Professional Documents
Culture Documents
Attach-11 Work Procedure For PWHT
Attach-11 Work Procedure For PWHT
17125
WUHUAN Talcher Fertilizers Project
ENGINEERING 17125-PC10-WD-004
CO.,LTD
WORK PROCEDURE 1 of 11 Rev. 0
PWHT PROCEDURE
0 For Bidding
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN
ENGINEERING 17125-PC10-WD-004
PWHT PROCEDURE
CO.,LTD 2 of 11 Rev. 0
TABLE OF CONTENT
1. PURPOSE ........................................................................................................................................................ 3
2. SCOPE ............................................................................................................................................................. 3
3. PERSONNEL ...................................................................................................................................................3
4. PREHEATING ................................................................................................................................................ 3
6. REPORTING ................................................................................................................................................. 10
7. SAFETY ......................................................................................................................................................... 11
8. ATTACHMENTS .......................................................................................................................................... 11
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN
ENGINEERING 17125-PC10-WD-004
PWHT PROCEDURE
CO.,LTD 3 of 11 Rev. 0
1. PURPOSE
The purpose of this procedure is to ensure that preheat and post weld heat treatment of
piping welds will be carried out correctly and in accordance with the requirements of the
applicable codes/standards and project specifications.
2. SCOPE
(1)This procedure covers the minimum requirements for preheat and post weld heat treatment
of weld joints on pipe works.(Reference to ASME B31.3 par.330 par331-2016)
(2)This procedure refers to the application of controlled heated band encompassing a
welded joint in pipes to effect a preheat or local post weld heat treatment in accordance
with the governing code of practice, specification, or drawing.
(3) In case of necessity of furnace PWHT, related procedure will be issued in advance.
3. PERSONNEL
All technician conduct preheat and post weld heat treatment activities have at least 1 year
experience in preheat and post weld heat treatment and supported by the supervisors. The
technician/operator PWHT shall witness the equipment and monitor temperature recorder.
4. PREHEATING
(1) The preheat temperatures for different materials are shown in the following table:
Pipe
Material
Thk(mm ) Preheat temp(℃)
(2) Preheat temperature for dissimilar material: the preheat temperature of higher alloy steel
shall be selected.
(3) Preheating shall be performed in accordance with requirements of ASME B31.3, Par. 330.
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN
ENGINEERING 17125-PC10-WD-004
PWHT PROCEDURE
CO.,LTD 4 of 11 Rev. 0
(4) Preheat temperature higher than those specified in ASME code may be required in order
to satisfy hardness requirements or to prevent the risk of hydrogen cold cracking
particularly in the case of highly restrained welds as required by project specification.
(5) The Preheat zone shall be at or above the specified minimum temperature in all directions
from the point of welding for distance of the larger of 75mm(3in) or 1.5 times the greater
normal thickness
(6) The weld shall be maintained at the required preheat temperature until completion of
welding operation. Minimum and maximum interpass annealing temperature limits shall
be in accordance with the approved WPS.
5.1 PREPARATION
(6) Prior to commencement of PWHT, the weldment undergoing PWHT shall be adequately
supported (where required)
(7) Check all cable connection using proper plugs sockets protect the paver cable
thermocouple cables from damage.
(8) Before the execution of PWHT, the pipe or tube end shall be closed by the use of
insulation to avoid air circulation inside the pipe.
(9) PWHT shall be done as per following table:
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN
ENGINEERING 17125-PC10-WD-004
PWHT PROCEDURE
CO.,LTD 5 of 11 Rev. 0
PWHT
Material Holding Minimum hold time(min)
Thickness (mm)
temperature ℃ ≥
P-No. 3 1 h/25mm
>16 595–650
Alloy steels Cr ≤ 0.5% (15min, Min)
P-No. 4 1 h/25mm
>16 650–705
A335 P11 (15min, Min)
P-No. 5A 1 h/25mm
>16 675–760
A335 P22 (15min, Min)
(10) The heat treatment temperature of dissimilar metal shall be confirmed according to the
base metal and welding rod (wire), generally no more than the Ac1 of the base metal with
lower critical point. Refer to the following table for common steel Ac1 point:
Material Ac1 (℃ )
C-Mo steel (P-No.3) 730
5.2 METHOD
Electrical resistance heating using modular, flexible ceramic pads, either of standard rating
and dimension or otherwise as may be necessary to suit particular weld geometry.
