You are on page 1of 25

CONDUCT DETAILED RAPID VISUAL ASSESSMENT,

DESIGN AND ESTIMATION OF UNREINFORCED


STONE MASONRY IN MUD MORTAR SCHOOL
BUILDING RETROFITTING WORKS AT NAWADURGA
BASIC SCHOOL

Shree Nawadurga Aadharbhut Bidhalaya, Block-2

APPENDIX C:
RETROFIT STRUCTURAL AND WORKING
DRAWINGS

JAN 4, 2022
KATHMANDU, NEPAL
STRUCTURAL DRAWINGS FOR
SEISMIC RETROFITTING OF SCHOOL BUILDING OF
SHREE NAWADURGA AADHARBHUT VIDHYALAYA, BLOCK B2
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari

SUBMITTED TO :- SHREE NAWADURGA AADHARBHUT VIDHYALAYA, Reviewed By:-


USAID TAYAR Nepal AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
Improved Disaster Risk Management Project DATE :- DECEMBER, 2021 scale :- Approved By:-
GENERAL NOTES:-
A. General:
1. All works to be carried out in accordance with current best practice, Building Regulations, the project specification and relevant
Nepal Building Code(NBC), Indian Standards and Codes of Practice. Materials and components to be appropriate for their LIMITATIONS
intended use. The retrofitting design has been done using available architectural/ structural drawings, limited site explorations and tests. As it was
2. The Site Supervisor shall be responsible for verifying all dimensions on site and ensuring that all dimensions and levels shown not possible to test all elements of the building during assessment, there still exist some uncertainties. Therefore the design needs to
on the drawings are correct and consistent with other relevant drawings. be verified with the actual situation when the work progresses and may require some changes during the implementation.
3. During construction, the Site Supervisor shall be responsible for maintaining the structure in a stable condition and ensuring no Some of the possible uncertainties are listed below.
part shall be damaged under construction activities.
4. Workmanship and materials are to be in accordance with the relevant current Indian Standards including all amendments and 1. The quality of the existing materials and detailing cannot be fully ascertained, so assumptions have to be made which may not
the local statutory authorities. be 100% right. If the quality of some parts of the building structure found significantly different from the assumptions in the
design, the design will need to be reviewed and possibly revised.
B. Structural:
1. Cast-In-Situ concrete/micro-concrete shall have minimum 28 days compressive cube strength of 20N/mm² for all structural
members.
2. The concrete compressive strength shall be measured on 150*150*150mm cube at 28 days, for various structural elements.
3. High strength deformed steel bars, produced by the thermomechanical treatment process, of grades Fe 500 , having elongation
more than 15 percent and conforming to other requirements of IS 1786:2008 / NS: 191- 2046 shall be used for the
reinforcement.
4. Development length for tor steel bar shall be as follows:

Diameter Tension (58Ø) Compression (46Ø)


4.75 276 220

8 465 392
10 580 460
12 700 552
16 930 736

5. The hot dipped galvanised welded wiremesh shall be used to ensure the corrosion protection. It should be high quality low
carbon steel wire and the zinc coating layer in the wire shall not be less than 50 micron.
6. Laps of galvanised iron wire mesh shall have length of 150mm.
7. Cover to main reinforcing steel be in accordance with IS 456:1978 & as specified on structural drawing.
8. Clear Cover of Concrete shall be:
· Beam surface at soil = 50mm
· Beam surface on brick/PCC = 25mm
· Reinforced Cement Concrete Jacketing = 15mm
9. Unless otherwise specified, all horizontal & vertical construction joints shall be roughened.
10. The cement used shall be ordinary Portland cement conforming to IS 269:1976.
11. All R.C.C work shall be continuously cured for 14-days by moist jute sheets.
12. All cement plaster works shall be continuously cured for 7 days.
13. Plaster over G.I. wire mesh shall be 1:3 (cement:coarse sand)
14. A layer of cement slurry shall be applied in wall before erecting wire mesh or reinforcement for wall jacketing.
15. The position of holes for G.I. wires to anchor the mesh of both sides of the wall shall be according to the drawings

C. Units:
1. Do not scale drawings. Any missing dimensions shall be furnished upon request.
2. All dimensions are in millimeters unless otherwise stated.

