You are on page 1of 29

Salleri Chialsa Electricity Company Limited

Solududhkunda Municipality-05, Solukhumbu, Nepal

Salleri Chialsa Hydropower Project


Solukhumbu, Nepal

Proposal
For
Desk Study Report

Client
Salleri Chialsa Electricity Company Limited
Solududhkunda Municipality-05, Solukhumbu, Nepal

Consultant
Gorkha Hydro & Engineering Pvt. Ltd.
Narephat, Nepal

February, 2023

Table of Contents
1 Invitation to Submit Proposal....................................................................................................................1
2 Background...............................................................................................................................................1
3 Project Summary.......................................................................................................................................2
4 Work Plan.................................................................................................................................................2
5 Annex.......................................................................................................................................................2
5.1 Quotation..........................................................................................................................................2
5.2 Company Details (Registration, PAN and Tax Clearance)................................................................3
6 Experience................................................................................................................................................6
6.1 LIST OF PROJECT..........................................................................................................................6
6.1.1 Ongoing Projects.................................................................................................................6
6.1.2 Completed Projects..............................................................................................................6
7 The Proposed Team..................................................................................................................................8
7.1 Resume of Team...............................................................................................................................9
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

PROPOSAL: DESCRIPTION OF THE METHODOLOGY AND WORK PLAN FOR


PERFORMING THE ASSIGNMENT

1 Invitation to Submit Proposal


In response to the Invitation of the Technical Proposals for the Consulting services by Salleri Chialsa
Electricity Company Limited (SCECO) Solukhumbu, Nepal (hereinafter referred to as the
“Client”), to provide the “DESK STUDY REPORT OF SALLERI CHIALSA HYDROPOWER
PROJECT, SOLUKHUMBU DISTRICT; we are pleased to submit the proposal.

This proposal is being submitted by GORKHA HYDRO & ENGINEERING PVT. LTD, Narephat,
Jadibutti. This proposal deals with the approach, methodology, work program and personnel schedule to
carry out the consulting assignment in stipulated time frame.

2 Background
Water resources are the major natural resources of Nepal. Nepal has more than 6000 rivers and rivulets
belonging to three main drainage basins: Koshi, Gandaki and Karnali. Most of the rivers are perennial as
they are originated from high Himalayas and are nourished by snow and glaciers. Water resources of
Nepal have been regarded as nature's bountiful gift to the country. This leads to the emergence of
hydropower sector bearing a high potentiality in boosting the nation’s economy with the best use of
available water resources. The main reason for hydropower projects being the most attractive is due to
environment friendly, reliable, safe and cheap source of energy. Regarding the nation’s capacity of
hydropower generation, Nepal has 83,000 MW theoretical potential among which 42,000 MW is
economically viable potential. At present, only about 2.5% of the techno-economically viable potential
has been harnessed.

It has been realized that hydropower can play vital role in Nepalese economy, both by providing cost
efficient & environment friendly power supply to improve energy services. It can also make a great
contribution to GDP growth by exporting power. In addition, the harnessing of un-tapped water
resources on large scale could provide significant contribution to the poverty reduction and employment
generation. It could be considered as the major economic backbones of the country.

The Government of Nepal intends to develop this hydropower potential in economical, efficient and
sustainable manner to meet the growing power demand in the country as well as to export. In line with
the Hydropower Development Policy, 2001 and Water Resources Strategy, 2002, the Government of
Nepal has emphasized to increase the private sector involvement in the hydropower development for
large, medium and small hydropower projects. Government of Nepal has provided various incentives to
private sector for development of hydropower sector. In order to promote private sector, Nepal
Electricity Authority (NEA) has fixed the energy rates for small hydropower projects up to 25 MW
capacity initiated by Independent Power Producers (IPPs). Similarly, domestic commercial banks are
also interested to invest in hydropower projects as priority sector investment. Furthermore, the
hydropower development policy has envisaged the development of small to medium size hydropower
plant for the purpose of regional power system balance, utilization of local resources, sustainable and
reliable electricity access in the remote region of Nepal. The importance of small to medium size
hydropower project is further amplified by the employment opportunities, opportunities for federal and
local level government to invest on clean energy thus strengthening federal system.

