Construction of Mass Rapid Transit Jakarta

Contract Package CP101

Lebak Bulus Station


Structural Design
(Foundations)

TWJO-1-TCD-ST1-0004-Rev C

TOKYU-WIKA JOINT OPERATION

When viewed in ACONEX this document is Controlled, this means:


1. Distribution is centralized - in this case through ACONEX. Any improvement suggestions should be
forwarded to the Quality Manager.
2. Each copy is issued to a particular person or organization.
3. Copy holders will be automatically issued with any amendments through ACONEX.
4. Photocopies of this document are uncontrolled and users should confirm validity in ACONEX prior to
use.
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

DOCUMENT/DRAWING TECHNICAL
VERIFICATION AND REVISION RECORD

PROJECT NAME Jakarta MRT


PROJECT NO. AECOM 60313051 FILE 1800
*DOC/DWG NO. AECOM-1-TCD-ST1-0004 DATE OF FIRST ISSUE 17-10-2014
*DOC/DWG TITLE Lebak Bulus Station – Foundation Design
ISSUE/REV.

APPROVED
PREPARED
/DESIGNED

CHECKED
DATE OF
REV. No.

DESCRIPTION

- 17-10- Initial Submission SG NB IDJ


2014
1 12-12- Change in column location at grade SG NB IDJ
2014
2 29-12- Revised as per JO & 3PDV comments SG NB IDJ
2014
3 26-03- Revised as per latest architecture and utilities SG NB IDJ
2015
4 15-04- Revised as per TWJO’s comments SG NB IDJ
2015

* Delete as Appropriate

TWJO-1-TCD-ST1-0004-Rev C Page 2 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

CONTENTS

1. INTRODUCTION ............................................................................................................ 7
1.1 Scope of Report........................................................................................................ 7
1.2 Design Package Affiliation ........................................................................................ 7
2. DETAILED DESCRIPTION – LEBAK BULUS STATION .............................................. 8
2.1 Description of structure ............................................................................................. 8
2.2 Structural modelling .................................................................................................11
2.2.1 General ....................................................................................................... 11
2.2.2 Methodology................................................................................................ 12
2.3 Loadings ..................................................................................................................13
2.3.1 Dead Load................................................................................................... 13
2.3.2 Super imposed Dead Load .......................................................................... 15
2.3.3 Live Load .................................................................................................... 16
2.3.4 Braking & Traction Load .............................................................................. 17
2.3.5 Temperature Load ....................................................................................... 18
2.3.6 Wind effects ................................................................................................ 18
2.3.7 Seismic Loadings ........................................................................................ 19
2.4 Load Combinations..................................................................................................22
3. STRUCTURAL ANALYSIS ...........................................................................................23
3.1 Seismic Response of structure ................................................................................23
3.2 Mode Shapes ..........................................................................................................23
3.3 Fundamental Time period ........................................................................................25
3.4 Seismic mass participation ......................................................................................25
3.5 Lateral Seismic Inter-storey drift ..............................................................................25
4. SUBSOIL CONDITIONS ...............................................................................................33
4.1 Stratification.............................................................................................................33
4.1.1 Stratum 1: Alluvial Fan (Unit Qav) ............................................................... 33
4.1.2 Stratum 2: Bojongmanik Formation (Unit Tmb) ............................................ 33
4.2 Groundwater Conditions ..........................................................................................33
4.2.1 Borehole Reference .................................................................................... 34
4.3 Reduction of Soil Properties due to Cyclic Loading ..................................................34
4.3.1 Reduction of Undrained Shear Strength ...................................................... 34
4.3.2 Reduction of Soil Stiffness ........................................................................... 34
4.4 Subsoil Properties ...................................................................................................36

TWJO-1-TCD-ST1-0004-Rev C Page 3 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

5. SITE SPECIFIC RESPONSE ANALYSIS .....................................................................37


5.1 Earthquake Ground Motion at Bedrock ....................................................................37
5.2 Correlation of Shear Wave Velocity (Vs) to SPT-N Value ........................................37
5.3 Site Zoning ..............................................................................................................37
5.4 Site Specific Response Spectra Result ....................................................................39
6. PILE BEARING CAPACITY ..........................................................................................40
6.1 Factor of Safety .......................................................................................................40
6.2 Bearing Capacity Analysis .......................................................................................40
6.2.1 Axial Bearing Capacity ................................................................................ 40
6.3 Design Parameters for Axial Bearing Capacity ........................................................41
6.4 Pile Group ...............................................................................................................42
6.4.1 Spacing of Piles........................................................................................... 42
6.4.2 Block Failure Analysis ................................................................................. 42
6.5 Result of Analysis ....................................................................................................43
7. LATERAL DEFLECTION OF PILE ...............................................................................44
7.1 Allowable Lateral Displacements .............................................................................44
7.2 Pile Model and Soil-Structure-Interaction .................................................................44
7.3 Design Parameters for Lateral Soil Capacity and Stiffness ......................................44
7.3.1 Lateral Capacity of Soils .............................................................................. 44
7.3.2 Horizontal Subgrade Modulus ..................................................................... 45
7.4 Pile Group ...............................................................................................................45
7.4.1 Spacing of Piles........................................................................................... 45
7.4.2 Group Effect ................................................................................................ 45
8. Design of Foundation..................................................................................................46
8.1 Bored Pile Design ....................................................................................................46
8.2 Bored Pile Design ....................................................................................................49
8.2.1 Summary of Section Analysis ...................................................................... 50
8.2.2 Typical reinforcement section ...................................................................... 50
8.3 Structural Design of Pile Cap ...................................................................................51
8.3.1 Lateral deflection of pile cap top .................................................................. 52
9. SETTLEMENT OF PILES .............................................................................................54
9.1 Settlement Limit .......................................................................................................54
9.2 Pile Settlement Analysis ..........................................................................................54
9.3 Group Pile Settlement .............................................................................................54
9.4 Consolidation Settlement .........................................................................................55
9.5 Result of Analysis ....................................................................................................55
TWJO-1-TCD-ST1-0004-Rev C Page 4 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

10. CONCLUSION ........................................................................................................60


11. REFERENCES ........................................................................................................61

APPENDICES
Appendix A : Geological Profile at CP102 Cipete Raya Station
Appendix B : Site Zoning and SPT-N Design Line
Appendix C : Pile Schedule
Appendix D : Calculation Sheet for Pile Axial Bearing Capacity
Appendix E : Summary of pile Settlement
Appendix F : List of Relevant Drawings
Appendix G : List of Reference Drawings
Appendix H : List of standards & codes
Appendix I : Loading Plan Drawing
Appendix J : Design Calculation of Pile & Pile Cap

List of Tables
Table 1 – Design Package Affiliation ..................................................................................... 7
Table 2 – Summary of Load Combinations ...........................................................................22
Table 3 – STAAD mass participation table ...........................................................................23
Table 4 – Drift Displacements from STAAD and amplified values in longitudinal direction ....26
Table 5 – Comparison of displacements with inter-storey drift limits .....................................28
Table 6 – Drift Displacements from STAAD and amplified values in Transverse direction ....29
Table 7 – Comparison of displacements with inter-storey drift limits .....................................31
Table 8 – Recommended Geotechnical Design Parameters ................................................36
Table 9 – List of published studies on Vs to SPT-N correlations ...........................................37
Table 10 – Site Zoning .........................................................................................................37
Table 11 – Minimum Factor of Safety for Design ..................................................................40
Table 12 – Bored Pile Design Parameters* ..........................................................................41
Table 13 – Summary of Design Pile Length..........................................................................47
Table 14 – Typical axial loads & moments for pile design.....................................................49
Table 15 – Typical analysis results of pile design .................................................................50
Table 16 – Design moments in Pile Cap ...............................................................................51
Table 17 – Stress Check from Oasys ...................................................................................51
Table 18 – Recommended Allowable Settlement for Buildings*............................................54
Table 19 – Summary of Pile Settlement ...............................................................................56

List of Figures
Figure 1 – Typical section at the pier location of entire station ............................................... 8
Figure 2 – Typical platform layout of station. ......................................................................... 8
Figure 3 – Typical Section of Box Girder with Rail Plinth & Rolling Stock .............................. 9
Figure 4 – Typical Section at pier location supporting viaduct & precast girders. ................... 9
Figure 5 – Typical Plan at pier location supporting viaduct & precast girders ......................... 9
Figure 6 – Typical Elevation at pier location supporting viaduct & precast girders ................10
Figure 7 – Concourse floor layout of Lebak Bulus Station ....................................................10
Figure 8 – Column Layout at Ground Level ..........................................................................11
Figure 9 – Beam Frame layout at Concourse Level ..............................................................11

TWJO-1-TCD-ST1-0004-Rev C Page 5 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Figure 10 – Structural Design Model ....................................................................................12


Figure 11 – Envelop Curve of Load-Displacement Relation of Reinforced Concrete Members
(under low axial force) ..........................................................................................................19
Figure 12 – Comparison of ODE Design Spectrum ..............................................................21
Figure 13 – Comparison of MDE Spectrum ..........................................................................21
Figure 14 – Mode Shape 1 – Transverse Translation ...........................................................23
Figure 15 – Mode Shape 2 – Ineffective participation ...........................................................24
Figure 16 – Mode Shape 3 – Longitudinal Translation ..........................................................24
Figure 17 – Soil stratification ................................................................................................35
Figure 18 – Layout of Site Zoning .........................................................................................35
Figure 19 – Design shear wave velocity profiles for each zone.............................................38
Figure 20 – Zoning for site specific response analysis ..........................................................38
Figure 21 – Design Spectra for ODE case ............................................................................39
Figure 22 – Design Spectra for MDE case............................................................................39
Figure 23 – Bearing capacity factor (after Meyerhof) and shape factor (Meyerhof-Skempton
.............................................................................................................................................42
Figure 24 – Pile-Soil Model (after Reese and O’Neill, 1988) .................................................44
Figure 25 – Idealized variation of limiting resistance with depth (after Fleming et al, 2009) ..45
Figure 26 – Typical reinforcement section of piles ................................................................50
Figure 27 – Typical Pile cap schematic diagram ...................................................................51
Figure 28 – Pile-raft foundation to estimate load distribution for consolidation settlement
analysis, if applicable (Das, 2011) ........................................................................................55
Figure 29 – Contour of Pile Settlement .................................................................................59

TWJO-1-TCD-ST1-0004-Rev C Page 6 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

1. INTRODUCTION
The proposed rail based Jakarta Mass Rapid Transit (MRT) will consist of South-
North and East West Corridors. The construction of the South-North Corridor will be
completed in two stages. Stage 1 will be carried out to connect Cipete Raya with
Bunderan HI which comprises 15.7km of twin track rails, of which 4.8km passes
through twin tunnels with the remainder supported on elevated viaducts. There are
13 stations in total, of which 6 are underground, including a fully functional depot
covering approximately 8.3 hectares. Stage 2 will expand the South-North corridor
from Bunderan HI to Kampung Bandan.
Stage 1 of the project is divided into six civil contract packages (CP), in which
CP101 to CP103 are elevated sections and CP104 to CP106 are underground
section. There are two other contract packages; CP107 for the track work and
CP108 for the rolling stock.
CP101 and CP102 are the contract packages relevant to the elevated sections.
These comprise three elevated stations (lebak bulus, Fatmawati and Cipete Raya),
a depot, approach structures and a viaduct structure of approximately 5.95 km,
which stretches from chainage -0K576m714 to +5K369m249. From the depot at
Jalan Pasar Jumat, the alignment follows Jalan Kartini and Jalan Cipete Raya to the
north and towards the contract boundary with CP103 at the southern end of Haji
Nawi Station.

1.1 Scope of Report

This report describes the structural and geotechnical design methodology of the
foundations for the Lebak Bulus Station of CP101 contract package.
The design of following structural elements of Lebak Bulus Station is covered in this
report
 Bored Pile Foundation
 Pile Cap reinforcement design

1.2 Design Package Affiliation


The following table shows the relationship of this package to other design packages
of Lebak Bulus Station. Design packages of CP101 and CP102 are divided into
segments in accordance with Appendix 22 of Employer’s Requirement.
Table 1 – Design Package Affiliation
Design Design Design Package
Design Package Description
Segment Elements Number
AECOM-1-TCD-ST1- Lebak Bulus Station - Structural Design
LEBAK Geotechnical
0004 (Foundations)
BULUS
STATION Civil & AECOM-1-TCD-ST1- Lebak Bulus Station - Structural Design
Structures 0009 (Superstructure & Entrances)
Addendum to AECOM-1-TCD-ST1-
Addendum to Foundation design
foundation 0004 Rev2 A1

TWJO-1-TCD-ST1-0004-Rev C Page 7 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

2. DETAILED DESCRIPTION – LEBAK BULUS STATION

2.1 Description of structure


Lebak Bulus Station is a side platform station at chainage Km 0+330. The typical
section of the station is 22.3m wide x 12.35m high. The length of station is divided
by 16 equal bays of 12.5m each making the station approximately 200m long.

Figure 1 – Typical section at the pier location of entire station

Figure 2 – Typical platform layout of station.


At the rail level, the station structure consists of the main viaduct box girders
carrying the railway tracks. The typical spans of these box girders are 25m and it is
envisaged that a shallower depth of 1.6m of box girder can be used in the station
area. The box girder would have similar shape as the rest of the viaduct box girder
so as to use the same outer form. However, the end section shall have a typical half
joint thereby changing the detail of end segment. The end segment is further also
proposed to be a complete solid concrete section to ensure the shearing capacity at
the reduced depth location.

TWJO-1-TCD-ST1-0004-Rev C Page 8 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Figure 3 – Typical Section of Box Girder with Rail Plinth & Rolling Stock
The platform level is supported via a cross pier head protruding from the main pier.
It is proposed that the tracks be made independent from the platform in order to
avoid continual vibrations being transferred to the main frame of station. This cross
arm pier head shall support precast girders as shown in the section below on both
sides.

Figure 4 – Typical Section at pier location supporting viaduct & precast girders.

Figure 5 – Typical Plan at pier location supporting viaduct & precast girders

TWJO-1-TCD-ST1-0004-Rev C Page 9 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Figure 6 – Typical Elevation at pier location supporting viaduct & precast girders
The platform slab shall be supported over these precast girders. The precast girders
are currently proposed with I sections and shall support the platform hollow core
slab and a 50mm concrete topping to provide in for a diaphragm type action in the
transverse direction. Further, the precast girders are proposed to be supported on
temporary steel work as shown in the above picture. Thereafter the central core
between the two girders & above the cross pier head shall be cast in cast – in – situ
concrete to provide a continuous junction. The reinforcement for negative moment
at this location shall be provided in the top 245mm cast – in – situ concrete.
A main concourse level is proposed beneath the main box girder to carry the
services pertaining to the station. The width of concourse is 22.3m. The columns
from concourse level to platform level only run on grid A & C of station as shown in
figure below.

Figure 7 – Concourse floor layout of Lebak Bulus Station


These columns are eccentric from the main columns from ground level by around
1.65m from C/L. Due to very limited vertical clearance a maximum of 2.55m
clearance below the box viaduct could have been possible. However, the areas on
both sides of box viaduct possess a structural clearance of more than 4m.
At the concourse to ground level, the column spacing in the direction of the viaduct
is in general 12.5m except at Grid no. 13 & 14 where the piers have been located in
such a way to avoid the road intersection underneath.

TWJO-1-TCD-ST1-0004-Rev C Page 10 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Figure 8 – Column Layout at Ground Level


In the transverse direction, the main beam frames into the viaduct columns as well
as the column between 2 viaduct columns spanning in the entire width of station.
This framing forms a rigid frame in the transverse direction of the viaduct.

Figure 9 – Beam Frame layout at Concourse Level


At the concourse level, cast – in – situ secondary beams support the cast – in – situ
slab to provide a proper diaphragm action in both longitudinal & transverse direction.
The main concourse is further supported on three longitudinal rows of columns
equally spaced at 9.5m in transverse direction. The columns on the outer grids are
smaller and have been kept with a size of 1m X 1m whereas the columns on the
centre line are alternatively of 2m X 2m & 1m X 1m in cross section. The smaller
columns only rise till the concourse slab whereas the larger columns further rise to
support the viaduct at a grid spacing of 25m.
All the columns are supported by bored piles over a pile cap. The details
arrangements of pile & pile cap are the part of the second part of this report.
The overhead covering roof shall be a steel roof structure supported on the columns
rising up from concourse level
2.2 Structural modelling
2.2.1 General
Extensive computer modeling was carried out to assess the action effects in the
foundation elements. Software STAAD Pro V8i was used for analysis of elevated
station. Complete model of elevated station including superstructure, substructure
and foundations were modelled in software to accurately capture the behavior of
viaduct structure under loads. The model was made accurately with exact dimension
so that the effect of boundary conditions is modelled correctly.
The following figure shows a snapshot of a typical model in STAAD Pro used for
analysis of elevated stations.

TWJO-1-TCD-ST1-0004-Rev C Page 11 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Figure 10 – Structural Design Model


2.2.2 Methodology
Structural elements of the station were modeled with their true material and section
properties. For the normal loading conditions a linear-elastic model was used to
assess the effect of the forces.
The lateral soil interaction with the pile structure is modelled as lateral soil springs.
The first soil spring was modelled at 1m below the pile cap bottom & 50% of the
spring value was applied at pile cap bottom node to account for the passive earth
resistance of the pile cap.
Under Seismic loading conditions, a linear-elastic dynamic analysis was used to
assess the response of the structure to the response spectrum under Operating
Design Earthquake (ODE) and Maximum Design Earthquake (MDE). The response
spectrum of the ODE and MDE is described in section 2.3.7. Directional
combinations of the earthquake motions were taken into account with in accordance
with EN1998-2 requirements. Cracked section properties (based on
recommendation of ACI 318 – 2011) were used to assess the deformation under
ODE & MDE conditions.

TWJO-1-TCD-ST1-0004-Rev C Page 12 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

2.3 Loadings
The basic loads & load combinations as defined in design manual have been
described and compared with relevant counterparts of Indonesian standard and it is
described that by adhering to the design manual parameter & EC8 guidelines a
conservative design has been envisaged.
2.3.1 Dead Load
The dead load of structure from various components can be described as follows:

a) Dead Load of 25m Box Girder ( Within Station)


Span C/C 25 m
Track beam width 1 m
Exp. Gap 0.025 m assumed
Area (m2) Length (m) No.
Segment type 1 7.16 1.975 2 both side
Segment type 2 5.07 5 2 both side
Segment type 3 4.68 10 1

Hence Weight 2.55 T/m3 = 330.69 Tonnes


3310 kN

b) Dead Load from Either Span of Viaduct (At Station/Viaduct Interface)


Pier no C18 Grid 1 Span 29.97m
DL from Viaduct 194.978 Tonnes
DL from Station 165.345 Tonnes
Total DL 360.322 Tonnes
3602.22 kN
Pier no C34 Grid 17 Span 22.42m
DL from Viaduct 147.987 Tonnes
DL from Station 165.345 Tonnes
Total DL 313.332 Tonnes
3133.32 kN

c) Dead Load from Hollow Core slab


Load of this slab is applied as point load in STAAD model
From the typical drawings of hollow core slab, the slab measured 1.196m for each
segment.
In longitudinal direction, span is 12.5m from column to column.
For approximately 12.5 m span in long section it comes 10 segments.
Cross sectional area of 1 segment = 0.23 m2
Total Cross sectional area of hollow core slab = 2.41 m2
Volume of hollow core slab = 20.125 m3
Total self-weight of hollow core slab = 503.125
Loads are applied at 12.5m apart in longitudinal direction
as nodal load at either side.
Load applied at intermediate support = 251.5625 kN
Load at end support = 125.7813 kN

TWJO-1-TCD-ST1-0004-Rev C Page 13 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

d) Dead Load of Stair Case


Width of staircase = 1.8 m
Riser = 0.168 m
FF thickness = 0.1 m
Waist slab thickness = 0.15 m
Weight of = 6.75 kN/m2
Steps = 3.78 kN/m2
Finishing = 4.32 kN/m2
Railing = 0.5 kN/m2

Total Load of staircase = 15.35 kN/m


LL of staircase = 9 kN/m
Width of escalator = 1.55 m
Escalator Live Load = 7.75 kN/m
Lift Load of 50kN is assumed for the analysis

e) Dead Load of wall and Slab


Slab Load Calculation
Slab Thickness = 125 mm
Self- Weight of Slab 0.125 X 25 = 3.125 kN/m2
Wall Load Calculation
Wall Thickness = 200 mm
Glazing Assumed 100mm Brick Work = 100 mm
Plaster Both Face = 20 mm
Floor Height At Platform Level = 4.2 m
Floor Height (H1) = 9.5 m
Floor Height (H2) = 7.4 m
Railing Height = 1.2 m
((Wall thickness x 20) + (2 x Plaster thickness)) * (Floor
Wall Load Calculation Height - Beam Depth)
1 m beam depth assumed for all wall load calculation.
200mm Wall Load (H1) = 42.16 kN/m
100mm Wall Load (H1) = 25.16 kN/m
200mm Wall Load(PL) = 20.832 kN/m
Glazing Load = 25.16 kN/m
200mm Wall Load (H2) = 31.744 kN/m
100mm Wall Load (H1) = 18.944 kN/m
Railing Load at periphery of PL = 3.552 kN/m
Railing Load at edges = 5.952 kN/m

TWJO-1-TCD-ST1-0004-Rev C Page 14 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

f) Dead Load of Roof Portal


For Portal, load of 0.75 kN/m2 is given in Design Manual
Self-Weight
Portal
Span Length 1 = 12.5 m
Width Measured from Architecture drawings = 27.4 m
Total Load At intermediate support = 128.4375 kN

Span Length = 12.91 m


Width Measured from Architecture drawings = 27.4 m
Total Load At end support = 132.6503 kN

2.3.2 Super imposed Dead Load


The super imposed dead load of structure from various components can be
described as follows:

a) SIDL of Track Plinth


Items Intensity
Track Panel Rail Double Track 2.13 kN/m 0.217 t/m
Fastening
Track Panel Device Double Track 0.26 kN/m 0.026 t/m
Track Panel Sleeper Double Track 6.93 kN/m 0.707 t/m
Rail Plinth/Road 0.853 m2 for
Bed Area one plinth 42.65 kN/m 4.348 t/m
Duct Trough 2 170.00 kg/m 0.170 t/m
Cable 2 17.40 kg/m 0.017 t/m
Cable 3 17.40 kg/m 0.017 t/m
5.5027 t/m
55.027 kN/m
SIDL per
Rail = 13.7566 kN/m

b) SIDL from Either Span of Viaduct (At Station/Viaduct Interface)


Pier no C18 Grid 1 Span 29.97m
SIDL Loading 9 Tonne/m
SIDL from Viaduct 134.865 Tonnes
SIDL from Station 0 Tonnes
Total SIDL 1348.65 kN
Pier no C34 Grid 17 Span 22.42m
SIDL Loading 9 Tonne/m
SIDL from Viaduct 100.89 Tonnes
SIDL from Station 0 Tonnes
Total SIDL 100.89 Tonnes
1008.9 kN

TWJO-1-TCD-ST1-0004-Rev C Page 15 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

c) SIDL from Roof Portal


Span Length = 12.5 m
Measured from
Width = 27.4 m Architecture drawings
Total Load = 128.4375 kN At intermediate support

Span Length = 12.91 m


Measured from
Width = 27.4 m Architecture drawings
Total Load = 132.6503 kN At end support

2.3.3 Live Load


The live load from the various components can be further described as:
d) Calculation of Live load (Viaduct in Station Area)

Maximum load/Rail = 140X4/(2X9.6) = 29.1 KN


CDI = 1.2
Applied UDL on each Rail = 34.92 KN/m.

e) Load from Either Span of Viaduct (At Station/Viaduct Interface)


Pier no C18 Grid 1 Span 29.97m
LL from Viaduct 58.03 Tonnes
LL from Station 0 Tonnes
Impact 1.2
Total LL 69.64 Tonnes
696.4 kN
Pier no C34 Grid 17 Span 22.42m
LL from Viaduct 38.2181 Tonnes
LL from Station 0 Tonnes
Impact 1.2
Total LL 45.8617 Tonnes
458.617 kN

TWJO-1-TCD-ST1-0004-Rev C Page 16 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

f) Load from Roof Portal


For LL at Portal, load of 1 kN/m2 is given in Design Manual
Span Length = 12.5 m
Width Measured from Architecture drawings = 27.4 m
Total Load At intermediate support = 171.25 kN

Span Length = 12.91 m


Width Measured from Architecture drawings = 27.4 m
Total Load At intermediate support = 176.867 kN

2.3.4 Braking & Traction Load


g) Braking and Traction within Station Area
For 25m span,
Number of Axle = 6 No’s
Total Load = 6 X140
= 840 KN
Braking/ Traction = 30% X840/25
= 10.08 KN
UDL/m / Rail = 10.08/2
= 5.04kN

h) Braking and Traction from Either Span of Viaduct (At Station/Viaduct


Interface)
Braking & Traction Load due to train live load (Non station End at Grid 1 )
For 29.97m Span
Total Axle Load 112 Tonnes 1120 kN
Braking & Traction force to be applied at C16
i.e. 30% of total axle load 336 kN
Braking & Traction Load due to train live load (Non station End at Grid 17)
For 22.42m Span
Total Axle Load 84 Tonnes 840 kN
Braking & Traction force to be applied at C30
i.e. 30% of total axle load 252 kN

TWJO-1-TCD-ST1-0004-Rev C Page 17 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

