MS0-0012 P&ID Of Brine Pipeline For FCRS July 31st-August 1st
11 LMB2-E-FC-PRO-AEF-MS0-0013 P&ID Of Steam Junction Point For FCRS July 31st-August 1st
12 LMB2-E-FC-PRO-AEF-MS0-0014 P&ID Of Steam Vessel For FCRS July 31st-August 1st
13 LMB2-E-FC-PRO-AEF-MS0-0015 P&ID Of Pipeline Steam Condensate & Drain Collection System For July 31st-August 1st
FCRS
14 LMB2-E-FC-PRO-AEF-MS0-0016 P&ID Of Steam Venting System For FCRS July 31st-August 1st
15 LMB2-E-FC-PRO-AEF-MS0-0017 P&ID Of Steam Scrubber For FCRS July 31st-August 1st

Page 2 of 6
Agenda for Basic Design Review Meeting
CLIENT: PT. Pertamina Geothermal Energy
LUMUT BALAI 2 GEOTHERMAL FCRS & POWER PLANT PROJECT
DESIGN REVIEW SHEET PROJECT:
Contract Number: 459/PGE000/2022-S0

Item Process Engineering Document(room2) Date Required or Note


16 LMB2-E-FC-PRO-AEF-MS0-0018 P&ID Of Compressed Air System For FCRS July 31st-August 1st

17 LMB2-E-FC-PRO-AEF-MS0-0019 P&ID Of Emergency Diesel Generator System of FCRS July 31st-August 1st

18 LMB2-E-FC-PRO-OEL-MS0-0003 Process Calculation for Steam Separators of FCRS July 31st-August 1st Separated with
P&ID Discussion
Room
19 LMB2-E-FC-PRO-OEL-MS0-0004 Process Calculation for Silencer of FCRS July 31st-August 1st Separated with
P&ID Discussion
Room
20 LMB2-E-FC-PRO-OEL-MS0-0005 Process Calculation for Geothermal Pond of FCRS July 31st-August 1st Separated with
P&ID Discussion
Room
21 LMB2-E-FC-PRO-OEL-MS0-0007 Process Calculation for Steam Vessel of FCRS July 31st-August 1st Separated with
P&ID Discussion
Room
22 LMB2-E-FC-PRO-OEL-MS0-0008 Process Calculation for Rock Muffler of FCRS July 31st-August 1st Separated with
P&ID Discussion
Room
23 LMB2-E-FC-PRO-OEL-MS0-0009 Process Calculation for Scrubber of FCRS July 31st-August 1st Separated with
P&ID Discussion
Room
24 LMB2-E-FC-PRO-OEL-MS0-0010 Process Calculation for Compressed Air System of FCRS July 31st-August 1st Separated with
P&ID Discussion
Room
25 LMB2-E-FC-PRO-OEL-MS0-0012 Process Calculation for Steam Trap of FCRS July 31st-August 1st Separated with
P&ID Discussion

Page 3 of 6
Agenda for Basic Design Review Meeting
CLIENT: PT. Pertamina Geothermal Energy
LUMUT BALAI 2 GEOTHERMAL FCRS & POWER PLANT PROJECT
DESIGN REVIEW SHEET PROJECT:
Contract Number: 459/PGE000/2022-S0

Item Process Engineering Document(room2) Date Required or Note


Room
26 LMB2-E-FC-PRO-OEL-MS0-0013 Process Calculation for Brine and Condensate Pump of FCRS July 31st-August 1st Separated with
P&ID Discussion
Room.

Item Mechanical Engineering Document(room3) Date Required or Note


1 MEETING POINTS(Engineering Document Comment Review)
2 LMB2-E-FC-MEC-OCS-MS9-0001 Strength Calculation For Steam Separators Cluster LMB-A July 28th Separated with
Piping Room
3 LMB2-E-FC-MEC-OCS-MS9-0002 Strength Calculation For Steam Separators Clsuter LMB-3 July 28th Separated with
Piping Room
4 LMB2-E-FC-MEC-OCS-MS9-0001 Strength Calculation For Air Receiver Tank Cluster LMB-A July 28th Separated with
Piping Room
5 LMB2-E-FC-MEC-OCS-MS9-0001 Strength Calculation For Air Receiver Tank Cluster LMB-3 July 28th Separated with
Piping Room
6 LMB2-E-FC-MEC-OCS-MS9-0001 Strength Calculation For Fuel Storage Tank Cluster LMB-A July 28th Separated with
Piping Room
7 LMB2-E-FC-MEC-OCS-MS9-0001 Strength Calculation For Fuel Storage Tank Cluster LMB-3 July 28th Separated with
Piping Room
8 LMB2-E-FC-MEC-OCS-MS9-0001 Strength Calculation For Fuel Storage Tank Cluster LMB-18 July 28th Separated with
Piping Room

Page 4 of 6
Agenda for Basic Design Review Meeting
CLIENT: PT. Pertamina Geothermal Energy
LUMUT BALAI 2 GEOTHERMAL FCRS & POWER PLANT PROJECT
DESIGN REVIEW SHEET PROJECT:
Contract Number: 459/PGE000/2022-S0

Item Mechanical Engineering Document(room3) Date Required or Note


9 LMB2-E-FC-MEC-OCS-MS9-0001 Strength Calculation For Fuel Storage Tank Cluster LMB-19 July 28th Separated with
Piping Room
10 LMB2-E-FC-MEC-OCS-MS9-0001 Strength Calculation For Steam Vessel July 28th Separated with
Piping Room
11 LMB2-E-FC-MEC-OCS-MS9-0001 Strength Calculation For Scrubber July 28th Separated with
Piping Room

Item Piping Engineering Document(room3) Date Required or Note


MEETING POINTS(Engineering Document Comment Review)
1 LMB2-E-FC-PIP-ADI-MS1-0037 Alignment Sheet For Brine From Existing Brine Lmb Unit-1 To Cluster July 28th
LMB-18
2 LMB2-E-FC-PIP-ADI-MS1-0036 Alignment Sheet For Brine From Brine Interconnection To Cluster LMB- July 28th
19 Rev.A
3 LMB2-E-FC-PIP-ADI-MS1-0032 Alignemnet Sheet For Steam Vessel LMB Unit 1 To Steam July 28th
Interconnection Line Rev.A
4 LMB2-E-FC-PIP-ADI-MS1-0031 Alignment Sheet For Steam From Cluster LMB-3 To Steam July 28th
Interconnection Line Rev.A
5 Calculation for Pipe Wall Thickness for Production Wells and LMB-19 July 28th

6 Calculation for Pipe Wall Thickness Brine Modification LMB-A and LMB-18 July 28th

Calculation for Thermal Insulation for Production Wells and LMB-19 July 28th

Page 5 of 6
Agenda for Basic Design Review Meeting
CLIENT: PT. Pertamina Geothermal Energy
LUMUT BALAI 2 GEOTHERMAL FCRS & POWER PLANT PROJECT
DESIGN REVIEW SHEET PROJECT:
Contract Number: 459/PGE000/2022-S0

Item Piping Engineering Document(room3) Date Required or Note


Calculation fro Thermal Insulation Brine Modification LMB-A and LMB-18 July 28th

Item Electrical Engineering Document(room4) Date Required or Note


MEETING POINTS(Engineering Document Comment Review)
1

Item I&C Engineering Document Date Required or Note


MEETING POINTS(Engineering Document Comment Review)
1 N/A