WEEKLY SERVICE PLANNED PREVENTIVE MAINTENANCE REPORT

EQUIPMENT

FIRE PUMP DATE /…….

EQUIPMENT TAG

FP - 01 & 02

LOCATION

CUP-2 BUILDING / ZONE-2 / LOWER LEVEL

 In
 Operation Not in Operation

SR.No

DESCRIPTION

DATE

FP -01

FP- 02

REMARKS

Weekly

Check the operation of machine


2

Check un-usual noise and vibration.

Check for leakage and at the Mechanical Seal.

Check valve seals for leakages

Check valves for proper operation and setting


6

Operate manually each pump

Weekly

Check the operation of machine

Check un-usual noise and vibration.


3

Check for leakage and at the Mechanical Seal.

Check valve seals for leakages

Check valves for proper operation and setting


6

Operate manually each pump

Weekly

Check the operation of machine

Check un-usual noise and vibration.


3

Check for leakage and at the Mechanical Seal.

Check valve seals for leakages

Check valves for proper operation and setting

6
Operate manually each pump

Weekly

Check the operation of machine

Check un-usual noise and vibration.

Check for leakage and at the Mechanical Seal.


4

Check valve seals for leakages

Check valves for proper operation and setting

Operate manually each pump