2.3.5 Temperature Load

Temperature and shrinkage effects


The temperature and shrinkage analysis has been done as per book "Design Aids for Limit State Design of
The seasonal variation in temperature , though more than its daily variation, is not important for structural
Maximum daily temperature t1 = 40 o C Design manual 5.1.4.2
Minimum daily temperature t2 = 15 o C Design manual 5.1.4.2
As the mean temperature of concreting of floors of a building is not likely to be the maximum or the minimum
Temperature differential for design of building = + 2/3 . (t1 - t2 ) = + 16.67 o C

The total shrinkage strain of concrete = 0.0003 Cl 4.2.6 C.Reynolds Handbook


Coefficient of thermal expansion of concrete = 1.20E-05 per o C BS 5400-2 Cl 5.4.6
Equivalent temperature for shrinkage = -25.00 o C
Since total shrinkage strain takes an infinite time to complete and that after about a year from the date of
= -12.50 o C
Thus, the temperature differential 't' of members is given by
t= 16.67 - 12.50 = 4.17 o C for temp. rise & shrinkage
t= -16.67 - -12.50 = 29.17 o C for temp. fall & shrinkage
For structural design of members, the calculated moments for temperature and shrinkage loading are to be
i) Shrinkage effect is reduced by 50% due to creep in a period of 30 days and gets reduced further as more
ii) Temperaure effect is partially reduced by creep, as it occurs gradually over a period of half a day.
iii) As the peak temperatures last only for a short duration and are, therefore, only skin deep, the average
iv) The elastic rebound of the columns reduces the floor displacement causing reduction in temperature and
v) The temperature and shrinkage moments are reduced by any loss of fixity at the base of columns due to
Hence the structure should be designed for a differential temperature of
t= 4.17 x 0.5 = 2.08 o C for temp. rise & shrinkage
With full
t= -29.17 x 0.5 = -14.58 o C for temp. fall & shrinkage value of E

Futher as per ACI the cracked inertia of RCC members may be taken as 70% of the gross inertia.
Therefore effective differential temperature for which the structure should be designed becomes
t= 2.08 x 0.7 = 1.46 o C for temp. rise & shrinkage With full
t= -14.58 x 0.7 = -10.21 o C for temp. fall & shrinkage value of E

2.3.6 Wind effects

Wind Load Calculation for all three Stations


Design Wind Pressure, Fd = 0.8 kN/m2
External Pressure Internal Span c/c Wind Load
Co-efficient, Cpe Pressure Co- of column to be
efficient, Cpi (m) applied
Ѳ (kN/m)

X Z X Z
0° 0.86 11 7.568
90° -1.3 11 -11.44
0° 0.59 12.5 5.9
90° -1.3 12.5 -13
0° 0.85 11 7.48
90° -0.6 11 -5.28
0° 0.68 12.5 6.8
90° -0.4 12.5 -4
Note : Pressure Coefficient are taken from BS 6399-2:1997 (Table 26 & Table 37)

TWJO-1-TCD-ST1-0004-Rev C Page 18 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

2.3.7 Seismic Loadings

Site Specific Seismic Design Spectra


Clause 15.1.3 of ODS stipulates the contractor shall derive the seismic wave
required for analysis and design of structures. Accordingly, seismic hazard
assessment was carried out by PT. LAPI ITB and submitted to the Engineer for
review. The report “Seismic hazard assessment for MRT project of DKI Jakarta”
dated 14 Feb. 2014 provides the details for derivation of seismic hazard
characteristics of the site. This report serves as the basis for derivation of ground
motions used in the design of viaduct and station structures contained in CP101 and
CP102.
The site specific response spectra for the project area were calculated using 18
earthquake time histories of ODE and other 18 earthquake time histories of MDE
from the above report. Section 5 describes the calculation of the site specific seismic
design spectra from the ground motion used in the seismic analysis.
Seismic Performance Criteria
In accordance with the “Supplemental Design Specification to ODS 15: Seismic
Loading” issued by the Engineer, the following criteria shall be met in verification of
structural response values:
i) Seismic Performance I (Service Limit Performance) shall be applied to
ODE earthquake
j) Seismic Performance II (Ultimate Limit Performance) shall be applied to
MDE earthquake.
The definition of seismic performance criteria are related to damage control as
below:-

k) Seismic Performance I
Function of structure is retained without conducting repair after an earthquake, and
no excessive displacement occurs.
l) Seismic Performance II
Repair may be required after an earthquake, but function of structure can be
restored within a short period.

The damage levels of reinforced concrete structures are defined in regards to the
load-displacement curve of the structure. The load-displacement relationship of
reinforced concrete columns subjected to moderate axial force for which the failure
mode is expected to be in flexure is similar to the curve shown in Figure 11.

Figure 11 – Envelop Curve of Load-Displacement Relation of Reinforced Concrete Members


(under low axial force)

TWJO-1-TCD-ST1-0004-Rev C Page 19 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Damage Level 1

Longitudinal reinforcement yield point is set as the limit for damage level 1. This is
shown by point B on the graph. It is expected that within this limit no extensive
repair will be necessary for the structure as the structure will remain essentially
elastic. Durability of structure however should be ensured as the structure has
suffered cracking.
Damage Level 2

The maximum capacity point (point C on graph) is set as the limit for damage level
2. At this point the longitudinal reinforcement has passed the yield point and the
cracks are wider. Crack injection and/or patching may be necessary.
Damage Level 3

The limit is set at the maximum displacement with no reduction in yield capacity
(point D). At this point it is expected that further displacement will occur without any
increase in capacity. The repair method is expected to include patching of spalled
concrete and remediation of ties.

The site specific spectrum defined as ODE is hence used as a serviceability


earthquake design wherein it is ensured that the structure remains in its elastic limit
and hence no Response Reduction Factor has been proposed with this condition

The site specific spectrum defined as ODE is hence used as a serviceability


earthquake design wherein it is ensured that the structure remains within the elastic
limit and hence no Response Reduction Factor has been proposed with this
condition.

For MDE, in accordance with EC8, the following response reduction factor is used:-

For I = 1, R = 1.61,
For I = 1.4, R = 2.26.
In line of the details specified above a graphical representation of spectrums is
compared and shown below. The graph compares the ODE, MDE spectrums with
the reduced spectrum for nominal earthquake as per SNI1726: 2012 with different
Response reduction factor as per SNI1726.

TWJO-1-TCD-ST1-0004-Rev C Page 20 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

0.70
SNI 1726 Design Spectrum
0.60
ODE - Soil Profile - A
0.50
Spectral Acceleration

SNI 1726 / (RRF = 8 / Ie =


1.25)
0.40
SNI 1726 / (RRF = 5 /Ie =
1.25)
0.30

0.20

0.10

0.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Time Period

Figure 12 – Comparison of ODE Design Spectrum


Hence based on the above comparison it can be clearly concluded that after
application of reduction factor, importance factor the design curve for spectrum is
lower than ODE when compared with SNI 1726:2012 if RRF is used as 5 or 8. Since
the structure is frame structure in both directions it cannot possess RRF less than 5
based on SNI1726 guidelines. Further since our design is entirely based on ODE
spectrum without any RRF it is deemed to have a higher structural strength than the
strength that would have been evaluated using the SNI1726 code for its general
service conditions.

1
SNI 1726 Design Spectrum * 1.5
0.9
MDE - Soil Profile A
0.8
SNI 1726 * 1.5 / (RRF = 8/Ie = 1.25)
Spectral Acceleration (g)

0.7
SNI 1726*1.5 / (RRF = 5 /Ie = 1.25)
0.6
MDE / (RRF 2.37/ I = 1.4)
0.5

0.4

0.3

0.2

0.1

0
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Time Period

Figure 13 – Comparison of MDE Spectrum

TWJO-1-TCD-ST1-0004-Rev C Page 21 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Further it can also be seen that as defined earlier the Reduction factor of 2.26 with
Importance factor of 1.4 resulting in net reduction of MDE spectrum by 1.61 can be
further used to decrease the MDE design spectrum to provide for an economic
design. Please note that even after this reduction this MDE spectrum still is higher
that the Ultimate earthquake spectrum with reduction factors of either 5 or 8.

In conclusion, for the seismic loading conditions, using the ODE and MDE response
spectrum and criterion as directed by the “Supplemental Design Specification to
ODS 15: Seismic Loading” issued by the Engineer is more onerous than the
response spectrum from SNI1726:2012 as can be seen from Figure 12 and Figure
13.

2.4 Load Combinations


The static load combinations and load factors for SNI and British Standards
(BS8110) and EC8 for Seismic are summarised in the Table below:-
Table 2 – Summary of Load Combinations
SNI BS8110/EC2
1 Normal - Service 1.0D + 1.0L 1.0D + 1.0L
2 Normal - Ultimate 1.2D + 1.6L 1.4D + 1.6L
3 Seismic - ODE 1.0D + 0.75L + 0.525E 1.0D + 1.0L + 1.0E
4 Seismic - MDE 1.2D + 1.0L + 1.0E 1.0D + 1.0L + 1.0E

From the table, under normal conditions the serviceability and ultimate limit state for
the load combination using the British code is more onerous. For the seismic
condition, ODE conditions, EC8 is more onerous. However, for MDE, based on load
combination factor, SNI is more onerous, but due to the higher response factor (E),
the design in accordance with EC8 is more onerous.

TWJO-1-TCD-ST1-0004-Rev C Page 22 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

3. STRUCTURAL ANALYSIS
3.1 Seismic Response of structure
Response Spectrum Analysis is adopted to analyze the behavior of the entire
structure during a seismic event. This approach permits the multiple modes of
response of a structure to be taken into account. This is required in many building
codes for all except for very simple or very complex structures. The response of a
structure can be defined as a combination of many mode shapes. In this analysis,
STAAD Pro software is used to determine these modes for a structure. For each
mode, a response is read from the design spectrum, two design spectrums i.e. ODE
and MDE. It is based on the modal frequency and the modal mass, and they are
further combined to provide an estimate of the total response of the structure.
Combination methods include the complete quadratic combination (CQC).

3.2 Mode Shapes


Mode shapes from the analysis are shown below and the behaviour of the structure
is quite balanced in both X and Z directions as it can be figure out from the output
results of STAAD analysis. In Mode 1, mass in Z direction is 96.13 and in Mode 3,
mass in X direction is 96.37 which is just a marginal difference. It concludes that the
structure is well behaved in translational and the chance of torsion is minimal.
Table 3 – STAAD mass participation table

Figure 14 – Mode Shape 1 – Transverse Translation

TWJO-1-TCD-ST1-0004-Rev C Page 23 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Figure 15 – Mode Shape 2 – Ineffective participation

Figure 16 – Mode Shape 3 – Longitudinal Translation

TWJO-1-TCD-ST1-0004-Rev C Page 24 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

3.3 Fundamental Time period


The fundamental time period of Mode 1 obtained in analysis is 1.42401 sec, as it
can be seen from the analysis output results. But the time period obtained from the
empirical formula which is given Clause 7.8.2.1 SNI 1726-2012 comes around 0.49
sec (Moment bearing load frame Table 15) and the height of structure is 13.8m. It
cannot be exactly matched with given in SNI 1726-2012 because the analysis has
been done with the pile model and it takes the actual height from the point of fixity of
pile. The actual time period used in the analysis has been calculated by default.

3.4 Seismic mass participation


From the analysis of this structure using STAAD Pro, the mass participation of this
entire structure comes around 97.624 and 97.783 percent at mode 3 in both X and Z
directions respectively. Since the mass participation is more than 90 percent and it
clearly shows that the analysis obtained mass participation of the actual mass of the
structure as per the Clause 7.9.1 of SNI1726 – 2012.

3.5 Lateral Seismic Inter-storey drift


Assuming Seismic Risk Category as Category IV while evaluating the seismic storey
drifts at different floor levels following parameters have been used from SNI
1726:2012.
Importance Factor =1.50 (Refer Table 2 of SNI 1726:2012)
Deflection Magnificaton Factor =5.50 (Refer Table 9 for SMRF – RC – C.5)
But please note that this amplification factor is based on a reduction factor in
spectrum. The reduction factor = 8.0 (Refer Table 9 for SMRF – RC – C.5)

With the site specific spectrum since we are following a reduction factor of 2.37 with
Importance factor 1.4 we should alter this amplification factor in proportionality to
make it on the same grounds for SNI1726:2012.

Mass center deflection on level x (δx) (mm) must be determined in accordance with
following equation:
𝐶𝑑 𝛿𝑥𝑒
𝛿𝑥 =
𝐼𝑒

Annotation:
Cd = deflection amplification factor in Table 9
δxe = deflection on required location in this article that determined by elastic
analysis
Ie = earthquake significance factor that determined in accordance with 4.1.2 of
SNI 1726:2012.
SNI 1726:2012 Design value
Design Spectrum (Sa/g) (Sa/g)SNI 1726:2012 (Sa/g)SOIL PROFILE A - MDE
Load Combination Factor 1.5 1.0
Importance Factor 1.5 1.4
Response Reduction 8.0 2.35
Factor
Deflection Amplification 5.5 To be evaluated (X)
factor

TWJO-1-TCD-ST1-0004-Rev C Page 25 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Hence for both the parameters to be on same grounds the following


relationship can be established:
(Sa/g)SNI 1726:2012 * FOS * Ie * Cd / RRF = (Sa/g)SOIL PROFILE A - MDE* FOS * Ie * (X) / RRF

For,
Time period (T) = 1.42401 seconds
(Sa/g)SNI 1726:2012 = 0.765 (including FOS = 1.5)
(Sa/g)SOIL PROFILE A – MDE = 0.33408

Hence
X = (0.765 * 1.5 * 5.5 / 8.0)/ (.33408*1.4/2.35) = 4.373 say 4.40

Allowable deviation between the floors is = 0.015hsx.

Following table gives the nodal displacements at different level including ground,
their amplified values and relative displacement between the floors compared to the
limits.
Table 4 – Drift Displacements from STAAD and amplified values in longitudinal
direction

Concourse level Platform level

Magnified Magnified
Nodal Drift Displacement Nodal Drift Displacement
from STAAD at lower from STAAD, at upper
δe2 concourse δe3 concourse
level, δ2 level, δ3

mm mm mm mm
68.329 113.88 97.341 162.24
69.190 115.32 97.964 163.27
66.528 110.88 97.800 163.00
70.154 116.92 97.766 162.94
66.322 110.54 98.128 163.55
70.694 117.82 98.088 163.48
66.536 110.89 98.509 164.18
71.295 118.83 98.495 164.16
66.604 111.01 98.953 164.92
71.968 119.95 98.870 164.78
66.913 111.52 99.192 165.32
72.019 120.03 98.922 164.87
66.869 111.45 99.056 165.09
71.454 119.09 98.657 164.43
66.709 111.18 98.753 164.59
70.942 118.24 98.387 163.98
66.744 111.24 98.459 164.10

TWJO-1-TCD-ST1-0004-Rev C Page 26 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

64.246 107.08 97.967 163.28


72.757 121.26 98.033 163.39
64.918 108.20 98.435 164.06
66.434 110.72 98.631 164.39
66.745 111.24 98.778 164.63
63.991 106.65 98.857 164.76
64.232 107.05 98.893 164.82
64.161 106.94 98.860 164.77
62.858 104.76 98.775 164.63
60.585 100.98 98.153 163.59
61.196 101.99 99.013 165.02
64.298 107.16 98.202 163.67
63.168 105.28 98.331 163.89
64.161 106.94 98.512 164.19
63.344 105.57 98.743 164.57
65.307 108.85 99.038 165.06
64.624 107.71 99.266 165.44
64.681 107.80 99.730 166.22
63.629 106.05 99.917 166.53
65.967 109.95 100.131 166.89
64.900 108.17 100.186 166.98
65.856 109.76 99.572 165.95
64.589 107.65 99.126 165.21
64.851 108.09 99.044 165.07
60.472 100.79 97.967 163.28
59.301 98.84 98.549 164.25
64.171 106.95 97.999 163.33
63.083 105.14 98.092 163.49
60.003 100.01 98.206 163.68
59.680 99.47 98.351 163.92
64.862 108.10 98.499 164.17
63.954 106.59 98.696 164.49
65.064 108.44 99.040 165.07
63.977 106.63 99.158 165.26
65.646 109.41 99.348 165.58
103.546 172.58 99.565 165.94
104.222 173.70 99.215 165.36
63.139 105.23 98.983 164.97
63.322 105.54 98.814 164.69
61.398 102.33 98.652 164.42
62.550 104.25 98.566 164.28
63.508 105.85 99.331 165.55
65.562 109.27 99.188 165.31

TWJO-1-TCD-ST1-0004-Rev C Page 27 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Table 5 – Comparison of displacements with inter-storey drift limits

Ground to concourse Concourse to platform


Deviation Deviation Result Deviation Deviation Result
value limit value limit
mm mm mm mm
0.015 * 0.015 *
8000 5700
68.329 120 OK 48.353 85.5 OK
69.190 120 OK 47.957 85.5 OK
66.528 120 OK 52.120 85.5 OK
70.154 120 OK 46.020 85.5 OK
66.322 120 OK 53.010 85.5 OK
70.694 120 OK 45.657 85.5 OK
66.536 120 OK 53.288 85.5 OK
71.295 120 OK 45.333 85.5 OK
66.604 120 OK 53.915 85.5 OK
71.968 120 OK 44.837 85.5 OK
66.913 120 OK 53.798 85.5 OK
72.019 120 OK 44.838 85.5 OK
66.869 120 OK 53.645 85.5 OK
71.454 120 OK 45.338 85.5 OK
66.709 120 OK 53.407 85.5 OK
70.942 120 OK 45.742 85.5 OK
66.744 120 OK 52.858 85.5 OK
64.246 120 OK 56.202 85.5 OK
72.757 120 OK 42.127 85.5 OK
64.918 120 OK 55.862 85.5 OK
66.434 120 OK 53.662 85.5 OK
66.745 120 OK 53.388 85.5 OK
63.991 120 OK 58.110 85.5 OK
64.232 120 OK 57.768 85.5 OK
64.161 120 OK 57.832 85.5 OK
62.858 120 OK 59.862 85.5 OK
60.585 120 OK 62.613 85.5 OK
61.196 120 OK 63.028 85.5 OK
64.298 120 OK 56.507 85.5 OK
63.168 120 OK 58.605 85.5 OK
64.161 120 OK 57.252 85.5 OK
63.344 120 OK 58.998 85.5 OK
65.307 120 OK 56.218 85.5 OK
64.624 120 OK 57.737 85.5 OK
64.681 120 OK 58.415 85.5 OK
63.629 120 OK 60.480 85.5 OK
65.967 120 OK 56.940 85.5 OK

TWJO-1-TCD-ST1-0004-Rev C Page 28 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

64.900 120 OK 58.810 85.5 OK


65.856 120 OK 56.193 85.5 OK
64.589 120 OK 57.562 85.5 OK
64.851 120 OK 56.988 85.5 OK
60.472 120 OK 62.492 85.5 OK
59.301 120 OK 65.413 85.5 OK
64.171 120 OK 56.380 85.5 OK
63.083 120 OK 58.348 85.5 OK
60.003 120 OK 63.672 85.5 OK
59.680 120 OK 64.452 85.5 OK
64.862 120 OK 56.062 85.5 OK
63.954 120 OK 57.903 85.5 OK
65.064 120 OK 56.627 85.5 OK
63.977 120 OK 58.635 85.5 OK
65.646 120 OK 56.170 85.5 OK
103.546 120 OK -6.635 85.5 OK
104.222 120 OK -8.345 85.5 OK
63.139 120 OK 59.740 85.5 OK
63.322 120 OK 59.153 85.5 OK
61.398 120 OK 62.090 85.5 OK
62.550 120 OK 60.027 85.5 OK
63.508 120 OK 59.705 85.5 OK
65.562 120 OK 56.043 85.5 OK
Table 6 – Drift Displacements from STAAD and amplified values in Transverse
direction

Concourse Level Platform Level

Magnified Magnified
Nodal Drift Displacement Nodal Drift Displacement
from STAAD at lower from STAAD, at upper
δe2 concourse δe3 concourse
level, δ2 level, δ3

mm mm mm mm
67.874 113.12 95.141 158.57
64.666 107.78 90.750 151.25
63.340 105.57 96.031 160.05
69.028 115.05 96.495 160.83
64.761 107.94 97.123 161.87
70.089 116.82 97.567 162.61
64.601 107.67 98.402 164.00
71.131 118.55 98.699 164.50
65.071 108.45 99.529 165.88
72.545 120.91 99.801 166.34

TWJO-1-TCD-ST1-0004-Rev C Page 29 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

66.197 110.33 100.192 166.99


72.926 121.54 99.484 165.81
64.937 108.23 98.361 163.94
69.322 115.54 96.632 161.05
62.148 103.58 95.472 159.12
67.161 111.94 93.887 156.48
61.140 101.90 92.500 154.17
62.225 103.71 98.361 163.94
68.659 114.43 98.517 164.20
63.070 105.12 99.513 165.86
57.280 95.47 99.957 166.60
57.802 96.34 100.188 166.98
52.503 87.51 99.692 166.15
62.209 103.68 98.332 163.89
62.787 104.65 96.744 161.24
62.407 104.01 95.436 159.06
62.509 104.18 95.203 158.67
59.712 99.52 90.842 151.40
60.507 100.85 96.032 160.05
63.042 105.07 96.552 160.92
61.149 101.92 97.155 161.93
63.798 106.33 97.657 162.76
62.308 103.85 98.431 164.05
64.524 107.54 98.803 164.67
63.326 105.54 99.551 165.92
65.265 108.78 99.927 166.55
62.494 104.16 100.196 166.99
64.047 106.75 99.593 165.99
62.945 104.91 98.409 164.02
61.081 101.80 93.988 156.65
58.408 97.35 92.539 154.23
62.506 104.18 95.212 158.69
53.263 88.77 90.763 151.27
60.502 100.84 96.040 160.07
63.028 105.05 96.560 160.93
55.391 92.32 97.062 161.77
57.734 96.22 97.571 162.62
65.210 108.68 98.395 163.99
68.328 113.88 98.697 164.50
66.096 110.16 99.535 165.89
67.203 112.01 99.939 166.57
65.278 108.80 100.199 167.00
65.388 108.98 99.577 165.96
65.266 108.78 98.354 163.92
58.768 97.95 96.699 161.17
TWJO-1-TCD-ST1-0004-Rev C Page 30 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

56.929 94.88 95.433 159.06


54.958 91.60 93.870 156.45
51.983 86.64 92.455 154.09
60.789 101.32 96.832 161.39
58.362 97.27 95.298 158.83

Table 7 – Comparison of displacements with inter-storey drift limits

Ground To Concourse Concourse to platform


Deviation Deviation Result Deviation Deviation Result
value limit value limit
mm mm mm mm
0.015 * 0.015 *
8000 5700
67.874 120 OK 45.445 85.5 OK
64.666 120 OK 43.473 85.5 OK
63.340 120 OK 54.485 85.5 OK
69.028 120 OK 45.778 85.5 OK
64.761 120 OK 53.937 85.5 OK
70.089 120 OK 45.797 85.5 OK
64.601 120 OK 56.335 85.5 OK
71.131 120 OK 45.947 85.5 OK
65.071 120 OK 57.430 85.5 OK
72.545 120 OK 45.427 85.5 OK
66.197 120 OK 56.658 85.5 OK
72.926 120 OK 44.263 85.5 OK
64.937 120 OK 55.707 85.5 OK
69.322 120 OK 45.517 85.5 OK
62.148 120 OK 55.540 85.5 OK
67.161 120 OK 44.543 85.5 OK
61.140 120 OK 52.267 85.5 OK
62.225 120 OK 60.227 85.5 OK
68.659 120 OK 49.763 85.5 OK
63.070 120 OK 60.738 85.5 OK
57.280 120 OK 71.128 85.5 OK
57.802 120 OK 70.643 85.5 OK
52.503 120 OK 78.648 85.5 OK
62.209 120 OK 60.205 85.5 OK
62.787 120 OK 56.595 85.5 OK
62.407 120 OK 55.048 85.5 OK
62.509 120 OK 54.490 85.5 OK
59.712 120 OK 51.883 85.5 OK
60.507 120 OK 59.208 85.5 OK
63.042 120 OK 55.850 85.5 OK
61.149 120 OK 60.010 85.5 OK
63.798 120 OK 56.432 85.5 OK

TWJO-1-TCD-ST1-0004-Rev C Page 31 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

62.308 120 OK 60.205 85.5 OK


64.524 120 OK 57.132 85.5 OK
63.326 120 OK 60.375 85.5 OK
65.265 120 OK 57.770 85.5 OK
62.494 120 OK 62.837 85.5 OK
64.047 120 OK 59.243 85.5 OK
62.945 120 OK 59.107 85.5 OK
61.081 120 OK 54.845 85.5 OK
58.408 120 OK 56.885 85.5 OK
62.506 120 OK 54.510 85.5 OK
53.263 120 OK 62.500 85.5 OK
60.502 120 OK 59.230 85.5 OK
63.028 120 OK 55.887 85.5 OK
55.391 120 OK 69.452 85.5 OK
57.734 120 OK 66.395 85.5 OK
65.210 120 OK 55.308 85.5 OK
68.328 120 OK 50.615 85.5 OK
66.096 120 OK 55.732 85.5 OK
67.203 120 OK 54.560 85.5 OK
65.278 120 OK 58.202 85.5 OK
65.388 120 OK 56.982 85.5 OK
65.266 120 OK 55.147 85.5 OK
58.768 120 OK 63.218 85.5 OK
56.929 120 OK 64.173 85.5 OK
54.958 120 OK 64.853 85.5 OK
51.983 120 OK 67.453 85.5 OK
60.789 120 OK 60.072 85.5 OK
58.362 120 OK 61.560 85.5 OK

TWJO-1-TCD-ST1-0004-Rev C Page 32 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

4. SUBSOIL CONDITIONS

4.1 Stratification
The subsoil encountered at the Cipete Raya Station site generally consists of the
Alluvial Fan (Unit Qav) and the Bojongmanik Formation (Unit Tmb) as shown below.
The stratification of the project site can be found in Appendix A.
Detailed information of geotechnical condition at the project site is described in
Geotechnical Interpretative Report ((TWJO-CP12-TCD-DSR-0001-Rev 2)).

