Professional Documents
Culture Documents
R901085027P00
R901085027P00
N
AWAY AWAY
CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911
2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).
1 PIPE , CS API 5L-B-PSL2 , SMLS , BE , 10 PPPCPVSMBESTD5F 36.8 M 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.
STD , B36.10M , FBE INT COATED 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.
(B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.
7. PIPING MATERIAL IS
2 90 LR ELBOW , CS A234-WPB , SMLS , BE , 10 P9LC34SMBESTDE5 2
STD , B16.9 , FBE INT COATED PIPE SIZE SCHEDULE SPECIFICATION
FLANGES
3 WN FLG , CS A105N , CL150 , FF , STD , 10 PFWC1B15FFSTD5V 10
B16.5 , FBE INT COATED
FOR CONT. SEE 8. WELDING STRESS RELIEF - YES NO
X
SHT 028 PIPE SUPPORTS RADIOGRAPHY % 100% X-RAY SPOT X-RAY 01-SAMSS-10 SHOP FIELD
FR05-B-450-250-250-0-E-1 13. FOR SMALL BORE LINES (UPTO 1-1/2" ) DIMENSIONS, ROUTING & SUPPORTING SHALL BE FIELD ADJUSTED.
10"N.B. PT N.B. 14. ALL DIMENSIONS AND COORDINATES ARE IN MM. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OF THE SPOOL.
15. FOR INTERNAL LINED PIPE, LINING SHALL BE DONE AFTER SPOOL FABRICATION & COMPLETION OF ALL HOT WORKS.
93 NO DESCRIPTION (INS) STOCK CODE QTY 16. TIE-IN POINTS CO-ORDINATES TO BE VERIFIED BY CONTRACTOR IN FIELD.
17. PAINTING / COATING SHALL BE IN ACCORDANCE WITH SAES-H-001/002 AND PROJECT APPROVED COATING MAP.
S4 GASKETS
18. SEAL WELDING REQUIREMENT OF THREADED JOINTS SHALL BE AS PER CL.NO.9 OF SAES-L-110.
19. WELDS SHALL BE RADIOGRAPHED AS PER SAES-W-012 (FOR LINES WITH DESIGN CODE ASME B31.8/B31.4) &
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
WA01-10-550-CS AS PER SAES-W-011 (FOR LINES WITH DESIGN CODE ASME B31.3).
5 GASKET , SYNTHETIC W/ CENTERING RING , 10 PGGNSC20115BL02 5 20. CONSTRUCTION OF PLANT PIPING SHALL BE IN ACCORDANCE WITH SAES-L-350.
41 36 21. ALL INTERFACE CONNECTIONS WITH OTHER PROJECT (WHEREVER APPLICABLE), CO-ORDINATES AND ELEVATIONS
21 01 FULL FACE , 1/16" (1.6 MM) THK , SHALL BE VERIFIED BY CONTRACTOR IN FIELD.
S9 22. INTERNAL FBE LINING CONTRACTOR TO VERIFY AND CONFIRM THE BREAK UP FLANGES PRIOR TO THE SPOOL FABRICATION
1 S7 CL150 , B16.5 , B16.21 23. PLANT COORDINATE SYSTEM HAS BEEN FOLLOWED AS PART OF BI-10-00930.
HIGH POINT OF PLANT DATUM ELEVATION 100.000m WHICH EQUALS 2.05m ABOVE MEAN SEA LEVEL
GL01-10
FR05-B-450-250-250-0-E-1 SPOOLS TO BE FABRICATED BY VENDOR
S8 BOLTS NO. WEIGHT NO. WEIGHT
MARK NO. SIZE MARK NO. SIZE
BP01-C-300-25 S10 S7
PIECES LBS PIECES LBS
46
04
10 LINE STOP FOR BARE PIPE 10 LS01-10 1
S7 2
FR05-B-450-250-250-0-E-1 1 PIECE MARKS
481 89 90 91 92 93
90
FLG3
FOR CONT. SEE 41
REST 85 78
SHT 026 54
E 30321432
1
N 30970900
REFERENCE DRAWINGS
EL +99987
REST DRAWING CONTROL SHEET FOR J.O. 10-00930-0002 RD-086148
10"N.B.
88 02 RA-685466.001
17
PIPING PLAN
2 23 FLG3 GAS5 BLT6
P&ID NA-518622.008
LINE DESIGNATION TABLE RD-912750
REVISION VALIDATION
10-00930-0002-001
ENGG./DATE
(DESIGN AGENCY)
CERTIFIED BY/DATE
REVIEW FOR KEY DRAWINGS
REQUIRED
CONST. AGENCY/DATE
(SAUDI ARAMCO)
OPERATIONS/DATE BY/DATE
OTHER
NO 150 262 120 49 NOTE-12 WATER NOTE-19 NOTE-19 0 mm NO NOTE-17 SYS-02 OW-5063
060 L RB-901085 027 00
Saudi Aramco 2825 ENG. (05/05)
RESTRICTED
SA-TR-799 SMART CADD-03