Irfan Muneer's Residence Lake City Lahore Classic Schedule Layout 20-Feb-23 13:29
Activity ID Activity Name Original Start Predecessors
Duration

IMR-1 Mr. Irfan Muneer's Residence Lake City Lahore 5 24-Oct-22


IMR-1.1 Design 0
IMR-1.2 Procurement 0
IMR-1.3 Construction Works 5 24-Oct-22
IMR-1.3.2 Remaining Structural Works 5 24-Oct-22
A4470 Water proofing and casting of Projection Wall 5 24-Oct-22
at The Back side
A4460 Back filling and Leveling of Swimming Pool 5 24-Oct-22
area
A4450 Casting of Sheds in Front of Drawing and 5 24-Oct-22
Dining Works
A4440 Concrete Works for Balcony at First Floor 5 24-Oct-22
A4430 Construction of Septic Tank and Rain Water 5 24-Oct-22
Tanks
A4420 Columns for Parapet wall at top Roof 5 24-Oct-22
A4410 Casing of Sump pit in Basements 5 24-Oct-22
A4400 Overhead Water Tanks 5 24-Oct-22
A4390 Swimming Pool Structural Works 5 24-Oct-22
A4380 Dismantling and Recasting of Parapet wall in 5 24-Oct-22
slope
IMR-1.3.7 Ground Floor 5 24-Oct-22
IMR-1.3.7.1 MEP Works 5 24-Oct-22
IMR-1.3.7.1.1 Electrical & IT Works 5 24-Oct-22
A1390 Electrical and Networking conduiting in Floors 5 24-Oct-22

A1380 Testing and Commissioning of DBs 5 24-Oct-22


A1370 Installation of DBs 5 24-Oct-22
A1300 Installation of of Wi-Fi Devices 5 24-Oct-22
A1290 Installation of Ceiling Fans 5 24-Oct-22
A1280 Installation of Switch and Sockets 5 24-Oct-22
A1270 Installation of Lighting Fixtures 5 24-Oct-22
A1260 Electrical and Networking Wiring 5 24-Oct-22
A1250 Installation of Extended Rod for Ceiling Fans 5 24-Oct-22
A1240 Installation of Cable Tray 5 24-Oct-22
A1230 Installation of Back boxes 5 24-Oct-22
A1220 Electrical and Networking conduiting in Walls 5 24-Oct-22

IMR-1.3.7.1.2 Plumbing Works 5 24-Oct-22


A1670 Installation of Booster Pumps 5 24-Oct-22
A1660 Installation of Circular Pumps for Greaser 5 24-Oct-22
A1360 Installation of Plumbing Fixtures 5 24-Oct-22
A1350 Installation of Gas pipe 5 24-Oct-22
A1340 Performing the water pressure test 5 24-Oct-22
A1330 Installation of Flush Tanks 5 24-Oct-22
A1320 Installation of Drainage Pipes 5 24-Oct-22
A1310 Installation of Water Supply Pipes 5 24-Oct-22
IMR-1.3.7.1.3 Air Conditioning Works 5 24-Oct-22
A1650 Testing and Commissioning of Air Conditioning 5 24-Oct-22
Units

Page 1 of 10 TASK filter: All Activities


© Oracle Corporation
Mr. Irfan Muneer's Residence Lake City Lahore Classic Schedule Layout 20-Feb-23 13:29
Activity ID Activity Name Original Start Predecessors
Duration

