METHOD STATEMENT
SAIPEM S.p.A.
FOR
FILLING OF TIE ROD
Checked By
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 0200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-10
INDEX
1. PURPOSE
2. SCOPE
3. REFERENCES
4. DEFINITIONS / ABBREVIATIONS
5. RESPONSIBILITIES
6. PROCEDURE
7. EQUIPMENT
8. SAFETY
9. QA&QC
10. JHA
1. PURPOSE
This method statement describes the procedure proposed to be adopted for filling/
repairing of Tie Rod holes filling works for all concrete structures and underground
coordination works.
2. SCOPE
This method statement is applicable to all the concrete structures for buildings, foundations
and underground coordination works to be done in Shah Gas Development Plant Units
U726, U727, U740, U742 and general area 0230.
3. REFERENCES
Specification:
Drawings:-
Material submittal:-
Approved Material submittal to be used in the activity prior to start the work
BS – British Standard
4. DEFINITIONS / ABBREVIATIONS
Contractor SAIPEM
CM Construction Manager
CE Civil Engineer
5. RESPONSIBILITIES
Special care shall be taken in designing the mix ratio for the repairing works.
The Civil QA&QC shall ensure the implementation of approved mix ratio design.
Area supervisor shall ensure that upon completion of each activity, area has
been cleaned of waste materials & left tidy for the next activity. At the end of all
activities easement area will be left graded.
6. PROCEDURES
6.1 MATERIAL
Tie holes shall be filled with approved waterproofing repair material that should be
submitted to Company for approval prior to start the job
6.2 EXECUTION
Any work related to this job shall be conducted according to the specification for
concrete works (DGS-1783-002) under sections 22.5, 22.6, 22.8 and QCP (MP02-0230-
92-SPE-0D9612).
Ensure that PVC cones are removed and substrate is rough enough.
Ensure that the tie rod hole area shall be thoroughly cleaned and free from
sand dust, shavings dust or other debris by air jetting before repairing.
Ensure that substrate must be free from oil, grease or any adhering material. If
surface have laitance, it must be cut back to sound base
Soak concrete substrate for a minimum of two hours continuously prior to fill
approved materials in the tie rod holes. Immediately prior to filling, all free water
should be removed leaving the substrate in a surface dry condition
Tie rod hole filling/repair will start only after the final QC inspection and
approval.
7 Equipment:
Water Basket
Mixing bucket
Trowel
8. Safety
Safety helmet
Safety Shoes
Safety Glasses
The workers shall be made aware of safety requirements related to this activity
through daily tool box and safety talk.
All required work permits shall be acquired and the necessary copy kept available
at respective work site.
All stages of work and testing shall be documented in accordance with the approved
QCP(MP02-0230-92-SPE-0D9612)
10 . JHA
Job Safety Analysis
Activity: Filling of tie rod holes in the concrete.
Steps Hazards Control Measures to be Enforced Remarks/
Action
Obtain PTW Necessary information not Obtain PTW prior to the Site
communicated to the facility commencement of the work Supervisor
owner and to be kept at the work site.
Basic PPE to be used by all
employees.
Mixing and Tools not inspected. Tools used should be properly Site
application of Used of defective tools inspected and color coded. Supervisor
repair mortar Area not barricaded. Proper PPE should be worn at
Heat stress all time during mixing of
Health hazards chemicals for repair mortar.
Rubber gloves should be used
for application of mortar.
Proper rest shelter
Cold drinking water shall be
available at site.
Frequent break as per area
temperature
ORS should be available at
site with Male nurse
Ambulance should be available
at site.
File name:
THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION TO
BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED.