Proposal
For
Desk Study Report
Client
Salleri Chialsa Electricity Company Limited
Solududhkunda Municipality-05, Solukhumbu, Nepal
Consultant
Gorkha Hydro & Engineering Pvt. Ltd.
Narephat, Nepal
February, 2023
Table of Contents
1 Invitation to Submit Proposal....................................................................................................................1
2 Background...............................................................................................................................................1
3 Project Summary.......................................................................................................................................2
4 Work Plan.................................................................................................................................................2
5 Annex.......................................................................................................................................................2
5.1 Quotation..........................................................................................................................................2
5.2 Company Details (Registration, PAN and Tax Clearance)................................................................3
6 Experience................................................................................................................................................6
6.1 LIST OF PROJECT..........................................................................................................................6
6.1.1 Ongoing Projects.................................................................................................................6
6.1.2 Completed Projects..............................................................................................................6
7 The Proposed Team..................................................................................................................................8
7.1 Resume of Team...............................................................................................................................9
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT
This proposal is being submitted by GORKHA HYDRO & ENGINEERING PVT. LTD, Narephat,
Jadibutti. This proposal deals with the approach, methodology, work program and personnel schedule to
carry out the consulting assignment in stipulated time frame.
2 Background
Water resources are the major natural resources of Nepal. Nepal has more than 6000 rivers and rivulets
belonging to three main drainage basins: Koshi, Gandaki and Karnali. Most of the rivers are perennial as
they are originated from high Himalayas and are nourished by snow and glaciers. Water resources of
Nepal have been regarded as nature's bountiful gift to the country. This leads to the emergence of
hydropower sector bearing a high potentiality in boosting the nation’s economy with the best use of
available water resources. The main reason for hydropower projects being the most attractive is due to
environment friendly, reliable, safe and cheap source of energy. Regarding the nation’s capacity of
hydropower generation, Nepal has 83,000 MW theoretical potential among which 42,000 MW is
economically viable potential. At present, only about 2.5% of the techno-economically viable potential
has been harnessed.
It has been realized that hydropower can play vital role in Nepalese economy, both by providing cost
efficient & environment friendly power supply to improve energy services. It can also make a great
contribution to GDP growth by exporting power. In addition, the harnessing of un-tapped water
resources on large scale could provide significant contribution to the poverty reduction and employment
generation. It could be considered as the major economic backbones of the country.
The Government of Nepal intends to develop this hydropower potential in economical, efficient and
sustainable manner to meet the growing power demand in the country as well as to export. In line with
the Hydropower Development Policy, 2001 and Water Resources Strategy, 2002, the Government of
Nepal has emphasized to increase the private sector involvement in the hydropower development for
large, medium and small hydropower projects. Government of Nepal has provided various incentives to
private sector for development of hydropower sector. In order to promote private sector, Nepal
Electricity Authority (NEA) has fixed the energy rates for small hydropower projects up to 25 MW
capacity initiated by Independent Power Producers (IPPs). Similarly, domestic commercial banks are
also interested to invest in hydropower projects as priority sector investment. Furthermore, the
hydropower development policy has envisaged the development of small to medium size hydropower
plant for the purpose of regional power system balance, utilization of local resources, sustainable and
reliable electricity access in the remote region of Nepal. The importance of small to medium size
hydropower project is further amplified by the employment opportunities, opportunities for federal and
local level government to invest on clean energy thus strengthening federal system.
In this context, Salleri Chialsa Electricity Company Limited (SCECO) intends to procure services to
domestic consulting firms for Desk Study, DPR and Construction Drawing of proposed hydropower
project to execute the project.
3 Project Summary
Salleri Chialsa Electricity Company Limited (SCECO) is developers of Salleri Chialsa Hydropower
Project (SCHP) which is located in Solukhumbu district of the Province 1 of Nepal.
4 Work Plan
All works pertaining to the Desk Study Report and Construction Drawings will be carried out at
consultancy. Within a week’s time after completion of the contractual formalities, a group of Key
Experts, headed by the Team Leader shall arrange a meeting with the Client and collect detailed project
information, Hydrology data, Topographical, Geology and Environment study. The team will carry out a
desk study / preliminary study.