A1450 Fixing of Air Conditioning Out Doors units 5 24-Oct-22


A1440 Fixing of Air Conditioning In Doors units 5 24-Oct-22
A1430 Installation of Power and Control Cable for 5 24-Oct-22
Units
A1420 Installation of Insulation on copper piping 5 24-Oct-22
A1410 Installation of Drain Piping 5 24-Oct-22
A1400 Installation of Copper Piping 5 24-Oct-22
IMR-1.3.7.2 Civil & Finishes Works 5 24-Oct-22
IMR-1.3.7.2.1 Wall Finishes 5 24-Oct-22
A1900 Mirror Cladding Works 5 24-Oct-22
A1890 Wooden Grove Paneling in baths 5 24-Oct-22
A1880 Fixing of Mirror In bath rooms 5 24-Oct-22
A1870 Fixing of glass doors in bath 5 24-Oct-22
A1760 Final Coat of Paint 5 24-Oct-22
A1750 Copper Cladding Works 5 24-Oct-22
A1740 Fabric Cladding Works 5 24-Oct-22
A1730 Mirror Cladding Works 5 24-Oct-22
A1720 R.C.C. Shelves 5 24-Oct-22
A1710 Fixing of Wooden Cabinets 5 24-Oct-22
A1700 Fixing of Wardrobes and Dressing 5 24-Oct-22
A1690 Fixing of Tiles Dado 5 24-Oct-22
A1680 Fixing of wooden doors 5 24-Oct-22
A1520 Tiles Fixing for bath walls 5 24-Oct-22
A1510 Fixing of Cabinets 5 24-Oct-22
A1500 Wooden Wall Cladding 5 24-Oct-22
A1490 Marble Cladding (Fluting) Works 5 24-Oct-22
A1480 Surface Preparation of Paint Works 5 24-Oct-22
A1470 Installation of Aluminum Windows 5 24-Oct-22
A1460 Plaster Works 5 24-Oct-22
IMR-1.3.7.2.2 Ceiling Finishes 5 24-Oct-22
A1860 Polishing of Wooden Ceiling 5 24-Oct-22
A1850 Wooden Ceiling 5 24-Oct-22
A1810 Final Coat of paint 5 24-Oct-22
A1800 Paint Work for Ceiling 5 24-Oct-22
A1790 Final Coat of paint 5 24-Oct-22
A1780 Paint Work for Ceiling 5 24-Oct-22
A1770 Surface preparation of Ceiling Paint Works 5 24-Oct-22
A1550 Marking and Opening for MEP Services 5 24-Oct-22
A1540 Gypsum Ceiling Works 5 24-Oct-22
A1530 Plaster Ceiling Works 5 24-Oct-22
IMR-1.3.7.2.3 Floor Finishes 5 24-Oct-22
A1840 2nd Layer of Floor Screed 5 24-Oct-22
A1830 1st Layer of Floor screed 5 24-Oct-22

Page 2 of 10 TASK filter: All Activities


© Oracle Corporation
Mr. Irfan Muneer's Residence Lake City Lahore Classic Schedule Layout 20-Feb-23 13:29
Activity ID Activity Name Original Start Predecessors
Duration

A1820 Waterproofing in bath flooring 5 24-Oct-22


A1600 Tiles Flooring for Washrooms 5 24-Oct-22
A1590 Carpet Flooring 5 24-Oct-22
A1580 Wooden Flooring 5 24-Oct-22
A1570 Tiles Flooring 5 24-Oct-22
A1560 Marble Flooring 5 24-Oct-22
IMR-1.3.7.2.4 Soft IDs 5 24-Oct-22
A1950 Fixing of Fireplaces and LED TVs 5 24-Oct-22
A1940 Fixing of Kitchen Equipments 5 24-Oct-22
A1930 Fixing of Floor lamps 5 24-Oct-22
A1920 Fixing of Paintings & artifacts 5 24-Oct-22
A1910 Fixing of Carpets & rugs 5 24-Oct-22
A1640 Fixing of Drapes & curtains 5 24-Oct-22
A1630 Fixing of Hanging Lights 5 24-Oct-22
A1620 Placing the Furniture 5 24-Oct-22
A1610 Fixing of Crystal Chandelier 5 24-Oct-22
IMR-1.3.7.2.5 Allied Works 5 24-Oct-22
A1970 MS Works 5 24-Oct-22
A1960 Installation of Spiral Stairs 5 24-Oct-22
IMR-1.3.25 First Floor 5 24-Oct-22
IMR-1.3.25.1 MEP Works 5 24-Oct-22
IMR-1.3.25.1.1 Electrical & IT Works 5 24-Oct-22
A2240 Electrical and Networking conduiting in Floors 5 24-Oct-22

A2230 Testing and Commissioning of DBs 5 24-Oct-22


A2220 Installation of DBs 5 24-Oct-22
A2150 Installation of of Wi-Fi Devices 5 24-Oct-22
A2140 Installation of Ceiling Fans 5 24-Oct-22
A2130 Installation of Switch and Sockets 5 24-Oct-22
A2120 Installation of Lighting Fixtures 5 24-Oct-22
A2110 Electrical and Networking Wiring 5 24-Oct-22
A2100 Installation of Extended Rod for Ceiling Fans 5 24-Oct-22
A2090 Installation of Cable Tray 5 24-Oct-22
A2080 Installation of Back boxes 5 24-Oct-22
A2070 Electrical and Networking conduiting in Walls 5 24-Oct-22

