SECOND MONTH REPORT

- Kiran George Abraham

NO. OF
S. NO. START DATE END DATE TOPICS COVERED REMARKS
DAYS

Preparation of Instrument Schedule (guided by Mr. Ashok)


1 16-Aug 21-Aug 5 Instrument Range overview only
PUO FPSO project 1068-1-GD-801-1 Sheets 1-20

Preparation of Instrument I/O List (guided by Mr. Ashok)


2 23-Aug 27-Aug 5 Transitter & DCS Range overview only
Cristal Unit 400 Expansion Project 400-J3-4715 Sheets 1-10

Counter-checking Instrument Cable Schedule for Mr. Ashok


3 30-Aug - 1
Cristal Unit 300 Expansion Project 300-J3-3128 Sheets 1-21

Preparation of Cable Schedule (guided by Mr. Ashok)


4 31-Aug 1-Sep 2 Cable Length overview only
Cristal Unit 300 Expansion Project 300-J3-3128 Sheets 1-21

Appraising the scope of work involved in Ibn Rushd project


5 2-Sep 4-Sep 3
ITB Documents provided by SABIC and JK E&C, KSA

Rate comparisons of Offshore Training courses for Mr. Anath Sir


6 8-Sep 9-Sep 2
Getting quotations from HIMT and NAMAC

AIPL Project - Preparation of PLC I/O list and Cable Schedule for
7 13-Sep 15-Sep 2
designing PLC panel and Terminal Block drawings

Preparation of Manual Valve List (guided by Mr. Elias)


8 16-Sep 17-Sep 2 Inclusive of Stock Codes
Cristal Unit 300 Expansion Project AP-301, AP-302.1, AP-303.2