You are on page 1of 9

CLIENT JOB UNIT

Abu Dhabi Gas Development Company Ltd. 032090 0200


PLANT LOCATION DES.DOC.No. AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-10
Saipem No.: 0200-CA-E-2D0010
PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sh. Sht-1 of 8
B1 B2

Doc. No. MP02-0200-17-MES-2D0010


Date
Approved By
COMPANY

SHAH PROCESS PLANT


Approved By

METHOD STATEMENT
SAIPEM S.p.A.

FOR
FILLING OF TIE ROD
Checked By

HOLES IN THE CONCRETE


Description
Rev.
Site

B2 Issue for Review NS ARK MAS 28-06-11


B1 Issue for Review KA ZH MAS 25-04-11
Rev. Description Prepared Checked Approved Date
File name: MP02-0200-17-MES-2D0010_B2.doc DES.REF FORM NO

THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 0200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-10

Saipem No.: 0200-CA-E-2D0010


PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht 2 of 8
B1 B2
Doc. No. MP02-0200-17-MES-2D0010

INDEX

1. PURPOSE

2. SCOPE

3. REFERENCES

4. DEFINITIONS / ABBREVIATIONS

5. RESPONSIBILITIES

6. PROCEDURE

7. EQUIPMENT

8. SAFETY

9. QA&QC

10. JHA

File name: MP02-0200-17-MES-2D0010_B2.doc DES. REF.FORM NO.


THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 0200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-10

Saipem No.: 0200-CA-E-2D0010


PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht 3 of 8
B1 B2
Doc. No. MP02-0200-17-MES-2D0010

1. PURPOSE

This method statement describes the procedure proposed to be adopted for filling/
repairing of Tie Rod holes filling works for all concrete structures and underground
coordination works.

2. SCOPE

This method statement is applicable to all the concrete structures for buildings, foundations
and underground coordination works to be done in Shah Gas Development Plant Units
U726, U727, U740, U742 and general area 0230.

3. REFERENCES

 Specification:

Specification for concrete construction (DGS-1783-002)

Addendum to the specification for concrete construction (MP02-0230-17-ADD-083002)

 Drawings:-

Relevant approved construction drawings

 Material submittal:-

Approved Material submittal to be used in the activity prior to start the work

 Codes and Standards:-

 ASTM – American Society For Testing and Materials

 BS – British Standard

 ISO – International Organization for Standardization

File name: MP02-0200-17-MES-2D0010_B2.doc DES. REF.FORM NO.


THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 0200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-10

Saipem No.: 0200-CA-E-2D0010


PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht 4 of 8
B1 B2
Doc. No. MP02-0200-17-MES-2D0010

4. DEFINITIONS / ABBREVIATIONS

Company Abu Dhabi Gas Development Company Limited

Contractor SAIPEM

Subcontractor DESCON ENGINEERING

CM Construction Manager

I/C Area Area In charge

CE Civil Engineer

QA&QC Quality Assurance & Quality Control

QCP Quality Control Plan

ITP Inspection and Test Plan

PPE Personal Protection Equipment

5. RESPONSIBILITIES

 It is the overall responsibility of CM reporting to SM to organize resources to


perform construction activities as per project specification, in compliance with
quality, schedule & safety requirements.

 It is the responsibility of CE reporting to CM that construction activities are


executed according to the relevant project specifications and drawings in
compliance with quality, schedule & safety requirements.

 Special care shall be taken in designing the mix ratio for the repairing works.
The Civil QA&QC shall ensure the implementation of approved mix ratio design.

File name: MP02-0200-17-MES-2D0010_B2.doc DES. REF.FORM NO.


THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 0200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-10

Saipem No.: 0200-CA-E-2D0010


PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht 5 of 8
B1 B2
Doc. No. MP02-0200-17-MES-2D0010
 QA&QC-Civil shall ensure that repairing activities of concrete are conducted
according to this method statement and shall ensure that work is executed
according to ITP and that requirements of quality dossier are fulfilled.

 Area supervisor shall ensure that upon completion of each activity, area has
been cleaned of waste materials & left tidy for the next activity. At the end of all
activities easement area will be left graded.

 Safety and Construction supervision will be done by Subcontractor under responsibility


of Company.

6. PROCEDURES

6.1 MATERIAL

Tie holes shall be filled with approved waterproofing repair material that should be
submitted to Company for approval prior to start the job

6.2 EXECUTION

Any work related to this job shall be conducted according to the specification for
concrete works (DGS-1783-002) under sections 22.5, 22.6, 22.8 and QCP (MP02-0230-
92-SPE-0D9612).

The following methodology shall be adopted:

 Ensure that PVC cones are removed and substrate is rough enough.

 Ensure that the tie rod hole area shall be thoroughly cleaned and free from
sand dust, shavings dust or other debris by air jetting before repairing.