IMR-1.3.25.1.2 Plumbing Works 5 24-Oct-22


A2510 Installation of Booster Pumps 5 24-Oct-22
A2500 Installation of Circular Pumps for Greaser 5 24-Oct-22
A2210 Installation of Plumbing Fixtures 5 24-Oct-22
A2200 Installation of Gas pipe 5 24-Oct-22
A2190 Performing the water pressure test 5 24-Oct-22
A2180 Installation of Flush Tanks 5 24-Oct-22
A2170 Installation of Drainage Pipes 5 24-Oct-22

Page 3 of 10 TASK filter: All Activities


© Oracle Corporation
Mr. Irfan Muneer's Residence Lake City Lahore Classic Schedule Layout 20-Feb-23 13:29
Activity ID Activity Name Original Start Predecessors
Duration

A2160 Installation of Water Supply Pipes 5 24-Oct-22


IMR-1.3.25.1.3 Air Conditioning Works 5 24-Oct-22
A2490 Testing and Commissioning of Air Conditioning 5 24-Oct-22
Units
A2300 Fixing of Air Conditioning Out Doors units 5 24-Oct-22
A2290 Fixing of Air Conditioning In Doors units 5 24-Oct-22
A2280 Installation of Power and Control Cable for 5 24-Oct-22
Units
A2270 Installation of Insulation on copper piping 5 24-Oct-22
A2260 Installation of Drain Piping 5 24-Oct-22
A2250 Installation of Copper Piping 5 24-Oct-22
IMR-1.3.25.2 Civil & Finishes Works 5 24-Oct-22
IMR-1.3.25.2.1 Wall Finishes 5 24-Oct-22
A2750 Mirror Cladding Works 5 24-Oct-22
A2740 Wooden Grove Paneling in baths 5 24-Oct-22
A2730 Fixing of Mirror In bath rooms 5 24-Oct-22
A2720 Fixing of glass doors in bath 5 24-Oct-22
A2600 Final Coat of Paint 5 24-Oct-22
A2590 Copper Cladding Works 5 24-Oct-22
A2580 Fabric Cladding Works 5 24-Oct-22
A2570 Mirror Cladding Works 5 24-Oct-22
A2560 R.C.C. Shelves 5 24-Oct-22
A2550 Fixing of Wooden Cabinets 5 24-Oct-22
A2540 Fixing of Wardrobes and Dressing 5 24-Oct-22
A2530 Fixing of Tiles Dado 5 24-Oct-22
A2520 Fixing of wooden doors 5 24-Oct-22
A2370 Tiles Fixing for bath walls 5 24-Oct-22
A2360 Fixing of Cabinets 5 24-Oct-22
A2350 Wooden Wall Cladding 5 24-Oct-22
A2340 Marble Cladding (Fluting) Works 5 24-Oct-22
A2330 Surface Preparation of Paint Works 5 24-Oct-22
A2320 Installation of Aluminum Windows 5 24-Oct-22
A2310 Plaster Works 5 24-Oct-22
IMR-1.3.25.2.2 Ceiling Finishes 5 24-Oct-22
A2710 Polishing of Wooden Ceiling 5 24-Oct-22
A2700 Wooden Ceiling 5 24-Oct-22
A2650 Final Coat of paint 5 24-Oct-22
A2640 Paint Work for Ceiling 5 24-Oct-22
A2630 Final Coat of paint 5 24-Oct-22
A2620 Paint Work for Ceiling 5 24-Oct-22
A2610 Surface preparation of Ceiling Paint Works 5 24-Oct-22
A2400 Marking and Opening for MEP Services 5 24-Oct-22
A2390 Gypsum Ceiling Works 5 24-Oct-22

Page 4 of 10 TASK filter: All Activities


© Oracle Corporation
Mr. Irfan Muneer's Residence Lake City Lahore Classic Schedule Layout 20-Feb-23 13:29
Activity ID Activity Name Original Start Predecessors
Duration