The team will work-out for the project Design parameters study, Data processing and Analysis. The
Estimation of power, Energy Cost and time will be carried-out. Then the Desk Study Report will be
submitted within one weeks of contractual formalities.
The Desk Study Report will include preliminary study of hydrology of project area. The report will also
include preliminary design layout of project component like weir, desander, headrace alignment, forebay,
penstock and powerhouse. The team will assist client for obtaining Survey Licensing procedures also
coordinate with DoED for further assist.
5 Annex
5.1 Quotation
6 Experience
GHE PVT. LTD. is a cohesive group of professionals in the field of Multi-Disciplinary Engineering
Service Providing Consultancy established in December 2011 to serve the expertise for the various
development activities of nation. The major services of the company includes hydropower
development, pre-feasibility, feasibility study, detailed survey, design, estimate, project preparation
and implementation, geological and geotechnical study, ground water investigation, structural and
architectural design, socio-economic and environmental study, human resource development,
software development etc.
This company has full time staffs consisting of managers, planners, designers, engineers, estimators,
surveyors, geologists, computer engineers, system analysts, programmers, contract specialists,
insurance experts, software developers, junior technicians and administrative staff. The company has
part time staff in various disciplines such as project preparation, detail engineering, agricultural
forestry, environmental science, social mobilization, construction, and commissioning. Further it has
number of professionals, who are available for the consultation as and when required to render the
better services to the satisfaction of the client.
The company is an organization of highly experienced personnel as well as young, energetic, skilful
and dedicated professionals with wide range of expertise. It is capable of combining different talents
to achieve a smooth on time performance and achieve a goal of complete satisfaction of clients.
The company is fully aware of its services towards nation. Its ultimate goal is to participate for the
nation's development by offering excellent multidisciplinary services required for the developing
country.
Hydro Power
Desk study of Ranma Khola Hydropower Project (30MW), East Rukum District – 2021
Detailed design & engineering of Shyam Khola Hydropower Project (7.20 MW),
Bhojpur District-2020
Feasibility study of Dorpa Sapsup Khola Hydropower Project (4.30MW), Khotang District-
2020
Detailed design & engineering of Dana Khola Hydropower Project (34.80 MW), Manang
District-2020
Desk study of Lumsa Khola Small Hydropower Project (1.6 MW), Solukhumbu District – 2020
Desk study of Dorje Khola Hydropower Project (0.96 MW), Ramechhap District – 2020
Detailed design & engineering of Upper Bhurungdi-A Hydropower Project (4.5MW), Kaski
District – 2019
Construction Supervision of under-construction Upper Chirkhwa Khola Hydropower
Project (4.70MW), Bhojpur District – 2019
Transmission Line
Supervision work of 33kV transmission line of Upper Chirkhwa Khola HP (4.7MW), Bhojpur -
2021.