In this context, Salleri Chialsa Electricity Company Limited (SCECO) intends to procure services to
domestic consulting firms for Desk Study, DPR and Construction Drawing of proposed hydropower
project to execute the project.

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 1|Page


PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

3 Project Summary

Salleri Chialsa Electricity Company Limited (SCECO) is developers of Salleri Chialsa Hydropower
Project (SCHP) which is located in Solukhumbu district of the Province 1 of Nepal.

4 Work Plan

All works pertaining to the Desk Study Report and Construction Drawings will be carried out at
consultancy. Within a week’s time after completion of the contractual formalities, a group of Key
Experts, headed by the Team Leader shall arrange a meeting with the Client and collect detailed project
information, Hydrology data, Topographical, Geology and Environment study. The team will carry out a
desk study / preliminary study.

The team will work-out for the project Design parameters study, Data processing and Analysis. The
Estimation of power, Energy Cost and time will be carried-out. Then the Desk Study Report will be
submitted within one weeks of contractual formalities.

The Desk Study Report will include preliminary study of hydrology of project area. The report will also
include preliminary design layout of project component like weir, desander, headrace alignment, forebay,
penstock and powerhouse. The team will assist client for obtaining Survey Licensing procedures also
coordinate with DoED for further assist.

5 Annex

5.1 Quotation

Salleri Chialsa Hydropower Project


Solukhumbu, Nepal

Quotation for Desk Study Report


SN Description of Works Rate Remarks
1 Study of Project Information, Hydrology, 1,20,000
Topographical, Geology with Site Visit
2 Preliminary design for the project component 50,000
3 Power and Energy Estimate 10,000
4 Report Preparation 20,000
5 Documentation (Printing and Stationary) 5,000.0
Sub Total Cost 2,05,000
13% Value Added Tax 26,650
Total Cost 2,31,650
In Rupees Two Lakh Thirty One Thousand Six Hundred Fifty Only
Words:

Prepared By: Submitted To:


Salleri Chialsa Electricity
Gorkha Hydro & Engineering Pvt.Ltd Company Limited

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 2|Page


PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

5.2 Company Details (Registration, PAN and Tax Clearance)

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 3|Page


PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 4|Page


PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 5|Page


PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

6 Experience

GHE PVT. LTD. is a cohesive group of professionals in the field of Multi-Disciplinary Engineering
Service Providing Consultancy established in December 2011 to serve the expertise for the various
development activities of nation. The major services of the company includes hydropower
development, pre-feasibility, feasibility study, detailed survey, design, estimate, project preparation
and implementation, geological and geotechnical study, ground water investigation, structural and
architectural design, socio-economic and environmental study, human resource development,
software development etc.

This company has full time staffs consisting of managers, planners, designers, engineers, estimators,
surveyors, geologists, computer engineers, system analysts, programmers, contract specialists,
insurance experts, software developers, junior technicians and administrative staff. The company has
part time staff in various disciplines such as project preparation, detail engineering, agricultural
forestry, environmental science, social mobilization, construction, and commissioning. Further it has
number of professionals, who are available for the consultation as and when required to render the
better services to the satisfaction of the client.

The company is an organization of highly experienced personnel as well as young, energetic, skilful
and dedicated professionals with wide range of expertise. It is capable of combining different talents
to achieve a smooth on time performance and achieve a goal of complete satisfaction of clients.

The company is fully aware of its services towards nation. Its ultimate goal is to participate for the
nation's development by offering excellent multidisciplinary services required for the developing
country.