D. Abbreviations:
1. CL = Centre line
2. C/C = Centre to centre
3. RC = Reinforced concrete
4. G.I. = Galvanized Iron
5. N/A = Not applicable
6. SWG = Standard Wire Gauge

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
GENERAL NOTES
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- N/A
Reviewed By:-

Approved By:-
00
10
Water m
W
tanks ID
E
T1 RO
AD

BACK
GATE B3

T2

B2
B4

Slope land

B5 B1

MAIN
ENTRANCE

Slope land B6

SITE PLAN
SCALE 1:400

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
SITE PLAN OF NAWADURGA BASIC SCHOOL
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:400 FOR A3 PAPER
Reviewed By:-

Approved By:-
1
TO PADUKASTHAN TEMPLE

PU
SH
NAWADURGA

PA
SCHOOL

LA AJ
L MA
R

M R
AD G
HY A
A
PA
HA
DI

TO PANCHAKOSHI
POLYTECHNIC
LOCATION PLAN SCHOOL

NOT TO THE SCALE


PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
LOCATION PLAN OF NAWADURGA BASIC SCHOOL
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- NOT TO SCALE
Reviewed By:-

Approved By:-
2
3 A
ELE SEC
A B C
15000

7125 7425

450 6675 450 6975 450

1050 925 1550 925 1250 925 1700 925 1200 925 1200 925 1500

500
W W W W W W
450

450
2 2

BLOCK-B3
4 CLASS ROOM-1 CLASS ROOM-2 2
4950

4500

4500

4950
5400

5400
ELE 6825 x 4500 6825 x 4500 ELE
450

450
1 500 1
D W W D W W

1200 900 1100 925 950 925 1850 900 1500 925 1400 925 1500

450 6675 450 6975 450

7125 7425

15000

A 1 B A C
ELE SEC

GROUND FLOOR PLAN


AREA= 81.00 sq.m.
(Scale 1:100)

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
FLOOR PLAN OF EXISTING BUILDING
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100 FOR A3 PAPER
Reviewed By:-

Approved By:-
3
3 A
ELE SEC
A B C
15000

7125 7425

450 6675 450 6975 450

1050 925 1550 925 1250 925 1700 925 1200 925 1200 925 1500

Rafter (125 x 150) Purlin (75 x 50)


Ridge Beam (100 x 100)
500
450

450
2 2

4 2
4950

4500

4500

4950
5400

5400
BLOCK-B3
ELE ELE
450

450
1 500 1
Existing Purlins (50 x 75)
Existing Incomplete Truss

1200 900 1100 925 950 925 1850 900 1500 925 1400 925 1500

450 6675 450 6975 450

7125 7425

15000

A 1 B A C
ELE SEC

ROOF PLAN SHOWING ROOFING MEMBERS


(Scale 1:100)

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
FLOOR PLAN OF EXISTING BUILDING
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100 FOR A3 PAPER
Reviewed By:-

Approved By:-
4
ELEVATION -1 ELEVATION -2
(Scale 1:100) (Scale 1:100)

ELEVATION -3 ELEVATION -4

OPENING SCHEDULE
S. NO. DESCRIPTION SYMBOL NOS SIZE SILL HEIGHT RMKS
Ridge cover 1 DOOR D 2 900 X 1800
CGI Sheet ---
Ridge Beam (100 x 100) 600
Rafter (125 x 150) 2 WINDOW W 10 900 X 1200
Vertical Post (100 x 100) +3000 Ridge Level
Purlins (75 x 50)
Bottom Chord(150 x 150)

+2100 Eaves Level


75 450 75
+1800 Lintel Level
GL

750
+600 Sill Level

600
750

750

EXISTING FOOTING SECTION


600 600
SECTION AT A-A OF BLOCK B2
SCALE 1:20
SCALE 1:50

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
ELEVATIONS AND SECTION OF EXISTING BUILDING
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100, 1:50, 1:20 FOR A3 PAPER
Reviewed By:-

Approved By:-
5
Notes:

Add buttress wall of stone masonry

Remove the existing incomplete truss 450

Add new truss - two nos. in each room Existing Stone Wall
(Refer roof strengthening sheet for timber
truss details) Replace CGI sheets
New Buttress Wall
450
Add new purlins between existing purlins
(Refer roof strengthening sheet for details) half width of wall +50
275

450
8mm Ø bars at every
300mm height
A B C (Insert bar after drilling)
15000 Cement Slurry filling
7125 7425 VIEW-1
450 6675 450 6975 450

