You are on page 1of 13

CLIENT JOB UNIT

Abu Dhabi Gas Development Company Ltd. 032090 200


PLANT LOCATION DES.DOC.No. AUH/1341/
Abu Dhabi - Emirates QA&QC/C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sh. Sht. 1 of 10
B1 B2

Doc. No. MP02-0200-14-MES-2D0005


Date
Approved By
COMPANY

SHAH PROCESS PLANT


Approved By

METHOD STATEMENT
FOR
LAYING PIPES IN DUCT BANKS, CONDUITS IN
SAIPEM S.p.A.

CONCRETE AND BURIED CONDUITS


Checked By
Description
Rev.

B2 Issue for Review NS ARK MAS 28/06/11


B1 Issue for Review KA ZH MAS 26/04/11
Rev. Description Prepared Checked Approved Date
File name: MP02-0200-14-MES-2D0005_B2.doc DES.REF FORM NO

THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 2 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005

INDEX

1. PURPOSE

2. WORK PERMIT REQUIRED

3. SCOPE

4. REFERENCES

5. DEFINITIONS / ABBREVIATIONS

6. RESPONSIBILITIES

7. PROCEDURE / METHOD OF WORKS / INSTRUCTION

8. TOOLS AND EQUIPMENTS

9. SAFETY

10. QA&QC

11. JHA

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 3 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005
1. PURPOSE:

The purpose of this method statement is to clarify the works to be carried out for the pipe laying in
duct banks, conduits in concrete and buried conduits in areas specified in approved drawings and
specifications.

2. WORK PERMIT REQUIRED (TICK AS REQUIRED)

Contractor Permit to Work Procedure shall be applied in this case.

2.1 Hot Work Permit

2.2 Radiography Work Permit

2.3 Cold Work Permit

2.4 Confined Space Entry Certificate

2.5 Working at height Certificate

2.6 Excavation Certificate

2.7 Lifting Work Certificate


2.8 Electrical Work Certificate

3. SCOPE

The scope of this method statement covers pipe laying in duct banks, conduits in concrete
and buried conduits to be done in Shah Gas Development Project for the Plant units
U726,U727,U740,U742 and General Area Unit 0230.

4. REFERENCES

Specification:-

o Specification for earthwork (DGS-1486-001)

o Addendum to Specification for earthwork (MP02-0230-14-ADD-086001)

o Specification for excavation and backfill (DGS-1486-002)

o Addendum to Specification for excavation and backfill (MP02-0230-14-ADD-086002)

o Specification for on site bund construction ( DGS-1783-003)

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 4 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005
o Addendum to Specification for on site bund construction (MP02-0230-14-ADD-086003)

Drawings & Documents:-

Relevant approved construction drawings, QCP (MP02-0230-92-SPE-0D9612).

Code and Standards:-

o ASTM – American Society For Testing and Materials

o BS – British Standard

o ISO – International Organization for Standardization

5. DEFINITIONS / ABBREVIATIONS

Company Abu Dhabi Gas Development Company

Contractor SAIPEM

Subcontractor DESCON Engineering

CM Construction Manager

CE Civil Engineer

QA&QC Quality Assurance & Quality Control

QCP Quality Control Plan

ITP Inspection and Test Plan

PPE Personal Protection Equipment

6. RESPONSIBILITIES

 It is the overall responsibilities of CM that construction activities are conducted according to


the relevant project specifications, in compliance with the quality, schedule and safety
requirement.

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 5 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005
 Area CE will ensure that the excavation and backfilling activities are conducted according
to this method statement, latest approved Project drawings & relevant specifications for the
activities and will be directly reporting to CM.

 CE & surveyor will ensure that location & levels of the excavations are as per approved
drawings.

 QA&QC civil will ensure that all work is executed according to ITP and that requirements of
quality dossier are fulfilled.

 Safety and Construction supervision will be carried out by Subcontractor under supervision
of Contractor.

7. PROCEDURES – METHOD OF WORKS – INSTRUCTIONS

7.1 EXCAVATION
 Before starting the activity, site surveyor shall mark the coordinates as per approved latest
drawings.
 Excavation area shall be marked by a qualified and competent surveyor.
 All the Excavation works will be carried out as per the following Method Statements:

Excavation & Backfilling (MP02-0230-17-MES- 2D0001)

 Excavation shall be done with help of suitable equipment as per site conditions with a proper
Contractor permit to work System.

 All necessary compaction / trimming at bottom of excavation shall be done.

 If any underground services / utilities found; only hand excavation shall be carried

out as per excavation work permit in order to avoid any mishap.


 Any excavated material shall be stockpiled at min. 5 Mtr. Away from the excavated area.
The unsuitable material shall be removed to an approved dump area.

7.2 PVC PIPE IN DUCT BANKS AND CONDUITS IN CONCRETE

7.2.1 PIPE LAYING

 After the Blinding concrete and water proofing activities, the Surveyor shall mark the positions of
the approved PVC Pipes on the lean concrete.

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 6 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005
 Reinforcement at the bottom shall be placed first and then the PVC pipes shall be placed as per final
position.

 External side be installed and properly supported as per dimension indicated into the drawings.

 Tie-ins proper the conduit to avoid moving and to avoid uplifting during concrete pouring.

7.2.2 CONCRETING

 The PVC pipe levels and positions will be checked and upon approval by the QC inspector, the
pouring of concrete shall be in accordance with the following Method Statements:

 Construction of foundations MP02-0230-17-MES-2D0003

7.3 BURIED CONDUITS

7.3.1 PIPE LAYING

 After the excavation of the trench has been completed, the base of the trench shall be compacted,
cleaned at the required level. Surveyor shall mark the positions of the PVC Pipes on the soil.

