RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
2 Material Delivery Falling of Workers, 3 4 12 H Ensure all the operators, drivers are AEGC 1 3 3 L OSHAD-SF–COP
on Site ( Anti- materials Drivers, inducted. 1.0 – Hazardous
Fungal paint ) Collision of Property Ensure that all the pickup driver Materials - V 3.0
delivery damage, company/supplier are informed about OSHAD-SF–COP
truck/pick up flagman, public the project safety requirements prior 2.0 – Personal
with men and to the delivery of the materials. Protective
materials. Ensure that the road access from the Equipment - V 3.0
OSHAD-SF – COP
Slips, Trips & site entrance to the storage area will
4.0 – First Aid and
2
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
3
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
4
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
3 Use of Hand Eye injuries Workers, 3 3 9 H Proper body position and safety glass AEGC 1 2 2 L OSHAD-SF –COP
Tools ( tools for Laceration when Personnel with side shields. 08.0 – General
mixing paint ) using sharp tools walking nearby Training to be provided to the workers Workplace
Defective tools prior to the start of the works. Amenities – V 3.0
Tool to be suitable for the purpose OSHAD-SF –COP
intended and maintained in good 14.0 – Manual
working order. Tools to be inspected Handling and
Ergonomics – V 3.0
regularly in accordance with
OSHAD-SF– COP
manufacturer’s instructions.
47.0 – Machine
Hand gloves, Safety glasses should
Guarding Version
be used when using hand tools. 3.0
All operatives to be given instructions OSHAD-SF – CoP
in the safe use of hand tools as part 36.0 – Plant and
of their skill training. Tools which may Equipment – V 3.0
5
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
3.0
OSHAD-SF –
deteriorate are to be checked on a COP 35.0 –
regular basis and maintained or Portable Power
replaced as necessary. Tools – Version 3.0
OSHAD-SF –
First Aider and First Aid items to be
Element 6 -
made available on site.
Emergency
Ensure that cables are routed safely
Management
and don’t pose a tripping hazard for OSHAD-SF –
the workers/engineers etc. COP 4.0 – First Aid
Daily TBT to be carried out prior to and Medical
the start of the works. Also ensure Emergency
that the workers are inducted. Treatment - V 3.0
Musanada Key HSE
Requirements
4 Fungal Paint Falling of paint Workers , 3 4 12 H Ensure that all workers carrying out OSHAD-SF–COP
Application on personnel Engineers, painting works to be trained prior to 2.0 – Personal
working below. Consultants, the start of their works Protective
Falling of men Personnel Ensure that the workers are getting Equipment - V 3.0
(from working nearby daily Toolbox talks from competent OSHAD-SF – COP
scaffolding/highe foreman & HSE Representative. 4.0 – First Aid and
r platform). Ensure that sharp channels are Medical Emergency
Treatment - V 3.0
Slips, Trips and handled only by workers who are
OSHAD-SF –COP
falls wearing hand gloves.
08.0 – General
Waste Ensure that safety glasses &
Workplace
Contact with respirators are worn by workers Amenities – V 3.0
6
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
7
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
5 Working on Falling of men Workers, 3 4 12 H Ensure that only approved scaffolding AEGC 1 3 3 L OSHAD-SF–COP
Mobile Scaffolds and materials. personnel materials is used on site. Bent and 2.0 – Personal
Collapse of nearby damaged scaffold materials not be Protective
scaffolds used. Equipment - V 3.0
Slips, trips & falls, Certified and trained scaffolds to erect OSHAD-SF – COP
Electrocution modify and dismantle scaffolds. 4.0 – First Aid and
Certified Scaffolding supervisor to Medical Emergency
Treatment - V 3.0
inspect and tag the scaffold. In case
OSHAD-SF –COP
of any modification, the certified
8
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
9
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
6 Working on Falling from Ensure that step ladders are in good AEGC 1 3 3 L OSHAD-SF–COP
Step ladders ladders, condition, free from cracks, bents or 2.0 – Personal
Falling of tools damages. Protective
Electrocution Ensure that all ladders are inspected Equipment - V 3.0
Slips, Trips and and tagged by competent personnel. OSHAD-SF – COP
falls Untagged aluminum ladders not to be 4.0 – First Aid and
Cut injury due to used. Medical Emergency
Treatment - V 3.0
sharp edges/ Ensure that damaged /broken ladders
OSHAD-SF –COP
broken steps are tagged red ( do not use ) to
08.0 – General
Floor Damages prevent workers from using them on
Workplace
site. Amenities – V 3.0
Ensure that the spreader locks, front OSHAD-SF –
10
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
& rear rails, braces, steps, shelf are in COP 17.0 – Safety
good condition and free from defects. Signage and
Ensure that spreader lock is extended Signals – V 3.0
and locked before accessing the top OSHAD-SF- COP
of ladder. 22.0 – Barricading
Ensure that there is always a person of Hazards – V 3.0
standing below holding the ladder to OSHAD-SF– COP
23.0 – Working at
prevent the personnel working on
Heights– V 3.0
ladder from falling.