1050 925 1550 925 1250 925 1700 925 1200 925 1200 925 1500
PLAN
450 450
500
450

450
W W W W W W
450

450
2 2 450 450

Existing Stone Wall


BLOCK-B3
CLASS ROOM-1 CLASS ROOM-2 New Buttress Wall
4950

4500

4500

4950
5400

5400
6825 x 4500 6825 x 4500

8mm Ø bars at every


300mm height
(Insert bar after slightly
inclined drilling)
450

450
1 500 1
450

450
D W W D W W Cement Slurry filling 50 50
450 450 GL
1200 900 1100 925 950 925 1850 900 1500 925 1400 925 1500 New Foundation, same

350
450 6675 450 6975 450 as existing foundation

7125 7425
Existing Foundation 450 550
15000

A B C SECTIONAL VIEW-1
DETAIL SHOWING CONNECTION OF
MODIFICATION IN GROUND FLOOR PLAN NEW BUTTRESS WALL WITH EXISTING WALL
(Scale 1:100) SCALE = 1:20

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
MODIFICATION IN EXISTING FLOOR PLANS
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100, 1:20 FOR A3 PAPER
Reviewed By:-

Approved By:-
6
Notes:

Add buttress wall of stone masonry

Remove the existing incomplete truss

Add new truss - two nos. in each room


(Refer roof strengthening sheet for timber
truss details) Replace CGI sheets

Add new purlins between existing purlins


(Refer roof strengthening sheet for details)

A B C
15000

7125 7425

450 6675 450 6975 450

1050 925 1550 925 1250 925 1700 925 1200 925 1200 925 1500

Existing incomplete truss to be removed


Ridge Beam (100 x 100)
500
450

450
2 2
4950

4500

4500

4950
5400

5400
BLOCK-B3
450

450
1 500 1
New truss Existing Purlins (50 x 75) New truss
Added Purlins (50 x 75)

1200 900 1100 925 950 925 1850 900 1500 925 1400 925 1500

450 6675 450 6975 450

7125 7425

15000

A B C
MODIFICATION IN ROOF PLAN
(Scale 1:100)
*Existing Rafters not shown in this drawing

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
MODIFICATION IN EXISTING ROOF PLAN
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100 FOR A3 PAPER
Reviewed By:-

Approved By:-
7
A B C
15000

7125 7425

450 6675 450 6975 450


450
1050 925 450450 650 925 1250 925 1700 925 1200 925 275 475 925 1500

500
W W W W W W
450

450
2 2

BLOCK-B3
CLASS ROOM-1 CLASS ROOM-2
4950

4500

4500

4950
5400

5400
6825 x 4500 6825 x 4500
450

450
1 500 1
D W W D W W

450
1200 900 325 325 925 950 925 1850 900 1500 925 475 450475 925 1500

450 6675 450 6975 450

7125 7425

15000

A B C

GROUND FLOOR PLAN AFTER MODIFICATION


(Scale 1:100)

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
FLOOR PLAN AFTER MODIFICATION
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100 FOR A3 PAPER
Reviewed By:-

Approved By:-
8
A B C
15000

7125 7425

450 6675 450 6975 450

1050 925 1550 925 1250 925 1700


11075 925 1200 925 1200 925

500
450

450
2 5400 2
4950

4500

4500

4950
5400

BLOCK-B3

450
1 500 1

1200 900 1100 925 950 925 1850 900 1500 925 1400 925 1500

450 6525 450 7125 450

7075 7575

15000

A B C

ROOF PLAN AFTER MODIFICATION


(Scale 1:100)
*Existing Rafters not shown in this drawing

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
ROOF PLAN AFTER MODIFICATION
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100 FOR A3 PAPER
Reviewed By:-

Approved By:-
9
NOTES:

Tie beam on both sides of wall for Jacketing

A B C
7125 7425

15000
500

2 2

BLOCK-B3
CLASS ROOM-1 CLASS ROOM-2
4950

4950
5400
A2 A2 6825 x 4500 6825 x 4500

A1

1 500 1
D
A1
15000

7125 7425

A B C

GROUND FLOOR PLAN SHOWING TIE BEAM FOR JACKETING


(Scale 1:100)

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
TIE BEAM FOR JACKETING
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100 FOR A3 PAPER
Reviewed By:-