 Proper sand bed shall be done as indicated into the approved latest drawings.

 Laying of the PVC pipes on the sand bed and backfilled with suitable material as per approved
drawings.
 Warning tiles shall be placed above the PVC pipes as per approved project drawings.

7.4 BACKFILL & FILL


All the Earth works will be carried out as per the following Method Statements:

Excavation & Backfilling MP02-0230-17-MES-2D0001

 The backfill material shall be sourced from suitable stockpile or from excavated material if
suitable for the project.

 Backfilling shall be done with a proper permit to work System.

 The CE shall ensure that particular area/structure has been released for backfilling
by QC department.

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 7 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005

 The backfill material will be placed in layers according to the specification (DGS-1486-001&
MP02-0230-14-ADD-086001)

 The layer will be moisturized and compacted to 95% compaction.

 Backfill will be tested by the test laboratory and frequency of test will be according to
agreed QCP (MP02-0230-92-SPE-0D9612).

8. TOOLS & EQUIPMENTS

8.1 EXECUTION

 All equipment shall be inspected and approved by the Contractor before attempting work on
site and have valid certificates & inspection sticker.

 A register of all machinery & equipment shall be maintained and held available for
inspection. Equipment shall be visually checked prior to each major work and validity of
inspection status will be verified.

 All equipment shall have their type & capacity clearly indicated with a permanent stamp
or an approved identification alternative.

 Should additional or different equipment be required during the course of the works,
they will be mobilized as necessary.

 Excavator/JCB

 Dump Truck

 Compactor / Roller

 Plate Compactor

 Front End Loader

 Water Tanker

8.2. SAFETY

 Safety helmet

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 8 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005
 Safety Shoes

 Gloves

 Safety Glasses

8.3 TESTING EQUIPMENT

 Sieves

 Proctor test Apparatus

 Field Density Test Apparatus

9. SAFETY INSTRUCTIONS

 All personnel involved shall use necessary PPE as required such as safety helmet, glasses,
coverall, shoes, gloves, ear plugs etc.

 The workers shall be made aware of safety requirements related to this activity through
daily tool box and safety talk.

 All required work permits shall be acquired and kept available at respective work site
hanged clearly in plastic folders.

 Safety notice board shall be installed.

10 QUALITY ASSURANCE & QUALITY CONTROL (QA&QC)

 All stages of work and testing shall be documented in accordance with the appoved
QCP(MP02-0230-92-SPE-0D9612)

11 JHA

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 9 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005

Job Safety Analysis


Activity: Pipe laying in concrete , duct banks and buried conduits

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 10 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005
Steps Hazards Control Measures to be Enforced Remarks/
Action

Obtain Method  Method statement to be


Statement and Hazard assessed and explained to all employees and
Safety Document safety precautions are it must be made available at
not identified/
& Job specific Tool Box the site. Engineer,
Talk assessed and  JSA to be made available at Supervisor
required control the site and Job specific
measures not hazards & control measures to
communicated. be communicated for all
personnel involved in the job.
 Equipment must be checked
thoroughly and inspection
check list to be filled up by the
operator prior to operate
 Operator and banks man and
he should ensure that the
appropriate control measures
implemented in the site.

Obtain PTW Necessary  Obtain PTW prior to the Site


information not commencement of the work Supervisor
communicated to the and to be kept at the work site.
facility owner  Basic PPE to be used by all
employees.
 Ensure proper access is
Pipe placing in Fall into maintained in the area
trenches or in excavation  Ensure hard barricade is Site
concrete Physical injury erected Supervisor
 Sign boards/ hazards blinking
lights (for night) to be provided.
 No vehicle will be permitted to
drive within 5 meter of
excavation.
 No material shall be permitted
to stack near the edges of
excavation.
Collapse of  Any excavation work on
excavation previously disturbed soil will be
shored, sloped or benching to
be carried out. (if required)

 Proper access like ladders etc.


Confined space to be provided.
Hazards  Confined space permit to be Site
Emergency raised and obtained before Supervisor/

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 11 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005
condition commencement of job. Authorized Gas
 Ensure Gas testing is carried Tester
out prior to enter in to the
trench
 Gas tester performed his
testing by using long probe
without entering the confined
space.
 Take gas test on different
location and depths.
 People should trained and
aware about the confined
space hazards
 Evacuation procedure shall be
in place and explained to
everybody.
 Ambulance and male nurse
shall be available at site.
 Emergency Telephone No.
shall be displayed at site.

Heat Stress  Proper rest shelter must be Site


provided Supervisor /
 Cold drinking water shall be Male Nurse
available at site
 Frequent break as per area
temperature
 ORS should be available at site
with Male nurse
 Ambulance should be available
at site during work

 Appropriate barricade to be
Pipe fixing and Fall into maintained till the completion of Site
leveling excavation job fully. Supervisor
Collapse of  Sign boards/ hazards blinking
trenches lights (for night) to be provided
Physical injury till the completion of work.
 No vehicle will be permitted to
drive within 5 meter of the pit.
 All workers are to wear
appropriate PPE.
 Proper access to work should
be made.

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-05
Saipem No.: 0200-CA-E-2D0005
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht. 12 of 10
B1 B2
Doc. No. MP02-0200-14-MES-2D0005

MP02-0200-14-MES-2D0005_B2.doc
File name: DES. REF.FORM NO.
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
13 of 13

File name: 691061100.doc

THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION TO
BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED.