You are on page 1of 16

Document Risk Assessment

Abu Dhabi Future School Program - Phase 8,


Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

Project Abu Dhabi Future School Program - Phase 8, Package 1, Al  Falah KG

Employer MUSANADA Contract No. PD/CA/BPS/DJ/R618/P301-2017-ADCE/17/181

Consultant: Al Suweidi Engineering Consultant LLC Date:

Contractor Al Eslah General Contracting Est Document No.

RISKASSESSMENT TEAM SITE REPRESENTATIVES

NAME DESIGNATION SIGNATURE NAME DESIGNATION SIGNATURE

Eng. Ayham Sabouni Project Manager Ahmed Hajeer Project Engineer

Eng.Zafeer Arif OSH Coordinator

Subject RISK ASSESSMENT for Anti-Fungal Paint above False Celing-

NOTE:- This Risk Assessment is prepared in line with the METHOD STATEMENT for Anti-Fungal Paint above False Celling - Rev. 00; and it
covers all activities described in this Method Statement.

1
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

 Site OSH induction course for every


Parking at live worker working in this project.
road to drop or  Bus should be park at safe area with
carry workers. double indicators and gate should not OSHAD-SF– Codes
open until bust fully stop. Construction of Practice CoP
Unfamiliar with the
local situation and  Worker should not cross the road manager, 44.0 Traffic
the Safety rules until bus is move from road to clear Management and
OSH In Logistics – Version
1 sight for upcoming traffic.
Unfamiliar to the charge, 3.0
Mobilization of  Proper training and guidance for all
nature of work and Employees 1 1 1 L
Employees 3 2 6 M new workers HR staff,
weather condition OSHAD-SF –
 Minimum PPE must be worn at all Supervisor Codes of Practice
Lack of training times CoP 08.0 – General
&
 Follow site safety rules Workplace
Younger workers  Follow the traffic safety regulations Individuals Amenities – Version
Medically not fit  Medical Check up to be done 3.0
 Special care for young people and
should not be involved in high risky
work

2 Material Delivery Falling of Workers, 3 4 12 H  Ensure all the operators, drivers are AEGC 1 3 3 L OSHAD-SF–COP
on Site ( Anti- materials Drivers, inducted. 1.0 – Hazardous
Fungal paint ) Collision of Property  Ensure that all the pickup driver Materials - V 3.0
delivery damage, company/supplier are informed about OSHAD-SF–COP
truck/pick up flagman, public the project safety requirements prior 2.0 – Personal
with men and to the delivery of the materials. Protective
materials.  Ensure that the road access from the Equipment - V 3.0
OSHAD-SF – COP
Slips, Trips & site entrance to the storage area will
4.0 – First Aid and

2
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

falls, be properly leveled, maintained and Medical Emergency


Pickup trucks compacted. Treatment - V 3.0
toppling over  Ensure that all drivers and vehicle OSHAD-SF –COP
Damaging exiting comply with the safety requirements. 08.0 – General
utilities ( Street  Ensure that the delivery truck is Workplace
light poles, etc ) inspected at the project gate by the Amenities – V 3.0
Unsafe storage of security and safety personnel to OSHAD-SF –COP
14.0 – Manual
materials. check if the load/material is secured
Handling and
Unsafe unloading properly, the vehicle doesn’t have any
Ergonomics – V 3.0
of materials defects ( leaks, damages)
OSHAD-SF –
Delivery during  Ensure that the drivers have COP 17.0 – Safety
night time. adequate PPE Signage and
 Ensure that the drivers are provided Signals – V 3.0
with a visitor induction at the site OSHAD-SF- COP
entrance ( they are instructed/ 22.0 – Barricading
informed about the site rules, driving of Hazards – V 3.0
speed limit, storage areas, OSHAD-SF –COP
emergency procedures etc) 36.0 – Plant and
 Ensure that they are guided by Equipment – V 3.0
trained banksman towards the safe OSHAD-SF–COP
storage zone. 44.0 Traffic
 Ensure that AEGC provides a safe Management and
Logistics – V 3.0
and clear vehicle access for the
OSHAD-Sf–
delivery trucks/pick ups.
Element 2 - Risk
 Separate pedestrian access to be
Management
used by pedestrians. OSHAD-SF –
 Ensure that there is adequate lighting Element 3 –