Approved By:-
10
4.75mmØ additional 4.75mmØ additional
Outer Side anchorage bars @450mm c/c anchorage bars @450mm c/c
at the neck of the bent at the neck of the bent
SWG 10(3.25mmØ) G.I wire Outer Side
Outer Side Inner Side
staggered @ 600mm c/c Inner Side Inner Side

(Connecting Inner & outer mesh)


Portion for Portion for 4.75mm Anchorage bars 4.75mm Anchorage bar
GI wiremesh bent in 1:6 slope
excavation excavation @ 450mm c/c @ 450mm c/c
New Apron and drainage
75 450 75
Existing Floor Finish at front part of block Existing Floor Finish GL Existing Floor Finish
GL
Concrete (1:121:3) Concrete (1:121:3) Concrete (1:121:3)

225

225

225
2-12Ø bars 2-12Ø bars 2-12Ø bars
8Ø C-hook 8Ø C-hook 8Ø C-hook
450

450
Portion to be refilled Portion to be refilled Portion to be refilled

150 75

150 75

150 75
PCC (1:3:6) PCC (1:3:6) PCC (1:3:6)
750

Stone Soling Stone Soling Stone Soling


225 225
125 100 100 125 100 125

600

SECTION SHOWING THE PORTION TO BE SECTION AT A1-A1 SECTION AT A2-A2


EXCAVATED FOR TIE BEAM SHOWING DETAILS OF TIE BEAM SHOWING DETAILS OF TIE BEAM
SCALE = 1:16 ON BOTH SIDES OF WALL ON WALL
(FOR GI WIREMESH) (FOR GI WIREMESH)
SCALE = 1:16 SCALE = 1:16

4.75mm Anchorage bar 4.75mm Anchorage bar

16mm hole
16mm hole

Hole filled with Hole filled with


cement sand mortar cement sand mortar

100
50
100

50
wall + 50
Half thickness of 3 thickness of wal
l + 50
4

ANCHORAGE BAR DETAILS ANCHORAGE BAR DETAILS


(FOR BOTH SIDES OF WALL) (FOR ONE SIDE OF WALL)
SCALE 1:4 SCALE 1:4

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
TIE BEAM FOR JACKETING
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:16, 1:4 FOR A3 PAPER
Reviewed By:-

Approved By:-
11
NOTES:

Jacketing on both sides of wall using GI Wiremesh


(double twisted hexagonal shaped) of SWG 10
(3.24mmØ) and size 100 x 115mm

Provide additional 3nos. of diagonal SWG 10


(3.24mmØ) G.I. wires of length 600mm @50mm c/c,
at each four corners of windows and top two corners
of doors on both sides of walls.

*For outer wall in Grid A-A, there is no sufficient


space available to work. So tie beam cannot be laid,
only GI wiremesh shall be erected and anchored on
wall from inner sides and plaster shall be applied
only at ends for reachable length (at least 600mm).
The plaster thickness for this wall shall be 50mm.

A B C · A layer of cement slurry shall be applied in wall


7125 7425 before erecting wire mesh for jacketing.
· Apply plaster of 35mm thick on both surfaces of wall
over G.I. wire mesh with cement sand mix (1:3)

500
W W W W W W
2 2

BLOCK-B3
CLASS ROOM-1 CLASS ROOM-2
4950

4950
B2 B2 6825 x 4500 6825 x 4500

B1

1 500 1
D W W D W W
900

B1 New Apron at the front part of block

7125 7425

A B C

GROUND FLOOR PLAN SHOWING JACKETING ON WALLS


(Scale 1:100)

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
FLOOR PLANS SHOWING JACKETING ON WALLS
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100 FOR A3 PAPER
Reviewed By:-

Approved By:-
12
NOTES:

Jacketing on both sides of wall using GI Wiremesh


(double twisted hexagonal shaped) of SWG 10
(3.24mmØ) and size 100 x 115mm

Provide additional 3nos. of diagonal SWG 10


(3.24mmØ) G.I. wires of length 600mm @50mm c/c,
at each four corners of windows and top two corners
of doors on both sides of walls.

el
ev Jacketing

o rL
Flo
Diagonal Bars

Tie Beam

TYPICAL VIEW OF JACKETING USING GI WIREMESH


(DOUBLE TWISTED HEXAGONAL SHAPED)
SCALE 1:30

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
TYPICAL VIEW OF JACKETING
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:30 FOR A3 PAPER
Reviewed By:-