6.1 LIST OF PROJECT

6.1.1 Ongoing Projects

Hydro Power

 Desk study of Ranma Khola Hydropower Project (30MW), East Rukum District – 2021
 Detailed design & engineering of Shyam Khola Hydropower Project (7.20 MW),
Bhojpur District-2020
 Feasibility study of Dorpa Sapsup Khola Hydropower Project (4.30MW), Khotang District-
2020
 Detailed design & engineering of Dana Khola Hydropower Project (34.80 MW), Manang
District-2020
 Desk study of Lumsa Khola Small Hydropower Project (1.6 MW), Solukhumbu District – 2020
 Desk study of Dorje Khola Hydropower Project (0.96 MW), Ramechhap District – 2020
 Detailed design & engineering of Upper Bhurungdi-A Hydropower Project (4.5MW), Kaski
District – 2019
 Construction Supervision of under-construction Upper Chirkhwa Khola Hydropower
Project (4.70MW), Bhojpur District – 2019

Transmission Line
 Supervision work of 33kV transmission line of Upper Chirkhwa Khola HP (4.7MW), Bhojpur -
2021.

6.1.2 Completed Projects

Hydro Power

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 6|Page


PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

 Feasibility Study Report of Dana Khola Hydropower Project (34.80MW), Manang– 2020
 Preparation of Detailed Design of Upper Deumai Khola Small Hydropower Project
(8.30MW), Ilam district-2020
 Detailed design & engineering of Lower Chirkhwa Khola Hydropower Project (4.06MW),
Bhojpur District– 2019
 Feasibility study of Shyam Khola Hydropower Project (7.20 MW), Bhojpur District-2019
 Desk study report of Upper Sapsup Khola Hydropower Project (1.70 MW), Ramechhap District
– 2019
 Desk study of Dorpa Sapsup Khola Hydropower Project (4.30MW), Khotangdistrict-2019
 Evaluation of Electromechanical works of Sapsup Khola Hydropower Project (6.6 MW),
Khotang-2019
 Scoping Study, Detail Design & Construction supervision of Pung-pho MHP (15 kW), Chin
State, Myanmar, 2018/19
 Scoping Study, Detail Design & Construction supervision of Muizawl MHP (15 kW), Chin
State, Myanmar, 2018/19
 Scoping Study, Detail Design & Construction supervision of Donlui MHP (30 kW), Chin State,
Myanmar,2018/19
 Detailed design& engineering of Sabha Khola-C Hydropower Project (4.55MW),
Sankhuwasabha District-2018
 Feasibility study of Upper Deumai Khola Small Hydropower Project (8.30MW), Ilam district-
2018
 Feasibility study of Palun-1 Hydropower Project (21.8MW), Taplejung district-2018
 Desk study of Shyam Khola Hydropower Project (7.20MW), Bhojpur district – 2018
 Feasibility study of Bajra Madi Hydropower Project (24.80MW), Kaski district-2017/18
 Desk study of Pokhara Seti Hydropower Project (23.3MW), Kaski district - 2017
 Feasibility study of SonaKhola Hydropower Project (5MW), Taplejung district-2017
 Feasibility study of SabhaKhola-C Hydropower Project (4.2MW), Sangkhuwasabhadistrict-
2017
 Feasibility study of Palun Khola Hydropower Project (21MW), Taplejung district-2017
 Feasibility study of Middle Trishuli Ganga Hydropower Project (21.9MW), Nuwakot district -
2017
 Desk study Report of Dana Khola Hydropower Project (19.0MW), Manang– 2017
 Detailed design of Upper Chirkhwa Hydroelectric Project (4.70MW), Bhojpur district – 2016
 Working as a local Consultant to prepare FS Report for Sigma Engineering (Japan) for 7
different
 Hydropower Projects within Nepal. – 2015-2016.
 Feasibility Study of Lower Tara Khola HP Project, 3.5 MW, BaglungDistrict-2016
 Prefeasibility study of up to 26 numbers of Micro-hydro Projects under UN-Habitat program,
Chin State, Myanmar-2017.
 Detail topographical survey and report preparation of Nalsingad Hydroelectric Projects
(416MW), Jajarkot district – 2016 (sub consulting).
 Detail topographical survey at Budhiganga Hydropower Projects (20MW & 6MW) – 2016 (Sub
consulting)
 Detail topographical survey at Myagdi Khola Hydropower Projects (32MW) – 2016 (Sub
consulting)
 Detail topographical survey at Kaligandaki Khola Hydropower Projects (57MW) – 2016(Sub
consulting)
 Desk study Report of Palun Khola -1 Hydropower Project (4.95MW), Taplejung - 2016
 Desk Study Report of Sabha Khola-C small HPP, 4.55 MW, Sangkhuwasabha District - 2016.
 Desk Study Report of Namili Khola Micro Hydro Project, 496 kW, Baglung District - 2016.
 Detail design and Supervision of Tara Khola Samudayik HPP (380KW), Baglung – 2016
 Detail Design and Engineering of Sano MiltiKhola Small Hydroelctric Project, 3.0 MW,
RamechhapDistrict-2015
 Detail Design and Engineering of SabhaKhola-B Hydropower Project, 15.1 MW,
SankhuwasabhaDistrict-2015
 Prefeasibility study of Jiri khola hydropower project (Storage Type), 2.40 MW, Dolkha - 2016
 Feasibility Study of Madhya Daram Khola B Hydopower Project, 4.2 MW, Baglung-2015
 Detail Design and Engineering of Middle Tara Khola Small Hydopower Project, 1.7 MW,
BaglungDistrict-2015
 Redesign of Project Alignment & Review of Feasibility Study Report of Madhya Daram
Khola“A” Small
 Hydropower Project, 3.0 MW, BaglungDistrict-2015.
 Detail Topographic and Bathymetry Survey at Powerhouse area of Lower Solu Hydroelectric
Project, 82
 MW, Solukhumbu District-2015.
 Review of Feasibility Study Report of Lower Tara Khola Small Hydropower Project, 3.5 MW,
BaglungDistrict-2015.
 Feasibility Study of Sano Milti Khola Small Hydroelectric Project, 3 MW, Ramechhap District-
2015