A2380 Plaster Ceiling Works 5 24-Oct-22


IMR-1.3.25.2.3 Floor Finishes 5 24-Oct-22
A2690 2nd Layer of Floor Screed 5 24-Oct-22
A2680 1st Layer of Floor screed 5 24-Oct-22
A2670 Waterproofing in bath flooring 5 24-Oct-22
A2660 Tiles Flooring for Washrooms 5 24-Oct-22
A2440 Carpet Flooring 5 24-Oct-22
A2430 Wooden Flooring 5 24-Oct-22
A2420 Tiles Flooring 5 24-Oct-22
A2410 Marble Flooring 5 24-Oct-22
IMR-1.3.25.2.4 Soft IDs 5 24-Oct-22
A2800 Fixing of Fireplaces and LED TVs 5 24-Oct-22
A2790 Fixing of Kitchen Equipments 5 24-Oct-22
A2780 Fixing of Floor lamps 5 24-Oct-22
A2770 Fixing of Paintings & artifacts 5 24-Oct-22
A2760 Fixing of Carpets & rugs 5 24-Oct-22
A2480 Fixing of Drapes & curtains 5 24-Oct-22
A2470 Fixing of Hanging Lights 5 24-Oct-22
A2460 Placing the Furniture 5 24-Oct-22
A2450 Fixing of Crystal Chandelier 5 24-Oct-22
IMR-1.3.25.2.5 Allied Works 5 24-Oct-22
A2820 MS Works 5 24-Oct-22
A2810 Installation of Spiral Stairs 5 24-Oct-22
IMR-1.3.3 Basements 5 24-Oct-22
IMR-1.3.3.1 Servants Basement 5 24-Oct-22
IMR-1.3.3.1.1 MEP Works 5 24-Oct-22
IMR-1.3.3.1.1.1 Electrical & IT Works 5 24-Oct-22
A3000 Electrical and Networking conduiting in Floors 5 24-Oct-22

A2990 Testing and Commissioning of DBs 5 24-Oct-22


A2980 Installation of DBs 5 24-Oct-22
A2900 Installation of Ceiling Fans 5 24-Oct-22
A2890 Installation of Switch and Sockets 5 24-Oct-22
A2880 Installation of Lighting Fixtures 5 24-Oct-22
A2870 Electrical and Networking Wiring 5 24-Oct-22
A2860 Installation of Extended Rod for Ceiling Fans 5 24-Oct-22
A2850 Installation of Cable Tray 5 24-Oct-22
A2840 Installation of Back boxes 5 24-Oct-22
A2830 Electrical and Networking conduiting in Walls 5 24-Oct-22

IMR-1.3.3.1.1.2 Plumbing Works 5 24-Oct-22


A3270 Installation of Booster Pumps 5 24-Oct-22
A3260 Installation of Circular Pumps for Greaser 5 24-Oct-22
A2970 Installation of Plumbing Fixtures 5 24-Oct-22
A2960 Installation of Gas pipe 5 24-Oct-22

Page 5 of 10 TASK filter: All Activities


© Oracle Corporation
Mr. Irfan Muneer's Residence Lake City Lahore Classic Schedule Layout 20-Feb-23 13:29
Activity ID Activity Name Original Start Predecessors
Duration