Hydro Power
Feasibility Study Report of Dana Khola Hydropower Project (34.80MW), Manang– 2020
Preparation of Detailed Design of Upper Deumai Khola Small Hydropower Project
(8.30MW), Ilam district-2020
Detailed design & engineering of Lower Chirkhwa Khola Hydropower Project (4.06MW),
Bhojpur District– 2019
Feasibility study of Shyam Khola Hydropower Project (7.20 MW), Bhojpur District-2019
Desk study report of Upper Sapsup Khola Hydropower Project (1.70 MW), Ramechhap District
– 2019
Desk study of Dorpa Sapsup Khola Hydropower Project (4.30MW), Khotangdistrict-2019
Evaluation of Electromechanical works of Sapsup Khola Hydropower Project (6.6 MW),
Khotang-2019
Scoping Study, Detail Design & Construction supervision of Pung-pho MHP (15 kW), Chin
State, Myanmar, 2018/19
Scoping Study, Detail Design & Construction supervision of Muizawl MHP (15 kW), Chin
State, Myanmar, 2018/19
Scoping Study, Detail Design & Construction supervision of Donlui MHP (30 kW), Chin State,
Myanmar,2018/19
Detailed design& engineering of Sabha Khola-C Hydropower Project (4.55MW),
Sankhuwasabha District-2018
Feasibility study of Upper Deumai Khola Small Hydropower Project (8.30MW), Ilam district-
2018
Feasibility study of Palun-1 Hydropower Project (21.8MW), Taplejung district-2018
Desk study of Shyam Khola Hydropower Project (7.20MW), Bhojpur district – 2018
Feasibility study of Bajra Madi Hydropower Project (24.80MW), Kaski district-2017/18
Desk study of Pokhara Seti Hydropower Project (23.3MW), Kaski district - 2017
Feasibility study of SonaKhola Hydropower Project (5MW), Taplejung district-2017
Feasibility study of SabhaKhola-C Hydropower Project (4.2MW), Sangkhuwasabhadistrict-
2017
Feasibility study of Palun Khola Hydropower Project (21MW), Taplejung district-2017
Feasibility study of Middle Trishuli Ganga Hydropower Project (21.9MW), Nuwakot district -
2017
Desk study Report of Dana Khola Hydropower Project (19.0MW), Manang– 2017
Detailed design of Upper Chirkhwa Hydroelectric Project (4.70MW), Bhojpur district – 2016
Working as a local Consultant to prepare FS Report for Sigma Engineering (Japan) for 7
different
Hydropower Projects within Nepal. – 2015-2016.
Feasibility Study of Lower Tara Khola HP Project, 3.5 MW, BaglungDistrict-2016
Prefeasibility study of up to 26 numbers of Micro-hydro Projects under UN-Habitat program,
Chin State, Myanmar-2017.
Detail topographical survey and report preparation of Nalsingad Hydroelectric Projects
(416MW), Jajarkot district – 2016 (sub consulting).
Detail topographical survey at Budhiganga Hydropower Projects (20MW & 6MW) – 2016 (Sub
consulting)
Detail topographical survey at Myagdi Khola Hydropower Projects (32MW) – 2016 (Sub
consulting)
Detail topographical survey at Kaligandaki Khola Hydropower Projects (57MW) – 2016(Sub
consulting)
Desk study Report of Palun Khola -1 Hydropower Project (4.95MW), Taplejung - 2016
Desk Study Report of Sabha Khola-C small HPP, 4.55 MW, Sangkhuwasabha District - 2016.
Desk Study Report of Namili Khola Micro Hydro Project, 496 kW, Baglung District - 2016.
Detail design and Supervision of Tara Khola Samudayik HPP (380KW), Baglung – 2016
Detail Design and Engineering of Sano MiltiKhola Small Hydroelctric Project, 3.0 MW,
RamechhapDistrict-2015
Detail Design and Engineering of SabhaKhola-B Hydropower Project, 15.1 MW,
SankhuwasabhaDistrict-2015
Prefeasibility study of Jiri khola hydropower project (Storage Type), 2.40 MW, Dolkha - 2016
Feasibility Study of Madhya Daram Khola B Hydopower Project, 4.2 MW, Baglung-2015
Detail Design and Engineering of Middle Tara Khola Small Hydopower Project, 1.7 MW,
BaglungDistrict-2015
Redesign of Project Alignment & Review of Feasibility Study Report of Madhya Daram
Khola“A” Small
Hydropower Project, 3.0 MW, BaglungDistrict-2015.
Detail Topographic and Bathymetry Survey at Powerhouse area of Lower Solu Hydroelectric
Project, 82
MW, Solukhumbu District-2015.
Review of Feasibility Study Report of Lower Tara Khola Small Hydropower Project, 3.5 MW,
BaglungDistrict-2015.
Feasibility Study of Sano Milti Khola Small Hydroelectric Project, 3 MW, Ramechhap District-
2015
For the efficient and effective completion of works, the professionals competent and skilled in their fields
have been proposed. Their names, position along with their task are listed in Table below.
S. POSITION HELD TASK ASSIGNED
N.
