You are on page 1of 3

DocumentNo.

AMNS/IMS/EHS/

Issue.No. 01 Rev.No. 00
MOCK DRILL Rev.
Issue.Date 18.08.2023 Date 00-00-00

Page No. 1 OF 3

Name of Site/Location: FILTRATION No of Participants: 6


Name of Contract agency: Ms. Quess. WorkArea: F-24,15 M FLOOR
Department Mechanical Reporting person Mr.Nagendra Behera(Fitter)
Mockdrill Date 18.08.2023 Mock drill report No 02

EmergencySituation(Tick the appropriate emergencysituation)


Excavation Snake /Insect bite
Fall of material
✓ Suffocation/Heat/Heart Stroke

Fire incident Others – specify – Electric Shock


Work at height rescue
Details of Incident: We did a surprise mock drill date on 18.08.2023 at 11.00 AM. Because of we want to see,
What the difference between pre-planned and Surprise Mock drills.

We don't know in advance when something will happen. That’s why we are conducted a Surprise mock Drill with
the Help of Mech HOD Mr. N.K.RAO sir and Mechanical Team.

And the theme is:- When Mr. Jaganath Mohanty, was doing plate replacement job, at that time suddenly his
hand trapped in between plate and gratings floor while resting the plate on the floor due to slip of packing, then he
loudly called the other persons and screaming-agitating out of pain, after that Mr. Nagendra Behera rescue him
and called the team and Ambulance.
Photographs.
DocumentNo. AMNS/IMS/EHS/

Issue.No. 01 Rev.No. 00
MOCK DRILL Rev.
Issue.Date 18.08.2023 Date 00-00-00

Page No. 2 OF 3

Response time during emergencies


Agencies Information Time Reporting Time Remarks
Incident Report time 11:00 AM
Dept. HOD 11.00 AM 11:06- AM He immediately arranged for
Ambulance.
Central control room NA
Emergency Siren/Emergency declared NA
Fire Brigade NA
Ambulance 11.02 AM 11.16 PM Ambulance reporting time is
late due to lack of knowledge
of plant location. Ambulance
not operating its siren

HR/Admin Officer NA
Security Officer 11:04 AM 11:14 AM YES
Safety Officer 11:03 AM 11:10 AM YES
Plant Head NA

Time required for total evacuation(min.) Total Head Count (Nos.) 07

Resource Available Yes /No Remarks Action &Target Date


Emergency Plan Yes
Communication or public address NO Informed to Safety Dept
system
Audio Alarm system (Siren etc.) NO Informed to Electrical for hooter
connection
Assembly Place Yes
Barricading Material No
Firefighting system No

Workable of safety devices


Emergency Rescue Kit& Foldable No
Stretcher
First-Aid Kit with Layout Yes
Others(specify)
Document No. AMNS/IMS/EHS/
Issue. No. Rev. No. 00
MOCK DRILL Rev.
Issue. Date 18-08-2023 Date 00-00-00

Page No. 3 OF 3

Observation Action Sheet – Mock Drill


1. Positive observations:
1.Response time for all is good.
2.Primary first-aid treatment available in time.
3.Emergency evacuation is in time.

2. For continual improvement:

Target Closing
Sl. No. Observation Action Taken By Whom Remarks
date Date

1. The ambulance was unable to 1.We have to keep one NA NA


identify accident location. rescue member on road
to guide the ambulance.
2.Ambulance should
carry one medical
person and one person
who knows every
location to guide the
vehicle.

The medical team not able to 1.We are discussing this


2. report at site in time with with management
stretcher due to space
constraint of staircase.

Rescue teams face network 1.Informed to Hooter available


3. issue while reporting and no Electrical, Admin & but connection not
other mode of communication HSE to take immediate provided.
(like siren/hooter) available at action on this
site

4
Trained medical professional 1.Communicated to
not available with stretcher. HSE dept.

5. Work man don’t keep 1.We communicate this


emergency contact no in their to all who are working
phone, while it is displayed at at Filtration unit.
site

Sign of Site Engineer/In charge

Sign of site observer

Sign of HSE office

Sign of Dept. HOD.