A2950 Performing the water pressure test 5 24-Oct-22


A2940 Installation of Flush Tanks 5 24-Oct-22
A2930 Installation of Drainage Pipes 5 24-Oct-22
A2920 Installation of Water Supply Pipes 5 24-Oct-22
IMR-1.3.3.1.1.3 Air Conditioning Works 5 24-Oct-22
A3250 Testing and Commissioning of Exhaust Fans 5 24-Oct-22
A3040 Installation of Exhaust Fans 5 24-Oct-22
A3030 Installation of Insulation 5 24-Oct-22
A3020 Installation of Fresh Air Ducts 5 24-Oct-22
A3010 Installation of Exhaust Air Duct 5 24-Oct-22
IMR-1.3.3.1.2 Civil & Finishes Works 5 24-Oct-22
IMR-1.3.3.1.2.1 Wall Finishes 5 24-Oct-22
A3360 Final Coat of Paint 5 24-Oct-22
A3320 R.C.C. Shelves 5 24-Oct-22
A3310 Fixing of Wooden Cabinets 5 24-Oct-22
A3280 Fixing of wooden doors 5 24-Oct-22
A3130 Tiles Fixing for bath walls 5 24-Oct-22
A3120 Fixing of Cabinets 5 24-Oct-22
A3090 Surface Preparation of Paint Works 5 24-Oct-22
A3080 Installation of Aluminum Windows 5 24-Oct-22
A3070 Plaster Works 5 24-Oct-22
IMR-1.3.3.1.2.2 Ceiling Finishes 5 24-Oct-22
A3410 Final Coat of paint 5 24-Oct-22
A3400 Paint Work for Ceiling 5 24-Oct-22
A3390 Final Coat of paint 5 24-Oct-22
A3380 Paint Work for Ceiling 5 24-Oct-22
A3370 Surface preparation of Ceiling Paint Works 5 24-Oct-22
A3140 Plaster Ceiling Works 5 24-Oct-22
IMR-1.3.3.1.2.3 Floor Finishes 5 24-Oct-22
A3450 2nd Layer of Floor Screed 5 24-Oct-22
A3440 1st Layer of Floor screed 5 24-Oct-22
A3430 Waterproofing in bath flooring 5 24-Oct-22
A3420 Tiles Flooring for Washrooms 5 24-Oct-22
A3180 Tiles Flooring 5 24-Oct-22
IMR-1.3.3.1.2.4 Soft IDs 5 24-Oct-22
A3220 Placing the Furniture 5 24-Oct-22
IMR-1.3.3.1.2.5 Allied Works 5 24-Oct-22
A3580 MS Works 5 24-Oct-22
IMR-1.3.3.2 Executive Basement 5 24-Oct-22
IMR-1.3.3.2.1 MEP Works 5 24-Oct-22
IMR-1.3.3.2.1.1 Electrical & IT Works 5 24-Oct-22
A3760 Electrical and Networking conduiting in Floors 5 24-Oct-22

A3750 Testing and Commissioning of DBs 5 24-Oct-22


A3740 Installation of DBs 5 24-Oct-22

Page 6 of 10 TASK filter: All Activities


© Oracle Corporation
Mr. Irfan Muneer's Residence Lake City Lahore Classic Schedule Layout 20-Feb-23 13:29
Activity ID Activity Name Original Start Predecessors
Duration

A3670 Installation of of Wi-Fi Devices 5 24-Oct-22


A3660 Installation of Ceiling Fans 5 24-Oct-22
A3650 Installation of Switch and Sockets 5 24-Oct-22
A3640 Installation of Lighting Fixtures 5 24-Oct-22
A3630 Electrical and Networking Wiring 5 24-Oct-22
A3620 Installation of Extended Rod for Ceiling Fans 5 24-Oct-22
A3610 Installation of Cable Tray 5 24-Oct-22
A3600 Installation of Back boxes 5 24-Oct-22
A3590 Electrical and Networking conduiting in Walls 5 24-Oct-22

IMR-1.3.3.2.1.2 Plumbing Works 5 24-Oct-22


A4030 Installation of Booster Pumps 5 24-Oct-22
A4020 Installation of Circular Pumps for Greaser 5 24-Oct-22
A3730 Installation of Plumbing Fixtures 5 24-Oct-22
A3710 Performing the water pressure test 5 24-Oct-22
A3700 Installation of Flush Tanks 5 24-Oct-22
A3690 Installation of Drainage Pipes 5 24-Oct-22
A3680 Installation of Water Supply Pipes 5 24-Oct-22
IMR-1.3.3.2.1.3 Air Conditioning Works 5 24-Oct-22
A4370 Installation of Exhaust Fans 5 24-Oct-22
A4360 Installation of Fresh Air Ducts 5 24-Oct-22
A4350 Installation of Exhaust Ducts 5 24-Oct-22
A4010 Testing and Commissioning of Air Conditioning 5 24-Oct-22
Units
A3820 Fixing of Air Conditioning Out Doors units 5 24-Oct-22
A3810 Fixing of Air Conditioning In Doors units 5 24-Oct-22
A3800 Installation of Power and Control Cable for 5 24-Oct-22
Units
A3790 Installation of Insulation on copper piping 5 24-Oct-22
A3780 Installation of Drain Piping 5 24-Oct-22
A3770 Installation of Copper Piping 5 24-Oct-22
IMR-1.3.3.2.2 Civil & Finishes Works 5 24-Oct-22
IMR-1.3.3.2.2.1 Wall Finishes 5 24-Oct-22
A4120 Final Coat of Paint 5 24-Oct-22
A4040 Fixing of wooden doors 5 24-Oct-22
A3890 Tiles Fixing for bath walls 5 24-Oct-22
A3880 Fixing of Cabinets 5 24-Oct-22
A3850 Surface Preparation of Paint Works 5 24-Oct-22
A3840 Installation of Aluminum Windows 5 24-Oct-22
A3830 Plaster Works 5 24-Oct-22
IMR-1.3.3.2.2.2 Ceiling Finishes 5 24-Oct-22
A4170 Final Coat of paint 5 24-Oct-22
A4160 Paint Work for Ceiling 5 24-Oct-22
A4150 Final Coat of paint 5 24-Oct-22