4.1.1 Stratum 1: Alluvial Fan (Unit Qav)


The Alluvial Fan (Unit Qav) mainly consists of recent deposits of volcanic ash (tuff)
consisting of high plasticity clayey silts. The Alluvial Fan can be further subdivided
into three layers, in the order of increasing consistency as follows:
m) Layer 1: AC1
The thickness of this layer ranges from 4m to 19m. It is of very soft to medium
consistency with SPT N values generally of 5 and below. The colour of AC1
material is generally red to reddish brown.
n) Layer 2: AC2
The colour of the AC2 material is generally reddish brown, greyish brown and
yellowish brown. The consistency of the soil varies from medium to very stiff
with the SPT-N blow counts generally in the range of 6 to 20. The AC2 layer is
generally encountered beneath AC1 with thickness ranging from 1m to 24m.
o) Layer 2: AC3
The AC3 layer lies beneath the AC2 layer, with thickness between 1 to 12m.
The AC3 material is generally brown, greyish brown and yellowish brown. The
consistency of the AC3 layer varies from very stiff to hard with the SPT-N blow
counts in the range of 15 to 50.

4.1.2 Stratum 2: Bojongmanik Formation (Unit Tmb)


This stratum underlies the Alluvial Fan (Unit Qav) and mainly consists of weathered
claystone alternating with weathered sandstone. No bedrock was encountered at
the borehole locations at the project site. The stratum is typically black and dark
grey, and becomes brown to brownish yellow to the top of the stratum. The deposits
can be further divided into two sublayers as follows:
a) Layer 1: TC (clay layer)
The TC layer consists of high plasticity clayey silts. Generally, TC layer has a
very stiff to very hard consistency, where the majority of the SPT-N values are
50 and above.
b) Layer 2: TS (sand layer)
TS layer generally consists of cemented sands, silty sands and silty gravels.
The sands are generally dense to very dense with the majority of SPT-N
values being 50 and above.

4.2 Groundwater Conditions


TWJO-1-TCD-ST1-0004-Rev C Page 33 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Groundwater was measured in all boreholes during the SI works. Based on the
groundwater levels measured during borehole drilling, the groundwater levels
generally range from 1.0m to 9.6m below ground level (mbgl) with an average of
4.7mbgl.
Casagrande type standpipes were installed in boreholes within CP104 and CP105
to monitor the existing ground water table for approximately 6 months. Based on the
groundwater monitoring results of these standpipes, the groundwater levels
generally range from 2.3mbgl to 8.1mbgl with an average of 5.1mbgl. The readings
were relatively stable throughout the six months of monitoring period. However,
discrepancies would be expected as this monitoring are located few kms away from
the CP101 and CP102 site.

4.2.1 Borehole Reference


There are four boreholes in the vicinity of Lebak Bulus Station, namely: 1ABH-4, E-
120, 1ABH-5, E-130. For the design, 1ABH-4 will be adopted to compute the pile
axial capacity conservatively. The soil stratification is presented in Figure 17.

4.3 Reduction of Soil Properties due to Cyclic Loading


4.3.1 Reduction of Undrained Shear Strength
Undrained shear strength (Su) based methodology was used to assess the potential
for cyclic softening (Boulanger and Idriss 2007). Based on this assessment, about
half of the AC1 and AC2 layers will undergo cyclic softening under the ODE
earthquake and almost the entire layers under the MDE earthquake. Thus, it could
be assumed that all of the AC1 and AC2 layers will undergo cyclic softening during
the design earthquake.
Reduction in undrained strength was calculated according to the Designers’ Guide
to EN 1998 Section 10.3.1.1 (Fardis et al. 2005). Based on these analysis, it is
recommended that 20% reduction in the undrained shear strength should be applied
to the soft and medium cohesive soils (AC1 and AC2) under earthquake loading.
Detailed calculation of cyclic softening assessment and undrained shear strength
reduction due to earthquake loading at the project site is described in Geotechnical
Interpretative Report (TWJO-CP12-TCD-DSR-0001-Rev 2)

4.3.2 Reduction of Soil Stiffness


The effective reduction in the soil stiffness due to cyclic loading under earthquake
conditions shall be taken into account by using stiffness parameters equal to 70% of
their static values. The suggestion is based on the recommendations of ACI
Committee 336.

TWJO-1-TCD-ST1-0004-Rev C Page 34 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Figure 17 – Soil stratification

Figure 18 – Layout of Site Zoning

TWJO-1-TCD-ST1-0004-Rev C Page 35 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

4.4 Subsoil Properties


The subsoil properties for geotechnical design from the Geotechnical Interpretative Report are reproduced in Table 8 below.

Table 8 – Recommended Geotechnical Design Parameters

ALLUVIAL FAN BOJONGMANIK FORMATION


Soil Parameter Symbol Unit
AC1 AC2 AC3 TC TS
SPT-N  0-5 6-20 20-50 20-50 20-50
Bulk Density w kN/m3 15.5 (14 – 17) 15.5 (14 – 17) 15.5 (14 – 17) 16 (14 – 17.5) 18 (16 – 20)
2 a a
Undrained Shear Strength cu kN/m 5N 4.5N 4.5N 4.5N -
2 f f
Effective Cohesion c' kN/m 4 4 6 10 0
Effective Angle of Friction ' o
22 22 25 b
28 b
35c
Void ratio e0 2.0 (1.2 – 2.5) 2.0 (1.2 – 2.5) 2.0 (1.2 – 2.5) 1.8 (1.2 – 2.2) 1.0 (0.5 – 1.2)
Compression Index Cc 0.45 (0.3 – 0.7) 0.45 (0.3 – 0.7) 0.2 – 1.0d 0.2 – 1.0d -
Recompression Index Cr 0.045 (0.03 – 0.07) 0.045 (0.03 – 0.07) 0.05 – 0.25d 0.05 – 0.25d -
Preconsolidation
P’c kN/m2 80 (50 – 150) 80 (50 – 150) 460-1350 460-1350 -
Pressure
Coefficient of
Cv m2/yr 11 (5 – 25) 11 (5 – 25) 9.5d 9.5d -
Consolidation
Eu MPa 1.5N 1.5N 2N 2N -
Elastic Modulus
E' MPa Eu/1.15 2N
Permeability k m/s 1×10-7 1×10-7 1×10-7 1×10-7 1×10-6e

a d
Based on Stroud (1989) Based on Toha and Sengara (2009)
b e
Based on Bjerrum and Simons (1960) Based on Casagrande (1938)
c f
Based on Peck et al. (1974) Based on common correlation of c’ = 0.2 N (using average SPT-N of 30 for AC3 and 50 for TC)

TWJO-1-TCD-ST1-0004-Rev C Page 36 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

5. SITE SPECIFIC RESPONSE ANALYSIS

5.1 Earthquake Ground Motion at Bedrock


This SSRA are based on total of 36 earthquake time histories at bedrock (18 for
ODE and 18 for MDE) produced by PT LAPI ITB. These time histories are part of
the input of EERA program. Detail information regarding this earthquake time
histories is delivered by PT LAPI ITB in “Seismic Hazard Assessment for MRT
Project of DKI Jakarta”, dated February 2014.
According to the SDS Clause 3.2.2, bedrock is located 350m beneath the existing
ground surface.

5.2 Correlation of Shear Wave Velocity (Vs) to SPT-N Value


Correlation of Imai Tonouchi (1982) was selected for the SSRA. This correlation
also matches the local correlation for Jakarta soils quite well (Fauzi et al., 2014).

Table 9 – List of published studies on Vs to SPT-N correlations

Published Studies Source Published correlation


Local Jakarta soils Fauzi et al. 2014 105.03N0.286
Imai and Tonouchi 1982 96.9N0.314
International
Sun et al. 2008 75.76N0.371

5.3 Site Zoning


Based on the sensitivity analysis, it can be concluded that there are two main
variable of subsoil condition which controlling the SSRA result, for instance:
1. The SPT-N of the top layer (of around 0-10mbgl): where the amplification effect
increases with decreasing SPT-N, and
2. The thicknesses of the low SPT-N layer: where amplification effect reaches a
maximum at a certain critical depth of 10-12m for the MDE earthquake and 12-
15m.
Thus, the project site was classified into SSRA zone based on its soft soil layer
thicknesses (Table 10). Moderately conservative SPT-N values of the top 10m soil
layer were selected for this analysis. The Vs profiles can be seen in Figure 19. The
plan view showing the zoning of the project site is presented in Figure 20.

Table 10 – Site Zoning

Zone Thickness of Soft Soil Layer (Layer A)


A <10m
B 10-15m
C >15m

TWJO-1-TCD-ST1-0004-Rev C Page 37 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Vs (m/s)
100 150 200 250 300 350
0

10
Depth below Ground Level (mbgl)

15

20

25

30

35

40
Group A (Layer A thickness <=10m)
Group B (Layer A thickness = 10-15m)
45
Group C (Layer A thickness > 15m)

50

Figure 19 – Design shear wave velocity profiles for each zone.

Figure 20 – Zoning for site specific response analysis

TWJO-1-TCD-ST1-0004-Rev C Page 38 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

5.4 Site Specific Response Spectra Result


The site specific response spectra for each of the 3 zones were calculated using 18
earthquake time histories of ODE and other 18 earthquake time histories of MDE.
Afterwards, the overall design spectra was determined based on the envelope of the
average + standard deviation line of all the 18 site specific response spectra result.
This approach was applied for both the ODE and MDE cases. The site specific
response analyses for these 3 zones are plotted together (Figure 21 and Figure 22).
0.5
Design Spectra - Group A

0.5 Design Spectra - Group B


Design Spectra - Group C

0.4
Spectral Acceleration (g)

0.4

0.3

0.3 ODE (Return Period 100 years)

0.2

0.2

0.1

0.1

0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8 4.0
Period (sec)
Figure 21 – Design Spectra for ODE case

1.0
Design Spectra - Group A
Design Spectra - Group B
0.9
Design Spectra - Group C

0.8
Spectral Acceleration (g)

0.7

0.6

0.5 MDE (Return Period 1000 years)

0.4

0.3

0.2

0.1

0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8 4.0
Period (sec)
Figure 22 – Design Spectra for MDE case

TWJO-1-TCD-ST1-0004-Rev C Page 39 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

6. PILE BEARING CAPACITY

6.1 Factor of Safety


Factor of safety for axial bearing capacity of pile foundation shall be based on BS
8004. For the design under seismic conditions, the factor of safety also complies
with Jakarta’s regulation of Structural and Geotechnical Design Guidelines for
Buildings (Dinas Penataan dan Pengawasan Bangunan DKI Jakarta, 2007).
The minimum factor of safety for pile design from the Civil and Structure Design
Manual (TWJO-CP1-TCD-DSM-0001-Rev 2) are reproduced Table 11.

Table 11 – Minimum Factor of Safety for Design

Minimum Factor of Safety


Loading Condition
Compression Tension
(Qs + Qb) / 2.5
Static Loading Qs / 3.0
Qs / 2.0
Seismic Loading Level-1 (ODE) Qs / 1.5 Qs / 2.0
Seismic Loading Level-2 (MDE) (Qs + Qb) / 1.0 Qs / 1.5

6.2 Bearing Capacity Analysis


6.2.1 Axial Bearing Capacity
The allowable geotechnical bearing capacity for compression pile is given by the
following equation:
Qa = Qu / FS
where:
Qa : allowable bearing capacity;
Qu : ultimate bearing capacity;
FS : factor of safety.

The value of ultimate bearing capacity, Qu, unit frictional resistance, fs, and unit base
resistance, qb, can be determined by following.
c) Ultimate Bearing Capacity
The ultimate geotechnical bearing capacity for compression pile is given by the
following equation:
Qu = Qsp + Qb
= fs As + qb Ab
where:
Qsp : is the ultimate positive shaft resistance
Qb : is the ultimate end bearing resistance
fs : is the average skin friction or adhesion per unit area of the shaft at
the condition of full mobilization of frictional resistance;

TWJO-1-TCD-ST1-0004-Rev C Page 40 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

qb : is the ultimate value of the resistance per unit area of base due to the
shearing strength of the soil;
As : is the surface of the pile shaft;
Ab : is the plan area of the base.

d) Unit frictional resistance


fs = Ks N
where:
N : N-SPT values along the pile shaft;
Ks : coefficient of unit frictional resistance, determined based on empirical
correlation and verified with preliminary pile test.

e) Unit base resistance


qb = Kb N
where:
N : N-SPT values at the pile base;
Kb : coefficient of unit base resistance, determined based on empirical
correlation and verified with preliminary pile test.
6.3 Design Parameters for Axial Bearing Capacity
The unit frictional resistance, fs, and unit base resistance, qb, being adopted in the
design from the Civil and Structure Design Manual (TWJO-CP1-TCD-DSM-0001-
Rev 2) are reproduced inTable 12. These design parameters shall be confirmed with
preliminary pile test result.

Table 12 – Bored Pile Design Parameters*

Unit frictional resistance, fs Unit base resistance, qb


Soil Type (kN/m2) (kN/m2)
Value Limit Value Limit
AC1 4.5 Na - - -
a a
AC2 4.5 N 200 45 N 4000
a a
AC3 4N 200 45 N 4000
TC 4 Na 200 45 Na 4000
TS 3 Nb 170b 60 Nb 4000b
* The design unit frictional resistance and unit base resistance of the pile foundation
to be duly verified by result of preliminary pile test
a
Based on reference to Rudianto & Soedjono (2009)
b
Based on reference to Reese & Wright (1997)

TWJO-1-TCD-ST1-0004-Rev C Page 41 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

6.4 Pile Group


6.4.1 Spacing of Piles
According to BS 8004, general working rules of pile spacing are as follows:
 Friction piles: centre to centre spacing should be not less than the perimeter
of the pile or, for circular piles, centre to centre spacing should be not less
than three times the diameter.
 End-bearing piles: spacing may be reduced, but the distance between the
surfaces of the shafts of adjacent piles should be not less than the least
width of the piles.
Generally, group reduction factors need not be applied where:
 The centre-to-centre spacings are of more than 3 times the perimeter of the
piles or the circumscribed rectangles in the case of H-piles; or
 The load capacity of the piles is derived from end-bearing; or
 The piles are rock-socketed piles

6.4.2 Block Failure Analysis


There would be negligible risk of general shear failure of the group since the piles in
groups are designed to be embedded in hard soils (SPT-N > 50). However, block
failure check based on Tomlinson (1994) is carried out to confirm the safety of the
groups.
𝑄 = 2𝐷(𝐵 + 𝐿)𝑐 + 1.3𝑐𝑏 𝑠𝑁𝑐 𝐵𝐿
Where,
D : depth of the piles below ground level,
B : overall width of the group,
L : overall length of the group,
c : average cohesion of the clay over the pile embedment depth,
cb : cohesion of the clay at the pile base level or within the zone of soil below the
base affected by the loading,
s : shape factor, and
Nc : bearing capacity factor.

Figure 23 – Bearing capacity factor (after Meyerhof) and shape factor (Meyerhof-
Skempton

TWJO-1-TCD-ST1-0004-Rev C Page 42 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Based on the analysis, the ultimate bearing capacity of the soil block is significantly
higher than the sum of working load on the pile groups.

6.5 Result of Analysis


Pile lengths are designed based on available working load. The summary of the
result will be presented in Appendix C. Detailed calculation of the pile axial bearing
capacity is presented in Appendix D. Table 13 summarizes the result of pile length
analysis and the working loads adopted.

TWJO-1-TCD-ST1-0004-Rev C Page 43 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

7. LATERAL DEFLECTION OF PILE

7.1 Allowable Lateral Displacements


Allowable lateral displacements for piles should be consistent with the function and
type of structure, the anticipated service life, and the consequences of
unacceptable displacements on the performance of the structure.

7.2 Pile Model and Soil-Structure-Interaction


The problem of the laterally loaded pile is a soil-structure-interaction problem since
the amount of pile bending must be consistent with the soil properties and the pier
stiffness. In the analysis, the pile deflection analysis is done integrated with the
structural model by modeling the piles with spring constant as soil resistance. Model
of a pile under lateral loading showing concept of bilinear soil response curve
(Reese and O’Neill, 1988) is shown in Figure 24.
The 2D p-y concept is based on the synthesis of full scale pile load tests and soil
properties. Shear at the base of the pile is neglected because the pile is considered
sufficiently long that lengths are assumed to extend below the theoretical depth of
fixity. Spring support stiffness as well as the pressure limitation to represent the soil
elastic-plastic behavior is described in the following section.

Figure 24 – Pile-Soil Model (after Reese and O’Neill, 1988)

7.3 Design Parameters for Lateral Soil Capacity and Stiffness


7.3.1 Lateral Capacity of Soils
The limiting pressure of soils (Pu) for laterally loaded pile is taken as 2Su×D at
ground surface (where Su is undrained shear strength and D is pile diameter), and
linearly increase until 9Su×D at depth of 3D (Broms, 1964; Fleming et al, 2009).

TWJO-1-TCD-ST1-0004-Rev C Page 44 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Figure 25 – Idealized variation of limiting resistance with depth (after Fleming et al,
2009)

7.3.2 Horizontal Subgrade Modulus


The modulus of subgrade reaction (k’s) is a conceptual relationship between soil
pressure and deflection of foundation structures. The value of this modulus will be
determined based on its relationship to the soil stiffness parameter (E) using Vesic
equation (1961a, 1961b).

12 𝐸𝑠 𝐵 4 𝐸𝑠
𝑘 ′ 𝑠 = 0.65 √
𝐸𝑓 𝐼𝑓 1 − 𝜇2

where,
k’s : modulus of subgrade reaction, in units of Es,
Es and Ef : modulus of soil and foundation structures, respectively; inconsistent
units,
B and If : foundation width and its moment of inertia based on cross section;
inconsistent units,
 : Poisson ratio of soil.

Detailed of this equation is described in Geotechnical Interpretative Report (TWJO-


CP12-TCD-DSR-0001-Rev 2). This design horizontal subgrade modulus shall be
duly verified by result of preliminary pile test.

7.4 Pile Group


7.4.1 Spacing of Piles
General working rules of pile spacing are described in Section 5.4.1.
7.4.2 Group Effect
To capture the effect of pile group under lateral loadings, the load deformation
response of pile groups under general loading conditions will be further verified.

TWJO-1-TCD-ST1-0004-Rev C Page 45 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

8. Design of Foundation

8.1 Bored Pile Design


Pile lengths are designed based on the result of the working load obtained from the
pile-structure interaction model. Table 13 – Summary of Design Pile Length
summarizes the result of pile length design for the working loads.
A detailed summary of the result are presented in Appendix C and detailed
calculation of the pile axial bearing capacity is presented in Appendix D.

TWJO-1-TCD-ST1-0004-Rev C Page 46 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Table 13 – Summary of Design Pile Length

No. of Pile Vertical Load per Pile (kN)


Load Column No(s). / Pile
Piles / Diameter Static ODE MDE
Category Pile Group Length (m)
Column (m) Compression Tension Compression Tension Compression Tension
A PG1B 1 1.0 647 - 790 - 957 - 11.0

B PG1F 1 1.0 1327 - 1327 - 1580 - 13.5

C C57 1 1.0 2132 - 2132 - 2530 - 21.5

C C55 & C56 1 1.0 2333 - 2494 - 2777 - 21.5


C52, C54, C58, C59,
1 1.0 2451 - 2675 - 2919 - 21.5
C C60
C25, C27, C29, C31 &
1 1.0 3645 - 3559 - 4326 - 26.5
D C33
D C17 1 1.0 3781 - 4791 - 5232 - 32.5
E C1 & C35 1 1.0 3934 - 4711 - 5163 - 28.0
E C19, C21 & C23 1 1.0 4071 - 4071 - 5095 - 28.0
F C8 & C13 1 1.0 5166 - 5706 - 6236 - 32.5
F C2, C3, C4, C36 & C37 1 1.0 5350 - 5350 - 6540 - 32.5
G C5, C6 1 1.0 5802 - 6775 - 7241 - 37.5

C15 & C16 1 1.0 6279 - 7559 - 8081 - 39.0


G

G C7, C9 to C12 & C14 1 1.0 6356 - 8011 - 8733 - 37.5

H C51 2 1.0 3489 - 6478 541 7507 1357 30.0

C39 2 1.0 3490 - 6085 535 7069 1513 30.0


H

H C38 2 1.0 3587 - 4610 1178 5462 2037 30.0

I C47, C48 2 1.0 4270 - 5997 1164 6733 1854 30.5

I C49 & C50 2 1.0 4335 - 6616 605 7478 1306 30.5

J C53 4 1.0 1914 - 6484 4301 8108 5925 30.0

K C40 1 1.2 5238 - 4506 - 6319 - 28.0

L C46 1 1.2 5708 - 5708 - 6859 - 31.5

TWJO-1-TCD-ST1-0004-Rev C Page 47 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

No. of Pile Vertical Load per Pile (kN)


Load Column No(s). / Pile
Piles / Diameter Static ODE MDE
Category Pile Group Length (m)
Column (m) Compression Tension Compression Tension Compression Tension
M C41, C44 1 1.2 6660 - 8323 - 8961 - 33.0

M C45 1 1.2 7010 - 8723 - 9389 - 33.0

N PG2A 2 1.2 2645 - 6357 2423 7666 3743 27.0

O C34 4 1.2 4629.1 - 8597 2020 10162.3 3592.6 31.0

O C18 4 1.2 4862.85 - 8686 2153 10278.6 3745.6 31.0

O C24, C26, C28 & C30 4 1.2 4916.1 - 8776 2229 10345.0 3832.3 31.0

O C32 4 1.2 5080.1 - 8815 1673 10356.4 3214.4 32.5

O C20 & C22 4 1.2 5252.56 - 8686 2005 10225.2 3553.4 32.5

TWJO-1-TCD-ST1-0004-Rev C Page 48 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

8.2 Bored Pile Design


The detailed bending moments and N-M interaction curves have been used to
design the structural reinforcement of pile.
Table 14 – Typical axial loads & moments for pile design
1
Typical values at pile top for column C18 Axial Load Resultant Moment
S.No. Load Case ID Category kN kN-m
1 L1 10278.544 2872.616

MOMENTS & STATIC ULS


2 L2 -3745.58 3051.981
3 L3 9220.537 4872.642
4 L4 -3241.538 4131.054

MDE – FORCES &


5 L5 9905.861 2937.558
6 L6 -3039.968 2868.722
7 L7 9837.795 2984.514
8 L8 -3197.422 4140.790
9 L9 9856.87 4228.175
CASES
10 L10 -3197.422 4140.790
11 L11 9220.537 4872.642
12 L12 -3241.538 4131.054
13 L13 8685.558 2168.995
14 L14 -2152.594 2348.387
15 L15 6823.148 3273.319
16 L16 -1648.551 3193.775
17 L17 8346.688 2230.123
ODE – FORCES &

18 L18 -1535.333 2162.047


19 L19 8308.935 2265.754
MOMENTS

20 L20 -1668.559 3184.339


21 L21 8321.898 3272.492
22 L22 -1668.559 3184.339
23 L23 6823.148 3273.319
24 L24 -1648.551 3193.775
25 L25 4862.844 401.643
STATIC SLS LOAD CASES

26 L26 3457.811 70.740


27 L27 4798.094 506.080
28 L28 4820.126 365.704
29 L29 4028.863 48.651
30 L30 4798.094 506.080
31 L31 3526.072 162.236
32 L32 4028.863 227.814
33 L33 4798.094 506.080
34 L34 4028.863 227.814
35 L35 4798.094 506.080
36 L36 4820.126 365.704

1
The negative values depicted in here refer to the tensile force in piles.

TWJO-1-TCD-ST1-0004-Rev C Page 49 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

8.2.1 Summary of Section Analysis


Section analysis using Oasys Adsec, a section analysis program is carried out using
the concurrent forces. A typical section analysis results is shown in Table 15.

Table 15 – Typical analysis results of pile design


ULS Adequacy for MDE
N M Mu M/Mu
Case
[kN] [kNm] [kNm]
Maxima -3197 4141 5579 0.7422 OK
Minima 10280 2873 6949 0.4134 OK

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 137 OK
Minima -278.1 OK

SLS Stresses
Permissible Stresses Concrete 0.5fcu 20.000 Mpa
Steel 0.75fy 292.500 Mpa
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)
Stress in
Stress in Concrete
Case Reinforcement
[N/mm²] [N/mm²]
Maxima 5.725 OK 37.19 OK
Minima 1.087 OK 11.46 OK

8.2.2 Typical reinforcement section

Figure 26 – Typical reinforcement section of piles


The typical calculation procedure shown above is appended for different pile groups
in appendix. The reinforcement drawing has been further appended with the
package based on the analysis results.

TWJO-1-TCD-ST1-0004-Rev C Page 50 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

8.3 Structural Design of Pile Cap


The pile cap for all the columns are modelled with exact dimensions given in column
layout and is kept at 1.5m below the ground surface. The same has been modelled
in the STAAD Pro and its design has been carried out based on beam bending
theory.