Detailed Project Report Team
Overall responsibility to execute the project.
Preliminary study from available data like topomap sheet.
Team Leader Regular Interaction with Client for finalization of each report.
1
(Biswo Shrestha) Finalize the layout, design, drawings & infrastructure facility
area conducting regular meeting with the team members.
Allocate facilities and mobilize team members.
Assist in overall planning of project components.
Hydropower Expert Develop alternative hydropower schemes for the initially
(Dawa Jangmu identified sites.
2
Shrestha Lama) Prepare desk study before site visit during inception report.
Guide senior surveyor for topographic survey works.
Design of project components.
Hydrology Expert Study of Hydrology to assist preliminary design of project
3
(Nabina Rai) component.
Civil Engineer
(Rajendra Koirala)
4 Drawing and Report preparation.
(Sujan Malbul)
(Rinki Bhattarai)
Geology Expert
5 (Indra Lamsal) Assistance in geological data as per required
Electromechanical
6 expert Assistance in Electro Mechanical equipment
(Ram Prashad Sapkota)
7 Assistant Engineer Assistance in Drawing, Report and Printing
(Apsara Khatri)
(Rosan Yadav)
Education:
• M.Sc in Hydropower Engineering (Specialization in Hydropower), Ukrainian State Academy
of Water Management,1997 Trainings:
• Autocad 2014, Microstation - 8
• Primavera (Project planning computer program )
• PROF CAD -06 (Computer program for building ,Road, Sewerage, Strom water design )
• Earthwork program (Computer program for calculating earth work quantity )
• Visual basic (Computer language to design various software)
• Working in MS project,MS Excel, MS word and MS Access
• STAAD Pro. (Structural design software)
• Design and preparation of technical software called “PROFCAD-06 ” which can be used to
design sewage / storm water.
• Design of “HYDROSOFT” (software for Hydropower design)
• Design of other several technical and non technical software.
Work Experience:
From Dec. Gorkha Hydro and Nepal Over all responsible for the management of the
2011 To Till Engineering Pvt. Ltd./ company. Fully responsible for the business
to date Managing Director development, staff management, preparation of
future strategy of the company. Management of the
01-5149162
all departments & task division to the departments.
Responsible for the development of staff welfare.
Responsible for the all the all activities of the works
assigned to the staff & experts. Quality management
of the works & reports.
.
From PERENNIAL POWER & • Feasibility study and design, preparing drawings
2001 To CONSULTING of
2002 ENGINEERS(P)LTD / Shalpu Khola Microhydro Project – 18 KW
Hydropower Engineer Ragani Khola Microhydro Project – 10 KW
Kakani Khola Microhydro Project - 20 KW
Khiji Khola Microhydro Project - 12 KW
Certification:
I, the undersigned, certify to the best of my knowledge and belief that
(i) This CV correctly describes my qualifications and experience
(ii) I am not a current employee of the GoN
(iii)I was not part of the team who wrote the terms of reference for this consulting services
assignment
(iv)I am not currently debarred by a multilateral development bank (In case of DP funded project]
Date: 06/10/2077
[Signatureofexpert
] Day/Month/Year
Date: 06/10/2077
[Signature of authorized representative ofthefirm
] Day/Month/Year
Full name of authorized representative:
Bishwo Shrestha
CURRICULUM
VITAE (CV)
Work Experiences :
Key strengths
• Interpersonal skills and the ability to develop and maintain professional relationships
with senior executives.
• Well organized and motivated.
• Keen to learn and take on responsibility.
• Friendly and reliable.
• Adaptable as team worker or an individual.
• Excellent time management skills.
• Ability to keep calm under pressure.
Educational Verification
Degree University/Institution Specializati
M.Sc. (2018) Tribhuvan University, Central department of Geology Engineering Geo
B.Sc. (2016) Tribhuvan University, Tri-Chandra Multiple campus Geology
Intermediate ((2011) Jana Higher Secondary School, Birendranagar, Surkhet Science
SLC (2009) Surya Prakash Secondary School, Salkot, Surkhet
Interests
• Field investigation and research.
