Professional Documents
Culture Documents
Classroom Readiness For Sy 2023
Classroom Readiness For Sy 2023
D epartment of Education
REGION X
SCHOOLS DIVISION OF CAMIGUIN
COMPLIANCE AUDIT
Instruction to the Monitoring Team: Please check the box under E if the indicator is “Evident”, check NE
if not evident. For remarks, write: remove if items must not be displayed, relocate if items are not in
proper place, repair if items need repair, Recondition if items are not functional/ need cleaning /fix up,
C -if compliant.
Attendance Chart
Enough light
Sufficient number of functional Chairs for learners
Functional Comfort room with water supply
Note: Some rooms are designed w o CR
inside ,checked the CR in the building where the
room is located.
Two cabinets in good condition are visible.
Potable water for learners
C. General Impressions
The classroom walls are bare and devoid of
posters, decorations or other posted materials
The classroom is not used as stockpile materials
and thus, it is clear of other unused items for
disposal
The classroom wall paint follows the prescribed
color.
Exterior Wall-Pearled Ivory/Crisp Ecru/Beige
Interior Wall-Pearled Ivory/Bright Wonder/Bright
Wonder/Beige
Ceiling-Brilliant White
It is free from hazards and it is clean.
Level or Readiness: 25 and up- Excellently Ready 15-24 -Approaching Readiness
15 and below-Developing Readiness
Monitored by: Concurred:
_________________ DR. BAZIL T. SABACAJAN, MPA
Signature Over Printed Name Chief ES, CID