Moment in
Pile Cap
1 2

Lever arm

3 4
PIER

PILE
LOAD

Figure 27 – Typical Pile cap schematic diagram


Table 16 – Design moments in Pile Cap

Case M1 (kN.m) M = (M1 - M2) (kN.m)


MDE Seismic 16057.600 15470.782
ODE Seismic 13005.600 12495.324
Static 7236.000 6725.724

Based on the above evaluated moments under different combinations the


reinforcement has been evaluated and cross checked using Oasys section check
software.
Table 17 – Stress Check from Oasys
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 15470 20210 0.7656 OK
Minima
2 0.0 4488 17960 0.2499 OK

TWJO-1-TCD-ST1-0004-Rev C Page 51 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Crack Width Check :-


Permissible crack width = 0.250 mm
Design surface crack width = 0.135 mm OK

8.3.1 Lateral deflection of pile cap top

The lateral or longitudinal deflections of entire structure have been depicted under
ODE conditions. The values are well acceptable under inter storey drift limits.

Lateral Displacement
No. of Pile at Pile Top (mm)
S. No. Column No(s). Piles / Diameter
Column (m) ODE
X Z
1 C1 1 1.0 37.374 39.558
2 C2 1 1.0 40.09 37.948
3 C3 1 1.0 39.253 39.732
4 C4 1 1.0 39.964 38.247
5 C5 1 1.0 39.345 40.119
6 C6 1 1.0 40.749 38.924
7 C7 1 1.0 40.228 40.431
8 C8 1 1.0 40.231 39.384
9 C9 1 1.0 39.446 40.656
10 C10 1 1.0 41.139 38.507
11 C11 1 1.0 40.357 39.569
12 C12 1 1.0 41.104 39.569
13 C13 1 1.0 39.394 37.215
14 C14 1 1.0 40.914 35.47
15 C15 1 1.0 40.205 37.455
16 C16 1 1.0 40.403 35.561
17 C17 1 1.0 37.729 36.554
18 C18 4 1.2 48.673 49.108

TWJO-1-TCD-ST1-0004-Rev C Page 52 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

19 C19 1 1.0 41.772 40.049


20 C20 4 1.2 50.1 49.817
21 C21 1 1.0 41.6 40.917
22 C22 4 1.2 50.515 50.515
23 C23 1 1.0 41.729 40.609
24 C24 4 1.2 50.977 51.123
25 C25 1 1.0 41.749 40.669
26 C26 4 1.2 51.479 51.84
27 C27 1 1.0 41.955 41.2
28 C28 4 1.2 51.512 51.858
29 C29 1 1.0 41.93 40.201
30 C30 4 1.2 51.072 48.93
31 C31 1 1.0 41.832 38.201
32 C32 4 1.2 50.674 48.93
33 C33 1 1.0 41.876 37.53
34 C34 4 1.2 49.306 45.235
35 C35 1 1.0 37.349 39.555
36 C36 1 1.0 40.054 37.944
37 C37 1 1.0 39.256 39.721
38 C38 2 1.0 40.046 38.85
39 C39 2 1.0 40.044 40.283
40 C40 1 1.2 32.598 39.686
41 C41 1 1.2 41.091 41.596
42 C42 1 1.2 41.154 41.908
43 C43 1 1.2 40.404 42.554
44 C44 1 1.2 41.576 41.058
45 C45 1 1.2 1.941 41.181
46 C46 1 1.2 2.189 41.038
47 C47 2 1.0 41.938 40.043
48 C48 2 1.0 42.589 38.98
49 C49 2 1.0 41.378 37.135
50 C50 2 1.0 42.295 35.051
51 C51 2 1.0 39.674 35.825
52 C52 1 1.0 40.322 38.854
53 C53 4 1.0 48.673 49.108
54 C54 1 1.0 40.592 39.223
55 C55 1 1.0 42.607 34.007
56 C56 1 1.0 42.812 34.242
57 C57 1 1.0 39.949 31.187
58 C58 1 1.0 40.117 38.221
59 C59 1 1.0 40.064 38.66
60 C60 1 1.0 39.109 38.389

TWJO-1-TCD-ST1-0004-Rev C Page 53 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

9. SETTLEMENT OF PILES

9.1 Settlement Limit


It is anticipated that the total and differential pile settlement due to soil conditions
are less that those values considered in the design of the structure for serviceability.
The recommended allowable settlement developed based on Outline Design
Specification (ODS) is shown in Table 18.
Table 18 – Recommended Allowable Settlement for Buildings*

Maximum Allowable Settlement


Type of Structures
Short Term (mm) Long Term (mm)
Total settlement 10** 150
Differential settlement 1:1000 1:300
* Developed Based on ODS (PT MRTJ, 2012) and Jakarta’s regulation of Structural
and Geotechnical Design Guidelines for Buildings (Dinas Penataan dan
Pengawasan Bangunan DKI Jakarta, 2007)
** With the exception if any justification on structural element adequacy available

9.2 Pile Settlement Analysis


The settlement of piles shall be estimated using Tomlinson (1994).
(𝑊𝑠 + 2𝑊𝑏 )𝐿 𝜋 𝑊𝑏 𝐵(1 − 𝑣 2 )𝐼𝑝
𝑠= +
2𝐴𝑠 𝐸𝑝 4 𝐴𝑏 𝐸𝑏
Where,
Ws : Load in the pile shaft
Wb : Load in the pile base
As : Cross-sectional area of the shaft
Ab : Cross-sectional area of the base
Ep : Elastic modulus of the pile (Short Term)
Ep : Elastic modulus of the pile (Long Term)
Eb : Deformation modulus of soil beneath pile base
L : Shaft length
B : Pile width
 : Poisson’s ratio of the soil
IP : Influence factor related to the ratio of L/B
9.3 Group Pile Settlement
For group of piles, it is possible to link the settlements of single piles and pile groups
(Poulos, 1989). For general pile groups, the group settlement ratio Rs, defined as
𝑠𝑒𝑡𝑡𝑙𝑒𝑚𝑒𝑛𝑡 𝑜𝑓 𝑔𝑟𝑜𝑢𝑝
𝑅𝑠 =
𝑠𝑒𝑡𝑡𝑙𝑒𝑚𝑒𝑛𝑡 𝑜𝑓 𝑠𝑖𝑛𝑔𝑙𝑒 𝑝𝑖𝑙𝑒 𝑎𝑡 𝑡ℎ𝑒 𝑠𝑎𝑚𝑒 𝑎𝑣𝑒𝑟𝑎𝑔𝑒 𝑙𝑜𝑎𝑑
Fleming et al. (1985) have presented results which suggest that Rs can be
approximated as follows,

TWJO-1-TCD-ST1-0004-Rev C Page 54 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

𝑅𝑠 = 𝑛𝜔
Where n is the number of piles and is an exponent which lies between 0.4 and 0.6
for most pile groups.

9.4 Consolidation Settlement


There would be negligible consolidation settlement of the group since the piles in
groups are designed to be embedded in hard soils (SPT-N > 50). Further, no soft to
stiff compressible clay layer found in 3 times of pile group length below the pile toe.
If the consolidation settlement is applicable for a site, pile-raft foundation theory will
be used for the analysis.

Figure 28 – Pile-raft foundation to estimate load distribution for consolidation


settlement analysis, if applicable (Das, 2011)

9.5 Result of Analysis


The immediate pile settlement of designed pile length in both short and long term
analyses falls within the tolerable limiting value as shown in Table 12. The detailed
calculation of the pile settlement and its summary are presented in Appendices D
and E, respectively.

TWJO-1-TCD-ST1-0004-Rev C Page 55 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Table 19 – Summary of Pile Settlement


TOTAL PILE PILE GROUP
STATIC
SETTLEMENT SETTLEMENT
WORKING
PILE AT WORKING AT WORKING
COLUMN NO. OF BOREHOLE LOAD / PILE LOAD
DIAMETER LOAD LOAD
NO. PILES REFERENCE SHORT LONG SHORT LONG CATEGORY
COMPRESSION
TERM TERM TERM TERM
(m) (kN) (mm) (mm) (mm) (mm)

PG1B 1 1.0 1 ABH-4 647 0 0 0 0


A

PG1F 1 1.0 1 ABH-4 1327 0 1 0 0


B

C57 1 1.0 1 ABH-4 2132 1 2 0 0


C

C55 & C56 1 1.0 1 ABH-4 2333 1 2 0 0

C
C52, C54,
C58, C59, 1 1.0 1 ABH-4 2451 1 2 0 0
C60
C
C25, C27,
C29, C31 & 1 1.0 1 ABH-4 3645 2 5 0 0 D
C33

C17 1 1.0 1 ABH-4 3781 2 5 0 0 D

C1 & C35 1 1.0 1 ABH-4 3934 3 5 0 0 E

C19, C21 &


1 1.0 1 ABH-4 4071 3 5 0 0 E
C23

C8 & C13 1 1.0 1 ABH-4 5166 4 8 0 0 F

C2, C3, C4,


1 1.0 1 ABH-4 5350 4 8 0 0 F
C36 & C37

C5, C6 1 1.0 1 ABH-4 5802 5 11 0 0 G

C15 & C16 1 1.0 1 ABH-4 6279 5 11 0 0 G

TWJO-1-TCD-ST1-0004-Rev C Page 56 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

TOTAL PILE PILE GROUP


STATIC
SETTLEMENT SETTLEMENT
WORKING
PILE AT WORKING AT WORKING
COLUMN NO. OF BOREHOLE LOAD / PILE LOAD
DIAMETER LOAD LOAD
NO. PILES REFERENCE SHORT LONG SHORT LONG CATEGORY
COMPRESSION
TERM TERM TERM TERM
(m) (kN) (mm) (mm) (mm) (mm)

C7, C9 to
1 1.0 1 ABH-4 6356 5 11 0 0 G
C12 & C14

C51 2 1.0 1 ABH-4 3489 2 5 3 7 H

C39 2 1.0 1 ABH-4 3490 2 5 3 7 H

C38 2 1.0 1 ABH-4 3587 2 5 3 7 H

C47, C48 2 1.0 1 ABH-4 4270 3 6 4 9 I

C49 & C50 2 1.0 1 ABH-4 4335 3 6 4 9 I

C53 4 1.0 1 ABH-4 1914 1 3 3 5


J

C40 1 1.2 1 ABH-4 5238 2 5 0 0 K

C46 1 1.2 1 ABH-4 5708 3 6 0 0 L

C42, C43 1 1.2 1 ABH-4 6273 3 6 0 0 L

C41, C44 1 1.2 1 ABH-4 6660 4 7 0 0 M

C45 1 1.2 1 ABH-4 7010 4 7 0 0 M

PG2A 2 1.2 1 ABH-4 2645 1 2 2 3


N

C34 4 1.2 1 ABH-4 4629 3 5 5 11 O

TWJO-1-TCD-ST1-0004-Rev C Page 57 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

TOTAL PILE PILE GROUP


STATIC
SETTLEMENT SETTLEMENT
WORKING
PILE AT WORKING AT WORKING
COLUMN NO. OF BOREHOLE LOAD / PILE LOAD
DIAMETER LOAD LOAD
NO. PILES REFERENCE SHORT LONG SHORT LONG CATEGORY
COMPRESSION
TERM TERM TERM TERM
(m) (kN) (mm) (mm) (mm) (mm)

C18 4 1.2 1 ABH-4 4863 3 5 5 11 O

C24, C26,
4 1.2 1 ABH-4 4916 3 5 5 11 O
C28 & C30

C32 4 1.2 1 ABH-4 5080 3 5 5 11 O

C20 & C22 4 1.2 1 ABH-4 5253 3 5 5 11 O

TWJO-1-TCD-ST1-0004-Rev C Page 58 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Figure 29 – Contour of Pile Settlement

TWJO-1-TCD-ST1-0004-Rev C Page 59 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

10. CONCLUSION
All edge grid columns (along grids A & C) are founded on 1000/1200mm diameter
bored mono piles. Along grid B, viaduct-supporting columns are founded on groups
of four 1200mm diameter bored piles each, and the rest of the columns are founded
on 1200mm diameter bored mono piles.
The diameter and no. of piles to be provided for each column has been deciphered
based on the axial loads and the available pile capacities. The moments from
STAAD.Pro have been combined with these axial effects to design the
reinforcement for each pile using Oasys. The design calculations have been
attached with this report as appendices.

Factor of safety for axial bearing capacity of pile foundation has been designed to
comply with BS 8004 and Jakarta’s regulation of Structural and Geotechnical Design
Guidelines for Buildings (Dinas Penataan dan Pengawasan Bangunan DKI Jakarta,
2007).
Allowable lateral displacements for piles is designed be consistent with the function
and type of structure, the anticipated service life, and the consequences of
unacceptable displacements on the performance of the structure.
The anticipated total and differential pile settlement due to soil conditions are
designed to be less that those values considered in the design of the structure for
serviceability. There would be negligible consolidation settlement of the group since
the piles in groups are designed to be embedded in hard soils (SPT-N > 50), and no
soft to stiff compressible clay layer found in 3 times of pile group length below the
pile toe.

TWJO-1-TCD-ST1-0004-Rev C Page 60 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

11. REFERENCES

1) ACI Committee 336. (1972) “Suggested Design and Construction Procedures


for Pier Foundations”, Journal of the American Concrete Institute.
2) AECOM, (2014), Geotechnical Interpretative Report, Doc. No. AECOM-CP12-
TCD-DSR-0001-Rev 2.
3) AECOM, (2014), Design Manual for Civil and Structures, Doc. No. TWJO-
CP12-TCD-DSM-0001-Rev 2.
4) Bjerrum, L., and Simons, N.E. (1960). Comparison of Shear Strength
Characteristics of Normally Consolidated Clays, Proceedings of the ASCE
research Conference on the Shear Strength of Cohesive Soils, Boulder, pp.
711-726.
5) Boulanger, R.W and Idriss, I.M. (2007). Evaluation of Cyclic Softening in Silts
and Clays, Journal of Geotechnical and Geoenvironmental Engineering, ASCE,
Vol. 133, pp. 641-652.
6) Broms, B.B (1964), Lateral resistance of piles in cohesive soils, ASCE J. Soil
Mech. And Found. Div., 90(SM2): 27-63.
7) BS8004, (1986). Code of Practice for Foundations.
8) Casagrande, A. (1938). Notes on Soil Mechanics-First Semester, Harvard
University (unpublished), 129 pp.
9) Fardis, M., Carvalho, E., Elnashai, A., Faccioli, E., Pinto, P. and Plumier, A.
(2005). Designers’ Guide to EN 1998-1 and EN 1998-5 Eurocode 8: Design of
Structures for Earthquake Resistance, Thomas Telford, London.
10) Fauzi, A, Irsyam, M and Fauzi, U. J. (2014). Empirical Correlation of Shear
Wave Velocity and N-SPT Value For Jakarta. International Journal of
GEOMATE, Vol. 7, No. 1 (S1. No. 13), pp. 980-984.
11) Fleming, K., Weltman, A., Randolph, M., and Elson, K., (2009). Piling
Engineering 3rd Edition, Taylor & Francis, Oxon.
12) Imai, T., and Tonouchi, K., (1982). Correlation of N-value with S-wave velocity,
Proceedings of 2nd European Symposium on Penetration Testing, pp. 67-72.
13) Peck, R.B., Hanson, W.E. and Thornburn, T.H (1974). Foundation Engineering,
2nd edn., Wiley, New York.
14) Peraturan Kepala Dinas Penataan dan Pengawasan Bangunan Propinsi DKI
Jakarta (2007). Pedoman Perencanaan Struktur dan Geoteknik Bangunan, No.
50.
15) PT Mass Rapid Transit Jakarta (2012). Tender Documents for Construction of
Jakarta Mass Rapid Transit Project, Vol. 4: Employer's Requirements - Outline
Design Specifications and Appendices, Republic of Indonesia.
16) Rudianto, S. and Soedjono, B. (2009). Diskusi Load Transfer Bored Pile (Studi
Kasus di Jakarta), Pertemuan Ilmah Tahunan – XII HATTI, Bali.
17) SNI (2002). Design method of earthquake resistance for buildings. Badan
Standardisasi Nasional, Indonesia.
18) SNI (2012). Procedure of earthquake resistance design for building and non-
building structure. Badan Standardisasi Nasional, Indonesia.

TWJO-1-TCD-ST1-0004-Rev C Page 61 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

19) Stroud, M A (1989). The Standard Penetration Test – Its Application and
Interpretation, Proceedings of ICE Conference, Birmingham.
20) Toha, F.X. and Sengara, I.W. (2009). Consolidation Settlements of Deep Clay
Layers under High Rise Buildings in Jakarta, Development of Geotechnical
Engineering in Civil Construction, Bali, Indonesia, pp 22-36.
21) Tomlinson, M.J., (1994). Pile Design and Construction Practice, 4th Ed., Taylor
& Francis, Oxon.
22) Vesic, A. S. (1961a). Bending Beams Resting on Isotropic Elastic Solid, Jour.
Eng. Mech. Division, ASCE, vol. 87, EM 2, April, pp. 35-53.
23) Vesic, A. S. (1961b). Beams on Elastic Subgrade and the Winkler’s Hypothesis,
5th ICSMFE, vil 1, pp. 845-850.

TWJO-1-TCD-ST1-0004-Rev C Page 62 of 62
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Appendix A

Geological Profile at CP101 (Lebak Bulus Station)

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix A


E-100
1ABH-4 1ABH-6 E-140
1ABH-5
1ABH-3 E-150
1ABH-2
E-110 Fence(Type1)
Shop in Track Gate House
E-120
E-130
AE-03 (Gantry Crane)

(Stock Yard)
AE-04
CO
NC
RE

AE-02
T E
Back Gate
1AD-1 Domestic Wastewater Treatment Shed

1ABH-1 Hazardous Store Industrial Wastewater Treatment Shed (Wheel Turning

Infrastructure Maintenence Garage


Shop)
(Emergency Repair Shop) 1AD-5
Fire Strage Tank & Pump House D-120
Inspection Shed
Water Strage Tank & Pump House (Train Inspection Shop) (Space for future)
(Train Inspection Shop)

Car Parking
Motorbike Parking2 (Space for future)
1AD-8
Fence(Type1)
Workshop Main Building
AE-01 D-110 Fence(Type1)
Workshop
Emergency Exit Office
Building
Site Administration Car Garage1 Fuel Tank
Office
Car Parking Car Parking

Garbage Collection Site Main Gate

9. -1

7. -2

9. -3

8. -4

6. -6
9. -5
6. 1

0. 2

+3 100

+3 110

+3 120
+2 B H

+3 B H

+3 B H

+3 B H
+2 E-0

+3 E-0

+3 B H
8

+3 B H
32

67

+3 130

+3 140

+3 150
3
29

92

50

12

51

36

83

4
51
1A

1A

1A

1A

41
E-

E-

E-

61

61

58
1A
A

1A
5.

4.

8.

E-

E-

E-
9.

5.

7.
NOTES:

ENDORSED BY NANJO DAISUKE Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY YASUYOSHI NOMURA NOTICED BY NAME SIGNATURE


SOIL PROFILE
Km 0-600 TO Km 0+600
PRESIDENT DIRECTOR DONO BOESTAMI
VERIFIED BY CHU-YUAN LEE SHEET 3
DIRECTOR OF M. NASYIR
CONSTRUCTION
DESIGNED BY JOE CHAN
AS SHOWN 1/CWD/GTE/2013 - T
PROJECT MANAGER HERU NUGROHO
PT. AECOM INDONESIA 1CWDGTE2011-2013.dwg

O:\60313051\TR\Technical Stage\GTE\1CWDGTE2011-2013.dwg, 3/7/2014 6:29:48 PM, PDF-XChange 4 Jakarta_A1.pc3


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Appendix B

Site Zoning & SPT-N Design Line

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix B


SPT-N Value
0 5 10 15 20 25 30 35 40 45 50 55 60
0

10

15
Depth below Ground Level (mbgl)

20

25

30

35

40 E-120

1ABH4

1ABH5
45
Moderately Conservative Design Line

Most Probable Design Line

50

PROJECT TITLE:- ORIGINATOR:-

Engineering Consulting Services for Jakarta


Mass Rapid Transit System Project (IP-536)
(CP101 to CP102) SKETCH / FIG No.:-

SKETCH / FIG TITLE:- REPORT No.:-

Pile Zoning Profile


Station Lebak Bulus DATE:-

Oct-14
SOIL LATERAL SPRING CONSTANT - LEBAK BULUS STATION

Unit Pile Diameter, D


Description
m 1
Pile Stiffness, Ep kN/m2 31,000,000
Pile Inertia, I m4 0.0491
Soil Poisson Ratio, v - 0.3

Based on Moderately Conservative Design Line


Modulus of Subgrade
Soil Layer Stiffness Soil Spring Constant, ks
SPT-N Reaction, KH
Modulus
Top Bottom Static Seismic Static Seismic
(m) (m) - (kN/m2) (kN/m2) (kN/m2) (kN/m) (kN/m)
0 1 3 4,500 1,979 1,385 1,979 1,385
1 2 3 4,500 1,979 1,385 1,979 1,385
2 3 3 4,500 1,979 1,385 1,979 1,385
3 4 3 4,500 1,979 1,385 1,979 1,385
4 5 3 4,500 1,979 1,385 1,979 1,385
5 6 3 4,500 1,979 1,385 1,979 1,385
6 7 3 4,500 1,979 1,385 1,979 1,385
7 8 3 4,500 1,979 1,385 1,979 1,385
8 9 5 7,500 3,441 2,409 3,441 2,409
9 10 5 7,500 3,441 2,409 3,441 2,409
10 11 5 7,500 3,441 2,409 3,441 2,409
11 12 5 7,500 3,441 2,409 3,441 2,409
12 13 5 7,500 3,441 2,409 3,441 2,409
13 14 5 7,500 3,441 2,409 3,441 2,409
14 15 5 7,500 3,441 2,409 3,441 2,409
15 16 8 12,000 5,725 4,008 5,725 4,008
16 17 8 12,000 5,725 4,008 5,725 4,008
17 18 15 22,500 11,313 7,919 11,313 7,919
18 19 15 22,500 11,313 7,919 11,313 7,919
19 20 15 22,500 11,313 7,919 11,313 7,919
20 21 15 22,500 11,313 7,919 11,313 7,919
21 22 50 75,000 41,688 29,182 41,688 29,182
22 23 50 75,000 41,688 29,182 41,688 29,182
23 24 50 75,000 41,688 29,182 41,688 29,182
24 25 50 75,000 41,688 29,182 41,688 29,182
25 26 50 75,000 41,688 29,182 41,688 29,182
26 27 50 75,000 41,688 29,182 41,688 29,182
27 28 50 75,000 41,688 29,182 41,688 29,182
28 29 50 75,000 41,688 29,182 41,688 29,182
29 30 50 75,000 41,688 29,182 41,688 29,182
30 31 50 75,000 41,688 29,182 41,688 29,182
31 32 50 75,000 41,688 29,182 41,688 29,182
32 33 50 75,000 41,688 29,182 41,688 29,182
33 34 50 75,000 41,688 29,182 41,688 29,182
34 35 50 75,000 41,688 29,182 41,688 29,182
35 36 50 75,000 41,688 29,182 41,688 29,182
36 37 50 75,000 41,688 29,182 41,688 29,182
37 38 50 75,000 41,688 29,182 41,688 29,182
38 39 50 75,000 41,688 29,182 41,688 29,182
39 40 50 75,000 41,688 29,182 41,688 29,182
* The Modulus of Subgrade Reaction are derived from Vesic's formula to be duly verified by
result of preliminary lateral pile test.
** Pile design shall be based on moderately conservative design parameter.
SOIL LATERAL SPRING CONSTANT - LEBAK BULUS STATION

Unit Pile Diameter, D


Description
m 1.2
Pile Stiffness, Ep 2 31,000,000
kN/m
4 0.1017
Pile Inertia, I m
Soil Poisson Ratio, v - 0.3

Based on Moderately Conservative Design Line


Modulus of Subgrade
Soil Layer Stiffness Soil Spring Constant, ks
SPT-N Reaction, KH
Modulus
Top Bottom Static Seismic Static Seismic
2 2 2
(m) (m) - (kN/m ) (kN/m ) (kN/m ) (kN/m) (kN/m)
0 1 3 4,500 1,979 1,385 1,979 1,385
1 2 3 4,500 1,979 1,385 1,979 1,385
2 3 3 4,500 1,979 1,385 1,979 1,385
3 4 3 4,500 1,979 1,385 1,979 1,385
4 5 3 4,500 1,979 1,385 1,979 1,385
5 6 3 4,500 1,979 1,385 1,979 1,385
6 7 3 4,500 1,979 1,385 1,979 1,385
7 8 3 4,500 1,979 1,385 1,979 1,385
8 9 5 7,500 3,441 2,409 3,441 2,409
9 10 5 7,500 3,441 2,409 3,441 2,409
10 11 5 7,500 3,441 2,409 3,441 2,409
11 12 5 7,500 3,441 2,409 3,441 2,409
12 13 5 7,500 3,441 2,409 3,441 2,409
13 14 5 7,500 3,441 2,409 3,441 2,409
14 15 5 7,500 3,441 2,409 3,441 2,409
15 16 8 12,000 5,725 4,008 5,725 4,008
16 17 8 12,000 5,725 4,008 5,725 4,008
17 18 15 22,500 11,313 7,919 11,313 7,919
18 19 15 22,500 11,313 7,919 11,313 7,919
19 20 15 22,500 11,313 7,919 11,313 7,919
20 21 15 22,500 11,313 7,919 11,313 7,919
21 22 50 75,000 41,688 29,182 41,688 29,182
22 23 50 75,000 41,688 29,182 41,688 29,182
23 24 50 75,000 41,688 29,182 41,688 29,182
24 25 50 75,000 41,688 29,182 41,688 29,182
25 26 50 75,000 41,688 29,182 41,688 29,182
26 27 50 75,000 41,688 29,182 41,688 29,182
27 28 50 75,000 41,688 29,182 41,688 29,182
28 29 50 75,000 41,688 29,182 41,688 29,182
29 30 50 75,000 41,688 29,182 41,688 29,182
30 31 50 75,000 41,688 29,182 41,688 29,182
31 32 50 75,000 41,688 29,182 41,688 29,182
32 33 50 75,000 41,688 29,182 41,688 29,182
33 34 50 75,000 41,688 29,182 41,688 29,182
34 35 50 75,000 41,688 29,182 41,688 29,182
35 36 50 75,000 41,688 29,182 41,688 29,182
36 37 50 75,000 41,688 29,182 41,688 29,182
37 38 50 75,000 41,688 29,182 41,688 29,182
38 39 50 75,000 41,688 29,182 41,688 29,182
39 40 50 75,000 41,688 29,182 41,688 29,182
* The Modulus of Subgrade Reaction are derived from Vesic's formula to be duly verified by result of preliminary lateral pile test.
** Pile design shall be based on moderately conservative design parameter.
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Appendix C

