Beckground : The surface of the slab scouring way which has been badly damaged will gradually affect the conditions
in the dam structure, especially the erosion of the concrete and the damage to the iron in the structure.
To prevent this from happening, we have a plan to improve the slab structure on the scouring way
Dailyeorker : 4- 6 persons
Work methode : 1. Prepare the tools and material, and apply the bodyharness to worker before starting the work
2. Install rope a long of stuctures from gate until bottom slab scouring and cable power from gate control
3. After rope and power ready, we start cleanup surface concrete by water high presure use Alcon
4. After clean it, drilling and install stick rebar to attached the wiremesh
5. Install wiremesh a long slab concrete and pouring cement with thickness 3-5 cm
6. At the concrete work time we need more manpower to finally the work