Approved By:-
13
35 450 35

Jacketing on outer surface of wall Jacketing on inner surface of wall


Plaster Stripped,Chiffed and Plaster Stripped,Chiffed and

115
Cleaned Surface Cleaned Surface
Cement Slurry Coating Cement Slurry Coating
100 G.I. Wiremesh (double twisted G.I. Wiremesh (double twisted
hexagonal shaped) of 3.24mm Ø hexagonal shaped) of 3.24mm Ø
and size 100 x 115mm and size 100 x 115mm
50mm thick Plaster (1: 3) 50mm thick Plaster (1: 3)
DOUBLE TWISTED
SWG 10(3.25mmØ) G.I wire 4.75mmØ additional anchorage bars
HEXAGONAL SHAPED G.I. WIRE staggered @ 600mm c/c @450mm c/c at the neck of the bent
SCALE 1:20
(Connecting Inner & outer mesh)
GI wiremesh bent in 1:6 slope
GL Existing Floor Finish
35 450 35

Jacketing on outer surface of wall


Jacketing on inner surface of wall
Plaster Stripped,Chiffed and
Plaster Stripped,Chiffed and
Cleaned Surface
Cleaned Surface
Cement Slurry Coating
Cement Slurry Coating
G.I. Wiremesh (double twisted
G.I. Wiremesh (double twisted
hexagonal shaped) of 3.24mm Ø
and size 100 x 115mm hexagonal shaped) of 3.24mm Ø
and size 100 x 115mm
35mm thick Plaster (1: 3)
35mm thick Plaster (1: 3)
SECTION AT B2-B2
SHOWING DETAILS OF JACKETING
SWG 10(3.25mmØ) G.I wire
staggered @ 600mm c/c ON WALL
SCALE = 1:10
(Connecting Inner & outer mesh)
4.75mmØ additional anchorage bars
GI wiremesh bent in 1:6 slope @450mm c/c at the neck of the bent
New Apron and drain
at front part of block Existing Floor Finish
GL

SECTION AT B1-B1
SHOWING DETAILS OF JACKETING
ON BOTH SIDES OF WALL
SCALE = 1:10

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
DETAILS OF JACKETING ON WALLS
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:20, 1:10 FOR A3 PAPER
Reviewed By:-

Approved By:-
14
GI Wiremesh (double twisted hexagonal
shaped) of SWG 10 (3.24mmØ) and
size 100 x 115mm

Diagonal bars

0
30
0
30

50 0
30

50
0
30

50
50

Typical Detail showing Jacketing wiremesh on wall


(Elevation)
SCALE 1:30

at least 600mm SWG 10 (3.24mmØ) G.I anchorage wire staggered at least 600mm
@ 600mm c/c(from inner side of the wall)
G.I. Wiremesh (double twisted hexagonal shaped)
of 3.24mmØ and size 100 x 115mm
50mm thick Plaster at ends for reachable length

ELEVATION OF OUTER SIDE OF WALL AT GRID A-A


SCALE 1:30

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
DETAILS OF JACKETING ON WALLS
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:30 FOR A3 PAPER
Reviewed By:-

Approved By:-
15
*For retrofit on top of wall, the CGI sheet is to be removed and replaced
by new ones after retrofit works. CGI sheets are to be anchored to truss
using J-hooks.

Wall Thickness
4.75mm Anchorage bar

16mm hole
75 mm thick Concrete (1:1.5:3)
35 450 35 SWG 10 (3.24mmØ) Hole filled with
cement sand mortar

100
G.I. Anchorage wire
(Black Japan coated)

75
Wall top level

100
50
wall + 50
Half thickness of

Jacketing wiremesh
bent along the G.I. WIRE DETAILS ANCHORAGE BAR DETAILS
thickness of wall SCALE 1:10 SCALE 1:4

TYPICAL SECTION
1200
SHOWING ANCHORAGE OF JACKETING
WIREMESH ON TOP OF WALL 600 600 600 600
SCALE = 1:10

600
35 450 35 1200
Concrete (1:1.5:3) over existing truss

1200
on wall (thickness of concrete
depends on size of roofing member,
maintaining cover of minimum 50mm) SWG 10 (3.24mmØ) G.I wire staggered @ 600mm c/c
Wall top level (Connecting Inner & outer mesh)