Pile Schedule

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix C


PILE SCHEDULE FOR STATIONS
SUMMARY_ LEBAK BULUS STATION
BORED PILE SCHEDULE
Vertical Load per Pile(kN)
MIN. PILE
STATIC ODE MDE MIN PILE
SOCKET LENGTH
PILE NEGATIVE SKIN PILE CUT-OFF MIN. PILE LENGTH
NO. OF INTO BEARING
COLUMN NO. DIAMETER BOREHOLE FRICTION LEVEL TOE LEVEL (FROM
PILES REFERENCE COMPRESSION TENSION COMPRESSION TENSION COMPRESSION TENSION LAYER SPT-N >
COL)
50
(m) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (mRL) (mRL) (m) (m)
PG1B 1 1.0 1 ABH-4 647 - 790 - 957 - 0 35.275 24.275 11.0 0.0
PG1F 1 1.0 1 ABH-4 1327 - 1327 - 1580 - 0 35.275 21.775 13.5 0.0
C57 1 1.0 1 ABH-4 2132 - 2132 - 2530 - 0 35.275 13.775 21.5 0.0
C55 & C56 1 1.0 1 ABH-4 2333 - 2494 - 2777 - 0 35.275 13.775 21.5 0.0
C52, C54, C58, C59, C60 1 1.0 1 ABH-4 2451 - 2675 - 2919 - 0 35.275 13.775 21.5 0.0
C25, C27, C29, C31 & C33 1 1.0 1 ABH-4 3645 - 3559 - 4326 - 0 35.275 8.775 26.5 3.6
C17 1 1.0 1 ABH-4 3781 - 4791 - 5232 - 0 35.275 2.775 32.5 9.6
C1 & C35 1 1.0 1 ABH-4 3934 - 4711 - 5163 - 0 35.275 7.275 28.0 5.1
C19, C21 & C23 1 1.0 1 ABH-4 4071 - 4071 - 5095 - 0 35.275 7.275 28.0 5.1
C8 & C13 1 1.0 1 ABH-4 5166 - 5706 - 6236 - 0 35.275 2.775 32.5 9.6
C2, C3, C4, C36 & C37 1 1.0 1 ABH-4 5350 - 5350 - 6540 - 0 35.275 2.775 32.5 9.6
C5, C6 1 1.0 1 ABH-4 5802 - 6775 - 7241 - 0 35.275 -2.225 37.5 14.6
C15 & C16 1 1.0 1 ABH-4 6279 - 7559 - 8081 - 0 35.275 -3.725 39.0 16.1
C7, C9 to C12 & C14 1 1.0 1 ABH-4 6356 - 8011 - 8733 - 0 35.275 -2.225 37.5 14.6
C51 2 1.0 1 ABH-4 3489 - 6478 541 7507 1357 0 35.275 5.275 30.0 7.1
C39 2 1.0 1 ABH-4 3490 - 6085 535 7069 1513 0 35.275 5.275 30.0 7.1
C38 2 1.0 1 ABH-4 3587 - 4610 1178 5462 2037 0 35.275 5.275 30.0 7.1
C47, C48 2 1.0 1 ABH-4 4270 - 5997 1164 6733 1854 0 35.275 4.775 30.5 7.6
C49 & C50 2 1.0 1 ABH-4 4335 - 6616 605 7478 1306 0 35.275 4.775 30.5 7.6
C53 4 1.0 1 ABH-4 1914 - 6484 4301 8108 5925 0 35.275 5.275 30.0 7.1
C40 1 1.2 1 ABH-4 5238 - 4506 - 6319 - 0 34.975 6.975 28.0 5.4
C46 1 1.2 1 ABH-4 5708 - 5708 - 6859 - 0 34.975 3.475 31.5 8.9
C42, C43 1 1.2 1 ABH-4 6273 - 6326 - 7558 - 0 34.975 3.475 31.5 8.9
C41, C44 1 1.2 1 ABH-4 6660 - 8323 - 8961 - 0 34.975 1.975 33.0 10.4
C45 1 1.2 1 ABH-4 7010 - 8723 - 9389 - 0 34.975 1.975 33.0 10.4
PG2A 2 1.2 1 ABH-4 2645 - 6357 2423 7666 3743 0 34.975 7.975 27.0 4.4
C34 4 1.2 1 ABH-4 4629 - 8597 2020 10162 3593 0 34.975 3.975 31.0 8.4
C18 4 1.2 1 ABH-4 4863 - 8686 2153 10279 3746 0 34.975 3.975 31.0 8.4
C24, C26, C28 & C30 4 1.2 1 ABH-4 4916 - 8776 2229 10345 3832 0 34.975 3.975 31.0 8.4
C32 4 1.2 1 ABH-4 5080 - 8815 1673 10356 3214 0 34.975 2.475 32.5 9.9
C20 & C22 4 1.2 1 ABH-4 5253 - 8686 2005 10225 3553 0 34.975 2.475 32.5 9.9
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Appendix D

Calculation Sheet for Pile Axial Bearing Capacity

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix D


Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category: 1x1000 Load Category: A
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
gw : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : 24.28 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 24.28 37 0.1 148 148 41 41 1

Total 11.0 1489 1421

Ultimate Skin Friction, Q s (kN) = 1,489 1,421

B) END BEARING
Pile Depth 11.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe AC3 Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 45

Ultimate End bearing, Q b (kN) = 1,767

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.3 31.1 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 1,303 745 947 3,188 496 710 947

E) STRUCTURAL CAPACITY
Static kN
ODE kN
MDE kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 745 kN Static (kN) 647 OK 0
ODE 947 kN ODE (kN) 790 OK 0
MDE 3,188 kN MDE (kN) 957 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category: 1x1000 Load Category: A
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 − )
= +
2 4

Load in the pile shaft Ws 647 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 0.79 m²
Cross-sectional area of the base Ab 0.79 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 11.0 m
Pile width B 1.00 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 0.16 mm
2) Long Term Settlement 0.32 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 0.16 mm
2) Long Term Settlement 0.32 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category 1x1000


: Load Category: C
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
gw : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : 13.78 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.91 47 0.4 188 188 266 266 1
AC3 21.91 16.86 16.5 5.1 66 66 1,047 1,047 1
TS 16.86 13.78 45.5 3.1 137 137 1,325 1,325 1

Total 21.5 5015 4947

Ultimate Skin Friction, Q s (kN) = 5,015 4,947

B) END BEARING
Pile Depth 21.5 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TS Unit End Bearing 3000 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 60

Ultimate End bearing, Q b (kN) = 2,356

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.3 31.1 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 2,949 2,508 3,298 7,303 1,672 2,473 3,298

E) STRUCTURAL CAPACITY
Static kN
ODE kN
MDE kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 2,508 kN Static (kN) 2451 OK 0
ODE 3,298 kN ODE (kN) 2675 OK 0
MDE 7,303 kN MDE (kN) 2919 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: C
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 − )
= +
2 4

Load in the pile shaft Ws 2,451 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 0.79 m²
Cross-sectional area of the base Ab 0.79 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 21.5 m
Pile width B 1.00 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 1.20 mm
2) Long Term Settlement 2.40 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 1.20 mm
2) Long Term Settlement 2.40 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category1x1000


: Load Category: E
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
gw : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : 7.28 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.91 47 0.4 188 188 266 266 1
AC3 21.91 16.86 16.5 5.1 66 66 1,047 1,047 1
TS 16.86 13.36 45.5 3.5 137 137 1,501 1,501 1
TC 13.36 12.36 48 1.0 192 192 603 603 1
TC 12.36 11.36 50 1.0 200 200 628 628 1
TS 11.36 9.36 50 2.0 150 150 942 942 1
TC 9.36 7.28 48.75 2.1 195 195 1,280 1,280 1

Total 28.0 8645 8577

Ultimate Skin Friction, Q s (kN) = 8,645 8,577

B) END BEARING
Pile Depth 28.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 45

Ultimate End bearing, Q b (kN) = 1,767

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.3 31.1 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 4,165 4,323 5,718 10,344 2,882 4,288 5,718

E) STRUCTURAL CAPACITY
Static kN
ODE kN
MDE kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 4,165 kN Static (kN) 3934 OK 0
ODE 5,718 kN ODE (kN) 4711 OK 0
MDE 10,344 kN MDE (kN) 5163 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: E
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 − )
= +
2 4
Load in the pile shaft Ws 3,934 kN
Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 0.79 m²
Cross-sectional area of the base Ab 0.79 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 28.0 m
Pile width B 1.00 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 2.50 mm
2) Long Term Settlement 5.01 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 2.50 mm
2) Long Term Settlement 5.01 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category :1x1000 Load Category: G
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
gw : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : -2.23 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.91 47 0.4 188 188 266 266 1
AC3 21.91 16.86 16.5 5.1 66 66 1,047 1,047 1
TS 16.86 13.36 45.5 3.5 137 137 1,501 1,501 1
TC 13.36 12.36 48 1.0 192 192 603 603 1
TC 12.36 11.36 50 1.0 200 200 628 628 1
TS 11.36 9.36 50 2.0 150 150 942 942 1
TC 9.36 2.36 48.75 7.0 195 195 4,288 4,288 1
TS 2.36 -2.23 45.25 4.6 136 136 1,957 1,957 1

Total 37.5 13611 13542

Ultimate Skin Friction, Qs (kN) = 13,611 13,542

B) END BEARING
Pile Depth 37.5 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TS Unit End Bearing 3000 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 60

Ultimate End bearing, Qb (kN) = 2,356

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.3 31.1 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 6,387 6,805 9,028 15,899 4,537 6,771 9,028

E) STRUCTURAL CAPACITY
Static kN
ODE kN
MDE kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 6,387 kN Static (kN) 6356 OK 0
ODE 9,028 kN ODE (kN) 8011 OK 0
MDE 15,899 kN MDE (kN) 8733 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: G
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) (1 − 2)
+2
= +
2 4

Load in the pile shaft Ws 6,356 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 0.79 m²
Cross-sectional area of the base Ab 0.79 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 37.5 m
Pile width B 1.00 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 5.42 mm
2) Long Term Settlement 10.84 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 5.42 mm
2) Long Term Settlement 10.84 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category : 2x1000 Load Category: H
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
gw : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : 5.28 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.91 47 0.4 188 188 266 266 1
AC3 21.91 16.86 16.5 5.1 66 66 1,047 1,047 1
TS 16.86 13.36 45.5 3.5 137 137 1,501 1,501 1
TC 13.36 12.36 48 1.0 192 192 603 603 1
TC 12.36 11.36 50 1.0 200 200 628 628 1
TS 11.36 9.36 50 2.0 150 150 942 942 1
TC 9.36 5.28 48.75 4.1 195 195 2,505 2,505 1

Total 30.0 9870 9802

Ultimate Skin Friction, Qs (kN) = 9,870 9,802

B) END BEARING
Pile Depth 30.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 45

Ultimate End bearing, Qb (kN) = 1,767

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.3 31.1 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 4,655 4,935 6,535 11,569 3,290 4,901 6,535

E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 4,655 kN Static (kN) 3587 OK 0
ODE 6,535 kN ODE (kN) 6478 OK 1178 OK
MDE 11,569 kN MDE (kN) 7507 OK 2037 OK
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category : 2x1000 Load Category: H
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 − )
= +
2 4

Load in the pile shaft Ws 3,587 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 0.79 m²
Cross-sectional area of the base Ab 0.79 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 30.0 m
Pile width B 1.00 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 2.45 mm
2) Long Term Settlement 4.89 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 2.45 mm
2) Long Term Settlement 4.89 mm

PILE GROUP SETTLEMENT (FLEMING ET AL.,1985)

Rs=

Rs=√
Sg=Rs x Single Pile Settlement
Group Settlement Ratio Rs 1.41
Pile Group Settlement (Short Term) Sg(Short Term) 3.46 mm
Pile Group Settlement (Long Term) Sg(Long Term) 6.92 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category:2x1000 Load Category: I
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
gw : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : 4.78 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.91 47 0.4 188 188 266 266 1
AC3 21.91 16.86 16.5 5.1 66 66 1,047 1,047 1
TS 16.86 13.36 45.5 3.5 137 137 1,501 1,501 1
TC 13.36 12.36 48 1.0 192 192 603 603 1
TC 12.36 11.36 50 1.0 200 200 628 628 1
TS 11.36 9.36 50 2.0 150 150 942 942 1
TC 9.36 4.78 48.75 4.6 195 195 2,811 2,811 1

Total 30.5 10177 10108

Ultimate Skin Friction, Q s (kN) = 10,177 10,108

B) END BEARING
Pile Depth 30.5 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 45

Ultimate End bearing, Q b (kN) = 1,767

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.3 31.1 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 4,778 5,088 6,739 11,875 3,392 5,054 6,739

E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 4,778 kN Static (kN) 4335 OK 0
ODE 6,739 kN ODE (kN) 6616 OK 1164 OK
MDE 11,875 kN MDE (kN) 7478 OK 1854 OK
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category: 2x1000 Load Category: I
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) (1 − 2)
+2
= +
2 4

Load in the pile shaft Ws 4,335 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 0.79 m²
Cross-sectional area of the base Ab 0.79 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 30.5 m
Pile width B 1.00 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 3.01 mm
2) Long Term Settlement 6.01 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 3.01 mm
2) Long Term Settlement 6.01 mm

PILE GROUP SETTLEMENT (FLEMING ET AL.,1985)

Rs=

Rs=√
Sg=Rs x Single Pile Settlement
Group Settlement Ratio Rs 1.41
Pile Group Settlement (Short Term) Sg(Short Term) 4.25 mm
Pile Group Settlement (Long Term) Sg(Long Term) 8.50 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category : 4x1000 Load Category: J
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
gw : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : 5.28 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.91 47 0.4 188 188 266 266 1
AC3 21.91 16.86 16.5 5.1 66 66 1,047 1,047 1
TS 16.86 13.36 45.5 3.5 137 137 1,501 1,501 1
TC 13.36 12.36 48 1.0 192 192 603 603 1
TC 12.36 11.36 50 1.0 200 200 628 628 1
TS 11.36 9.36 50 2.0 150 150 942 942 1
TC 9.36 5.28 48.75 4.1 195 195 2,505 2,505 1

Total 30.0 9870 9802

Ultimate Skin Friction, Qs (kN) = 9,870 9,802

B) END BEARING
Pile Depth 30.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 45

Ultimate End bearing, Qb (kN) = 1,767

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.3 31.1 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 4,655 4,935 6,535 11,569 3,290 4,901 6,535

E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 4,655 kN Static (kN) 1914 OK 0
ODE 6,535 kN ODE (kN) 6484 OK 4301 OK
MDE 11,569 kN MDE (kN) 8108 OK 5925 OK
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category : 4x1000 Load Category: J
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 − )
= +
2 4

Load in the pile shaft Ws 1,914 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 0.79 m²
Cross-sectional area of the base Ab 0.79 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 30.0 m
Pile width B 1.00 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 1.31 mm
2) Long Term Settlement 2.61 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 1.31 mm
2) Long Term Settlement 2.61 mm

PILE GROUP SETTLEMENT (FLEMING ET AL.,1985)

Rs=

Rs=√
Sg=Rs x Single Pile Settlement
Group Settlement Ratio Rs 2.00
Pile Group Settlement (Short Term) Sg(Short Term) 2.61 mm
Pile Group Settlement (Long Term) Sg(Long Term) 5.22 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category1x1200


: Load Category: K
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.20 m
gw : 9.8 kN/m3 Pile Cut-off Level : 34.975 mRL
Pile Toe Level : 6.98 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 34.98 28.36 3.5 6.6 16 13 393 314 1
AC3 28.36 24.36 22 4.0 88 88 1,327 1,327 1
AC3 24.36 22.36 37 2.0 148 148 1,116 1,116 1
AC3 22.36 21.91 47 0.4 188 188 319 319 1
AC3 21.91 16.86 16.5 5.1 66 66 1,257 1,257 1
TS 16.86 13.36 45.5 3.5 137 137 1,801 1,801 1
TC 13.36 12.36 48 1.0 192 192 724 724 1
TC 12.36 11.36 50 1.0 200 200 754 754 1
TS 11.36 9.36 50 2.0 150 150 1,131 1,131 1
TC 9.36 6.98 48.75 2.4 195 195 1,756 1,756 1

Total 28.0 10577 10498

Ultimate Skin Friction, Q s (kN) = 10,577 10,498

B) END BEARING
Pile Depth 28.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 1.13 m²
End Bearing Multiplier 45

Ultimate End bearing, Q b (kN) = 2,545

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.0 31.0 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 5,249 5,288 6,999 13,043 3,526 5,249 6,999

E) STRUCTURAL CAPACITY
Static kN
ODE kN
MDE kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 5,249 kN Static (kN) 5238 OK 0
ODE 6,999 kN ODE (kN) 4506 OK 0
MDE 13,043 kN MDE (kN) 6319 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category : 1x1200 Load Category: K
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 − )
= +
2 4

Load in the pile shaft Ws 5,238 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 1.13 m²
Cross-sectional area of the base Ab 1.13 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 28.0 m
Pile width B 1.20 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 2.32 mm
2) Long Term Settlement 4.63 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 2.32 mm
2) Long Term Settlement 4.63 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category 1x1200


: Load Category: L
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.20 m
gw : 9.8 kN/m3 Pile Cut-off Level : 34.975 mRL
Pile Toe Level : 3.48 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 34.98 28.36 3.5 6.6 16 13 393 314 1
AC3 28.36 24.36 22 4.0 88 88 1,327 1,327 1
AC3 24.36 22.36 37 2.0 148 148 1,116 1,116 1
AC3 22.36 21.91 47 0.4 188 188 319 319 1
AC3 21.91 16.86 16.5 5.1 66 66 1,257 1,257 1
TS 16.86 13.36 45.5 3.5 137 137 1,801 1,801 1
TC 13.36 12.36 48 1.0 192 192 724 724 1
TC 12.36 11.36 50 1.0 200 200 754 754 1
TS 11.36 9.36 50 2.0 150 150 1,131 1,131 1
TC 9.36 3.48 48.75 5.9 195 195 4,329 4,329 1

Total 31.5 13150 13071

Ultimate Skin Friction, Q s (kN) = 13,150 13,071

B) END BEARING
Pile Depth 31.5 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 1.13 m²
End Bearing Multiplier 45

Ultimate End bearing, Q b (kN) = 2,545

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.0 31.0 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 6,278 6,575 8,714 15,616 4,383 6,536 8,714

E) STRUCTURAL CAPACITY
Static 11,310 kN
ODE 11,310 kN
MDE 18,096 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 6,278 kN Static (kN) 6273 OK 0
ODE 8,714 kN ODE (kN) 6326 OK 0
MDE 15,616 kN MDE (kN) 7558 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category : 1x1200 Load Category: L
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 − )
= +
2 4

Load in the pile shaft Ws 6,273 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 1.13 m²
Cross-sectional area of the base Ab 1.13 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 31.5 m
Pile width B 1.20 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 3.12 mm
2) Long Term Settlement 6.24 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 3.12 mm
2) Long Term Settlement 6.24 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category: 1x1200 Load Category: M
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.20 m
gw : 9.8 kN/m3 Pile Cut-off Level : 34.975 mRL
Pile Toe Level : 1.98 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 34.98 28.36 3.5 6.6 16 13 393 314 1
AC3 28.36 24.36 22 4.0 88 88 1,327 1,327 1
AC3 24.36 22.36 37 2.0 148 148 1,116 1,116 1
AC3 22.36 21.91 47 0.4 188 188 319 319 1
AC3 21.91 16.86 16.5 5.1 66 66 1,257 1,257 1
TS 16.86 13.36 45.5 3.5 137 137 1,801 1,801 1
TC 13.36 12.36 48 1.0 192 192 724 724 1
TC 12.36 11.36 50 1.0 200 200 754 754 1
TS 11.36 9.36 50 2.0 150 150 1,131 1,131 1
TC 9.36 2.36 48.75 7.0 195 195 5,146 5,146 1
TS 2.36 1.98 45.25 0.4 136 136 199 199 1

Total 33.0 14166 14087

Ultimate Skin Friction, Q s (kN) = 14,166 14,087

B) END BEARING
Pile Depth 33.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TS Unit End Bearing 3000 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 1.13 m²
End Bearing Multiplier 60

Ultimate End bearing, Q b (kN) = 3,393

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.0 31.0 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 7,023 7,083 9,391 17,480 4,722 7,044 9,391

E) STRUCTURAL CAPACITY
Static 11,310 kN
ODE 11,310 kN
MDE 18,096 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 7,023 kN Static (kN) 7010 OK 0
ODE 9,391 kN ODE (kN) 8723 OK 0
MDE 17,480 kN MDE (kN) 9389 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category: 1x1200 Load Category: M
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 − )
= +
2 4

Load in the pile shaft Ws 7,010 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 1.13 m²
Cross-sectional area of the base Ab 1.13 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 33.0 m
Pile width B 1.20 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 3.65 mm
2) Long Term Settlement 7.31 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 3.65 mm
2) Long Term Settlement 7.31 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category:2x1200 Load Category: N
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.20 m
gw : 9.8 kN/m3 Pile Cut-off Level : 34.975 mRL
Pile Toe Level : 7.98 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 34.98 28.36 3.5 6.6 16 13 393 314 1
AC3 28.36 24.36 22 4.0 88 88 1,327 1,327 1
AC3 24.36 22.36 37 2.0 148 148 1,116 1,116 1
AC3 22.36 21.91 47 0.4 188 188 319 319 1
AC3 21.91 16.86 16.5 5.1 66 66 1,257 1,257 1
TS 16.86 13.36 45.5 3.5 137 137 1,801 1,801 1
TC 13.36 12.36 48 1.0 192 192 724 724 1
TC 12.36 11.36 50 1.0 200 200 754 754 1
TS 11.36 9.36 50 2.0 150 150 1,131 1,131 1
TC 9.36 7.98 48.75 1.4 195 195 1,021 1,021 1

Total 27.0 9842 9763

Ultimate Skin Friction, Qs (kN) = 9,842 9,763

B) END BEARING
Pile Depth 27.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 1.13 m²
End Bearing Multiplier 45

Ultimate End bearing, Qb (kN) = 2,545

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to g 1 - sin f d =1f NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.0 31.0 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 4,955 4,921 6,509 12,308 3,281 4,882 6,509

E) STRUCTURAL CAPACITY
Static 11,310 kN
ODE 11,310 kN
MDE 18,096 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 4,921 kN Static (kN) 2645 OK 0
ODE 6,509 kN ODE (kN) 6357 OK 0
MDE 12,308 kN MDE (kN) 7666 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 14-Apr-2015

Site Location : Lebak Bulus station Pile Group Category: 2x1200 Load Category: N
BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 − )
= +
2 4

Load in the pile shaft Ws 2,645 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 1.13 m²
Cross-sectional area of the base Ab 1.13 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 27.0 m
Pile width B 1.20 m
Poisson’s ratio of the soil n 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 1.13 mm
2) Long Term Settlement 2.26 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 1.13 mm
2) Long Term Settlement 2.26 mm

PILE GROUP SETTLEMENT (FLEMING ET AL.,1985)

Rs=

Rs=√
Sg=Rs x Single Pile Settlement
Group Settlement Ratio Rs 1.41
Pile Group Settlement (Short Term) Sg(Short Term) 1.59 mm
Pile Group Settlement (Long Term) Sg(Long Term) 3.19 mm

ULTIMATE BEARING CAPACITY(BLOCK FAILURE ANALYSIS)

Average Undrained Shear Strength over Pile Embedment Depth(Static) Su(shaft)Static 984.2
Average Undrained Shear Strength over Pile Embedment Depth(Earthquake) Su(shaft)eq 976.3
Undrained Shear Strength at Pile Base Su(base) 225
Bearing Capacity factor Nc 9 3f
Shape Factor s 1.05
Length of planned group piles Lg 4.8
Width of planned group piles Bg 1.2

D= 27.0 m
Static B 1.2 m
Q = [2 x D x (Bg + Lg) x Su(shaft) ]+ [1.3Su(base) s Nc BL] D/B 23
= 334,797 kN >5290 kN OK! L/B 4