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 7|Page


PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

 Detail Feasibility Study of Middle Trishuli Ganga NadiHP, 55 MW, NuwakotDistrict-2015


 Review of Detail Design and Engineering of Chulepu Khola Hydropower Project, 8.52 MW,
RamechhapDistrict-2015
 Geological/ Engineering Geological Study of Thadekhani Khola Small Hydropower Project, 3
MW, Myagdi District- 2014
 Geological/ Engineering Geological Study of Sanigad Khola Micro- Hydro Project, 100 KW,
Bajhang District- 2014
 Preparation of Desk Study Report of Butterfly Hydropower Project-Storage Type, 8.40
 MW,RamechhapDistrict-2014
 Feasibility Study Report of Madhya Daram Khola “A” Small Hydopwer Project, 3.0 MW,
Baglung District -2014.
 Detail Feasibility Study Report of Middle Tara Khola Hydroelectric Project, 1.7 MW,Baglung
District-2013.
 Desk Study Report of Madhya Daram KholaA Small Hydopwer Project, 3.0 MW, Baglung
District - 2068.
 Desk Study Report of Madhya Daram Khola B Small Hydropower Project, 4.2 MW,
BaglungDistrict-2068.
 Desk Study Report of Middle Tara Khola Hydroelectric Project, 1.7 MW,BaglungDistrict-2068.
 Feasibility Study of Dorje Khola Hydropower Project,1.0 MW, Ramechhap District - 2012.
 Review and upgrading Report of Upper Hewa Khola HP, 12 MW, Panchthar District - 2012.
 Survey, design and construction supervision of various micro-hydro Projects with 5KW to
100KW in different location of Nepal.

7 The Proposed Team

For the efficient and effective completion of works, the professionals competent and skilled in their fields
have been proposed. Their names, position along with their task are listed in Table below.
S. POSITION HELD TASK ASSIGNED
N.
Detailed Project Report Team
 Overall responsibility to execute the project.
 Preliminary study from available data like topomap sheet.
Team Leader  Regular Interaction with Client for finalization of each report.
1
(Biswo Shrestha)  Finalize the layout, design, drawings & infrastructure facility
area conducting regular meeting with the team members.
 Allocate facilities and mobilize team members.
 Assist in overall planning of project components.
Hydropower Expert  Develop alternative hydropower schemes for the initially
(Dawa Jangmu identified sites.
2
Shrestha Lama)  Prepare desk study before site visit during inception report.
 Guide senior surveyor for topographic survey works.
 Design of project components.
Hydrology Expert  Study of Hydrology to assist preliminary design of project
3
(Nabina Rai) component.
Civil Engineer
(Rajendra Koirala)
4  Drawing and Report preparation.
(Sujan Malbul)
(Rinki Bhattarai)
Geology Expert
5 (Indra Lamsal)  Assistance in geological data as per required

