You are on page 1of 7

Shree Sahkar Education Trust’s

SHREE DHANVANTARY COLLEGE OF DIPLOMA


ENGINEERING, KIM - 394110

ELECTRICAL ENGINEERING DEPARTMENT

Assignment - 1

Subject Name and Code: Electrification of


Semester: 6th
Building Complexes(3360908)

Chapter Name: Elements of Electrification Name of Faculty: Mr. Vaishal M. goswami

2 Marks questions

 importance of bus-bar chamber in high rise electrical installation.


 On which factors the utilization factor of lamps depend
 State advantages of sub-circuits.
 State the advantages of sub circuits
 Find total load and number of sub-circuit for 4 light, 3 fan and 3 five amp Plug point

Marks questions
 Write a short note on three phase four wire supply.
 Write a shirt note on sub circuits
 Explain special requirements of theatre lighting from electrification point of view.
 Explain special requirements of hotel lighting from electrification point of view.
 Explain economical consideration in the illumination design.
 Explain the method for testing of polarity.
 Explain method of testing of earth continuity.
 Explain insulation resistance measurement test between conductor and earth as per IS
 Explain importance of symbol and blue print in any installation
 Prepare a test report for wiring installation.
Shree Sahkar Education Trust’s
SHREE DHANVANTARY COLLEGE OF DIPLOMA
ENGINEERING, KIM - 394110

ELECTRICAL ENGINEERING DEPARTMENT

Assignment - 2

Subject Name and Code: Electrification of


Semester: 6th
Building Complexes(3360908)
Chapter Name: Electrification of
Name of Faculty: Mr. Vaishal M. goswami
Multistoried Buildings

2 MARKS QUESTION
 Why surface or concealed conduit wiring is used in high rise building?
 State advantages of sub-circuits.
 Write two disadvantages of metal conduit wiring system.
 State the advantages of sub circuits.
 Find total load and number of sub-circuit for 4 light, 3 fan and 3 five amp plug point.
 Define lift and air-conditioner

3 MARKS QUESTIONS
 How electrical load of lift and air conditioner is added in electrification of high rise
building? Explain.
 Explain about S.O.R. in detail. Explain about S.O.R. in detail.
 Draw wiring diagram of multistores building by tree system.
 Draw the schematic and wiring diagram of stair case.s
 State factor consideration location of D.B.
 How load of Air-conditioner is added in any installation?
 Explain use of S.O.R for calculation of material cost in any electrical installation.
 List the points to be considered while preparing estimation of building wiring.
 Write a shirt note on sub circuits
 Write a short note on concealed wiring.
 Explain estimation of electrification cost of building by S.O.R. method.
 Write a short note on surface conduit wiring
 Explain different types of sub-stations used in commercial complex.
 Explain different types of wiring system
Shree Sahkar Education Trust’s
SHREE DHANVANTARY COLLEGE OF DIPLOMA
ENGINEERING, KIM - 394110

ELECTRICAL ENGINEERING DEPARTMENT

Assignment - 3

Subject Name and Code: Electrification of


Semester: 6th
Building Complexes(3360908)
Chapter Name: Electrification of
Name of Faculty: Mr. Vaishal M. goswami
commercial and public buildings

2 MARKS QUESTIONS

 define commercial installation. state different commercial installation.


 What is purpose of providing emergency supply in the commercial installations
 Why CCTV is provided for commercial installation ?
 What is the cull form of CCTV and EPABX?

3 MARKS QUESTION

 Compare electrification of residential and multistoried commercial building


 Rules to be observed in electrification of public building.
 Explain design considerations of electrical installation in commercial building
 Explain special requirements for electrification in hospital .
 List the different types of electrical installation in hotel.
 Write step estimating for internal electrification
 Define commercial complex. How wiring of commercial complexes differ from
residential wiring?
 Explain special requirements for electrification of hotels.
Shree Sahkar Education Trust’s
SHREE DHANVANTARY COLLEGE OF DIPLOMA
ENGINEERING, KIM - 394110

ELECTRICAL ENGINEERING DEPARTMENT

Assignment - 4

Subject Name and Code: Electrification of


Semester: 6th
Building Complexes(3360908)
Chapter Name: Electrification of
Distribution System for Multistoried
Name of Faculty: Mr. Vaishal M. goswami
Buildings

2 Marks Questions

 importance of bus-bar chamber in high rise electrical installation.


 different methods of cable laying.
 List the methods of cable laying.
 What is the minimum depth at which underground cables should be laid?

3 MARKS QUESTIONS
 Give difference between residential and multi-storied /commercial building.
 Explain how size of bus-bar and bus-bar chamber is determined.
 explain cable laying method in detail
 precautions to be taken in cable laying.
 Explain low voltage distribution system in multistoried building
 Explain under ground service connection used in multi storied building
 Explain how theft of power at consumer’s premises is prevented
 Draw and explain single line diagram of pole mounted distribution substation.
 State different cable laying method. Explain any one in detail.
 Explain construction of panel board.
 Explain about pole mounted sub-station used in multistoried building.
 Explain about bus-bar and bus-bar chamber.
 Explain the method of cable laying on cable tray.
 Draw and explain diagram of 3-phase 4-wire distribution system by using busbar.
 Draw layout of an indoor substation
 List the different types of electrical installation in multi-storeyed buildings
 Explain the method of cable laying in trench
 Explain precautions to be taken while laying cable in direct ground
 Write a short note on bus bar and bus bar chamber
 Write a short note on outdoor substation
 Write a short note on Indoor substation
 How you can prevent theft of power in commercial multi-storeyed building?
 Explain about various markers in cable laying.
 Write a short note on distribution board system
 Explain method of cable laying direct in ground.
 Explain method of cable laying in trench.
Shree Sahkar Education Trust’s
SHREE DHANVANTARY COLLEGE OF DIPLOMA
ENGINEERING, KIM - 394110

ELECTRICAL ENGINEERING DEPARTMENT

Assignment - 5

Subject Name and Code: Electrification of


Semester: 6th
Building Complexes(3360908)
Chapter Name: Electrical Safety and IE
Rules Name of Faculty: Mr. Vaishal M. goswami

2 Marks Questions

 Which type of electronic door locks are used for safety?


 Which type of firefighting system is provided for canteen and corridor?
 Write IE rules for lighting and power sub circuit.
 State factors affecting earth resistance
 Define smoke detector. State types of it
 Why earthing pin is long and thick in three pin plug socket?
 Why earthing pin is long and thick in three pin plug socket?
 State the function of earth pit for pole mounted transformer
 State types of fire detectors
 Describe the function of over speed governor in the lift.
 Describe the use of MCB and ELCB.

3 / 4 MARKS QUESTIONS

 Write a short note on Earthing system.


 List out the safety devices used in lift.
 Why ELCB are needed?
 Draw and explain fire alarm circuit.
 State name of safety devices in the escalators.
 Explain working principle and use of ELCB.
 Explain about smoke detector circuit
 List various safety devices used in lifts. Explain any three.
 Draw fire alarm circuit.
 Write short note on ELCB
 Explain construction and working of MCB.
 State only the names of safety devices in the lift.
 Explain construction, working and application of MCB.
 Explain electronic safety lock use at entrance at commercial complex

You might also like