600
Existing wooden member

1200
Jacketing wiremesh bent along the
thickness of the wall with roofing
member wherever available

Jacketing wiremesh on wall 600

TYPICAL SECTION
SHOWING ANCHORAGE OF JACKETING WIREMESH LAYOUT OF G.I. WIRE ANCHORAGE FOR CONNECTING
ON TOP OF WALL WITH ROOFING MEMBER JACKETING MESH ON BOTH SIDES OF WALL
SCALE = 1:10 SCALE 1:20

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
DETAILS OF JACKETING ON WALLS
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:20, 1:10, 1:4 FOR A3 PAPER
Reviewed By:-

Approved By:-
16
Notes:
Remove the existing incomplete truss

Add new truss - two nos. in each room


A B C
Add new purlins between existing purlins
7125 7425

· Dismantle the existing roof supporting timber


Existing incomplete truss to be removed elements considering their reuse.
· Reconstruct the truss using reusable rafters
500
as top chords, as placed in the modified roof
plan
2 2 · Remaining rafters are to be placed @1000mm
spacing. For this, reusable rafters can be used

New Truss-A

New Truss-A

New Truss-A

New Truss-A
and new rafters can be added as required
· Some purlins which are in poor condition need
BLOCK-B3
to be replaced by new ones
4950

4950
· Some portions of existing Ridge beam which
Existing Ridge beam are deteriorated need to be replaced
· CGI sheets need to be replaced by new ones

1 500 1
Existing Purlins
New truss New truss
Added Purlins

7125 7425

A B C

PLAN SHOWING STRENGTHENING OF EXISTING ROOF


SCALE 1:100

two roofing members


140
20 25 25 25 25 20
20 30 20
70

3mm thick metal plate


8nos of 6mmØ holes for
for connection of two
5mmØ 50mm long Screw
roofing members

DETAIL SHOWING CONNECTION OF Metal Plate


(3mm thick)
WOODEN MEMBERS (140x70)
SCALE = 1:8 SCALE 1:5

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
STRENGTHENING OF EXISTING ROOF
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100, 1:8, 1:5 FOR A3 PAPER
Reviewed By:-

Approved By:-
17
CGI Sheet Ridge Beam (100 x 100)

Existing Rafter (100 x 100)


Vertical Post (100 x 100)

Purlins (75 x 50) New Struts (100 x 100)

Bottom chord (150 x 100)

4950

TRUSS A
(ADDITION OF NEW TRUSS)
SCALE 1:30

Rafter Wall
Purlin
30 50
Rafter or purlin on walls

20 15
50
4nos. of holes for
5mmØ 50mm tying of purlin or rafter over walls,
Metal Strap to connect two

15
long Screws using 2 nos. of GI wire of SWG10
wooden members, from below
Metal Strap to connect two (3.24mmØ), binded to wiremesh
wooden members, from top of wall jacketing

METAL STRAP
SCALE 1:2 DETAILS FOR CONNECTION OF
DETAILS SHOWING CONNECTION *Screw Size: 50mm long
ROOFING WOODEN MEMBERS ON WALLS
OF WOODEN MEMBERS SCALE 1:10
SCALE 1:10

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
STRENGTHENING OF EXISTING ROOF
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:30, 1:10, 1:2 FOR A3 PAPER
Reviewed By:-

Approved By:-
18
Existing Stone wall
Steel Plate-P1
C2 C1
Bottom Chord of wooden truss
M20 Bolts connecting wooden
C3 C4 truss to Bent plate
Bent plate (350 x 140 x 8)
R1 connecting wooden truss to wall

CONNECTION DETAILS OF MEMBERS OF TRUSS


AND TRUSS TO WALL DETAIL R1 SHOWING CONNECTION
SCALE 1:30 OF WOODEN TRUSS TO WALL
SCALE = 1:20

20mmØ holes for M20 bolts


240 30
60
60
60

60
30

100
30 3

97
128
60

30 8
160
0

81 8 30 60 30
30
60
30

128
30

100

30 8

8
60
172
60

Steel Plate-P1
60

30

128
60
146
68

60
30

(100x100x8)

30
30 30
SCALE 1:5
60

140
40 60 40
CONNECTION PLATE-C2 40
CONNECTION PLATE-C1
0
SCALE = 1:8 24 )
SCALE = 1:8 50
y(1

80
50
8

60 60
201
30 201 4nos.- 22mmØ holes for
30
30

60 30

80
3 60
60 M20 bolts of Grade 4.6
79

30 30
60

60
60

60
170

8 Metal Bent Plate


230

60
60

215
(350x140x8)
30 30 20

20

90 60 90 SCALE 1:5
30 30
60

60

60

30 3 60 60 30
60 60 30 240
y = Distance y may vary as per the thickness of stone used
150
in the wall
CONNECTION PLATE-C3 CONNECTION PLATE-C4 For this drawing, y distance is assumed as 150mm
SCALE = 1:8 SCALE = 1:8