 Ensure that substrate must be free from oil, grease or any adhering material. If
surface have laitance, it must be cut back to sound base

 Soak concrete substrate for a minimum of two hours continuously prior to fill
approved materials in the tie rod holes. Immediately prior to filling, all free water
should be removed leaving the substrate in a surface dry condition

 Tie rod hole filling/repair will start only after the final QC inspection and
approval.

File name: MP02-0200-17-MES-2D0010_B2.doc DES. REF.FORM NO.


THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 0200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-10

Saipem No.: 0200-CA-E-2D0010


PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht 6 of 8
B1 B2
Doc. No. MP02-0200-17-MES-2D0010
 Apply the bonding agent at substrate prior to filling.

 The approved filling material and mix design shall be used.

 Ensure to fulfill the requirement of specification for quality control.

 The filling material shall be mixed manually.

 The filled/repaired surfaces must be cured as per specifications ( DGS-1783-002


and MP02-0230-17-ADD-083002.

7 Equipment:

 Water Basket

 Mixing bucket

 Trowel

8. Safety

8.1 SAFETY ITEMS

 Safety helmet

 Safety Shoes

 Gloves (Cotton & Rubber as per requirement)

 Safety Glasses

8.2 SAFETY INSTRUCTIONS


 All personnel involved will use necessary PPE as required such as safety helmet,
glasses, coverall, shoes, gloves etc.

 The workers shall be made aware of safety requirements related to this activity
through daily tool box and safety talk.

 All required work permits shall be acquired and the necessary copy kept available
at respective work site.

 Safety notice board shall be installed.

File name: MP02-0200-17-MES-2D0010_B2.doc DES. REF.FORM NO.


THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 0200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-10

Saipem No.: 0200-CA-E-2D0010


PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht 7 of 8
B1 B2
Doc. No. MP02-0200-17-MES-2D0010
9. QUALITY ASSURANCE & QUALITY CONTROL (QA&QC)

 All stages of work and testing shall be documented in accordance with the approved
QCP(MP02-0230-92-SPE-0D9612)

10 . JHA
Job Safety Analysis
Activity: Filling of tie rod holes in the concrete.
Steps Hazards Control Measures to be Enforced Remarks/
Action

Obtain Method Hazard assessed and  Method statement to be


Statement and safety precautions are not explained to all employees and
Safety Document &identified/ assessed and it must be made available at
Job specific required control measures the site. Engineer,
Tool Box Talk not communicated.  JSA to be made available at Supervisor
the site and Job specific
hazards & control measures to
be communicated for all
personnel involved in the job.
 Equipment must be checked
thoroughly and inspection
check list to be filled up by the
operator prior to operate
 Operator and banks man and
he should ensure that the
appropriate control measures
implemented in the site.

Obtain PTW Necessary information not  Obtain PTW prior to the Site
communicated to the facility commencement of the work Supervisor
owner and to be kept at the work site.
 Basic PPE to be used by all
employees.

File name: MP02-0200-17-MES-2D0010_B2.doc DES. REF.FORM NO.


THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
CLIENT JOB UNIT
Abu Dhabi Gas Development Company Ltd. 032090 0200
PLANT LOCATION DES.DOC.No AUH/1341/QA&QC/
Abu Dhabi - Emirates C/MS-10

Saipem No.: 0200-CA-E-2D0010


PROJECT TITLE Rev.
SHAH PROCESS PLANT – EPC2
Sht 8 of 8
B1 B2
Doc. No. MP02-0200-17-MES-2D0010
 All personnel to use proper Site
Surface Health hazards PPE during the course of work Supervisor
preparation by air Physical injury specially dust mask and hand
compressor or gloves. In case of eye contact
Mechanical use water to wash & seek
scabbler medical advice. Face shield
must be worn by the worker
who uses air compressor or
mechanical scabbler.

 Keep clean, cool fresh water in


bottle and cooler all the time
during preparation work
 All equipment to be certified
and equipped
with tag and must be in good
working condition.

 Connecting air pipe of the


compressor must be secure with
the valve using whip check or
secure rope
 Area around the work place
must be clean before and after
performance of work

Mixing and Tools not inspected.  Tools used should be properly Site
application of Used of defective tools inspected and color coded. Supervisor
repair mortar Area not barricaded.  Proper PPE should be worn at
Heat stress all time during mixing of
Health hazards chemicals for repair mortar.
 Rubber gloves should be used
for application of mortar.
 Proper rest shelter
 Cold drinking water shall be
available at site.
 Frequent break as per area
temperature
 ORS should be available at
site with Male nurse
 Ambulance should be available
at site.

File name: MP02-0200-17-MES-2D0010_B2.doc DES. REF.FORM NO.


THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION
TO BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED
9 of 9

File name:

THIS DOCUMENT IS THE PROPERTY OF ABUDHABI GAS DEVELOPMENT COMPANY LIMITED AND CONTAINS INFORMATION WHICH IS PROPRIETARY. THIS INFORMATION TO
BE HELD IN CONFIDENCE. NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ABUDHABI GAS
DEVELOPMENT COMPANY LIMITED.