Project Design & Build Upgrading of Existing Punitive &Reformatory Buildings Complex, Al Wathba Phase – 1 On Plot # P5

Employer MUSANADA Contract No.

Consultant: CORE ENGINEERING CONSULTANT Date:

Contractor M/s Ghantoot Tpt & Gen. Cont. L.L.C. (Building Division) Document No.

RISKASSESSMENT TEAM PROJECT REPRESENTATIVES

NAME DESIGNATION SIGNATURE NAME DESIGNATION SIGNATURE

Zafeer Arif OSH Eng Sifyan M Abdul kareem Resident Engineer

Subject Risk Assessment

Page 1 of 1
CORE Engineering consultancy RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Parking at live  Site OSH induction course mandatory


road for all working in this project.
 Vehicle should be park at safe area OSHAD-SF– Codes
Unfamiliar with the of Practice CoP
with reverse mode.
local situation and 44.0 Traffic
the Safety rules  Proper training and guidance for all
Management and
new Employees
1 Logistics – Version
Unfamiliar to the  Minimum PPE must be worn at site Managemen
Mobilization of 3.0
nature of work and Employees 3 2 6 M inspection. t 1 1 1 L
Employees weather condition  Follow site safety rules. OSHAD-SF –
 Follow the traffic safety regulations. Codes of Practice
Lack of training
 Medical Check up to be done. CoP 08.0 – General
Younger workers  Special care for young people and Workplace
should not be involved in high risky Amenities – Version
Medically not fit 3.0
work.

2 OFFICE WORK Personal injures – Employees 3 2 6 M 1. Work stations are designed for Main 1 1 1 L 1. Occupational
safety, using ergonomic principles, contractor Safety and Health
Work – related Abu Dhabi System
and overcrowding will be avoided.
upper limb framework OSHAD-
2. First-aid equipment available at all
disorders- SF CoP 53.1,
times when work is being done in
Manual Handling – offices, and trained first-aiders will be 2. Ministerial Order
provided where reasonably No 32 / 1982 (to
Electrocution/Fire
practicable to do so. protect employees

3. Records maintained of routine fire against
Environmental – inspections and the maintenance and occupational
testing of fire fighting equipment. hazards (artical -
4. Competent persons acting as 3,7,9,17)
marshals will be appointed as
3. OHSAS
appropriate. Heating & ventilation
18001:2007
systems will be monitored to ensure
3the working environment is

Page 2
RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

comfortable.
5. Fire emergency exit routes
established adequately signed and
kept free of obstruction.
6. An emergency action plan 4. Federal Law 8
(1980) UAE Labor
prepared and published for each
Law
office, and practiced at stated
intervals.
7. Dangerous parts of machinery are
suitably guarded.

3 Using the Strain and sprain , CORE 3 2 6 M 1. Ensure correct use and GTGC 1 1 1 L 1. Occupational
printer(changing Electrical shock , Employees maintenance of the equipment. Safety and Health
printer cartridge, Contact with toner CORE Abu Dhabi System
2. Do not overload the equipment with
loading paper ) visitor framework OSHAD-
excessive amounts of paper.
3. Be cautious when handling or SF CoP 53.1 OSH
Defective construction
equipment folding paper,
management plan,
CoP 4.0 First aid &
medical
emergenicies
treatment

2. Ministerial Order
No 32 / 1982 (to
protect employees
against
occupational
hazards (artical -
3,7,9,17)

3. OHSAS
18001:2007

4. Federal Law 8
(1980) UAE Labor

Page 3
RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Law

1. Ensure correct use and 1. Occupational


maintenance of the equipment. Safety and Health
2. Do not overload the equipment with Abu Dhabi System
excessive amounts of paper. framework OSHAD-
3. Be cautious when handling or SF CoP 53.1 OSH
folding paper, construction
management plan,
CoP 4.0 First aid &
medical
Using the emergenicies
printer(changing treatment
Strain and sprain , secretary & Office staff
printer cartridge,
4 Electrical shock , documents 3 2 6 M 1 1 1 M 2. Ministerial Order
loading paper ) Document
Contact with toner controller No 32 / 1982 (to
controller protect employees
Defective
equipment against
occupational
hazards (artical -
3,7,9,17)

3. OHSAS
18001:2007

4. Federal Law 8
(1980) UAE Labor
Law

5 Using the hole Cuts or piercing Office staff 3 2 6 M 1. Correct use and maintenance of Office staff 1 1 1 M 1. Occupational
puncher, from sharp edges the equipment. Safety and Health
scissors, stapler Document Document Abu Dhabi System
2. Do not overload the equipment with
& guillotine controller controller framework OSHAD-
excessive amounts of paper.
3. Be cautious when handling or SF CoP 53.1 OSH
folding paper, construction
management plan,
CoP 4.0 First aid &

Page 4
RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

medical
emergenicies
treatment

2. Ministerial Order
No 32 / 1982 (to
protect employees
against
occupational
hazards (artical -
3,7,9,17)

3. OHSAS
18001:2007

4. Federal Law 8
(1980) UAE Labor
Law

6 Using Display Repetitive Strain office staff 3 3 9 H 1. Operator takes regular breaks form Office staff 2 2 4 M 1. Occupational
Screen Injury, eyesight their machine. Safety and Health
Equipment deterioration Visitor Document Abu Dhabi System
2. Recommended standard
controller framework OSHAD-
equipment and accessories are used.
3. Regular assessments of operator’s Visitor SF CoP 53.1 OSH
workstations are carried out. construction
management plan,
CoP 4.0 First aid &
medical
emergenicies
treatment

2. Ministerial Order
No 32 / 1982 (to
protect employees
against
occupational
hazards (artical -

Page 5
RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

3,7,9,17)

3. OHSAS
18001:2007

4. Federal Law 8
(1980) UAE Labor
Law

7 Electrical Electricity Office staff 3 3 9 H 1. Installation, maintenance and Main 2 2 4 M 1. Occupational


connections repair of electrical services done by a contractor Safety and Health
Fire Document Abu Dhabi System
competent electrician. And lack out
controller framework OSHAD-
tag out system in place.
Visitor 2. The entire generator effectively SF CoP 53.1 OSH
earthed and a competent electrician construction
should test the effectiveness of the management plan,
CoP 15 Electrical
earth.
safety
3. All temporary electricity supplies
(generators) are installed Earth 2. Ministerial Order
Leakage Circuit Breakers. No 32 / 1982 (to
4. The lengthy supply cables for protect employees
movable plant and portable tools are against
protected from damage. occupational
5. Supply cables are routed clear of hazards (artical -
construction work and be protected 3,7,9,17)
against traffic movement. 3. OHSAS
6. The electrical persons wearing the 18001:2007
necessary personal protective
equipment’s. 4. Federal Law 8
7. Electricians received additional (1980) UAE Labor
Law
training in the above standards and
HSE guidance material, toolbox talks
will be given at regular intervals.
8. Operatives not permitted to work

Page 6
RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

alone on live systems.


9. Signs warning of electrical hazard
displayed on supply units.

OSHAD-SF – CoP
11.0 – Safety in
the Heat – V 3.0
OSHAD-SF –
Element 6 -
 Ensure that all Employees wear thin Emergency
and breathable clothing, preferably Management
Heat Rash due to
Working in Hot & Non wearing of cotton. OSHAD-SF –
Engineers,  Advice Engineer to wear light colored Managemen Element 2 - Risk
8 Humid appropriate PPE. 1 3 3 L Management
Visitors 3 4 12 H t
Conditions clothes
OSH OSHAD SF-
 Ensure that the clothes are washed Element- 5 –
engineer
on regular basis. Training and
awareness and
competency
OSHAD-SF – COP
4.0 – First Aid and
Medical
Emergency
Treatment - V 3.0

 Allow time for acclimatization starting Managemen


t
with a lower workload or shorter
OSHAD-SF –COP
working duration, and gradually
08.0 – General
Engineers, increasing the workload or duration Workplace
Acclimatization OSH
Visitors 3 3 9 H over a number of days. 1 2 2 L Amenities – V 3.0
Engineer,
 Strict supervision and monitoring is OSHAD-SF – CoP
required all the time by the 11.0 – Safety in
HR staff, the Heat – V 3.0
managment.

More Workload Engineers, 3 3 9 H  Reschedule tasks requiring the Managemen 1 2 2 L OSHAD-SF – CoP
Visitors wearing of thick or vapor t 11.0 – Safety in
impermeable clothing to cooler the Heat – V 3.0

periods of the day.

Page 7
RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

OSH
 Reorganize the work to reduce Engineer,
intensity and pace of bodily
movement of the workers. HR staff,
 Employees to take rest and frequent &
breaks in between
Individuals

OSHAD-SF –
Element 2 - Risk
 Display heat awareness signage, Management
 Increase awareness for the workers Main
OSHAD SF-
and engineers by posting signage contractor, Element- 5 –
and trainings, toolbox talks Training and
Lack of Information Engineers, OSH awareness and
 Train workers regarding heat stress, Engineer, competency
, awareness Visitors 3 4 12 H 1 2 2 L
precautions to be taken to prevent OSHAD-SF –
heat stress using HAAD materials. HR staff, Element 6 -
Emergency
 Management
Musanada Key
HSE
Requirements
Emergency Workers, 3 5 15 H  Ensure that all personnel are trained Main 1 2 2 L OSHAD-SF –
response Engineers, regarding the emergency situation contractor Element 3 –
Visitors faced during working in hot Management of
CORE Contractors
conditions.
OSHAD-SF –
 Ensure that there is an emergency Element 2 - Risk
vehicle on site at all times. Management
 Ensure that emergency procedures OSHAD SF-
are displayed in rest areas, notice Element- 5 –
Training and
boards, offices, site. awareness and
 Ensure that the procedures are well competency
communicated with the workers. OSHAD-SF –
 Ensure that there is a fully equipped Element 6 -
Emergency
first aid room with a certified advance Management
first aider.

Page 8
RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Musanada Key
HSE
Requirements
Heat Illness , Workers, 3 4 12 H  Ensure that the TWL (Thermal Work Main 1 2 2 L OSHAD-SF–COP
Engineers, limit) is measured on site on daily contractor – 2.0 – Personal
Heat Stroke, Visitors Protective
basis and that precautionary
CORE Equipment - V 3.0
Dehydration , measures are taken depending on the
OSHAD-SF – COP
Humidity level of working zone readings. ( TWL 4.0 – First Aid and
Reading Medical
 > 220- Unrestricted zone Emergency
Treatment - V 3.0
 140-220- Acclimatization zone
OSHAD-SF –COP
 115-140- Buffer Zone. 08.0 – General
 < 115- Withdrawal zone. Workplace
 Permit to work system to be in place if Amenities – V 3.0

the TWL limit goes below 115 w/m2. OSHAD-SF – CoP


11.0 – Safety in
 Ensure that the TWL (Thermal Work the Heat – V 3.0
limit) is measured on site on daily
OSHAD-SF –
basis and that precautionary COP 17.0 – Safety
measures are taken depending on the Signage and
Signals – V 3.0
level of working zone readings. ( TWL
Reading OSHAD-SF–
COP 21.0 – Permit
 > 220- Unrestricted zone to Work Systems
 140-220- Acclimatization zone - V 3.0
 115-140- Buffer Zone. OSHAD-SF - COP
 < 115- Withdrawal zone. 30.0 – Lone
Working and/or in
 Ensure that Employee are provided Remote Locations
with sufficient shelter / shaded areas – V 3.0
on site. If shaded shelter can’t be OSHAD-SF –
prepared on work zone then Element 3 –
Management of
umbrellas to be provided. Contractors
 Ensure that the workers increase the OSHAD-SF –
intake of salt in the food provided that Element 2 - Risk
they are not suffering from Management
hypertension. OSHAD SF-

Page 9
RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

 Ensure that Oral Rehydration


solutions are provided to the workers
working in hot n humid conditions.
 Ensure that Employees are provided
with water thermos with cool drinking
water.
 Ensure that the site adhere to the
UAE Ministry of Labour requirements
for a midday break during the
summer months for employees
Element- 5 –
working outside. Signage to be Training and
displayed and Employees to be made awareness and
aware regarding the same. competency

 Ensure appropriate availability of OSHAD-SF –


Element 6 -
appropriate fluids (e.g. potable water) Emergency
for the employees to maintain Management
hydration levels; Musanada Key
 Ensure an allowance is made for self- HSE
Requirements
pacing of work and appropriate rest
breaks are provided to exposed
employees;
 Ensure that in the event an employee
is suffering from a suspected heat
related illness they have immediate
access to medical attention.
 Ensure that An advance first Aider is
there on site at all times.

Emergency Fire All personnel 3 4 12 H  All personnel to be safety inducted. Main 1 3 OSHAD-SF –
situations  Train and inform all employees Contractor 3 Codes of Practice
Collision CoP 17.0 – Safety
regarding fire Emergency Evacuation
CORE Signage and
Electrocution Plan. Signals – Version
 Initiate and maintain good 3.0
housekeeping OSHAD-SF –

Page 10
RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

 Ensure that all materials used in porta


cabin construction are fire rated.
 Ensure that enough firefighting
equipment are made available on
site. ( Fire Ex., Fire Hose Reel) Codes of Practice
CoP 43.0 –
 Ensure that fire alarm and Fire siren Temporary
are available on site and are fully Structures -
Version 3.0
functional.
 No smoking in non-designated areas. OSHAD-SF –
Codes of Practice
 Ensure that smoke detectors are CoP 08.0 –
installed inside all offices. General
Failure to  Ensure that Employees are trained- Workplace
Evacuation Amenities –
how to fight fire, what to do in case of Version 3.0
an emergency OSHAD SF-
 Ensure that enough assembly points Element- 5 –
are made available on site and Training and
awareness and
access to them is kept clear at all competency
times. OSHAD-SF –
 Ensure emergency numbers are Element 6 -
posted at strategic locations. Emergency
Management
 Ensure that Evacuation plan is posted
on notice boards and all are informed
about it during inductions.

Risk Assessment handover

Page 11
RISK ASSESSMENT
RISK LEVEL RESIDUAL RISK LEVEL
S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Date: _ _ / _ _ /_ _ _

I have read, understood and accept the conditions of this Risk Assessment.
Name of Job Supervisor/Foremen/Site Engineer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
All operatives involved with this job must sign below
I have read, understood and accept the conditions of this method statement and Risk Assessment.

Sr. Emirates ID
Name Emp. No. Designation Date Signature Remarks
No. No
1
2
3
4
5
6
7
8
9
10
11
12
13