Electromechanical
6 expert  Assistance in Electro Mechanical equipment
(Ram Prashad Sapkota)
7 Assistant Engineer  Assistance in Drawing, Report and Printing
(Apsara Khatri)

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 8|Page


PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

(Rosan Yadav)

7.1 Resume of Team

CURRICULUM VITAE (CV)

Position Title and No. Hydropower Engineer


Name of Firm Gorkha Hydro and Engineering (GHE) Pvt. Ltd.
Name of Expert: Mr. Biswo Shrestha
Date of Birth: 1971
Citizenship Nepali
Years with Consultant / Entity: Since Dec. 2011 to Date / Managing Director
Contact : +977- 9841264457
Email: biswodawa@hotmail.com
Key Qualifications:
Mr. Biswo Shrestha, Managing Director of GHE Pvt. Ltd. has been performing the following activities:
Over all responsible for the management of the company. Fully responsible for the business
development, staff management, preparation of future strategy of the company. Management of the all
departments & task division to the departments. Responsible for the development of staff welfare.
Responsible for the all the all activities of the works assigned to the staff & experts. Quality management
of the works & reports.

Education:
• M.Sc in Hydropower Engineering (Specialization in Hydropower), Ukrainian State Academy
of Water Management,1997 Trainings:
• Autocad 2014, Microstation - 8
• Primavera (Project planning computer program )
• PROF CAD -06 (Computer program for building ,Road, Sewerage, Strom water design )
• Earthwork program (Computer program for calculating earth work quantity )
• Visual basic (Computer language to design various software)
• Working in MS project,MS Excel, MS word and MS Access
• STAAD Pro. (Structural design software)
• Design and preparation of technical software called “PROFCAD-06 ” which can be used to
design sewage / storm water.
• Design of “HYDROSOFT” (software for Hydropower design)
• Design of other several technical and non technical software.

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 9|Page


PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Work Experience:

Period Employing organization / Country Summary of activities performed relevant to the


title/position. Contact Assignment
information for references

From Dec. Gorkha Hydro and Nepal Over all responsible for the management of the
2011 To Till Engineering Pvt. Ltd./ company. Fully responsible for the business
to date Managing Director development, staff management, preparation of
future strategy of the company. Management of the
01-5149162
all departments & task division to the departments.
Responsible for the development of staff welfare.
Responsible for the all the all activities of the works
assigned to the staff & experts. Quality management
of the works & reports.
.

• Construction supervision of Upper Chirkhwa 4.7


MW
• Detail fesibility Study of Upper Deumai Small
Khola HPP (8.3 MW)
• Detail design of Sabha khola-C HPP
(4.2 MW )
• Detail design of Upper Chirkhwa HPP (4.7
MW )
• Detail design of Lower Chirkhwa HPP (4.07
MW )
• Detail design of Sabha Khola-B HP (15.1 MW )
• Detail design of Sano Milti Khola HP (3.0
MW )
• Review design of Lower Tara Khola HPP
(3.5 MW )
• Detail design of Madhya Tara Khola HEP (1.7
MW )
• Detail design of Tara Khola Samudayik HEP
(380 KW )
• Feasibility Study of Middle Trishuli Ganga HPP
(55MW)
• Review design of Chulepu Khola HPP (8.50
MW )
• Review Design of Hewa Khola Hydroelectric
Project (14MW).
• Pre-Feasibility study of Hewa
Khola Cascade-B Project.(5MW)
• Feasibility Study and Detail design of Tara K
MW)
• Detail design of Middle Daram Khola HP - A

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 10 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

• Detail design of Middle Daram Khola HP - B


• Feasibility and Detail design of Dorje Khola M
• Feasibility Study of Lapse Khola Small HP (3
• Tadi Khola Small HP (4.5 M W), Satbise, Nuw
• Detail design and construction supervision of
• Surma Khola Micro Hydro Project (10KW), R
• Involvement in various MicroHydro Projects.