5.3.1 General
(1)Elements shall be securely fixed in contact with the work piece with soft iron wire,
stainless steel banding tape, or mild steel banding tape to suit the application.
(2)Heating elements shall be thoroughly examined before use in order to ensure that the
element wire is not exposed. Examination to be made for broken beads in either the pad or
the leads.
(3)Where elements are manufactured with cold tails, care should be taken to avoid trapping
the cold tail and power supply cable between the work piece and the insulation. Element
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN
ENGINEERING 17125-PC10-WD-004
PWHT PROCEDURE
CO.,LTD 6 of 11 Rev. 0
tails should be adequately supported to avoid undue strain at the element tail junctions and
at the hot cold tail junction.
5.3.2 Element arrangement
(1)For pipe to pipe butt welds, where the members are equal thickness, the heating elements
shall be applied symmetrically about the weld centerline, either as one or more discrete
bands.
(2)Each band will comprise pads of equal width, and the same nominal heating intensity.
(3)Heat width is required as follows, counting from the weld ' center, each side' width shall be
not less than 3 times of the pipe wall thickness , and not less than 60mm .
(4)Where more than one band of elements is applied, the circumferential gap between bands
shall be limited to a maximum of 30mm or the pipe wall thickness, whichever is lesser.
(6)For a heating system, which comprises more than one circumferential band, the heater pads
in adjacent bands shall be rotated one quarter of a pad width with respect to each other.
(7)Where the wall thickness of the two pipe members differ, or for pipe to flange joints, the
elements shall be arranged as a minimum of two circumferential bands, such as to provide
independently controllable heating systems on each side of the weld center line.
(8) During heat treatment it is necessary to protect the mechanical surface line flange face, and
thread holes threads from oxidation by the application of coating such as deoxaminite or
any other suitable coating material.
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN
ENGINEERING 17125-PC10-WD-004
PWHT PROCEDURE
CO.,LTD 7 of 11 Rev. 0
Each circuit heating elements shall be controlled by a contractor. In turn this circuit shall be
controlled by one of the following system:
(1)Semi automatic control using a combination of a set point controller and a percentage
time/energy regulator. The set point temperature controller shall be employed to ensure the
correct temperature control during the soaking period.
(2)An automatic pre-set program control unit to control automatically the heat treatment
throughout the cycle.
(3)No single control zone will comprise more than four heating elements. All elements in one
control circuit shall have the same nominal power density rating (watt/m2).
5.5 THERMOCOUPLE
(2) Thermocouples shall be attached to the work piece by the direct wire capacitance
discharge method. The gap between to wire/work piece junction shall not exceed 5mm.
(3) After removal of the thermocouples, remain shall be slightly grained and shall be
examined by PT or MT if required by owner.
(4) Care shall be taken to ensure that thermocouple conductor wires do not touch each other,
or metallic components and away from the hot junction.
(5) Whenever possible, thermocouple shall not be located under a heating pad; thermocouple
shall be routed between heating pads or out through the insulation to avoid close contact
with the heating pads.
(6) The uncoated bare tip of the thermocouples shall not be touched by heating pads and shall
be covered by putty or insulation.
(7) The thermocouples shall be set on weld centerline. The number of thermocouple and
position shall be as detailed in following figure.
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN
ENGINEERING 17125-PC10-WD-004
PWHT PROCEDURE
CO.,LTD 8 of 11 Rev. 0
(1)
(6) (2)
(5) (3)
(4)
Note:
For D ≤10", T/c (1) is required.
For 10" < D 24", T/c (1) and (4) are required
For 24" < D 36", T/c (1), (3) and (5) are required
For D > 36 " ,Min 4 thermocouples but not more than 38 " apart. T/c (1), (2), (4)
and (6) are required.
(2)The copper lead (+ve) shall be connected to the nickel-chromium conductor of the
thermocouple (non-magnetic), and the constantan lead (-ve) shall be connected to the
nickel-chromium conductors (magnetic).
5.7RECORDER
(3)The chart speed shall be set at 25mm/h or other agreed standard and shall be checked
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN
ENGINEERING 17125-PC10-WD-004
PWHT PROCEDURE
CO.,LTD 9 of 11 Rev. 0
(4)Recorder pen shall have different color inks to distinguish temperature recording for each
heat zone .
5.8 INSULATION
(1) Ceramic fiber blanket, 25 or 50mm thick or equivalent material shall be provided for
insulation. The use of asbestos-type insulating material is not allowed.
(2) The width of the insulated bands shall be minimum heating band plus minimum 3 times
of the pipe wall thickness or 100mm,which even is greater to reduce the temperature
gradient.
(3) The number of layers may be adjusted to meet the variations of wall thickness, pipe
diameter, gradient requirements and site conditions.
(4) Wherever possible, pipe end shall be blanked off internally before heat treatment to limit
convection effects.
5.9 PROCEDURE
(1) All weld parts of the item/spools shall be completely welded before heat treatment.
(2) Not more than 6 weld joints shall be treated in one time (one chart).
(3) Related ISO drawing and PWHT request of the weld subject to PWHT shall be available
at location all the time for OWNER review.
(4) PWHT shall be performed in accordance with requirements of ASME B31.3, section
331.and project specification .
(5) Above 300°c,the rate of heating and cooling shall not exceed 335°c/h divided by one-half
the maximum material thickness in inches, but in no case shall the rate exceed 335°c/h.
(6) Below 300°c, the heat treated assembly may be cool to ambient temperature in still air.
(7) During heating and cooling the temperature difference between thermocouples in the
same weld shall not exceed 65°c
(8) The soaking temperature and soaking time shall be compliance with those required in
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN
ENGINEERING 17125-PC10-WD-004
PWHT PROCEDURE
CO.,LTD 10 of 11 Rev. 0
(9) In no case shall the process be paused. During the cooling cycle, any interruption will be
cause of rejection and whole process shall be restarted.
(12)Hardness tests are not required to verify proper heat treatment unless otherwise specified.
(13)After the heat treatment is completed , thermocouple shall be removed and surface at the
point of attachment need to be slightly grained , PT/MT shall be performed on such
procedure
6. REPORTING
(1) Reporting and recording of results shall be in accordance with relevant procedures and
recorded on PWHT Report .
(2) The chart shall be submitted to owner/PMC for review and approval.
(3) The PWHT temperature record shall have the following data recorded on the chart:
Heat treatment temperature
thermocouple location and related color.
Line number
Joint number
Heating, soaking and cooling data
Material
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN
ENGINEERING 17125-PC10-WD-004
PWHT PROCEDURE
CO.,LTD 11 of 11 Rev. 0
7. SAFETY
(1) All tools and equipment for the task are to be in safe condition and fit for the purpose.
Where possible registration papers and certification are to be produced.
(2) Dust masks and safety glasses shall be worn when working with thermal insulation.
8. ATTACHMENTS
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
Project: Talcher Fertilizers Project
Quality Control Form
Client: Talcher Fertilizers Limited
1 of 1
Talcher Fertilizers Project
Specification: Page : OF
Code/Standard :
Holding Temperature:
Holding Time:
Heating Rate:
Cooling Rate:
1 P
TOTAL