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
STRENGTHENING OF EXISTING ROOF
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:30, 1:20, 1:8, 1:5 FOR A3 PAPER
Reviewed By:-

Approved By:-
19
3mm Cement Punning
100 mmPCC (1:4:8)
Steel Grating metal cover 150mm Stone Soling
throughout the length of drainage
200 350 200 900
Stone wall in cement mortar

325
8Ø bars

700
100 100 @150mm c/c bothways

150 100100
Concrete (1:121:3)
B3 PCC (1:4:8)
950 Stone Soling
Y
DRAINAGE AND APRON SECTION 1000
Apron at front part SCALE = 1:20 30 940 30
of Block B3

30 26 26 30
110 118 110
450
X X

B2 Y
26 x 3mm metal strips @40mm c/c
26 x 3mm metal strip
New Drainage ISA 30 x 30 x 5
(2.5% longitudinal slope)
Apron at front part
METAL DRAINAGE COVER
of Block B2 SCALE = 1:20

ISA 30 x 30 x 5
26 x 3mm metal strip
26 x 3mm metal strips @40mm c/c

B1

30
1000

Apron at front part


of Block B1 SECTION X-X
SCALE = 1:10

ISA 30 x 30 x 5
LAYOUT PLAN OF DRAINAGE 26 x 3mm metal strip
SCALE 1:200 26 x 3mm metal strips @40mm c/c

30
450

SECTION Y-Y
SCALE = 1:10
PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
LAYOUT AND SECTION OF NEW DRAINAGE
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:200, 1:20 FOR A3 PAPER
Reviewed By:-

Approved By:-
20
A B C Notes:
7125 7425
Roughen the existing flooring by scrapping
the top surface
Apply screeding over roughened surface
Apply cement punning over screeding
500
W W W W W W
2 2

BLOCK-B3
CLASS ROOM-1 CLASS ROOM-2
4950

4950
6825 x 4500 6825 x 4500

1 500 1
D W W D W W
900

New Apron at the front part of block

7125 7425

A B C

GROUND FLOOR PLAN SHOWING MAINTENANCE


OF EXISTING FLOORING
(Scale 1:100)

3mm Cement Punning


100 mmPCC (1:4:8)
150mm Stone Soling

900
GL
350

3mm cement Punning Finish


38mm screeding
Roughened surface of existing cement
flooring

Drainage
600

SECTION SHOWING NEW FLOORING


SCALE = 1:20

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
DETAILS FOR FLOOR MAINTENANCE
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100, 1:20 FOR A3 PAPER
Reviewed By:-

Approved By:-
21
A B C
7125 7425 LEGEND:
Height from floor
Symbol Description
level (in mm)

500 Distribution Board 2100


W W W W W W
1 x 40W Tube Light 2100
2 2
16 A 2/3 Pin Power Socket 1200

Two gang single pole switch 1200


BLOCK-B3
4950

4950
Notes:

1.50 sq.mm. multi strand flexible copper wire for light

1 1 2.50 sq.mm. multi strand flexible copper wire for power supply
500
D W W D W W
Single switch is to be used for two tubelights connected
in parallel
to MCB

7125 7425

A B C

ELECTRICAL LAYOUT PLAN


FOR GROUND FLOOR
(Scale 1:100)

PREPARED BY :- JOB NAME :- SHEET TITLE :- Drawn By:- Rachana Kansakar NO. REVISION NOTE DATE SHEET NO
National Society for Earthquake Technology - Nepal (NSET)
SEISMIC RETROFITTING OF SCHOOL BLOCK - B2 OF Design and Checked by:- Kirty Tiwari
ELECTRICAL LAYOUT PLAN
SUBMITTED TO :-
USAID TAYAR Nepal
Improved Disaster Risk Management Project
SHREE NAWADURGA AADHARBHUT VIDHYALAYA,
AT BHAJANIYA POKHARI, DULLU-9, DAILEKH, NEPAL
DATE :- DECEMBER, 2021 scale :- 1:100 FOR A3 PAPER
Reviewed By:-

Approved By:-
22

You might also like