You are on page 1of 1

GNPOWER DINGININ LTD. CO.

28th Floor Orient Square Bldg., Don Francisco Ortigas Jr. Road, Ortigas Center, Pasig City 1605
Phone: (02) 638-5251

TECHNICAL EVALUATION FORM

PR No.: PR 22-497697, PR 22-497698, PR 22-497699, PR 22-497700, PR 22-497701 and PR 22-497702


Date : September 7, 2023

Please see attached proposals received from bidders for your review and evaluation based on your technical requirements. You are hereby
given two (2) working days to submit the result of your evaluation.
Instructions:
Kindly indicate C (for Complying ) if the technical specifications, scope of work, methodology and expected results of the specific proposal satisfactorily meets the key requirements for the goods
and/or services requested in the PR, NC (for Non-Complying ) if the technical specifications, scope of work, methodology and expected results of the specific proposal do not meet the key
requirements for the goods and/or services requested in the PR, or NQ (for No Quote ) if supplier has no offer.
(Note: If rated as NC , please give a short explanation why the proposal is Non-COmplying on the Remarks section below.)

S U P P L I E R

ITEM NO. PR DESCRIPTION QTY UNIT PR No. Supplier A Supplier B

1 MODULE, POWER, NR ELECTRIC, NR1301MN, FOR PCS‐9799 2 PC PR 22‐497697 c c

2 MODULE, CPU, NR ELECTRIC, NR1108C, FOR PCS‐9799 2 PC PR 22‐497698 c c

3 MODULE, POWER, NR ELECTRIC, NR4304B, FOR PCS‐9705 2 PC PR 22‐497699 c c

4 MODULE, CPU, NR ELECTRIC, NR4106MB, FOR PCS‐9705 1 PC PR 22‐497700 c c

5 MODULE, CPU, NR ELECTRIC, NR1108A, FOR PCS‐9794 1 PC PR 22‐497701 c c

6 MODULE, POWER, NR ELECTRIC, NR1301A, FOR PCS‐9794 2 PC PR 22‐497702 c c

REMARKS/RECOMMENDATION:

Evaluated by: Approved by: Received by:

Malvin Napao
_______________________________ Allen Andres
___________________________ ____________________________

DATE: 9/7/23 DATE: __________________________

You might also like