Earthquake
Q = [2 x D x (Bg + Lg) x Su(shaft) ]+ [1.3Su(base) s Nc BL]
= 332,253 kN >15332 kN OK!
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Appendix E

Summary of Pile Settlement

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix E


PILE SCHEDULE FOR STATIONS
SUMMARY_ LEBAK BULUS STATION
BORED PILE SCHEDULE
STATIC WORKING TOTAL PILE SETTLEMENT AT WORKING LOAD PILE GROUP SETTLEMENT AT WORKING LOAD
LOAD / PILE
PILE
NO. OF DIAMETER BOREHOLE LOAD
COLUMN NO. COMPRESSION SHORT TERM LONG TERM SHORT TERM LONG TERM
PILES REFERENCE CATEGORY

(m) (kN) (mm) (mm) (mm) (mm)


PG1B 1 1.0 1 ABH-4 692 0 1 0 0 A
PG1H 1 1.0 1 ABH-4 1327 0 1 0 0 A
C57 1 1.0 1 ABH-4 2132 1 2 0 0 B

C55 & C56 1 1.0 1 ABH-4 2333 1 2 0 0


B
C25, C27, C29, C31 & C33 1 1.0 1 ABH-4 3645 3 5 0 0 C

C17 1 1.0 1 ABH-4 3781 3 5 0 0 C

C1 & C35 1 1.0 1 ABH-4 3934 3 5 0 0 C

C19, C21 & C23 1 1.0 1 ABH-4 4071 3 5 0 0 C

C8 & C13 1 1.0 1 ABH-4 5166 4 8 0 0 D

C40 1 1.0 1 ABH-4 5238 4 8 0 0 D

C2, C3, C4, C36 & C37 1 1.0 1 ABH-4 5350 4 8 0 0 D

C5, C6 1 1.0 1 ABH-4 5802 5 11 0 0 E

C15 & C16 1 1.0 1 ABH-4 6279 5 11 0 0 E

C7, C9 to C12 & C14 1 1.0 1 ABH-4 6356 5 11 0 0 E

C51 2 1.0 1 ABH-4 3489 2 5 3 7 F

C39 2 1.0 1 ABH-4 3490 2 5 3 7 F

C38 2 1.0 1 ABH-4 3587 2 5 3 7 F

C47, C48 2 1.0 1 ABH-4 4270 3 6 4 9 G

C49 & C50 2 1.0 1 ABH-4 4335 3 6 4 9 G

C53 4 1.0 1 ABH-4 1914 1 3 3 5 H


C52, C54, C58, C59, C60 1 1.2 1 ABH-4 2451 1 2 0 0 I
C46 1 1.2 1 ABH-4 5708 3 6 0 0 J

C42, C43 1 1.2 1 ABH-4 6273 3 6 0 0 J


PILE SCHEDULE FOR STATIONS
SUMMARY_ LEBAK BULUS STATION
BORED PILE SCHEDULE
STATIC WORKING TOTAL PILE SETTLEMENT AT WORKING LOAD PILE GROUP SETTLEMENT AT WORKING LOAD
LOAD / PILE
PILE
NO. OF DIAMETER BOREHOLE LOAD
COLUMN NO. COMPRESSION SHORT TERM LONG TERM SHORT TERM LONG TERM
PILES REFERENCE CATEGORY

(m) (kN) (mm) (mm) (mm) (mm)

C41, C44 1 1.2 1 ABH-4 6660 4 7 0 0 K

C45 1 1.2 1 ABH-4 7010 4 7 0 0 K

PG2A 2 1.2 1 ABH-4 2507 1 2 2 3 L


PG2 2 1.2 1 ABH-4 2761 1 2 2 3 L
C34 4 1.2 1 ABH-4 4629.1 3 5 5 11 M

C18 4 1.2 1 ABH-4 4862.85 3 5 5 11 M

C24, C26, C28 & C30 4 1.2 1 ABH-4 4916.1 3 5 5 11 M

C32 4 1.2 1 ABH-4 5080.1 3 5 5 11 M

C20 & C22 4 1.2 1 ABH-4 5252.56 3 5 5 11 M


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Appendix F

List of Relevant Drawings

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix F


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

S. no. Drawing No. Rev no. Drawing Title


1 1/STN/STR/3011 1 Pile Layout Sheet 1 of 2
2 1/STN/STR/3012 1 Pile Layout Sheet 1 of 2
3 1/STN/STR/3016 1 Pile Reinforcement Sheet 1 of 2
4 1/STN/STR/3017 1 Pile Reinforcement Sheet 1 of 2
5 1/STN/STR/3020 1 Pile Cap Reinforcement – PG1
6 1/STN/STR/3021 1 Pile Cap Reinforcement Sheet – PG4
7 1/STN/STR/3022 1 Pile Cap Reinforcement Sheet – PG1A
8 1/STN/STR/3023 1 Pile Cap Reinforcement Sheet – PG2
9 1/STN/STR/3024 1 Pile Cap Reinforcement Sheet – PG2A

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix F


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Appendix G

List of Reference Drawings

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix G


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

S. no. Drawing No. Rev Drawing Title


no.
1 1/STN/STR/3001 1 Column Layout Sheet 1 of 2
2 1/STN/STR/3002 1 Column Layout Sheet 2 of 2
3 1/STN/STR/3003 1 Framing Plan - Concourse Level
Sheet 1 of 2
4 1/STN/STR/3004 1 Framing Plan - Concourse Level
Sheet 2 of 2
5 1/STN/STR/3005 1 Framing Plan at Track Level
6 1/STN/STR/3006 1 Framing Plan at Platform Level
7 1/STN/STR/3007 1 Longitudinal Section Sheet 1 of 3
8 1/STN/STR/3008 1 Longitudinal Section Sheet 2 of 3
9 1/STN/STR/3009 1 Longitudinal Section Sheet 3 of 3
10 1/STN/STR/3010 1 Cross Section

TWJO – 1 – TCD –ST1 - 0004- Rev C Appendix G


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Appendix H

List of Codes & Standards

TWJO – 1 – TCD –ST1 - 0004- Rev C Appendix H


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Table 1 and Table 2 below show technical standards and specifications.

Table 1

Alternative Codes to be
No. Item Code (specified)
Used
1 Viaducts
a Train Loads ODS ODS
BD37/01, BD60/04,
b Other Loads Japanese Standards
BS6779
c Load Factors Japanese Standards BD37/01
BS5400 Part 4, Part 7
d Concrete Member Design Japanese Standards
and Part 8
e Steel Member Design Japanese Standards BS5400 Part 3 and Part 6

2 Stations
a Loadings SNI 03-1727-1989 BS6339
Load Factors and Concrete
b SNI 03-2847-2002 BS8110
Member Design
Load Factors and Steel
c SNI 03-1729-2002 BS 5950
Member design

3 Depot
a Loadings SNI 03-1727-1989 BS6339
Load Factors and Concrete
b SNI 03-2847-2002 BS8110
Member Design
Load Factors and Steel
c SNI 03-1729-2002 BS 5950
Member design

4 Seismic
a Earthquake response SNI 03-2833-2008 PTLAPI ITB report
b Earthquake response SNI 03-1726-2002 PTLAPI ITB report
Structural response and
c DSRSC-SD Eurocode 8
design of structures
d Level 1 displacement limits DSRSC-DL DSRSC-DL

5 Others
Foundations Indonesian Code BS 8004
Retaining Walls Indonesian Code BS 8002 and BS 8006

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix H


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Table 2 Alternative Code Reference and Title

Code reference Title and Description

BS5400 Steel, Concrete and Composite Bridges


Part 1 General Statement
Part 3 Design of Steel Bridges
Part 4 Design of Concrete Bridges
Part 6 Specification for Materials and Workmanship - Steel
Part 7 Specification for Materials and Workmanship – Concrete,
Reinforcement and Prestressing Tendons
Part 8 Recommendations for Materials and Workmanship –
Concrete, Reinforcement and Prestressing Tendons
Part 9 Bridge Bearings
Part 10 Fatigue

BD37/01 Design Manual for Roads and Bridges Loads for Highway Bridges (UK
Department of Transport enactment of BS5400 Part 2)

BD60/04 Design of Highway Bridges for Collision Loads

BS6779 Highway Parapets for Bridges and Other Structures

BS6399 Loading for Buildings (only where loads are not covered by SNI
documents)

BS 8110 Code of Practice for Structural Use of Concrete

BS 5950 Structural Use of Steelwork in Building

BS 8004 Code of Practice for Foundations

BS 8002 Code of Practice for Earth Retaining Structures

BS 8006 Code of Practice for Strengthened/Reinforced Soils and Other Fills

Eurocode 8 Design of structures for earthquake resistance


- Part 1 : General Rules Seismic Action and Rules for Buildings
- Part 2 : Bridges

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix H


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Appendix I

Imposed Loading drawing

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix I


1 2 3 4 5 6 7 8 9 10 11

A1

2 IMPOSED DEAD LOAD ( FLOOR FINISH 100 MM THK. )


LOAD AREA
2.4 kN/m² 6128m²
THIS IMPOSED LOAD IS BASED ON:-
LEGEND LOADS AREA S.N. TITLE DRAWING REV. DATE REMARKS
NO.
2.5 kN/m² 320.70 m²
LEBAK BULUS STATION
1 CONCOURSE CP101-CP102-SK-031 R0 MAY;2012
4 kN/m² 331.90 m²
OVERALL LAYOUT
5 kN/m² 3727 m²

7.5 kN/m² 676 m² 2 CLAUSE NO-5.2(TABLE 17) OF DESIGN MANUAL


16 kN/m² 877.40 m²

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY YASUYOSHI NOMURA NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
IMPOSED LOADING
PRESIDENT DIRECTOR
VERIFIED BY SCHEDULE AT CONCOURSE LEVEL
DIRECTOR OF
CONSTRUCTION
JOE CHAN AS SHOWN 1/STN/STR/1201 - T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-SRT-1201 & 1202-A1 (IMPOSED LOADING ).DWG
12 13 14 15 16 17

A1

2 IMPOSED DEAD LOAD ( FLOOR FINISH 100 MM THK. )


LOAD AREA
2.4 kN/m² 6128m²
THIS IMPOSED LOAD IS BASED ON:-
LEGEND LOADS AREA S.N. TITLE DRAWING REV. DATE REMARKS
NO.
2.5 kN/m² 320.70 m² LEBAK BULUS STATION
1 CONCOURSE CP101-CP102-SK-031 R0 MAY;2012
4 kN/m² 331.90 m²
OVERALL LAYOUT
5 kN/m² 3727 m²

7.5 kN/m² 676 m² 2 CLAUSE NO-5.2(TABLE 17) OF DESIGN MANUAL


16 kN/m² 877.40 m²

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY YASUYOSHI NOMURA NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
IMPOSED LOADING
PRESIDENT DIRECTOR
VERIFIED BY SCHEDULE AT CONCOURSE LEVEL
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/1202 A1 T
DESIGNED BY JOE CHAN
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-SRT-1201 & 1202-A1 (IMPOSED LOADING ).DWG
1 2 3 4 5 6 7 8 9 10 11 12

A1

2 IMPOSED DEAD LOAD ( FLOOR FINISH 100 MM THK. ) THIS IMPOSED LOAD IS BASED ON:-
S.N. TITLE DRAWING REV. DATE REMARKS
LOAD AREA NO.
2.4 kN/m² 3518m² LEBAK BULUS STATION
1 PLATFORM CP101-CP102-SK-032 R0 MAY;2012
OVERALL LAYOUT
LEGEND LOADS AREA
4 kN/m² 41.52 m²
2 CLAUSE NO-5.2(TABLE 17) OF DESIGN MANUAL
5 kN/m² 3518.92 m²

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY YASUYOSHI NOMURA NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
IMPOSED LOADING
PRESIDENT DIRECTOR
VERIFIED BY SCHEDULE AT PLATFORM LEVEL
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/1203 - T
DESIGNED BY JOE CHAN
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-SRT-1201 & 1202-A1 (IMPOSED LOADING ).DWG
13 14 15 16 17

A1

2 IMPOSED DEAD LOAD ( FLOOR FINISH 100 MM THK. ) THIS IMPOSED LOAD IS BASED ON:-
S.N. TITLE DRAWING REV. DATE REMARKS
LOAD AREA NO.
2.4 kN/m² 3960m² LEBAK BULUS STATION
1 UPPER CONCOURSE CP101-CP102-SK-038 R0 MAY;2012
OVERALL LAYOUT
LEGEND LOADS AREA
4 kN/m² 41.52 m²
2 CLAUSE NO-5.2(TABLE 17) OF DESIGN MANUAL
5 kN/m² 3518.92 m²

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY YASUYOSHI NOMURA NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
IMPOSED LOADING
PRESIDENT DIRECTOR
VERIFIED BY SCHEDULE AT PLATFORM LEVEL
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/1204 - T
DESIGNED BY JOE CHAN
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-SRT-1201 & 1202-A1 (IMPOSED LOADING ).DWG
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Appendix J

Design Calculation Pile & Pile Cap

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix J


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Design of Pile

TWJO – 1 – TCD –ST1 - 0004 - Rev C Appendix J


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C1, C35


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C1, C35

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26066 1006 1DL25004
+ 1SIDL +3933.16
1CL + 1PLA -13.976
+ 1PLB + 1.1TLA
-3.826
+ 1.1TLB0.285
- 1.1BTA - 1.1BTB
1.325 69.121
Min Fx 26066 1001 1DL25004
+ 1SIDL 3330.839
+ 1CL + 1PLA +-2.946
1.1TLA + -3.356
1.1BTA 0.33 -17.498 -47.582
Max Fy 23949 1005 1DL22687
+ 1SIDL 3732.305
+ 1CL + 1PLA +21.526
1PLB + 1.1TLA
2.162
+ 1.1TLB
-0.309
+ 1.1BTA-22.023
+ 1.1BTB -33.385
Min Fy 26095 1006 1DL25003
+ 1SIDL +3933.16
1CL + 1PLA -37.804
+ 1PLB + 1.1TLA
-7.303
+ 1.1TLB0.285
- 1.1BTA -19.518
1.1BTB -18.044
Max Fz 23949 1006 1DL22687
+ 1SIDL 3892.151
+ 1CL + 1PLA -32.376
+ 1PLB + 1.1TLA5.29
+ 1.1TLB
-0.614
- 1.1BTA -26.099
- 1.1BTB 2.639
Min Fz 26095 1001 1DL25003
+ 1SIDL 3330.839
+ 1CL + 1PLA + 1.383
1.1TLA + -9.214
1.1BTA 0.33 3.686 -48.55
Max Mx 26066 1001 1DL25004
+ 1SIDL 3330.839
+ 1CL + 1PLA +-2.946
1.1TLA + -3.356
1.1BTA 0.33 -17.498 -47.582
Min Mx 23920 1006 1DL22688
+ 1SIDL 3892.151
+ 1CL + 1PLA -10.698
+ 1PLB + 1.1TLA
3.612
+ 1.1TLB
-0.614
- 1.1BTA - -11.91
1.1BTB 75.759
Max My 26095 1004 1DL25003
+ 1SIDL 3919.824
+ 1CL + 1PLB -24.674
+ 1.1TLB - 1.1BTB
-6.194 0.245 25.655 -27.804
Min My 23949 1002 1DL22687
+ 1SIDL 3914.903
+ 1CL + 1PLA -19.068
+ 1.1TLA - 1.1BTA
2.601 -0.5 -30.685 -6.927
Max Mz 26069 1006 1DL25008
+ 1SIDL +3933.16
1CL + 1PLA +-0.568
1PLB + 1.1TLA
-1.579
+ 1.1TLB0.285
- 1.1BTA - -9.218
1.1BTB 96.191
Min Mz 26066 1005 1DL25005
+ 1SIDL 3755.483
+ 1CL + 1PLA + 1PLB
1.52+ 1.1TLA
-3.854
+ 1.1TLB0.256
+ 1.1BTA +-8.151
1.1BTB -86.917

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26066 2078 1DL25005
+ 1SIDL 4710.685
+ 0.3CL + 0.3PLB
17.515
+ 0.3TLB 87.611
- 0.3BTB4.714
- 0.3SLX -636.989
0.3SLY - 1SLZ
213.575
- 1.1LLB
Min Fx 23920 1015 1DL22689
+ 1SIDL 1270.626
+ 0.3SLX + 0.3SLY
-28.868
+ 1SLZ -88.435 -5.013 -643.334 -214.924
Max Fy 23949 1152 1DL22687
+ 1SIDL 2487.022
- 1COL(-X)-MLC
415.362 12.535 1.172 -26.705 706.066
Min Fy 26095 1086 1DL25003
+ 1SIDL +2305.81
0.3CL + 0.3PLA
-247.245
+ 0.3PLB
-101.118
+ 0.3TLA +-2.793
0.3TLB - 0.3BTA
-7.413
- 0.3BTB
-115.859
- 1SLX - 0.3SLY - 0.3
Max Fz 23949 3071 1DL22687
+ 1SIDL 4320.234
+ 0.3CL + 0.3PLB
74.022
+ 0.3TLB270.513
+ 0.3BTB +4.06
0.3SLX +39.167
0.3SLY + 1SLZ
21.484
+ 1.1NLB
Min Fz 26095 3047 1DL25034
+ 1SIDL 1598.394
+ 0.3CL + 0.3PLA
-80.867
+ 0.3TLA
-274.814
+ 0.3BTA-4.207
+ 0.3SLX-202.022
+ 0.3SLY + -136.473
1SLZ + 1.1NLA
Max Mx 26066 3047 1DL25004
+ 1SIDL 4510.787
+ 0.3CL + 0.3PLA
19.371
+ 0.3TLA86.856
+ 0.3BTA 5.006
+ 0.3SLX536.414
+ 0.3SLY + 1SLZ
165.59
+ 1.1NLA
Min Mx 23920 3054 1DL22688
+ 1SIDL 1610.855
+ 0.3CL + 0.3PLA
-29.927
+ 0.3TLA -87.868
- 0.3BTA-5.301
- 0.3SLX-553.478
- 0.3SLY - 1SLZ
-184.807
- 1.1NLA
Max My 23923 3071 1DL22691
+ 1SIDL 4320.234
+ 0.3CL + 0.3PLB3.79
+ 0.3TLB5.099
+ 0.3BTB +4.06
0.3SLX715.433
+ 0.3SLY + 1SLZ
222.775
+ 1.1NLB
Min My 26068 3047 1DL25007
+ 1SIDL 1598.394
+ 0.3CL + 0.3PLA
-8.744
+ 0.3TLA -25.272
+ 0.3BTA-4.207
+ 0.3SLX-729.081
+ 0.3SLY + -221.259
1SLZ + 1.1NLA
Max Mz 23922 1086 1DL22691
+ 1SIDL 3970.139
+ 0.3CL + 0.3PLA
8.244
+ 0.3PLB11.597
+ 0.3TLA + 0.3TLB
2.677 - 0.3BTA
244.553 - 0.3BTB
730.495
- 1SLX - 0.3SLY - 0.3
Min Mz 23925 1152 1DL22694
+ 1SIDL 2487.022
- 1COL(-X)-MLC2.469 0.569 1.172 21.59 -786.923
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26066 2378 1.0DL
25005
+ 1.0SIDL
5162.675
+ 0.3CL + 0.3PLB
25.041 + 116.157
0.3TLB - 0.3BTB
6.112- 0.3SLX
833.561
- 0.3SLY - 1SLZ
276.46
- 1.54LLB
Min Fx 23920 2115 1.0DL
22689
+ 1.0SIDL
828.339
+ 0.3SLX +-36.637
0.3SLY + 1SLZ
-116.965 -6.445 -839.097 -281.218
Max Fy 23949 1452 1.15DL
22687
+ 1.2SIDL
2784.312
- 1.5COL(-X)-MLC
625.282 16.534 1.875 -29.318 1065.892
Min Fy 26095 2186 1.0DL
25003
+ 1.0SIDL
2017.573
+ 0.3CL -317.938
+ 0.3PLA + 0.3PLB
-129.339
+ 0.3TLA-3.69
+ 0.3TLB-17.315
- 0.3BTA - -140.928
0.3BTB - 1SLX - 0.3SLY
Max Fz 23949 3171 1.0DL
22687
+ 1.0SIDL
4755.379
+ 0.3CL + 0.3PLB
97.57 + 352.522
0.3TLB + 0.3BTB
5.394+ 0.3SLX
57.954
+ 0.3SLY +33.988
1SLZ + 1.54NLB
Min Fz 26095 3147 1.0DL
25034
+ 1.0SIDL
1144.173
+ 0.3CL -103.555
+ 0.3PLA + -356.757
0.3TLA + 0.3BTA
-5.519+ 0.3SLX
-267.915
+ 0.3SLY
-168.704
+ 1SLZ + 1.54NLA
Max Mx 26066 3147 1.0DL
25004
+ 1.0SIDL
4950.914
+ 0.3CL + 0.3PLA
26.842 + 0.3TLA
115.011+ 0.3BTA
6.513+ 0.3SLX
702.086
+ 0.3SLY +222.4
1SLZ + 1.54NLA
Min Mx 23920 3154 1.0DL
22688
+ 1.0SIDL
1161.425
+ 0.3CL +-37.745
0.3PLA + -116.054
0.3TLA - 0.3BTA
-6.831
- 0.3SLX
-718.892
- 0.3SLY-244.021
- 1SLZ - 1.54NLA
Max My 23923 3171 1.0DL
22691
+ 1.0SIDL
4755.379
+ 0.3CL + 0.3PLB
5.494 + 0.3TLB
6.005+ 0.3BTB
5.394+ 0.3SLX
937.02
+ 0.3SLY293.663
+ 1SLZ + 1.54NLB
Min My 26068 3147 1.0DL
25007
+ 1.0SIDL
1144.173
+ 0.3CL +-10.197
0.3PLA + 0.3TLA
-32.259
+ 0.3BTA
-5.519+ 0.3SLX
-950.626
+ 0.3SLY
-287.767
+ 1SLZ + 1.54NLA
Max Mz 23949 1451 1.15DL
22687
+ 1.2SIDL
2986.764
+ 1.5COL(X)-MLC
577.64 -4.273 2.711 -30.474 1088.93
Min Mz 23925 1452 1.15DL
22694
+ 1.2SIDL
2784.312
- 1.5COL(-X)-MLC
3.991 0.209 1.875 30.84 -1183.431

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 19 18

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1144 993.2 1120 0.887 OK
Minima 4755 67.19 1790 0.038 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 77.17 OK
Minima -120.6 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 5.76 OK 39.48 OK
Minima 3.583 OK 26.47 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 12.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26075 1006 1DL25013
+ 1SIDL +3933.16
1CL + 1PLA +10.738
1PLB + 1.1TLA
1.163
+ 1.1TLB0.285
- 1.1BTA -10.196
- 1.1BTB 66.294
Min Fx 26075 1001 1DL25013
+ 1SIDL 3330.839
+ 1CL + 1PLA + -3.19
1.1TLA + 1.1BTA
2.657 0.33 -16.273 -10.437
Max Fy 26075 1006 1DL25013
+ 1SIDL +3933.16
1CL + 1PLA +10.738
1PLB + 1.1TLA
1.163
+ 1.1TLB0.285
- 1.1BTA -10.196
- 1.1BTB 66.294
Min Fy 23929 1005 1DL22697
+ 1SIDL 3732.305
+ 1CL + 1PLA +-8.596
1PLB + 1.1TLA
0.579
+ 1.1TLB
-0.309
+ 1.1BTA +0.375
1.1BTB -44.855
Max Fz 26075 1001 1DL25013
+ 1SIDL 3330.839
+ 1CL + 1PLA + -3.19
1.1TLA + 1.1BTA
2.657 0.33 -16.273 -10.437
Min Fz 23931 1003 1DL22699
+ 1SIDL 3333.826
+ 1CL + 1PLB +-3.001
1.1TLB + -0.712
1.1BTB -0.446 3.853 -10.128
Max Mx 26075 1001 1DL25013
+ 1SIDL 3330.839
+ 1CL + 1PLA + -3.19
1.1TLA + 1.1BTA
2.657 0.33 -16.273 -10.437
Min Mx 23929 1006 1DL22697
+ 1SIDL 3892.151
+ 1CL + 1PLA +10.224
1PLB + 1.1TLA
-0.163
+ 1.1TLB
-0.614
- 1.1BTA - 1.1BTB
5.439 59.72
Max My 23929 1006 1DL22697
+ 1SIDL 3892.151
+ 1CL + 1PLA +10.224
1PLB + 1.1TLA
-0.163
+ 1.1TLB
-0.614
- 1.1BTA - 1.1BTB
5.439 59.72
Min My 26075 1001 1DL25013
+ 1SIDL 3330.839
+ 1CL + 1PLA + -3.19
1.1TLA + 1.1BTA
2.657 0.33 -16.273 -10.437
Max Mz 26075 1006 1DL25013
+ 1SIDL +3933.16
1CL + 1PLA +10.738
1PLB + 1.1TLA
1.163
+ 1.1TLB0.285
- 1.1BTA -10.196
- 1.1BTB 66.294
Min Mz 23929 1005 1DL22697
+ 1SIDL 3732.305
+ 1CL + 1PLA +-8.596
1PLB + 1.1TLA
0.579
+ 1.1TLB
-0.309
+ 1.1BTA +0.375
1.1BTB -44.855