OSHAD-SF –COP
Ensure that the person holding the
37.0 – Ladders – V
ladder also to comply with the same 3.0
PPE requirements . OSHAD-SF – COP
Ensure that all the bottoms of the 35.0 – Portable
rails have braces to prevent floor Power Tools – V 3.0
damages. OSHAD-SF –
Ensure that while working on ladders, Element 2 - Risk
the worker should not lean to reach. Management
Ensure that the belt buckle stays OSHAD SF-
within the stiles. Element- 5 –
Ensure that the ladder is long enough Training and
to reach the work ( ceiling ) awareness and
For A-type step ladders –ensure that competency
OSHAD-SF –
all four stepladder feet are in contact
Element 6 -
with the ground and the steps are
Emergency
level
Management
If it is single ladder and not A Type Musanada Key HSE
ladder, ensure that it is positioned at Requirements
11
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
12
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
7 Handling of Contact with Workers, Staff, 3 3 9 H MSDS for Anti-fungal Paint, to be AEGC 1 3 L OSHAD-SF –
chemicals ( Anti chemicals Visitors made available and the workers to be CoP 1.0 –
fungal Paint ) 3 Hazardous
trained regarding the safe usage
(PPE, emergency preparedness ) Materials - Version
Ensure that PPE (Respirators, Hand 3.0.
Gloves, Safety glasses etc) is worn OSHAD-SF – CoP
as mentioned in the MSDS while 2.0 – Personal
Protective
handling the chemicals.
Equipment - Version
Ensure that Chemicals are stored in a
3.0
safe storage area as recommended in
OSHAD-SF –
the MSDS (Material Safety Data Element 2 - Risk
Sheet). Management
Ensure that the area is barricaded OSHAD SF-
while carrying out the works. Element- 5 –
Daily TBT to be carried out prior to Training and
the start of the works. Also ensure awareness and
that the workers are inducted. competency
OSHAD-SF –
Element 6 -
Emergency
Management
Musanada Key HSE
13
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Requirements
Ensure all materials are stored safely
OSHAD-SF – CoP
Access and egress to be kept clear at
8.0 – General
Workers, Staff all times. 1 2 2 L
Tripping hazards 2 4 8 H AEGC Workplace
Regular housekeeping to be carried Amenities Version
out. 3.0
OSHAD-SF - CoP
22.0 – Barricading
Ensure the area is barricaded and
of Hazards –
Workers, Suitable Signage is displayed to
Unauthorized 1 2 2 L Version 3.0
Public, Staff 2 4 8 H prevent unauthorized access is AEGC
access OSHAD-SF –
prohibited. CoP 17.0 – Safety
Signage and
Signals – V 3.0
8 Emergency Fire All personnel 3 4 12 H All personnel to be safety inducted. AEGC 1 3 3 OSHAD-SF –
situations Collision Train and inform all employees Codes of Practice
Electrocution regarding fire Emergency Evacuation CoP 17.0 – Safety
Failure to Plan. Signage and
Evacuation Initiate and maintain good Signals – Version
housekeeping 3.0
Ensure that all materials used in porta OSHAD-SF –
Codes of Practice
cabin construction are fire rated.
CoP 43.0 –
Ensure that enough firefighting
Temporary
equipment are made available on
Structures - Version
site. ( Fire Ex., Fire Hose Reel) 3.0
Ensure that fire alarm and Fire siren OSHAD-SF –
are available on site and are fully Codes of Practice
14
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
functional.
No smoking in non-designated areas.
Ensure that smoke detectors are CoP 08.0 – General
installed inside all offices. Workplace
Ensure that workers are trained- how Amenities – Version
to fight fire, what to do in case of an 3.0
emergency OSHAD SF-
Ensure that enough assembly points Element- 5 –
are made available on site and Training and
access to them is kept clear at all awareness and
times. competency
Ensure emergency numbers are OSHAD-SF –
posted at strategic locations. Element 6 -
Ensure that Evacuation plan is posted Emergency
Management
on notice boards and all are informed
about it during inductions.
I have read, understood and accept the conditions of this method statement & Risk Assessment.
Name of Job Supervisor/Foremen/Site Engineer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
15
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 013
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Sr. Remarks
Name Emp. No. Emirates ID No Designation Date Signature
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
16