You are on page 1of 3

REPORT BAKED

DATE OBSERVATION : FRIDAY 07/08/2023


LOCATION : BAKED ULUWATU
OBSERVATION ON DUTY : ALL VENDOR

NO OBSERVATION REPORT ACTION

1 GLOBALXTREME 1. Optional 100 mbps (free router ) 1. price 1.100.000


(ON QUOTATION ) guaranteed 100 MBPS 2. split mirotic
2. Microtic 1 pcs a. access point guest
3. Hub 8 port (4 printer , 2 touch b. access point for
screen) system
4. 2 pcs access point for guest wifi c. pos system
and system ( ipad , edc , grab ) d. cctv hub
5. Installation cable lan from vendor 5. kang mul 081 380 591 132

- internet in
- router
- microtic
- accès point cashier
- acces point guest
- cctv
- lan pos system
1. printer kitchen
2. printer bar
3. printer pos kanan
4. printer pos kiri

2 AQUALIFE ( RO SYSTEM ) 1. machine ro and tandon are still ask confirmation from
outside ( staff parking area) mason about the capacity of
2. additional pump and water they RO treatment finals water
meter from main fresh water tank produce and calculate with
3. 1 line from main water tank split baked consumption
to be two line one goes to water
treatment ( ro) and one line goes
to toilet and washing area
4. Ro water 2000 GDP max output
300 liter/ hour
5. capacity RO water 2 x 1500 liter
6. optional indicator ro system
7. RO water PPR and fresh water
optional
8. drain dirty water after treatment
goes to front ( same pipe with
mason treatment )
9. electricity Ro system 1 phase 32 A
10. electricity for pump at main
fresh water tank

3 PARKING AREA 1. RO water system 3OO cm X 300 total building 300 cm X 600 cm
CONSUMED FOR cm
BUILDING 2. Outdoor panel for air
conditioning 200 cm X 300 cm
3. Gas station 4 tabung 100 cm X
300 cm
4. pipe drain RO for after filter water
goes to mason drain
5. electricity 1 phase 32 A

4 EXHAUST HOOD , AIR 1. Two pcs exhaust hood 1. 2 hood need 3 phase 25
FRESH , GAS PIPE , AIR - for kitchen A
CURTAIN , CENTRAL AC - for combi oven ( pastry ) 2. fresh air 1 phase 10 A
2. Fresh air 4 spot 3. toilet ceiling fan and
- bar alarm gas need 1 phase
- kitchen 10 A
- kitchen II
- steward area
3. Toilet ducting and grill ceiling fan
4. gas tabung 4pcs , from parking
area , installation for
- stove
- pasta cooker
- grider
5. alarm gas 3 spot ( optional )
6. central ac daikin for customers
area 2 X 6 px
7. central ac daikin for kitchen,
steward and washing station
toilet 1 x 4 px
8. air curtain gree 90 cm x 3 total
length 270 cm for kitchen and
bar
9. air curtain gree 120 cm x 1 for
main door

5 CCTV 1. 10 point location cctv location cctv ( vision from


2. cable full pipe conduit inside facing outside )
3. server room at office 1. front right wall corner
4. set cctv with all inside system 2. front left indor ( close
online windows )
5. monitor and mouse 3. 1 st pole inside facing
merchandise
4. right side of pole ( wall)
facing cashier and bar
front view
5. left back side cashier
facing bar and cashier
view
6. right side kitchen top
plating area facing inside
kitchen and bakery
7. middle front wall of
steward facing steward
and back door entrance
8. office inside
9. office back side
10. washing area toilet

6 SOUND SYSTEM JAYAWIJAYA AUDIO WATERING SCHEDULE

7 POS HARDWARE ANDY POS WAITING PO FROM US

8 POS SOFTWARE -