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26075 2078 1DL25014
+ 1SIDL 4710.685
+ 0.3CL + 0.3PLB
25.876
+ 0.3TLB 79.366
- 0.3BTB4.714
- 0.3SLX -382.846
0.3SLY - 1SLZ
130.333
- 1.1LLB
Min Fx 23929 1015 1DL22698
+ 1SIDL 1270.626
+ 0.3SLX + 0.3SLY
-23.801
+ 1SLZ -78.607 -5.013 -386.824 -110.637
Max Fy 23929 1086 1DL22698
+ 1SIDL 3970.139
+ 0.3CL + 0.3PLA
78.808
+ 0.3PLB27.145
+ 0.3TLA + 0.3TLB
2.677 - 0.3BTA
143.957- 0.3BTB
376.371
- 1SLX - 0.3SLY - 0.3
Min Fy 23930 1152 1DL22698
+ 1SIDL 2487.022
- 1COL(-X)-MLC-93.85 -2.583 1.172 16.226 -556.607
Max Fz 26075 3047 1DL25013
+ 1SIDL 4510.787
+ 0.3CL + 0.3PLA
23.418
+ 0.3TLA80.877
+ 0.3BTA 5.006
+ 0.3SLX452.386
+ 0.3SLY + 1SLZ
142.679
+ 1.1NLA
Min Fz 23929 3071 1DL22698
+ 1SIDL 1442.743
+ 0.3CL + 0.3PLB
-24.986
+ 0.3TLB -79.434
+ 0.3BTB-5.283
+ 0.3SLX-383.738
+ 0.3SLY + 1SLZ
-115.964
+ 1.1NLB
Max Mx 26075 3047 1DL25013
+ 1SIDL 4510.787
+ 0.3CL + 0.3PLA
23.418
+ 0.3TLA80.877
+ 0.3BTA 5.006
+ 0.3SLX452.386
+ 0.3SLY + 1SLZ
142.679
+ 1.1NLA
Min Mx 23929 3054 1DL22697
+ 1SIDL 1610.855
+ 0.3CL + 0.3PLA
-22.453
+ 0.3TLA -79.003
- 0.3BTA-5.301
- 0.3SLX-462.429
- 0.3SLY - 1SLZ
-126.963
- 1.1NLA
Max My 23929 3071 1DL22697
+ 1SIDL 4320.234
+ 0.3CL + 0.3PLB
24.372
+ 0.3TLB 77.308
+ 0.3BTB +4.06
0.3SLX481.754
+ 0.3SLY + 1SLZ
144.783
+ 1.1NLB
Min My 26075 3078 1DL25013
+ 1SIDL 1768.634
+ 0.3CL + 0.3PLB
-20.664
+ 0.3TLB-76.4
- 0.3BTB-4.226
- 0.3SLX -487.506
- 0.3SLY - 1SLZ
-114.225
- 1.1NLB
Max Mz 26075 1007 1DL25013
+ 1SIDL 3898.554
+ 1SLX + 0.3SLY
76.163
+ 0.3SLZ 28.704 3.029 150.371 443.291
Min Mz 23929 1152 1DL22697
+ 1SIDL 2487.022
- 1COL(-X)-MLC-89.11 -2.382 1.172 18.608 -645.717
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26075 2378 1.0DL
25014
+ 1.0SIDL
5162.675
+ 0.3CL + 0.3PLB
33.057 + 103.469
0.3TLB - 0.3BTB
6.112- 0.3SLX
504.31
- 0.3SLY -164.833
1SLZ - 1.54LLB
Min Fx 23929 2115 1.0DL
22698
+ 1.0SIDL
828.339
+ 0.3SLX +-31.409
0.3SLY + 1SLZ
-102.792 -6.445 -508.071 -147.011
Max Fy 23929 2186 1.0DL
22698
+ 1.0SIDL
4249.342
+ 0.3CL +102.061
0.3PLA + 0.3PLB
35.584
+ 0.3TLA3.624
+ 0.3TLB186.488
- 0.3BTA - 0.3BTB
486.523- 1SLX - 0.3SLY
Min Fy 23930 1452 1.15DL
22698
+ 1.2SIDL
2784.312
- 1.5COL(-X)-MLC
-141.143 -3.68 1.875 22.028 -837.594
Max Fz 26075 3147 1.0DL
25013
+ 1.0SIDL
4950.914
+ 0.3CL + 0.3PLA
30.63 + 0.3TLA
105.344 + 0.3BTA
6.513+ 0.3SLX
595.952
+ 0.3SLY184.535
+ 1SLZ + 1.54NLA
Min Fz 23929 3171 1.0DL
22698
+ 1.0SIDL
993.313
+ 0.3CL +-32.563
0.3PLB + -103.912
0.3TLB + 0.3BTB
-6.812+ 0.3SLX
-503.519
+ 0.3SLY-152.169
+ 1SLZ + 1.54NLB
Max Mx 26075 3147 1.0DL
25013
+ 1.0SIDL
4950.914
+ 0.3CL + 0.3PLA
30.63 + 0.3TLA
105.344 + 0.3BTA
6.513+ 0.3SLX
595.952
+ 0.3SLY184.535
+ 1SLZ + 1.54NLA
Min Mx 23929 3154 1.0DL
22697
+ 1.0SIDL
1161.425
+ 0.3CL +-30.031
0.3PLA + -103.481
0.3TLA - 0.3BTA-6.831
- 0.3SLX
-606.098
- 0.3SLY-170.729
- 1SLZ - 1.54NLA
Max My 23929 3171 1.0DL
22697
+ 1.0SIDL
4755.379
+ 0.3CL + 0.3PLB
32.01 + 101.201
0.3TLB + 0.3BTB
5.394+ 0.3SLX
628.941
+ 0.3SLY188.946
+ 1SLZ + 1.54NLB
Min My 26075 3178 1.0DL
25013
+ 1.0SIDL
1314.413
+ 0.3CL +-27.822
0.3PLB + -100.282
0.3TLB - 0.3BTB
-5.538- 0.3SLX
-634.592
- 0.3SLY -155.733
- 1SLZ - 1.54NLB
Max Mz 26075 2107 1.0DL
25013
+ 1.0SIDL
4186.792
+1SLX + 0.3SLY
99.272
+ 0.3SLZ37.103 3.926 200.915 575.889
Min Mz 23929 1452 1.15DL
22697
+ 1.2SIDL
2784.312
- 1.5COL(-X)-MLC
-133.975 -3.478 1.875 25.507 -971.569

ODE MDE
Maximum Tension Force (kN) 1270.63 828.339
Skin Friction (kN) 0.00
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 18

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2784 971.9 1318 0.737 OK
Minima 5163 530.6 1660 0.320 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 65.44 OK
Minima -23.27 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 5.551 OK 38.49 OK
Minima 3.945 OK 28.51 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7645 m
Hence de = 0.743 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 626 kN
Corresponding axial compressive force, N = 2784 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 5104 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0026 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.381 %
Horizontal shear force, Vu = 626 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 934.96 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.536 Mpa
= 536 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 498.111 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.18
Modified shear strength of concrete (n s vc ) = 586.40 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 233.19 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.61 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C5 & C6


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C5 & C6

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24085 1002 1DL22853
+ 1SIDL 5801.723
+ 1CL + 1PLA -11.882
+ 1.1TLA - 23.606
1.1BTA -0.114 -60.978 26.038
Min Fx 24052 1004 1DL22820
+ 1SIDL 4207.253
+ 1CL + 1PLB +-2.283
1.1TLB - 1.1BTB
8.134 -0.104 -13.607 43.583
Max Fy 24081 1005 1DL22819
+ 1SIDL +4956.44
1CL + 1PLA +34.647
1PLB + 1.1TLA
18.461
+ 1.1TLB0.099
+ 1.1BTA-81.783
+ 1.1BTB 11.641
Min Fy 24114 1006 1DL22852
+ 1SIDL 5766.476
+ 1CL + 1PLA -43.703
+ 1PLB + 1.1TLA
39.371
+ 1.1TLB
-0.226
- 1.1BTA-152.798
- 1.1BTB -40.332
Max Fz 24114 1006 1DL22852
+ 1SIDL 5766.476
+ 1CL + 1PLA -43.703
+ 1PLB + 1.1TLA
39.371
+ 1.1TLB
-0.226
- 1.1BTA-152.798
- 1.1BTB -40.332
Min Fz 24097 1006 1DL22865
+ 1SIDL 5766.476
+ 1CL + 1PLA +10.213
1PLB + 1.1TLA
-5.911
+ 1.1TLB
-0.226
- 1.1BTA -33.068
1.1BTB 39.719
Max Mx 24085 1001 1DL22853
+ 1SIDL + 1CL
5779.7
+ 1PLA +-0.526
1.1TLA + 23.039
1.1BTA 0.246 -62.849 -46.158
Min Mx 24052 1006 1DL22820
+ 1SIDL +4947.83
1CL + 1PLA +-7.098
1PLB + 1.1TLA
12.427
+ 1.1TLB
-0.278
- 1.1BTA -29.921
- 1.1BTB 80.934
Max My 24092 1006 1DL22861
+ 1SIDL 5766.476
+ 1CL + 1PLA + 8.153
1PLB + 1.1TLA
1.903
+ 1.1TLB
-0.226
- 1.1BTA -48.584
1.1BTB 83.787
Min My 24114 1002 1DL22852
+ 1SIDL 5801.723
+ 1CL + 1PLA -27.214
+ 1.1TLA - 37.108
1.1BTA -0.114 -158.427 -38.9
Max Mz 24088 1006 1DL22857
+ 1SIDL 5766.476
+ 1CL + 1PLA +-2.441
1PLB + 1.1TLA
12.871
+ 1.1TLB
-0.226
- 1.1BTA -21.916
1.1BTB 99.827
Min Mz 24055 1005 1DL22824
+ 1SIDL +4956.44
1CL + 1PLA + 0.072
1PLB + 1.1TLA
6.964
+ 1.1TLB0.099
+ 1.1BTA +4.356
1.1BTB -91.018

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24085 2039 1DL22853
+ 1SIDL 6774.751
+ 0.3CL + 0.3PLA
28.153
+ 0.3TLA102.003
+ 0.3BTA 1.945
+ 0.3SLX291.898
+ 1SLY + 0.3SLZ
157.112
+ 1.1LLA
Min Fx 24052 1015 1DL22821
+ 1SIDL 2278.299
+ 0.3SLX + 0.3SLY
-29.619
+ 1SLZ -87.9 -4.43 -671.352 -213.908
Max Fy 24081 1152 1DL22819
+ 1SIDL 3672.328
- 1COL(-X)-MLC
430.273 22.423 0.255 -67.826 756.584
Min Fy 24114 1086 1DL22852
+ 1SIDL 3974.248
+ 0.3CL + 0.3PLA
-288.451
+ 0.3PLB-76.565
+ 0.3TLA +-2.842
0.3TLB - 0.3BTA
-269.167 - 0.3BTB
-106.266
- 1SLX - 0.3SLY - 0.3
Max Fz 24114 3054 1DL22883
+ 1SIDL 6137.816
+ 0.3CL + 0.3PLA
75.203
+ 0.3TLA305.143
- 0.3BTA -4.121
0.3SLX -267.193
0.3SLY - 1SLZ52.125
- 1.1NLA
Min Fz 24081 3078 1DL22819
+ 1SIDL 2442.335
+ 0.3CL + 0.3PLB
-88.171
+ 0.3TLB -258.49
- 0.3BTB -4.32
- 0.3SLX -155.598
- 0.3SLY - 1SLZ-16.212
- 1.1NLB
Max Mx 24052 3047 1DL22820
+ 1SIDL 5502.267
+ 0.3CL + 0.3PLA
33.337
+ 0.3TLA108.46
+ 0.3BTA 4.456
+ 0.3SLX537.622
+ 0.3SLY + 1SLZ
184.297
+ 1.1NLA
Min Mx 24052 3054 1DL22820
+ 1SIDL 2669.045
+ 0.3CL + 0.3PLA
-30.475
+ 0.3TLA -86.805
- 0.3BTA-4.577
- 0.3SLX-598.268
- 0.3SLY - 1SLZ
-176.329
- 1.1NLA
Max My 24089 3071 1DL22857
+ 1SIDL 5930.126
+ 0.3CL + 0.3PLB
4.615
+ 0.3TLB 41.991
+ 0.3BTB4.162
+ 0.3SLX730.801
+ 0.3SLY + 1SLZ
230.044
+ 1.1NLB
Min My 24086 3047 1DL22855
+ 1SIDL 3586.755
+ 0.3CL + 0.3PLA
-22.326
+ 0.3TLA -43.365
+ 0.3BTA-4.058
+ 0.3SLX-730.611
+ 0.3SLY + -239.518
1SLZ + 1.1NLA
Max Mz 24081 1151 1DL22819
+ 1SIDL 3701.848
+ 1COL(X)-MLC395.345 11.622 1.268 -67.975 760.77
Min Mz 24057 1152 1DL22826
+ 1SIDL 3672.328
- 1COL(-X)-MLC4.864 2.855 0.255 30.6 -805.108
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24085 2339 1.0DL
22853
+ 1.0SIDL
7240.247
+ 0.3CL + 0.3PLA
37.802 + 0.3TLA
123.077+ 0.3BTA
2.501+ 0.3SLX
383.256
+ 1SLY +210.685
0.3SLZ + 1.54LLA
Min Fx 24052 2115 1.0DL
22821
+ 1.0SIDL
1858.508
+ 0.3SLX + -38.83
0.3SLY + 1SLZ
-117.661 -5.765 -872.881 -280.194
Max Fy 24114 1452 1.15DL
22852
+ 1.2SIDL
5030.212
- 1.5COL(-X)-MLC
646.86 39.082 -0.386 -121.004 1138.138
Min Fy 24114 2186 1.0DL
22852
+ 1.0SIDL
3741.759
+ 0.3CL -371.707
+ 0.3PLA + 0.3PLB
-107.886
+ 0.3TLA
-3.698
+ 0.3TLB-303.388
- 0.3BTA - -128.299
0.3BTB - 1SLX - 0.3SLY
Max Fz 24114 3154 1.0DL
22883
+ 1.0SIDL
6490.703
+ 0.3CL +102.547
0.3PLA + 0.3TLA
387.708- 0.3BTA
5.387
- 0.3SLX
371.687
- 0.3SLY - 1SLZ
73.705
- 1.54NLA
Min Fz 24081 3178 1.0DL
22819
+ 1.0SIDL
2025.14
+ 0.3CL -114.442
+ 0.3PLB + 0.3TLB
-342.36- 0.3BTB
-5.608- 0.3SLX
-180.587
- 0.3SLY - -22.541
1SLZ - 1.54NLB
Max Mx 24052 3147 1.0DL
22820
+ 1.0SIDL
5924.651
+ 0.3CL + 0.3PLA
42.565 + 0.3TLA
138.05
+ 0.3BTA
5.837+ 0.3SLX
711.29
+ 0.3SLY242.489
+ 1SLZ + 1.54NLA
Min Mx 24052 3154 1.0DL
22820
+ 1.0SIDL
2246.66
+ 0.3CL +-39.703
0.3PLA + -116.395
0.3TLA - 0.3BTA
-5.958
- 0.3SLX
-771.935
- 0.3SLY-234.521
- 1SLZ - 1.54NLA
Max My 24088 3171 1.0DL
22856
+ 1.0SIDL
6283.009
+ 0.3CL + 0.3PLB
-1.133 + 0.3TLB
34.032+ 0.3BTB
5.428+ 0.3SLX
952.564
+ 0.3SLY300.239
+ 1SLZ + 1.54NLB
Min My 24086 3147 1.0DL
22855
+ 1.0SIDL
3233.87
+ 0.3CL + 0.3PLA
-28.08 + 0.3TLA
-60.513
+ 0.3BTA
-5.325+ 0.3SLX
-951.823
+ 0.3SLY
-309.914
+ 1SLZ + 1.54NLA
Max Mz 24081 1451 1.15DL
22819
+ 1.2SIDL
4263.547
+ 1.5COL(X)-MLC
592.556 11.696 1.929 -77.952 1138.865
Min Mz 24090 1452 1.15DL
22859
+ 1.2SIDL
5030.212
- 1.5COL(-X)-MLC
7.378 5.232 -0.386 52.222 -1210.09

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 16 16
2nd Layer

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1859 916.8 1097 0.836 OK
Minima 2025 182 1140 0.160 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 93.67 OK
Minima -44.14 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 8.825 OK 60.21 OK
Minima 4.772 OK 34.88 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 10.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24092 1002 1DL22860
+ 1SIDL 5801.723
+ 1CL + 1PLA + 3.983
1.1TLA - 1.1BTA
2.938 -0.114 39.524 52.975
Min Fx 24059 1004 1DL22827
+ 1SIDL 4207.253
+ 1CL + 1PLB + 4.479
1.1TLB - 1.1BTB
0.299 -0.104 17.938 32.676
Max Fy 24095 1006 1DL22863
+ 1SIDL 5766.476
+ 1CL + 1PLA +11.441
1PLB + 1.1TLA
-4.935
+ 1.1TLB
-0.226
- 1.1BTA -43.662
1.1BTB 62.161
Min Fy 24061 1005 1DL22829
+ 1SIDL +4956.44
1CL + 1PLA -10.119
+ 1PLB + 1.1TLA
-1.096
+ 1.1TLB0.099
+ 1.1BTA +20.494
1.1BTB -61.555
Max Fz 24092 1001 1DL22860
+ 1SIDL + 1CL
5779.7
+ 1PLA +-4.378
1.1TLA + 1.1BTA
3.188 0.246 36.63 -25.243
Min Fz 24097 1006 1DL22865
+ 1SIDL 5766.476
+ 1CL + 1PLA +10.213
1PLB + 1.1TLA
-5.911
+ 1.1TLB
-0.226
- 1.1BTA -33.068
1.1BTB 39.719
Max Mx 24092 1001 1DL22860
+ 1SIDL + 1CL
5779.7
+ 1PLA +-4.378
1.1TLA + 1.1BTA
3.188 0.246 36.63 -25.243
Min Mx 24059 1006 1DL22827
+ 1SIDL +4947.83
1CL + 1PLA + 8.673
1PLB + 1.1TLA
1.337
+ 1.1TLB
-0.278
- 1.1BTA - 1.1BTB
22.08 69.769
Max My 24092 1006 1DL22861
+ 1SIDL 5766.476
+ 1CL + 1PLA + 8.153
1PLB + 1.1TLA
1.903
+ 1.1TLB
-0.226
- 1.1BTA -48.584
1.1BTB 83.787
Min My 28603 1006 1DL27588
+ 1SIDL 5766.476
+ 1CL + 1PLA +-0.536
1PLB + 1.1TLA
-0.305
+ 1.1TLB
-0.226
- 1.1BTA - -2.004
1.1BTB -4.473
Max Mz 24092 1006 1DL22860
+ 1SIDL 5766.476
+ 1CL + 1PLA + 8.153
1PLB + 1.1TLA
1.903
+ 1.1TLB
-0.226
- 1.1BTA -46.681
1.1BTB 91.94
Min Mz 24059 1005 1DL22827
+ 1SIDL +4956.44
1CL + 1PLA +-8.079
1PLB + 1.1TLA
1.697
+ 1.1TLB0.099
+ 1.1BTA +18.742
1.1BTB -79.201

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24092 2039 1DL22860
+ 1SIDL 6774.751
+ 0.3CL + 0.3PLA
18.858
+ 0.3TLA30.706
+ 0.3BTA 1.945
+ 0.3SLX303.736
+ 1SLY + 0.3SLZ
196.234
+ 1.1LLA
Min Fx 24059 1015 1DL22828
+ 1SIDL 2278.299
+ 0.3SLX + 0.3SLY
-21.326
+ 1SLZ -64.352 -4.43 -540.942 -180.288
Max Fy 24094 1086 1DL22863
+ 1SIDL 5736.402
+ 0.3CL + 0.3PLA
83.754
+ 0.3PLB24.121
+ 0.3TLA + 0.3TLB
2.746 - 0.3BTA
187.002- 0.3BTB
427.299
- 1SLX - 0.3SLY - 0.3
Min Fy 24062 1152 1DL22830
+ 1SIDL 3672.328
- 1COL(-X)-MLC
-96.058 -3.696 0.255 26.9 -573.922
Max Fz 24061 3047 1DL22829
+ 1SIDL 5502.267
+ 0.3CL + 0.3PLA
24.151
+ 0.3TLA79.139
+ 0.3BTA 4.456
+ 0.3SLX500.229
+ 0.3SLY + 1SLZ
144.212
+ 1.1NLA
Min Fz 24095 3071 1DL22864
+ 1SIDL 3378.657
+ 0.3CL + 0.3PLB
-25.772
+ 0.3TLB -82.348
+ 0.3BTB-4.173
+ 0.3SLX-295.846
+ 0.3SLY + 1SLZ
-102.459
+ 1.1NLB
Max Mx 24059 3047 1DL22827
+ 1SIDL 5502.267
+ 0.3CL + 0.3PLA
20.535
+ 0.3TLA67.487
+ 0.3BTA 4.456
+ 0.3SLX636.644
+ 0.3SLY + 1SLZ
187.038
+ 1.1NLA
Min Mx 24059 3054 1DL22827
+ 1SIDL 2669.045
+ 0.3CL + 0.3PLA
-20.123
+ 0.3TLA -64.339
- 0.3BTA-4.577
- 0.3SLX-603.132
- 0.3SLY - 1SLZ
-191.495
- 1.1NLA
Max My 24092 3071 1DL22860
+ 1SIDL 5930.126
+ 0.3CL + 0.3PLB
19.869
+ 0.3TLB 68.969
+ 0.3BTB4.162
+ 0.3SLX657.706
+ 0.3SLY + 1SLZ
205.867
+ 1.1NLB
Min My 24059 3078 1DL22827
+ 1SIDL 2442.335
+ 0.3CL + 0.3PLB
-20.176
+ 0.3TLB -64.264
- 0.3BTB -4.32
- 0.3SLX -608.799
- 0.3SLY - 1SLZ
-191.994
- 1.1NLB
Max Mz 24092 1007 1DL22860
+ 1SIDL 5347.927
+ 1SLX + 0.3SLY
64.554
+ 0.3SLZ 25.448 2.81 254.989 634.625
Min Mz 24059 1152 1DL22827
+ 1SIDL 3672.328
- 1COL(-X)-MLC
-51.728 -0.441 0.255 32.543 -793.618
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24092 2339 1.0DL
22860
+ 1.0SIDL
7240.247
+ 0.3CL + 0.3PLA
25.048 + 0.3TLA
38.914
+ 0.3BTA
2.501+ 0.3SLX
379.912
+ 1SLY +255.988
0.3SLZ + 1.54LLA
Min Fx 24059 2115 1.0DL
22828
+ 1.0SIDL
1858.508
+ 0.3SLX +-27.931
0.3SLY + 1SLZ-84.5 -5.765 -712.814 -235.165
Max Fy 24094 2186 1.0DL
22863
+ 1.0SIDL
5968.891
+ 0.3CL +108.418
0.3PLA + 0.3PLB
32.313
+ 0.3TLA3.602
+ 0.3TLB231.682
- 0.3BTA - 0.3BTB
551.543- 1SLX - 0.3SLY
Min Fy 24095 1452 1.15DL
22863
+ 1.2SIDL
5030.212
- 1.5COL(-X)-MLC
-144.378 -6.313 -0.386 46.591 -862.742
Max Fz 24061 3147 1.0DL
22829
+ 1.0SIDL
5924.651
+ 0.3CL + 0.3PLA
32.035 + 0.3TLA
103.831+ 0.3BTA
5.837+ 0.3SLX
647.921
+ 0.3SLY191.488
+ 1SLZ + 1.54NLA
Min Fz 24094 3171 1.0DL
22863
+ 1.0SIDL
3023.204
+ 0.3CL +-34.426
0.3PLB + -106.574
0.3TLB + 0.3BTB
-5.463+ 0.3SLX
-491.947
+ 0.3SLY-168.917
+ 1SLZ + 1.54NLB
Max Mx 24059 3147 1.0DL
22827
+ 1.0SIDL
5924.651
+ 0.3CL + 0.3PLA
27.129 + 0.3TLA
87.769
+ 0.3BTA
5.837+ 0.3SLX
826.989
+ 0.3SLY248.241
+ 1SLZ + 1.54NLA
Min Mx 24059 3154 1.0DL
22827
+ 1.0SIDL
2246.66
+ 0.3CL +-26.718
0.3PLA + 0.3TLA
-84.62
- 0.3BTA
-5.958
- 0.3SLX
-793.477
- 0.3SLY-252.699
- 1SLZ - 1.54NLA
Max My 24092 3171 1.0DL
22860
+ 1.0SIDL
6283.009
+ 0.3CL + 0.3PLB
26.388 + 0.3TLB89.62+ 0.3BTB
5.428+ 0.3SLX
848.191
+ 0.3SLY268.761
+ 1SLZ + 1.54NLB
Min My 24059 3178 1.0DL
22827
+ 1.0SIDL
2025.14
+ 0.3CL +-26.792
0.3PLB + 0.3TLB
-84.278- 0.3BTB
-5.608- 0.3SLX
-801.593
- 0.3SLY -253.408
- 1SLZ - 1.54NLB
Max Mz 24092 2107 1.0DL
22860
+ 1.0SIDL
5580.416
+1SLX + 0.3SLY
84.51
+ 0.3SLZ32.631 3.666 321.315 826.839
Min Mz 24092 1452 1.15DL
22860
+ 1.2SIDL
5030.212
- 1.5COL(-X)-MLC
-77.71 -0.547 -0.386 55.858 -1192.88