3
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

is provided if the delivery is done at Management of


night. Contractors
 Ensure that the access ways are OSHAD SF-
demarked with cones and warning Element- 5 –
tape to prevent them from going too Training &
close to the edges of the access awareness and
ways. competency
OSHAD-SF–
 Ensure that the pickup truck have
Element 6 -
reverse alarm and beacon light.
Emergency
 Ensure that there is enough distance
Management
maintained between the delivery Musanada Key HSE
access way and the pedestrian way. Requirements
 No unauthorized personnel to enter
the storage area while the material is
being unloaded.
 Adequate signage is displayed
around the access ways and the
storage areas.
 Ensure that the public property/
materials which are near the storage
area are protected and barricaded
with hard PVC barriers.
 Ensure that the materials are stored
safely on the project and storage is in
location as approved in the logistic
plan.
 Ensure that hazardous material if any

4
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

is stored in safe area and proper


precaution is taken as per the MSDS
or supplier’s recommendation.
 Ensure that mechanical aid is being
used for unloading materials of
heavy materials
 Ensure that workers wear adequate
ppe while handling/unloading
materials.
 Ensure that there is a certified First
Aider and adequate first aid facility
available on site.

3 Use of Hand Eye injuries Workers, 3 3 9 H  Proper body position and safety glass AEGC 1 2 2 L OSHAD-SF –COP
Tools ( tools for Laceration when Personnel with side shields. 08.0 – General
mixing paint ) using sharp tools walking nearby  Training to be provided to the workers Workplace
Defective tools prior to the start of the works. Amenities – V 3.0
 Tool to be suitable for the purpose OSHAD-SF –COP
intended and maintained in good 14.0 – Manual
working order. Tools to be inspected Handling and
Ergonomics – V 3.0
regularly in accordance with
OSHAD-SF– COP
manufacturer’s instructions.
47.0 – Machine
 Hand gloves, Safety glasses should
Guarding Version
be used when using hand tools. 3.0
 All operatives to be given instructions OSHAD-SF – CoP
in the safe use of hand tools as part 36.0 – Plant and
of their skill training. Tools which may Equipment – V 3.0

5
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

3.0
OSHAD-SF –
deteriorate are to be checked on a COP 35.0 –
regular basis and maintained or Portable Power
replaced as necessary. Tools – Version 3.0
OSHAD-SF –
 First Aider and First Aid items to be
Element 6 -
made available on site.
Emergency
 Ensure that cables are routed safely
Management
and don’t pose a tripping hazard for OSHAD-SF –
the workers/engineers etc. COP 4.0 – First Aid
 Daily TBT to be carried out prior to and Medical
the start of the works. Also ensure Emergency
that the workers are inducted. Treatment - V 3.0
Musanada Key HSE
Requirements

4 Fungal Paint Falling of paint Workers , 3 4 12 H  Ensure that all workers carrying out OSHAD-SF–COP
Application on personnel Engineers, painting works to be trained prior to 2.0 – Personal
working below. Consultants, the start of their works Protective
Falling of men Personnel  Ensure that the workers are getting Equipment - V 3.0
(from working nearby daily Toolbox talks from competent OSHAD-SF – COP
scaffolding/highe foreman & HSE Representative. 4.0 – First Aid and
r platform).  Ensure that sharp channels are Medical Emergency
Treatment - V 3.0
Slips, Trips and handled only by workers who are
OSHAD-SF –COP
falls wearing hand gloves.
08.0 – General
Waste  Ensure that safety glasses &
Workplace
Contact with respirators are worn by workers Amenities – V 3.0