Page 7 of 10 TASK filter: All Activities


© Oracle Corporation
Mr. Irfan Muneer's Residence Lake City Lahore Classic Schedule Layout 20-Feb-23 13:29
Activity ID Activity Name Original Start Predecessors
Duration

A4140 Paint Work for Ceiling 5 24-Oct-22


A4130 Surface preparation of Ceiling Paint Works 5 24-Oct-22
A3920 Marking and Opening for MEP Services 5 24-Oct-22
A3910 Gypsum Ceiling Works 5 24-Oct-22
A3900 Plaster Ceiling Works 5 24-Oct-22
IMR-1.3.3.2.2.3 Floor Finishes 5 24-Oct-22
A4230 Fixing of CC Paver Tiles 5 24-Oct-22
A4220 P.C.C for CC Paver Tiles 5 24-Oct-22
A4210 2nd Layer of Floor Screed 5 24-Oct-22
A4200 1st Layer of Floor screed 5 24-Oct-22
A4190 Waterproofing in bath flooring 5 24-Oct-22
A4180 Tiles Flooring for Washrooms 5 24-Oct-22
A3950 Wooden Flooring 5 24-Oct-22
A3940 Tiles Flooring 5 24-Oct-22
A3930 Marble Flooring 5 24-Oct-22
IMR-1.3.3.2.2.4 Soft IDs 5 24-Oct-22
A4320 Fixing of Fireplaces and LED TVs 5 24-Oct-22
A4280 Fixing of Carpets & rugs 5 24-Oct-22
A4000 Fixing of Drapes & curtains 5 24-Oct-22
A3990 Fixing of Hanging Lights 5 24-Oct-22
A3980 Placing the Furniture 5 24-Oct-22
A3970 Fixing of Crystal Chandelier 5 24-Oct-22
IMR-1.3.3.2.2.5 Allied Works 5 24-Oct-22
A4340 MS Works 5 24-Oct-22
IMR-1.3.21 Top Roof 5 24-Oct-22
A2060 CC Flooring 5 24-Oct-22
A2050 Sand Placing 5 24-Oct-22
A2040 PU Foam 5 24-Oct-22
A2030 Floor Screed 5 24-Oct-22
A2020 Application of Waterproofing 5 24-Oct-22
IMR-1.3.8 Facade Works 5 24-Oct-22
IMR-1.3.8.9 Front Elevation 5 24-Oct-22
A1110 Fixing of Glass Parapet 5 24-Oct-22
A1100 Paint Works 5 24-Oct-22
A1090 Parapet Columns 5 24-Oct-22
A1080 CC Molding 5 24-Oct-22
A1070 Plaster work 5 24-Oct-22
IMR-1.3.8.1 Right Elevation 5 24-Oct-22
A1160 Fixing of Glass Parapet 5 24-Oct-22
A1150 Paint Works 5 24-Oct-22
A1140 Parapet Columns 5 24-Oct-22
A1130 CC Molding 5 24-Oct-22
A1120 Plaster work 5 24-Oct-22
IMR-1.3.8.2 Left Elevation 5 24-Oct-22

Page 8 of 10 TASK filter: All Activities


© Oracle Corporation
Mr. Irfan Muneer's Residence Lake City Lahore Classic Schedule Layout 20-Feb-23 13:29
Activity ID Activity Name Original Start Predecessors
Duration