From 2004 Infrastructure Development Projects:


To Co. (IDC), Al Khobar, K.S.A / • Design of hydraulic structures, preparation of
December drawings and supervision of desalination plant
/ Design Section Head
2011 Project.
• Complete Planning and Design of Sewerage and
Storm water Networking. Preparing Plan and
Profiles for execution.
• Estimating quantities of various Sewerage and
Storm water Projects.
Structural Design of various structures related to
Storm water projects (Sea, Potable and Irrigation
Water tanks, Lift station, Pump stations etc).
Structural Analysis/Design and preparation of
drawings for Buildings,
Culverts, Pump station, Lift station and water
Tanks

From 2002Al-Masad Roads Company Projects:


To 2004 Pvt. Ltd., Riyadh, K.S.A./ • Structural Analysis/Design and preparation of
InCharge of Design Section in drawings, BOQ for Extension of Ministry of
Engineering Department Agriculture Building.
• Cost control work and managing to prepare
Project work schedule for various project using
Primavera (Project planning computer program)
• Structural design, preparation of drawings
calculating quantities for Riyadh Womens
Jail Project.
• Design and preparation of Technical Software
called "PROF CAD-06" USING Visual Basic
with Microsoft access as backend database. (This
program helps for Designing Roads and
Sewerage project, preparation of Bar-Bending
Schedule, basic structural design of buildings.)
• Design and preparing Construction Drawings for
Roads, Sewerage and Bridges using Auto-Cad
2004 and calculating quantities using various
software's.

• Complete Geometric Design, estimation of


quantity, preparation of drawings and get

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 11 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

approval FROM ministry for various projects


 Majmaah Sewerage Project-Part 5 (Sr
30 Million )
 Al Hair Road dualization Project.
 Al Ghat Sewerage project
 Al Ghat Storm water network Project.
 Zulfi Sewerage project
 Majmaah Hafr Al Batin Dualization Road
Project – Part 10 (SR 32 million)
 Hafr Al Batin – Rafa Road Project
(Section-5) (SR 84 Million )
 Nairiya-Hafr Al Batin Dualization Road
Project
 And other various Projects.

 Involving in design of various technical and non


technical softwares.

From PERENNIAL POWER & • Feasibility study and design, preparing drawings
2001 To CONSULTING of
2002 ENGINEERS(P)LTD / Shalpu Khola Microhydro Project – 18 KW
Hydropower Engineer Ragani Khola Microhydro Project – 10 KW
Kakani Khola Microhydro Project - 20 KW
Khiji Khola Microhydro Project - 12 KW

• Feasibility level design and Detail design of


Chhedengmo Minihydro Power Project (506
KW) and Bendang Khola Mini Hydro Project
(425 KW ).

From 1998 IMPREGILO S.P.A. • Assisted Planning Section in Calculation of


To 2001 (ITALY) / Civil / Concrete and formwork quantities. Prior revised
Hydropower Engineer in Project Work Schedule with Project Manager
Design Section utilizing Primavera ( Project planning Computer
Program).
• Worked on a 160MW internationally funded
KALI GANDAKI "A" Hydro electrical power
project (so far biggest power project in NEPAL)
under the supervision of MAKI (Morrision
Kunudson international, USA) consultant.
• Re-design of structures as per site condition and
prepare design drawings utilizing AutoCad.
• Prepare Concrete Lift and Steel
Reinforcement Drawing utilizing Auto-Cad and
prepare Bar Bending Schedule Utilizing Excel.
• Assisted Survey Section in data transfer from
instrument to computer, calculated qualities and
prepare survey drawings utilizing Auto-

Cad and Auto civil.


 Prepare details Construction Drawings of
embedded and other metal parts (e.g. pipes sleeves,
Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 12 |
Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

hatch frames, covers, handrails, platforms, metal


roof, ladders, etc.)  Utilizing Auto-Cad.