6
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

chemicals ( Anti- carrying out fungal paint works. OSHAD-SF –COP


Fungal Paint )  Ensure adequate signage is 14.0 – Manual
displayed in the work zone. Handling and
 Ensure the working area is barricaded Ergonomics – V 3.0
to prevent unauthorized access. OSHAD-SF –
 Ensure that manual handling training COP 17.0 – Safety
is given to workers who are doing Signage and
Signals – V 3.0
repetitive works
OSHAD-SF- COP
 Ensure that safe working platform is
22.0 – Barricading
provided for the workers to carry out
of Hazards – V 3.0
their works. The platform to be OSHAD-SF– COP
erected by competent Scaffolders and 23.0 – Working at
approved and tagged by Competent Heights– V 3.0
Scaffolding supervisor. The working OSHAD-SF –COP
platform to have adequate fall 26.0 – Scaffolding –
protection ( Top rail, Mid rail etc) V 3.0
 The working platform to have toe OSHAD-SF – COP
boards to ensure that the materials 35.0 – Portable
don’t fall on workers below. Power Tools – V 3.0
 Ensure that workers on platform OSHAD-SF–COP
above 1.8 meters don a safety 47.0 – Machine
harness and tie them to a safe Guarding V 3.0
OSHAD-SF –COP
anchorage point.
53.0 - OHS
 Ensure that only inspected and
Management During
approved hand tools are used by the
Construction Work –
workers. V 3.0
 Regular housekeeping to be done in OSHAD-SF–COP

7
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

the work zone to prevent trip hazard.


 Ensure that MSDS for paint is made 54.0 – Waste
available and workers are trained Management – V –
regarding the same. 3.0
 First Aid items and Eye wash station OSHAD-SF –
to be readily available. Element 2 - Risk
 Ensure that the paint leftovers are Management
segregated away and are stored in a OSHAD SF-
designated area. Element- 5 –
 Ensure that the paint leftovers, drums Training and
etc are disposed of as per the awareness and
requirements of Center of waste competency
OSHAD-SF –
Management.
Element 6 -
 Daily TBT to be carried out prior to
Emergency
the start of the works. Also ensure
Management
that the workers are inducted. Musanada Key HSE
Requirements

5 Working on Falling of men Workers, 3 4 12 H  Ensure that only approved scaffolding AEGC 1 3 3 L OSHAD-SF–COP
Mobile Scaffolds and materials. personnel materials is used on site. Bent and 2.0 – Personal
Collapse of nearby damaged scaffold materials not be Protective
scaffolds used. Equipment - V 3.0
Slips, trips & falls,  Certified and trained scaffolds to erect OSHAD-SF – COP
Electrocution modify and dismantle scaffolds. 4.0 – First Aid and
 Certified Scaffolding supervisor to Medical Emergency
Treatment - V 3.0
inspect and tag the scaffold. In case
OSHAD-SF –COP
of any modification, the certified

8
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Scaffolders to re-inspect and tag the 08.0 – General


scaffold. Workplace
 Ensure that the mobile Scaffolds Amenities – V 3.0
have safe working platform, fall OSHAD-SF –
protection ( Top rail, mid rails, Toe- COP 17.0 – Safety
boards ) to prevent falling of men and Signage and
materials. Signals – V 3.0
OSHAD-SF- COP
 Barrication to be done around the
22.0 – Barricading
scaffold to prevent unauthorized
of Hazards – V 3.0
access.
OSHAD-SF– COP
 Signage to be displayed ( Use safety 23.0 – Working at
harness, No unauthorized personnel, Heights– V 3.0
Don’t work on red tagged scaffolds OSHAD-SF –COP
etc) 26.0 – Scaffolding –
 Ensure that all workers comply with V 3.0
PPE requirements (Safety harness OSHAD-SF – COP
and tie it to a safe anchorage point). 35.0 – Portable
 Ensure that the workers are trained Power Tools – V 3.0
prior to the start of the works. OSHAD-SF –
 Ensure that the workers don’t lean Element 2 - Risk
over/ climb /stand on the top of mid Management
rail/ hand rail to do the job. OSHAD SF-
Element- 5 –
 Ensure that the platform is kept clear
Training and
at all times (no unwanted tools,
awareness and
materials) to prevent slips, trips and
competency
falls. OSHAD-SF –
 Ensure that the caster wheels of the Element 6 -

