PROJECT TITLE: DESIGN OF AN STP OF 25 MLD CAPACITY BASED ON VARIOUS TREATMENT PROCESSES

NOTE :-
ARRANGEMENT DRAWING
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHER WISE SHOWN.
102.80
2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSION SHALL BE FOLLOWED.
3. GRADE OF CONCRETE MIX SHALL BE M-25 CONFORMING TO I.S.456-2000.
4. CEMENT TO BE USED AS PPC/OPC OF MIN. GRADE 43 CONFORMING TO I.S.1489/I.S.8112:2013.
9 5. ALL MASS LEAN CONCRETE WORK TO BE DONE IN (1:4:8).
6 STP CONTROL ROOM 6. MAIN REINFORCEMENT SHALL BE HIGH YIELDING STRENGTH DEFORMED (HYSD) BARS OF GRADE Fe-415/500
CONFORMING
TO I.S. 1786-1985/2008 AND DENOTED BY "T".
15
99.60 99.60 10 99.60
7. LATERAL REINFORCEMENT AS STIRRUPS/TIES SHALL BE MILD STEEL BARS OF GRADE Fe-250 CONFORMING
TO I.S.
1786-1985/2008 AND DENOTED BY "R".
98.80 99.00
  1 8. REINFORCEMENT FOR BEAM IS REPRESENTED BY TWO NUMBER
17 (a).THE FIRST NUMBER INDICATES NUMBER OF BARS.
I.L. 98.80 98.50
13 (b).THE SECOND NUMBER INDICATES DIAMETER OF BAR.
97.60 9. THE SHAPE CODES ARE BASED ON TABLE B-2 OF I.S. SP:34-1987.
10. CLEAR COVER TO BEAM REINFORCEMENT SHALL BE 25mm OR THE DIAMETER OF BAR WHICHEVER IS
200 x 200 GREATER.
OPENING 4
11. CLEAR COVER TO FOOTING REINFORCEMENT SHALL BE 75mm AT THE BOTTOM AND 50mm AT TOP AND SIDE.
3
11 12. CLEAR COVER TO SLAB REINFORCEMENT SHALL BE 15mm TO 20 mm AS PER I.S.456-2000.
2 600 x 600 OPENING 96.00
13. CLEAR COVER TO COLUMN REINFORCEMENT SHALL BE 40/25 mm AS PER I.S.456-2000.
600 x 600
14. LAP LENGTH IN REINFORCEMENT BAR SHALL CONFORMING TO CLAUSE 25.2.5.1 OF I.S.456-2000.
OPENING 95.60
20
15. ALL LAPS SHALL BE STAGGERED AND NOT MORE THAN HALF THE COLUMN BARS TO BE LAPPED AT ANY GIVEN
94.8 95.00 SECTION.
16. LAP LENGTH IN COLUMN SHALL BE 50 TIMES THE DIAMETER OF BAR.
17. ALL BRICK MASONARY WORK TO BE DONE IN ACCORDANCE WITH I.S.2212 - 1991 AND BRICK USED
CONFORMING TO
SECTION AT "A-A" SECTION AT "B-B" I.S.1077 - 1991.
18. ALL BRICK WORK TO BE IN CEMENT MORTAR 1:6 EXCEPT HALF BRICK WHICH WILL BE IN 1:4 CEMENT MORTAR.
19. BRICK BATS IN 500mm WIDTH WILL BE PROVIDED BEHIND EARTH RETAINING WALL.
20. CROSS TIES WILL BE PROVIDED AS PER GENERAL SCHEDULE COLUMN DETAILS FOR TRANSVERSE STEEL
ARRANGEMENT.
7700 21. TRANSVERSE REINFORCEMENT AS LATERAL TIES IN COLUMN WILL BE PROVIDED AS PER SPACING GIVEN IN
SCHEDULE
GROUND FLOOR 100.00 LEVEL EXCEPT IN ZONE 'A'.
22. IN ZONE 'A', DIAMETER & SPACING OF LATERAL TIES SHALL BE 8R @ 100 mm c/c UNLESS NOTED OTHER
WISE SHOWN.

2350
23. LONGITUDINAL REINFORCEMENT AS MAIN STEEL IN COLUMN IS DENOTED BY NOMENCLATURE N1TD1+N2TD2
9 WHICH
 B B HAS FOLLOWING MEANING:-
D1 & D2- DIA OF BARS ARE D1 & D2 RESPECTIVELY.
 STP CONTROL ROOM T-GARDE OF STEEL Fe415/500.
8 N1-D1-TOTAL NO. OF BARS IN FIRST AND LAST ROW.
10
N2-D2-TOTAL NO. OF BARS BETWEEN FIRST AND LAST ROW.
99.60 IF N2=0 THEN TOTAL NO OF ROWS=2.
IF N2=2 THEN TOTAL NO OF ROWS=3.
24. SLAB TO BE CASTED MONOLITHICALLY WITH BEAM AND DEPTH OF BEAM INCLUDES THE THICKNESS OF
5000

C C
99.00 SLAB.
 25. SEISMIC PARAMETERS :-

7 ZONE = III
98.20 Sa/g = 2.5
IMPORTANCE FACTOR = 1.0
200 x 200 ZONE FACTOR Z = 0.16
OPENING
15 I.L. 98.20 26. FOR BAR SCHEDULES REFER BAR BENDING SCHEDULE BOOKLET.
STP CONTROL ROOM
12
27. FOR GAD REFER CE/CON DRG NO.
A 
 A 5
6
23 ANIS UL REHMAN ROLL NO. 18BCE009
12200
8350
95.00 95.00
MIR ARIF NAZIR ROLL NO. 18BCE025
22
OWAIS AHMAD PARRAY ROLL NO. 18BCE057
SECTION AT "C-C"
PLAN WASIM AKRAM ROLL NO. 17BCE061
SACHIN ROLL NO. 17BCE089