Assignment - 1
2 Marks questions
Marks questions
Write a short note on three phase four wire supply.
Write a shirt note on sub circuits
Explain special requirements of theatre lighting from electrification point of view.
Explain special requirements of hotel lighting from electrification point of view.
Explain economical consideration in the illumination design.
Explain the method for testing of polarity.
Explain method of testing of earth continuity.
Explain insulation resistance measurement test between conductor and earth as per IS
Explain importance of symbol and blue print in any installation
Prepare a test report for wiring installation.
Shree Sahkar Education Trust’s
SHREE DHANVANTARY COLLEGE OF DIPLOMA
ENGINEERING, KIM - 394110
Assignment - 2
2 MARKS QUESTION
Why surface or concealed conduit wiring is used in high rise building?
State advantages of sub-circuits.
Write two disadvantages of metal conduit wiring system.
State the advantages of sub circuits.
Find total load and number of sub-circuit for 4 light, 3 fan and 3 five amp plug point.
Define lift and air-conditioner
3 MARKS QUESTIONS
How electrical load of lift and air conditioner is added in electrification of high rise
building? Explain.
Explain about S.O.R. in detail. Explain about S.O.R. in detail.
Draw wiring diagram of multistores building by tree system.
Draw the schematic and wiring diagram of stair case.s
State factor consideration location of D.B.
How load of Air-conditioner is added in any installation?
Explain use of S.O.R for calculation of material cost in any electrical installation.
List the points to be considered while preparing estimation of building wiring.
Write a shirt note on sub circuits
Write a short note on concealed wiring.
Explain estimation of electrification cost of building by S.O.R. method.
Write a short note on surface conduit wiring
Explain different types of sub-stations used in commercial complex.
Explain different types of wiring system
Shree Sahkar Education Trust’s
SHREE DHANVANTARY COLLEGE OF DIPLOMA
ENGINEERING, KIM - 394110
Assignment - 3
2 MARKS QUESTIONS
3 MARKS QUESTION
Assignment - 4
2 Marks Questions
3 MARKS QUESTIONS
Give difference between residential and multi-storied /commercial building.
Explain how size of bus-bar and bus-bar chamber is determined.
explain cable laying method in detail
precautions to be taken in cable laying.
Explain low voltage distribution system in multistoried building
Explain under ground service connection used in multi storied building
Explain how theft of power at consumer’s premises is prevented
Draw and explain single line diagram of pole mounted distribution substation.
State different cable laying method. Explain any one in detail.
Explain construction of panel board.
Explain about pole mounted sub-station used in multistoried building.
Explain about bus-bar and bus-bar chamber.
Explain the method of cable laying on cable tray.
Draw and explain diagram of 3-phase 4-wire distribution system by using busbar.
Draw layout of an indoor substation
List the different types of electrical installation in multi-storeyed buildings
Explain the method of cable laying in trench
Explain precautions to be taken while laying cable in direct ground
Write a short note on bus bar and bus bar chamber
Write a short note on outdoor substation
Write a short note on Indoor substation
How you can prevent theft of power in commercial multi-storeyed building?
Explain about various markers in cable laying.
Write a short note on distribution board system
Explain method of cable laying direct in ground.
Explain method of cable laying in trench.
Shree Sahkar Education Trust’s
SHREE DHANVANTARY COLLEGE OF DIPLOMA
ENGINEERING, KIM - 394110
Assignment - 5
2 Marks Questions
3 / 4 MARKS QUESTIONS