A1210 Fixing of Glass Parapet 5 24-Oct-22


A1200 Paint Works 5 24-Oct-22
A1190 Parapet Columns 5 24-Oct-22
A1180 CC Molding 5 24-Oct-22
A1170 Plaster work 5 24-Oct-22
IMR-1.3.8.3 Rear Elevation 0
IMR-1.3.5 Elevators 5 24-Oct-22
A1060 Testing & Commissioning of Elevators 5 24-Oct-22
A1050 Installation of Lift Equipments & COP 5 24-Oct-22
A1040 Installation of Control Panel 5 24-Oct-22
A1030 Installation of Car Cabin 5 24-Oct-22
A1020 Installation of Doors 5 24-Oct-22
A1010 Installation of Guide Rail 5 24-Oct-22
A1000 Installation of Brackets 5 24-Oct-22
IMR-1.3.4 External Development 5 24-Oct-22
IMR-1.3.4.6 External Drive Way 5 24-Oct-22
A4510 Fixing of CC Paver Tiles 5 24-Oct-22
A4500 PC.C. Flooring 5 24-Oct-22
A4490 Leveling and Dressing of the area 5 24-Oct-22
A4480 Removing of Debris from the site 5 24-Oct-22
IMR-1.3.4.1 Entrance Gates 5 24-Oct-22
A4540 Installation of Main Gates 5 24-Oct-22
A4530 Columns 5 24-Oct-22
A4520 Foundation Works 5 24-Oct-22
IMR-1.3.4.2 Boundary Wall 5 24-Oct-22
A4580 Fixing of Prefabricated MS Boundary Grill 5 24-Oct-22
A4570 R.C.C Wall 5 24-Oct-22
A4560 P.C.C 5 24-Oct-22
A4550 Excavation 5 24-Oct-22
IMR-1.3.4.3 Guard Room 5 24-Oct-22
A4640 Fixing of Doors 5 24-Oct-22
A4630 Flooring Works 5 24-Oct-22
A4620 Plaster Works 5 24-Oct-22
A4610 Slab 5 24-Oct-22
A4600 Wall 5 24-Oct-22
A4590 Foundation works 5 24-Oct-22
IMR-1.3.4.4 Septic Tank 5 24-Oct-22
A4810 Fixing of submersible Pumps 5 24-Oct-22
A4800 Fixing of Manhole covers 5 24-Oct-22
A4790 Concrete 5 24-Oct-22
A4780 Fixing of Sleeves 5 24-Oct-22
A4770 Steel Fixing 5 24-Oct-22
A4760 P.C.C 5 24-Oct-22
A4750 Excavation 5 24-Oct-22

Page 9 of 10 TASK filter: All Activities


© Oracle Corporation
Mr. Irfan Muneer's Residence Lake City Lahore Classic Schedule Layout 20-Feb-23 13:29
Activity ID Activity Name Original Start Predecessors
Duration

IMR-1.3.4.7 Under Ground Water Tanks 5 24-Oct-22


A4820 Fixing of submersible Pumps 5 24-Oct-22
A4740 Fixing of Manhole covers 5 24-Oct-22
A4730 Concrete 5 24-Oct-22
A4720 Fixing of Sleeves 5 24-Oct-22
A4710 Steel Fixing 5 24-Oct-22
A4700 P.C.C 5 24-Oct-22
A4690 Excavation 5 24-Oct-22
IMR-1.3.4.8 Fountain Structure 5 24-Oct-22
A4680 Fixing of Fountains 5 24-Oct-22
A4670 Structural works 5 24-Oct-22
A4660 Plumbing works 5 24-Oct-22
A4650 Foundation Works 5 24-Oct-22
IMR-1.3.4.5 Landscaping & Plantation 5 24-Oct-22
A4860 New Activity 5 24-Oct-22
A4850 New Activity 5 24-Oct-22
A4840 New Activity 5 24-Oct-22
A4830 New Activity 5 24-Oct-22
IMR-1.3.6 Preparation & Clearance of Snags / Handing Over 5 24-Oct-22
A2010 External Development 5 24-Oct-22
A2000 Basement 5 24-Oct-22
A1990 1st Floor 5 24-Oct-22
A1980 Ground Floor 5 24-Oct-22

Page 10 of 10 TASK filter: All Activities