You are on page 1of 3

METHOD STATEMENT SUBMITTAL (MSS)

OWNER DEVELOPER EPC CONTRACTOR EPC CONTRACTOR

Aldahra Food Industries Abu Golden Falcon Technical Complete Energy


Dhabi Masdar & EDF Group Services Solutions

METHOD STATEMENT SUBMITTAL FOR


WATER LEAKAGE TEST

Project Name AL DAHRA FOOD INDUSTRIES – ABU DHABI

Document Number ADFI-EME-GFTS/CES-MOS-03_R04

Rev. 04

Date Submitted 15-February-2024

Prepared by Ahmed B H Construction Manager

Approved by Hossam Hamouda Project Manager

Issued Purpose Approval

Rev
Date Description Prepared By Checked Safety Approved Status
No
03-08- Project
02 Water Leakage Test HSE Supervisor PM Approved
2023 Engineer
Adding more tools, retractable
block (P. No – 11 to 13)
Modified Installation method, Approved
07-11- Project
03 rectified comments (Made on – 23- HSE Supervisor PM with
2023 Engineer
Oct-23, P. No – 13) comments
Access for silo building (ADM/ADCD
Approval, P. No – 09

15-02- Temporary Staircase (Scaffolding) Project Approve As


04 HSE Supervisor PM
2024 for silo (6.1 P.No -09) Engineer Noted
METHOD STATEMENT SUBMITTAL FOR WATER LEAKAGE TEST
Document Number Revision Date
ADFI-EME-GFTS/CES-MOS-03_R04 04 15-02-2024
Project: EPC for 1.2MWp Capacity Roof Top PV Plant for AL DAHRA FOOD Project
INDUSTRIES – Kizad City (Abu Dhabi) Code:
Ref. No. ADFI-EME-GFTS/CES-MOS-
METHOD STATEMENT 03_R04
Date: 15/02/2024
Required By:
Method Statement Submittal – Water
Description of Submittal:
Leakage Test Division:

Calculations O & M Manual (Prel.) Test Others (Specify) Issued For:


Reports Technical Submittal O & M Manual (Final) Warranty Approval
Enclosed:
PQD Samples
Info & Records Only
Method Statement Schedules
EPC Contractor's PM: Received by: (Name/ Signature/ Date)
(Name/ Signature/ Date)
Hossam Hamouda
ADFI-EME-GFTS/CES-MOS-03_R04 - Method statement for Installation Of Water Leakage Test

Revision-03 – In this revision, tools like pressure pump, motor pump, retractable fall arrester block have been added. Also,
more pictures & details have been added.
Modified Installation method, rectified comments (Made on – 23-Oct-23, P. No – 13)
Access for silo building (ADM/ADCD Approval) (Made on – 26-Oct-23, P. No – 09)

Revision-04 – Temporary Staircase access (Scaffolding) for Silo Building (Erected by 03-Feb-2024) Ref: ADFI-EME-GFTS
(CES-MOS-07_R00_SCAFFOLD STRUCTURE _ ADFI-EME-GFTS CES-RA-07_R00_SCAFFOLD STRUCTURE)
(Made On – 03-Feb-2024, P. No - 12)

REVIEW STATUS
A. Approved B. Approved As Noted C. Revise and Resubmit D. Not Approved

Client Comments:

Received by Client

Masdar/Emerge Al Dahra Food Industries

Name Signature/Date Name Signature/Date

2|Page
METHOD STATEMENT SUBMITTAL FOR WATER LEAKAGE TEST
Document Number Revision Date
ADFI-EME-GFTS/CES-MOS-03_R04 04 15-02-2024

3|Page

You might also like