All other areas should meet your final layout specifications and must be
human comfort level.
2. Temperature and Humidity data loggers are installed in the rooms.
( ✓) ( )
Calibration certificates are required for site following GMP.
3. Internet connectivity at the site is operational. Consultants will require
(✓ ) ( )
temporary internet connectivity for their PC’s.
2. Local installations and with related certificates Yes No
1. Gas tank valves and gauges have been labeled with gas type, purpose,
regulated pressure, and tolerance. Same with regulators and valves located (✓ ) ( )
at drop points. (All gas lines must be purged previous to start this activity).
2. Gas cylinder purity certificates are available on site. ( ) ( )
3. Certification by external company that clean rooms (production lab and
microbiology lab) and the hot cells/ laminar flow hood meet the design air ( ) ( )
classification criteria.
4. L-block shield is assembled and placed in the operational QC fume hood If it applies
( ) ( )
and/or shielded hood.
5. Extra lead bricks are available for addition of shielding, where necessary. ( ) ( )
1. Vials shielding. ( ) ( )
2. 10 mL and 30 mL Vial ( ) ( )
3. Stopers ( ) ( )
4. HPLC filtration equipment is recommended ( ) ( )
5. Beakers ( ) ( )
6. Volumetric flask ( ) ( )
7. Decapper/crimper ( ) ( )
8. Automatic pipettors of 1000 and 100 L and its disposables tips ( ) ( )
9. TLC developer chambers ( ) ( )
10. Desiccator ( ) ( )
11. Scissors, or cutters ( ) ( )
12. Syringes ( ) ( )
13. Microliter syringe ( ) ( )
14. Eppendorf 1 or 2 ml ( ) ( )
15. Pyrogen free tubes ( ) ( )
16. Tongs, crucible ( ) ( )
17. Spray bottle 500 mL ( ) ( )
If don’t have the exact match let us know what you
7. Ga-PSMA (Ga-68) Yes No
find, so we can confirm that it can be used.