9
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

scaffolding are in good condition and


are locked when the personnel are
working above.
 Ensure that the mobile scaffold is not
pushed/pulled while the workers are
on the platform.
Emergency
 Ensure that the cables (for portable
Management
power tools) are routed safely to Musanada Key HSE
prevent slips, trips and falls. Requirements
 Ensure that the electrical cables are
in good condition without any cuts,
free from cracks and free from non-
standard joints. Only Industrial plugs
to be used for joints.

6 Working on Falling from  Ensure that step ladders are in good AEGC 1 3 3 L OSHAD-SF–COP
Step ladders ladders, condition, free from cracks, bents or 2.0 – Personal
Falling of tools damages. Protective
Electrocution  Ensure that all ladders are inspected Equipment - V 3.0
Slips, Trips and and tagged by competent personnel. OSHAD-SF – COP
falls  Untagged aluminum ladders not to be 4.0 – First Aid and
Cut injury due to used. Medical Emergency
Treatment - V 3.0
sharp edges/  Ensure that damaged /broken ladders
OSHAD-SF –COP
broken steps are tagged red ( do not use ) to
08.0 – General
Floor Damages prevent workers from using them on
Workplace
site. Amenities – V 3.0
 Ensure that the spreader locks, front OSHAD-SF –

10
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

& rear rails, braces, steps, shelf are in COP 17.0 – Safety
good condition and free from defects. Signage and
 Ensure that spreader lock is extended Signals – V 3.0
and locked before accessing the top OSHAD-SF- COP
of ladder. 22.0 – Barricading
 Ensure that there is always a person of Hazards – V 3.0
standing below holding the ladder to OSHAD-SF– COP
23.0 – Working at
prevent the personnel working on
Heights– V 3.0
ladder from falling.
OSHAD-SF –COP
 Ensure that the person holding the
37.0 – Ladders – V
ladder also to comply with the same 3.0
PPE requirements . OSHAD-SF – COP
 Ensure that all the bottoms of the 35.0 – Portable
rails have braces to prevent floor Power Tools – V 3.0
damages. OSHAD-SF –
 Ensure that while working on ladders, Element 2 - Risk
the worker should not lean to reach. Management
Ensure that the belt buckle stays OSHAD SF-
within the stiles. Element- 5 –
 Ensure that the ladder is long enough Training and
to reach the work ( ceiling ) awareness and
 For A-type step ladders –ensure that competency
OSHAD-SF –
all four stepladder feet are in contact
Element 6 -
with the ground and the steps are
Emergency
level
Management
 If it is single ladder and not A Type Musanada Key HSE
ladder, ensure that it is positioned at Requirements

11
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

an angle of 75 degrees or use the 1:4


rule (ie. 1 mt base : 4 mt height ).
 Don’t stand ladders on moveable
objects, such as pallets, bricks, lift
trucks, tower scaffolds, excavator
buckets, vans, or mobile elevating
work platforms.
 Avoid holding items when climbing
(consider using a tool belt);
 Ensure that workers always grip &
face the ladder while climbing up and
same way while climbing down.
 Ensure that the workers maintain
three points of contact when climbing
(this means a hand and two feet) and
wherever possible at the work
position.
 Ensure that workers don’t stand and
work on the top two steps (including a
step forming the very top of the
stepladder).
 Ensure that damaged step ladders
are not used on site.
 Ensure that the cables (for portable
power tools) are routed safely to
prevent slips, trips and falls.