From 1997 JESCO SEWA (P) LTD./ Projects:


To 1998 Civil Engineer • Working as a cost control engineer to manage to
control the cost for Various Building Projects.
• Prepare Work Schedule in
various
Software's.
Membership in Professional Associations and Publications:
• Member Engineering Council of Nepal
• Member Engineering Association of Nepal

Language Skills (indicate only languages in which you can work):


English, Nepali, Hindi, Russian, Ukrainian. (Fluent in writing & Speaking)

Certification:
I, the undersigned, certify to the best of my knowledge and belief that
(i) This CV correctly describes my qualifications and experience
(ii) I am not a current employee of the GoN
(iii)I was not part of the team who wrote the terms of reference for this consulting services
assignment
(iv)I am not currently debarred by a multilateral development bank (In case of DP funded project]

I understand that any willful misstatement described herein may lead to my


disqualification or dismissal, if engaged.

Date: 06/10/2077
[Signatureofexpert
] Day/Month/Year

Date: 06/10/2077
[Signature of authorized representative ofthefirm
] Day/Month/Year
Full name of authorized representative:
Bishwo Shrestha

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 13 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

CURRICULUM
VITAE (CV)

Position Title and No. Hydrologist


Name of Firm Gorkha Hydro & Engineering(GHE) Pvt.Ltd.
Name of Expert: Mrs Nabina Rai
Date of Birth: 1988
Citizenship Nepali
Years with Consultant / Entity: Since Dec. 2011 To Date / Hydropower Engineer
Contact : 9803515659
Email: sabinanabina@gmail.com

Education: M.Sc in Construction Management (2015) with 10 years of Experience as


hydropower engineer in design cost estimation and drawing of following mentioned
Hydropower Project.

Work Experiences :

Period Employing organization and Country Summary of activities performed


your title/position. Contact relevantto theAssignment
information for references
Dec Gorkha Hydro & Engineering Pvt. Nepal Shyam Khola Hydropower Projec
2011- Ltd. (7.20 MW), Bhojpur District-2020
Till
Date Hydropower Engineer

Green Globe International Pvt.Ltd Nepal Dana Khola Hydropower Projec


(34.80MW), Manang– 2020
Hydrologist and involved in IEE
Report
Nepal Upper Deumai Khola Smal
Hydropower Project (8.30MW)
Ilam district-2020
Nepal Palun-1 Hydropower Projec
(21.8MW), Taplejung district-2018

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 14 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Curriculum Vitae – Indra Lamsa

INDRA LAMSAL, M.Sc.


Mobile: +977-9851140830, 9848160786

Email: lamsalindra.786@gmail.com, ilamsal@hotmail.com

Address: Kirtipur, Kathmandu, Nepal

Key strengths
• Interpersonal skills and the ability to develop and maintain professional relationships
with senior executives.
• Well organized and motivated.
• Keen to learn and take on responsibility.
• Friendly and reliable.
• Adaptable as team worker or an individual.
• Excellent time management skills.
• Ability to keep calm under pressure.

Educational Verification
Degree University/Institution Specializati
M.Sc. (2018) Tribhuvan University, Central department of Geology Engineering Geo
B.Sc. (2016) Tribhuvan University, Tri-Chandra Multiple campus Geology
Intermediate ((2011) Jana Higher Secondary School, Birendranagar, Surkhet Science
SLC (2009) Surya Prakash Secondary School, Salkot, Surkhet

Interests
• Field investigation and research.
• Lead to the challenging tasks.
• Public speaking
• Interpersonal communication
• Traveling and exploring new places and technologies.
• Like to do adventurous activities.