• Lead to the challenging tasks.
• Public speaking
• Interpersonal communication
• Traveling and exploring new places and technologies.
• Like to do adventurous activities.
CURRICULUM VITAE
APSARA KHATRI
Civil Engineer
Career Objective:
To enhance my knowledge and capabilities by working in a dynamic organization that prides itself
in giving substantial responsibility to a new talent. I am an energetic, enthusiastic and self-
motivated person having keen interest to work as an employee.
Personal details:
Date of Birth : 11 June 1996
Nationality : Nepalese
Sex : Female
Religion : Hindu
Citizenship No : 14-01-73-03089
Height : 5.5 feet
Language : Nepali, Hindi, English
Health Status : Good
Contact Info:
+9779862260046
subediapsara98@gmail.com
Triyuga municipality, Jaljale 06,Udayapur Nepal
Qualification
S.No Level Passed School/ College Division Percentage
year
1 SLC 2070 Merry Brood English Secondary 1st 78.62
School
2 intermedia 2071 Susma Koirala Memorial Campus 1st 62.08
te
3 Bachelor 2074 Tri-chandra multiple Campus 2nd 59.00
Strength
Good Communication and Inter Personal Skills
Quick learner and honest
Dedicated and highly motivated.
Formal Personality.
Technical Skills
Auto Cad.
Sketch up
Estimating and Costing
Ms. office (word, Excel, PowerPoint).
Projects
In Building construction
To handling Material & Equipment
Design of commercial building
In Hydropower Project
To read all Design of Hydropower
Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 24 |
Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT
Area of Interest
Modern Civil Engineering Techniques
Tunnel construction and groundwater technique
Hydropower Construction
Building Construction
Work Experience
Worked as Junior Engineer/Geologist in Hill Shade Engineering Consultancy Pvt.
Ltd(2077-2078)
Still working in Gorkha Hydro and Engineering Pvt. Ltd (from Baishakh 2079)
Declaration:
I hereby that the details furnished above are correct and true to the best of my knowledge
and belief.
CURRICULUM VITAE
Rosan Yadav
Civil Engineer
Career Objective:
To enhance my knowledge and capabilities by working in a dynamic organization that prides itself
in giving substantial responsibility to a new talent. I am an energetic, enthusiastic and self-
motivated person having keen interest to work as an employee.
Personal details:
Date of Birth : 13 July 1995
Nationality : Nepalese
Sex : Male
Religion : Hindu
Citizenship No : 16-01-69-01933
Height : 5.8 feet
Language : Nepali, Hindi, English & Maithili
Health Status : Good
Contact Info:
+9779815755851
Rosanyadav0013@gmail.com
Agnisar Krishna sabaran Gaunpalika-4, Spatari, Nepal
Qualification
S.No Level Passed School/ College Division Percentage
year
1 SLC 2068 Green Secondary English Boarding 1st 74.25
School
2 HSEB(+2) 2071 Goldenstar Higher Secondary 1st 63.40
School
3 Bachelor 2077 Adesh Institute of Technology, 1st 6.86 CGPA
Punjab India
Strength
Good Communication and Inter Personal Skills
Quick learner and honest
Dedicated and highly motivated.
Formal Personality.
Technical Skills
Auto Cad.
E. Tabs.
Surveying.
Estimating and Costing
Ms. office (word, Excel, PowerPoint).
Projects
In Highway
To handling Material & Equipment
Profile Leveling
Auto Level
In Hydropower Project
To read all Design of Hydropower
Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 26 |
Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT
Area of Interest
Modern Civil Engineering Techniques
Highway and Bridge Construction
Hydropower Construction
Building Construction
Training
6 months’ Industrial Training (As a Civil Engineering) in Megha Construction Pvt. Ltd.
Work Experience
Worked as site Junior Engineer in Gravity Consultancy Pvt. Ltd (from Bhadra 2078)
Still working in Gorkha Hydro and Engineering Pvt. Ltd (from Falgun 2078)
Declaration:
I hereby that the details furnished above are correct and true to the best of my knowledge
and belief.