12
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

 Ensure that the electrical cables are


in good condition without any cuts,
free from cracks and free from non-
standard joints. Only Industrial plugs
to be used for joints.

7 Handling of Contact with Workers, Staff, 3 3 9 H  MSDS for Anti-fungal Paint, to be AEGC 1 3 L OSHAD-SF –
chemicals ( Anti chemicals Visitors made available and the workers to be CoP 1.0 –
fungal Paint ) 3 Hazardous
trained regarding the safe usage
(PPE, emergency preparedness ) Materials - Version
 Ensure that PPE (Respirators, Hand 3.0.
Gloves, Safety glasses etc) is worn OSHAD-SF – CoP
as mentioned in the MSDS while 2.0 – Personal
Protective
handling the chemicals.
Equipment - Version
 Ensure that Chemicals are stored in a
3.0
safe storage area as recommended in
OSHAD-SF –
the MSDS (Material Safety Data Element 2 - Risk
Sheet). Management
 Ensure that the area is barricaded OSHAD SF-
while carrying out the works. Element- 5 –
 Daily TBT to be carried out prior to Training and
the start of the works. Also ensure awareness and
that the workers are inducted. competency
OSHAD-SF –
Element 6 -
Emergency
Management
Musanada Key HSE

13
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Requirements
 Ensure all materials are stored safely
OSHAD-SF – CoP
 Access and egress to be kept clear at
8.0 – General
Workers, Staff all times. 1 2 2 L
Tripping hazards 2 4 8 H AEGC Workplace
 Regular housekeeping to be carried Amenities Version
out. 3.0
OSHAD-SF - CoP
22.0 – Barricading
 Ensure the area is barricaded and
of Hazards –
Workers, Suitable Signage is displayed to
Unauthorized 1 2 2 L Version 3.0
Public, Staff 2 4 8 H prevent unauthorized access is AEGC
access OSHAD-SF –
prohibited. CoP 17.0 – Safety
Signage and
Signals – V 3.0
8 Emergency Fire All personnel 3 4 12 H  All personnel to be safety inducted. AEGC 1 3 3 OSHAD-SF –
situations Collision  Train and inform all employees Codes of Practice
Electrocution regarding fire Emergency Evacuation CoP 17.0 – Safety
Failure to Plan. Signage and
Evacuation  Initiate and maintain good Signals – Version
housekeeping 3.0
 Ensure that all materials used in porta OSHAD-SF –
Codes of Practice
cabin construction are fire rated.
CoP 43.0 –
 Ensure that enough firefighting
Temporary
equipment are made available on
Structures - Version
site. ( Fire Ex., Fire Hose Reel) 3.0
 Ensure that fire alarm and Fire siren OSHAD-SF –
are available on site and are fully Codes of Practice

14
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

functional.
 No smoking in non-designated areas.
 Ensure that smoke detectors are CoP 08.0 – General
installed inside all offices. Workplace
 Ensure that workers are trained- how Amenities – Version
to fight fire, what to do in case of an 3.0
emergency OSHAD SF-
 Ensure that enough assembly points Element- 5 –
are made available on site and Training and
access to them is kept clear at all awareness and
times. competency
 Ensure emergency numbers are OSHAD-SF –
posted at strategic locations. Element 6 -
 Ensure that Evacuation plan is posted Emergency
Management
on notice boards and all are informed
about it during inductions.

Method Statement & Risk Assessment handover


Date: _ _ / _ _ /_ _ _

I have read, understood and accept the conditions of this method statement & Risk Assessment.
Name of Job Supervisor/Foremen/Site Engineer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

15
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

All operatives involved with this job must sign below


I have read, understood and accept the conditions of this method statement and Risk Assessment.

Sr. Remarks
Name Emp. No. Emirates ID No Designation Date Signature
No.
1
2
3
4
5
6
7
8
9
10
11
12
13

16
RISK ASSESSMENT

You might also like