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 15 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 16 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 17 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 18 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 19 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 20 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 21 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 22 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 23 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

CURRICULUM VITAE

APSARA KHATRI
Civil Engineer
Career Objective:
To enhance my knowledge and capabilities by working in a dynamic organization that prides itself
in giving substantial responsibility to a new talent. I am an energetic, enthusiastic and self-
motivated person having keen interest to work as an employee.
Personal details:
 Date of Birth : 11 June 1996
 Nationality : Nepalese
 Sex : Female
 Religion : Hindu
 Citizenship No : 14-01-73-03089
 Height : 5.5 feet
 Language : Nepali, Hindi, English
 Health Status : Good
Contact Info:
+9779862260046
subediapsara98@gmail.com
Triyuga municipality, Jaljale 06,Udayapur Nepal

Qualification
S.No Level Passed School/ College Division Percentage
year
1 SLC 2070 Merry Brood English Secondary 1st 78.62
School
2 intermedia 2071 Susma Koirala Memorial Campus 1st 62.08
te
3 Bachelor 2074 Tri-chandra multiple Campus 2nd 59.00
Strength
 Good Communication and Inter Personal Skills
 Quick learner and honest
 Dedicated and highly motivated.
 Formal Personality.
Technical Skills
 Auto Cad.
 Sketch up
 Estimating and Costing
 Ms. office (word, Excel, PowerPoint).
Projects
In Building construction
 To handling Material & Equipment
 Design of commercial building

In Hydropower Project
 To read all Design of Hydropower
Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 24 |
Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

 Work on Hydropower Office

Area of Interest
 Modern Civil Engineering Techniques
 Tunnel construction and groundwater technique
 Hydropower Construction
 Building Construction

Work Experience
 Worked as Junior Engineer/Geologist in Hill Shade Engineering Consultancy Pvt.
Ltd(2077-2078)
 Still working in Gorkha Hydro and Engineering Pvt. Ltd (from Baishakh 2079)
Declaration:
I hereby that the details furnished above are correct and true to the best of my knowledge
and belief.

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 25 |


Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

CURRICULUM VITAE
Rosan Yadav
Civil Engineer
Career Objective:
To enhance my knowledge and capabilities by working in a dynamic organization that prides itself
in giving substantial responsibility to a new talent. I am an energetic, enthusiastic and self-
motivated person having keen interest to work as an employee.
Personal details:
 Date of Birth : 13 July 1995
 Nationality : Nepalese
 Sex : Male
 Religion : Hindu
 Citizenship No : 16-01-69-01933
 Height : 5.8 feet
 Language : Nepali, Hindi, English & Maithili
 Health Status : Good
Contact Info:
+9779815755851
Rosanyadav0013@gmail.com
Agnisar Krishna sabaran Gaunpalika-4, Spatari, Nepal

Qualification
S.No Level Passed School/ College Division Percentage
year
1 SLC 2068 Green Secondary English Boarding 1st 74.25
School
2 HSEB(+2) 2071 Goldenstar Higher Secondary 1st 63.40
School
3 Bachelor 2077 Adesh Institute of Technology, 1st 6.86 CGPA
Punjab India
Strength
 Good Communication and Inter Personal Skills
 Quick learner and honest
 Dedicated and highly motivated.
 Formal Personality.
Technical Skills
 Auto Cad.
 E. Tabs.
 Surveying.
 Estimating and Costing
 Ms. office (word, Excel, PowerPoint).
Projects
In Highway
 To handling Material & Equipment
 Profile Leveling
 Auto Level
In Hydropower Project
 To read all Design of Hydropower
Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 26 |
Page
PROPOSAL ______________________
CONSULTING SERVICES FOR DESK STUDY REPORT OF SALLERI CHAILSA HYDROPOWER PROJECT, SOLUKHUMBU DISTRICT

 Work on Hydropower Office

Area of Interest
 Modern Civil Engineering Techniques
 Highway and Bridge Construction
 Hydropower Construction
 Building Construction
Training
 6 months’ Industrial Training (As a Civil Engineering) in Megha Construction Pvt. Ltd.
Work Experience
 Worked as site Junior Engineer in Gravity Consultancy Pvt. Ltd (from Bhadra 2078)
 Still working in Gorkha Hydro and Engineering Pvt. Ltd (from Falgun 2078)
Declaration:
I hereby that the details furnished above are correct and true to the best of my knowledge
and belief.

Gorkha Hydro & Engineering Pvt. Ltd. Narephat, Jadibuti 27 |