ODE MDE
Maximum Tension Force (kN) 2278.30 1858.508
Skin Friction (kN) 0.00
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2025 840.7 1140 0.738 OK
Minima 7240 458.1 1712 0.268 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 89.55 OK
Minima -23.37 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 8.185 OK 56.68 OK
Minima 4.856 OK 35.33 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.766 m
Hence de = 0.744 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 648 kN
Corresponding axial compressive force, N = 5030 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 3217 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0016 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.240 %
Horizontal shear force, Vu = 648 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 968.03 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.459 Mpa
= 459 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 426.930 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.32
Modified shear strength of concrete (n s vc ) = 563.65 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 270.71 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.78 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 223 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Cipete Raya Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMNS C7, C9 TO C12 & C14


Project JMRT
Client TWJO
Job Design of Stations
Station Cipete Raya Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMNS C7, C9 TO C12 & C14

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30628 1001 1DL29632
+ 1SIDL 6355.061
+ 1CL + 1PLA +27.848
1.1TLA + 38.207
1.1BTA 0.886 -71.303 2.367
Min Fx 24151 1004 1DL22919
+ 1SIDL 4074.471
+ 1CL + 1PLB + 4.921
1.1TLB - 1.1BTB
-0.586 1.095 9.279 54.791
Max Fy 30645 1005 1DL29631
+ 1SIDL + 1CL
6320.8
+ 1PLA +70.225
1PLB + 1.1TLA
65.949
+ 1.1TLB0.786
+ 1.1BTA-231.27
+ 1.1BTB 137.57
Min Fy 24147 1006 1DL22885
+ 1SIDL 5545.278
+ 1CL + 1PLA -46.305
+ 1PLB + 1.1TLA
21.259
+ 1.1TLB
-0.721
- 1.1BTA -85.023
- 1.1BTB -50.03
Max Fz 30645 1005 1DL29631
+ 1SIDL + 1CL
6320.8
+ 1PLA +70.225
1PLB + 1.1TLA
65.949
+ 1.1TLB0.786
+ 1.1BTA-231.27
+ 1.1BTB 137.57
Min Fz 30640 1005 1DL29644
+ 1SIDL + 1CL
6320.8
+ 1PLA -14.355
+ 1PLB + 1.1TLA
-10.599
+ 1.1TLB0.786
+ 1.1BTA +55.965
1.1BTB -62.128
Max Mx 24217 1005 1DL22985
+ 1SIDL 5785.763
+ 1CL + 1PLA +13.818
1PLB + 1.1TLA5.27
+ 1.1TLB2.575
+ 1.1BTA-13.141
+ 1.1BTB -67.501
Min Mx 24118 1006 1DL22886
+ 1SIDL 5545.278
+ 1CL + 1PLA -19.081
+ 1PLB + 1.1TLA
13.12
+ 1.1TLB
-0.721
- 1.1BTA - -29.68
1.1BTB 59.095
Max My 30635 1005 1DL29640
+ 1SIDL + 1CL
6320.8
+ 1PLA +-7.324
1PLB + 1.1TLA
1.228
+ 1.1TLB0.786
+ 1.1BTA +87.079
1.1BTB -117.829
Min My 30645 1001 1DL29631
+ 1SIDL 6355.061
+ 1CL + 1PLA +54.245
1.1TLA + 64.183
1.1BTA 0.886 -236.699 136.813
Max Mz 30645 1005 1DL29631
+ 1SIDL + 1CL
6320.8
+ 1PLA +70.225
1PLB + 1.1TLA
65.949
+ 1.1TLB0.786
+ 1.1BTA-231.27
+ 1.1BTB 137.57
Min Mz 30633 1005 1DL29638
+ 1SIDL + 1CL
6320.8
+ 1PLA + 2.085
1PLB + 1.1TLA
11.309
+ 1.1TLB0.786
+ 1.1BTA +77.292
1.1BTB -125.767

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24217 2039 1DL22985
+ 1SIDL 8010.916
+ 0.3CL + 0.3PLA
56.854
+ 0.3TLA65.526
+ 0.3BTA 4.802
+ 0.3SLX241.614
+ 1SLY + 0.3SLZ
232.428
+ 1.1LLA
Min Fx 24118 1023 1DL22887
+ 1SIDL 1480.135
+ 0.3SLX + 1SLY
-63.048
+ 0.3SLZ -43.975 -2.656 -263.475 -248.72
Max Fy 30645 1152 1DL29631
+ 1SIDL - 5318.99
1COL(-X)-MLC
468.544 47.244 -1.026 -196.497 894.968
Min Fy 24147 1086 1DL22885
+ 1SIDL 3036.065
+ 0.3CL + 0.3PLA
-304.397
+ 0.3PLB-73.497
+ 0.3TLA +-4.506
0.3TLB - 0.3BTA
-179.064- 0.3BTB
-168.132
- 1SLX - 0.3SLY - 0.3
Max Fz 24518 3054 1DL23297
+ 1SIDL 6434.901
+ 0.3CL + 0.3PLA
90.475
+ 0.3TLA325.541
- 0.3BTA -4.198
0.3SLX -211.341
0.3SLY - 1SLZ
104.378
- 1.1NLA
Min Fz 24444 3047 1DL23215
+ 1SIDL 2682.561
+ 0.3CL + 0.3PLA
-77.334
+ 0.3TLA
-270.666
+ 0.3BTA-3.928
+ 0.3SLX-307.633
+ 0.3SLY + 1SLZ
-91.039
+ 1.1NLA
Max Mx 24217 2047 1DL22985
+ 1SIDL 7165.604
+ 0.3CL + 0.3PLA
41.78
+ 0.3TLA102.022
+ 0.3BTA 7.466
+ 0.3SLX570.599
+ 0.3SLY + 1SLZ
198.628
+ 1.1LLA
Min Mx 30628 3078 1DL29632
+ 1SIDL 3923.078
+ 0.3CL + 0.3PLB
-23.215
+ 0.3TLB-52.1
- 0.3BTB-5.363
- 0.3SLX -648.455
- 0.3SLY - 1SLZ
-153.575
- 1.1NLB
Max My 24493 3071 1DL23271
+ 1SIDL 6207.911
+ 0.3CL + 0.3PLB
9.254
+ 0.3TLB 38.611
+ 0.3BTB4.232
+ 0.3SLX747.185
+ 0.3SLY + 1SLZ
216.553
+ 1.1NLB
Min My 24417 3047 1DL23188
+ 1SIDL 2682.561
+ 0.3CL + 0.3PLA
-5.191
+ 0.3TLA-23.314
+ 0.3BTA-3.928
+ 0.3SLX -732.83
+ 0.3SLY + -248.177
1SLZ + 1.1NLA
Max Mz 30645 1152 1DL29631
+ 1SIDL - 5318.99
1COL(-X)-MLC
468.544 47.244 -1.026 -196.497 894.968
Min Mz 30633 1152 1DL29638
+ 1SIDL - 5318.99
1COL(-X)-MLC11.81 10.926 -1.026 43.045 -848.291
Project JMRT
Client TWJO
Job Design of Stations
Station Cipete Raya Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24217 2339 1.0DL
22985
+ 1.0SIDL
8732.133
+ 0.3CL + 0.3PLA
71.139 + 0.3TLA81.29
+ 0.3BTA
5.711+ 0.3SLX
314.171
+ 1SLY +300.681
0.3SLZ + 1.54LLA
Min Fx 24118 2123 1.0DL
22887
+ 1.0SIDL
770.546
+ 0.3SLX + -78.45
1SLY + 0.3SLZ
-58.421 -3.389 -336.983 -320.414
Max Fy 30645 1452 1.15DL
29631
+ 1.2SIDL
6194.451
- 1.5COL(-X)-MLC
692.743 53.428 -1.754 -233.636 1306.558
Min Fy 24147 2186 1.0DL
22885
+ 1.0SIDL
2575.25
+ 0.3CL +-391.04
0.3PLA + 0.3PLB
-100.63
+ 0.3TLA
-5.787
+ 0.3TLB-205.553
- 0.3BTA - 0.3BTB
-202.45- 1SLX - 0.3SLY
Max Fz 24518 3154 1.0DL
23297
+ 1.0SIDL
6948.336
+ 0.3CL +117.326
0.3PLA + 0.3TLA
413.763- 0.3BTA
5.447
- 0.3SLX
301.485
- 0.3SLY -128.682
1SLZ - 1.54NLA
Min Fz 24444 3147 1.0DL
23215
+ 1.0SIDL
2193.435
+ 0.3CL -102.906
+ 0.3PLA + -356.168
0.3TLA + 0.3BTA-5.18+ 0.3SLX
-387.433
+ 0.3SLY
-118.126
+ 1SLZ + 1.54NLA
Max Mx 24151 3154 1.0DL
22920
+ 1.0SIDL
4455.538
+ 0.3CL + 0.3PLA
62.4 + 0.3TLA
116.59
- 0.3BTA
9.346
- 0.3SLX
846.562
- 0.3SLY -298.146
1SLZ - 1.54NLA
Min Mx 24151 3178 1.0DL
22919
+ 1.0SIDL
3398.748
+ 0.3CL +-45.649
0.3PLB + 0.3TLB
-115.22- 0.3BTB
-7.239- 0.3SLX
-747.793
- 0.3SLY -217.402
- 1SLZ - 1.54NLB
Max My 24493 3171 1.0DL
23271
+ 1.0SIDL
6721.343
+ 0.3CL + 0.3PLB
11.662 + 0.3TLB
47.324+ 0.3BTB
5.481+ 0.3SLX
971.505
+ 0.3SLY288.631
+ 1SLZ + 1.54NLB
Min My 24417 3147 1.0DL
23188
+ 1.0SIDL
2193.435
+ 0.3CL + 0.3PLA
-6.962 + 0.3TLA
-31.448
+ 0.3BTA
-5.18+ 0.3SLX
-957.994
+ 0.3SLY
-320.362
+ 1SLZ + 1.54NLA
Max Mz 30645 1452 1.15DL
29631
+ 1.2SIDL
6194.451
- 1.5COL(-X)-MLC
692.743 53.428 -1.754 -233.636 1306.558
Min Mz 30633 1452 1.15DL
29638
+ 1.2SIDL
6194.451
- 1.5COL(-X)-MLC
15.935 13.402 -1.754 44.114 -1260.859

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 16 16
Bundled
2nd Layer

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2193 1010 1182 0.855 OK
Minima 6948 327.8 1721 0.191 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Cipete Raya Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 96.77 OK
Minima -41.05 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 10.61 OK 71.03 OK
Minima 4.509 OK 33.17 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Cipete Raya Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 10.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30635 1001 1DL29639
+ 1SIDL 6355.061
+ 1CL + 1PLA +-3.232
1.1TLA + 1.1BTA
2.118 0.886 79.944 -87.195
Min Fx 24158 1004 1DL22926
+ 1SIDL 4074.471
+ 1CL + 1PLB + 4.663
1.1TLB - 1.1BTB
-0.82 1.095 3.547 16.297
Max Fy 24128 1006 1DL22896
+ 1SIDL 5545.278
+ 1CL + 1PLA +11.786
1PLB + 1.1TLA
-2.548
+ 1.1TLB
-0.721
- 1.1BTA -23.309
1.1BTB 65.09
Min Fy 30638 1005 1DL29642
+ 1SIDL + 1CL
6320.8
+ 1PLA -15.028
+ 1PLB + 1.1TLA
-9.404
+ 1.1TLB0.786
+ 1.1BTA +75.75
1.1BTB -92.177
Max Fz 24496 1001 1DL23274
+ 1SIDL + 1CL
5499.3
+ 1PLA +-3.974
1.1TLA + 1.1BTA
3.108 0.39 38.048 -49.083
Min Fz 30640 1005 1DL29644
+ 1SIDL + 1CL
6320.8
+ 1PLA -14.355
+ 1PLB + 1.1TLA
-10.599
+ 1.1TLB0.786
+ 1.1BTA +55.965
1.1BTB -62.128
Max Mx 24224 1005 1DL22992
+ 1SIDL 5785.763
+ 1CL + 1PLA +-8.215
1PLB + 1.1TLA0.61
+ 1.1TLB2.575
+ 1.1BTA +9.098
1.1BTB -83.31
Min Mx 24125 1006 1DL22893
+ 1SIDL 5545.278
+ 1CL + 1PLA + 1PLB
8.06+ 1.1TLA
1.227
+ 1.1TLB
-0.721
- 1.1BTA -24.424
1.1BTB 95.15
Max My 30635 1005 1DL29640
+ 1SIDL + 1CL
6320.8
+ 1PLA +-7.324
1PLB + 1.1TLA
1.228
+ 1.1TLB0.786
+ 1.1BTA +87.079
1.1BTB -117.829
Min My 24158 1002 1DL22926
+ 1SIDL 4438.199
+ 1CL + 1PLA + 4.747
1.1TLA - 1.1BTA
1.31 1.232 -5.219 12.328
Max Mz 24125 1006 1DL22893
+ 1SIDL 5545.278
+ 1CL + 1PLA + 1PLB
8.06+ 1.1TLA
1.227
+ 1.1TLB
-0.721
- 1.1BTA -24.424
1.1BTB 95.15
Min Mz 30635 1005 1DL29639
+ 1SIDL + 1CL
6320.8
+ 1PLA +-7.324
1PLB + 1.1TLA
1.228
+ 1.1TLB0.786
+ 1.1BTA +85.851
1.1BTB -125.153

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24224 2039 1DL22992
+ 1SIDL 8010.916
+ 0.3CL + 0.3PLA
22.181
+ 0.3TLA24.931
+ 0.3BTA 4.802
+ 0.3SLX244.258
+ 1SLY + 0.3SLZ
213.137
+ 1.1LLA
Min Fx 24125 1023 1DL22894
+ 1SIDL 1480.135
+ 0.3SLX + 1SLY
-23.819
+ 0.3SLZ -23.036 -2.656 -190.557 -207.053
Max Fy 24127 1086 1DL22896
+ 1SIDL 6426.271
+ 0.3CL + 0.3PLA
85.45
+ 0.3PLB23.398
+ 0.3TLA + 0.3TLB
3.868 - 0.3BTA
153.209- 0.3BTB
445.399
- 1SLX - 0.3SLY - 0.3
Min Fy 30638 1152 1DL29642
+ 1SIDL - 5318.99
1COL(-X)-MLC
-101.323 -5.315 -1.026 51 -617.438
Max Fz 24424 3047 1DL23194
+ 1SIDL +6058.67
0.3CL + 0.3PLA
24.011
+ 0.3TLA +80.6
0.3BTA +4.12
0.3SLX501.138
+ 0.3SLY + 1SLZ
141.459
+ 1.1NLA
Min Fz 24499 3071 1DL23278
+ 1SIDL 2644.063
+ 0.3CL + 0.3PLB
-27.863
+ 0.3TLB-85.413
+ 0.3BTB-3.934
+ 0.3SLX-308.959
+ 0.3SLY + 1SLZ
-117.458
+ 1.1NLB
Max Mx 24224 2047 1DL22992
+ 1SIDL 7165.604
+ 0.3CL + 0.3PLA
21.324
+ 0.3TLA66.971
+ 0.3BTA 7.466
+ 0.3SLX624.458
+ 0.3SLY + 1SLZ
197.399
+ 1.1LLA
Min Mx 30635 3078 1DL29639
+ 1SIDL 3923.078
+ 0.3CL + 0.3PLB
-20.035
+ 0.3TLB-62.761
- 0.3BTB-5.363
- 0.3SLX -498.181
- 0.3SLY - 1SLZ
-245.794
- 1.1NLB
Max My 24496 3071 1DL23274
+ 1SIDL 6207.911
+ 0.3CL + 0.3PLB
20.428
+ 0.3TLB 68.338
+ 0.3BTB4.232
+ 0.3SLX685.839
+ 0.3SLY + 1SLZ
182.929
+ 1.1NLB
Min My 24422 1054 1DL23192
+ 1SIDL +2660.54
0.3CL + 0.3PLA
-20.375
+ 0.3TLA-65.253
- 0.3BTA --3.96
0.3SLX-623.973
- 0.3SLY - 1SLZ
-189.803
Max Mz 24125 1007 1DL22893
+ 1SIDL 6083.791
+ 1SLX + 0.3SLY
66.026
+ 0.3SLZ 22.732 4.018 219.901 654.491
Min Mz 30635 1152 1DL29639
+ 1SIDL - 5318.99
1COL(-X)-MLC
-50.684 3.327 -1.026 51.935 -842.142
Project JMRT
Client TWJO
Job Design of Stations
Station Cipete Raya Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24224 2339 1.0DL
22992
+ 1.0SIDL
8732.133
+ 0.3CL + 0.3PLA
29.096 + 0.3TLA
32.028
+ 0.3BTA
5.711+ 0.3SLX
312.462
+ 1SLY +280.841
0.3SLZ + 1.54LLA
Min Fx 24125 2123 1.0DL
22894
+ 1.0SIDL
770.546
+ 0.3SLX +-30.795
1SLY + 0.3SLZ
-30.112 -3.389 -251.688 -271.357
Max Fy 24127 2186 1.0DL
22896
+ 1.0SIDL
6887.087
+ 0.3CL +110.531
0.3PLA + 0.3PLB
31.035
+ 0.3TLA5.149
+ 0.3TLB192.846
- 0.3BTA - 0.3BTB
573.592- 1SLX - 0.3SLY
Min Fy 30638 1452 1.15DL
29642
+ 1.2SIDL
6194.451
- 1.5COL(-X)-MLC
-150.575 -5.484 -1.754 56.466 -914.648
Max Fz 24424 3147 1.0DL
23194
+ 1.0SIDL
6553.379
+ 0.3CL + 0.3PLA
31.91 + 0.3TLA
105.556+ 0.3BTA
5.329+ 0.3SLX
651.122
+ 0.3SLY 188.12
+ 1SLZ + 1.54NLA
Min Fz 24499 3171 1.0DL
23278
+ 1.0SIDL
2127.203
+ 0.3CL +-35.736
0.3PLB + -110.298
0.3TLB + 0.3BTB
-5.191+ 0.3SLX
-412.509
+ 0.3SLY-149.714
+ 1SLZ + 1.54NLB
Max Mx 24158 3154 1.0DL
22927
+ 1.0SIDL
4455.538
+ 0.3CL + 0.3PLA
29.57 + 0.3TLA
84.126
- 0.3BTA
9.346
- 0.3SLX
701.121
- 0.3SLY -250.311
1SLZ - 1.54NLA
Min Mx 24158 3178 1.0DL
22926
+ 1.0SIDL
3398.748
+ 0.3CL +-26.427
0.3PLB + 0.3TLB
-83.798- 0.3BTB
-7.239- 0.3SLX
-782.542
- 0.3SLY - -300.06
1SLZ - 1.54NLB
Max My 24496 3171 1.0DL
23274
+ 1.0SIDL
6721.343
+ 0.3CL + 0.3PLB
26.997 + 0.3TLB
88.783+ 0.3BTB
5.481+ 0.3SLX
883.462
+ 0.3SLY +245.14
1SLZ + 1.54NLB
Min My 24422 3178 1.0DL
23192
+ 1.0SIDL
1979.224
+ 0.3CL +-26.962
0.3PLB + 0.3TLB
-85.745- 0.3BTB
-5.221- 0.3SLX
-819.331
- 0.3SLY -250.385
- 1SLZ - 1.54NLB
Max Mz 24125 2107 1.0DL
22893
+ 1.0SIDL
6544.606
+1SLX + 0.3SLY
86.418
+ 0.3SLZ29.368 5.299 280.178 851.306
Min Mz 30635 1452 1.15DL
29639
+ 1.2SIDL
6194.451
- 1.5COL(-X)-MLC
-76.259 4.669 -1.754 55.19 -1250.277

ODE MDE
Maximum Tension Force (kN) 1480.14 770.546
Skin Friction (kN) 0.00
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1979 856.7 1129 0.759 OK
Minima 8732 420.1 1612 0.261 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Cipete Raya Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 98.67 OK
Minima -19.23 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 9.357 OK 64.21 OK
Minima 4.895 OK 35.25 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.766 m
Hence de = 0.744 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 695 kN
Corresponding axial compressive force, N = 6194 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 3217 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0016 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.240 %
Horizontal shear force, Vu = 695 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Cipete Raya Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 1037.88 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.459 Mpa
= 459 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 426.930 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.39
Modified shear strength of concrete (n s vc ) = 595.29 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 296.29 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.78 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 204 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C36, C37


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C36, C37

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26099 1003 1DL25037
+ 1SIDL +5350.138
1CL + 1PLB + 3.953
1.1TLB + -12.528
1.1BTB -0.25 25.018 -36.227
Min Fx 26132 1001 1DL25070
+ 1SIDL +4320.361
1CL + 1PLA + 7.511
1.1TLA + 1.1BTA
-8.058 0.033 -8.421 -29.766
Max Fy 26161 1005 1DL25069
+ 1SIDL +5053.658
1CL + 1PLA +35.103
1PLB + 1.1TLA
-22.037
+ 1.1TLB-0.134
+ 1.1BTA +65.178
1.1BTB 14.587
Min Fy 24048 1006 1DL22786
+ 1SIDL + 1CL
5154.8
+ 1PLA -41.159
+ 1PLB + 1.1TLA
13.758
+ 1.1TLB-0.436
- 1.1BTA --59.163
1.1BTB -30.027
Max Fz 23982 1006 1DL22720
+ 1SIDL +5135.625
1CL + 1PLA +-36.19
1PLB + 1.1TLA
19.592
+ 1.1TLB-0.324
- 1.1BTA --78.593
1.1BTB -11.474
Min Fz 26128 1005 1DL25036
+ 1SIDL + 5318.19
1CL + 1PLA +29.211
1PLB + 1.1TLA
-24.027
+ 1.1TLB-0.046
+ 1.1BTA +72.711
1.1BTB -6.284
Max Mx 26099 1001 1DL25037
+ 1SIDL +4679.463
1CL + 1PLA + 1.1TLA
4.37 + 1.1BTA
-6.756 0.12 -11.194 -34.998
Min Mx 24019 1006 1DL22787
+ 1SIDL + 1CL
5154.8
+ 1PLA -15.946
+ 1PLB + 1.1TLA
8.782
+ 1.1TLB-0.436
- 1.1BTA --22.996
1.1BTB 65.749
Max My 26128 1004 1DL25036
+ 1SIDL +5331.512
1CL + 1PLB +-19.131
1.1TLB - 1.1BTB
-21.17 -0.065 79.41 -8.253
Min My 23982 1002 1DL22720
+ 1SIDL +5190.264
1CL + 1PLA -19.998
+ 1.1TLA - 1.1BTA
17.278 -0.225 -84.562 -10.707
Max Mz 24022 1006 1DL22791
+ 1SIDL + 1CL
5154.8
+ 1PLA +-1.569
1PLB + 1.1TLA
5.026
+ 1.1TLB-0.436
- 1.1BTA - 1.1BTB
4.29 98.662
Min Mz 26135 1005 1DL25074
+ 1SIDL +5053.658
1CL + 1PLA + 1PLB
0.329+ 1.1TLA-5.34
+ 1.1TLB-0.134
+ 1.1BTA +-24.151
1.1BTB -90.585

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26099 1003 1DL25037
+ 1SIDL +5350.138
1CL + 1PLB + 3.953
1.1TLB + -12.528
1.1BTB -0.25 25.018 -36.227
Min Fx 23986 1015 1DL22755
+ 1SIDL +2105.231
0.3SLX + 0.3SLY
-27.847
+ 1SLZ -81.21 -4.592 -658.606 -208.44
Max Fy 26128 1152 1DL25036
+ 1SIDL - 1COL(-X)-MLC
3872.71 435.641 -21.09 -1.146 93.517 776.433
Min Fy 24048 1086 1DL22786
+ 1SIDL +3724.231
0.3CL + 0.3PLA
-276.538
+ 0.3PLB-69.931
+ 0.3TLA + 0.3TLB
-2.767 - 0.3BTA
-97.008
- 0.3BTB-66.922
- 1SLX - 0.3SLY - 0.3S
Max Fz 24015 3054 1DL22784
+ 1SIDL +5205.286
0.3CL + 0.3PLA
79.526
+ 0.3TLA282.599
- 0.3BTA - 4.047
0.3SLX - 169.857
0.3SLY - 1SLZ 90.959
- 1.1NLA
Min Fz 26161 3078 1DL25069
+ 1SIDL +2801.504
0.3CL + 0.3PLB
-79.692
+ 0.3TLB
-285.487
- 0.3BTB-4.296
- 0.3SLX - 0.3SLY
23.934- 1SLZ --0.873
1.1NLB
Max Mx 23953 3047 1DL22721
+ 1SIDL +4744.302
0.3CL + 0.3PLA30.87
+ 0.3TLA91.904
+ 0.3BTA +4.653
0.3SLX +532.922
0.3SLY + 1SLZ
169.516
+ 1.1NLA
Min Mx 23953 3071 1DL22722
+ 1SIDL +3008.955
0.3CL + 0.3PLB
-30.134
+ 0.3TLB -67.726
+ 0.3BTB-4.931
+ 0.3SLX -656.578
+ 0.3SLY + 1SLZ
-217.848
+ 1.1NLB
Max My 23990 3071 1DL22758
+ 1SIDL +4964.541
0.3CL + 0.3PLB7.966
+ 0.3TLB 26.744
+ 0.3BTB 4.055
+ 0.3SLX +723.551
0.3SLY + 1SLZ
219.984
+ 1.1NLB
Min My 26135 3047 1DL25074
+ 1SIDL +2564.406
0.3CL + 0.3PLA
-1.641
+ 0.3TLA -9.237
+ 0.3BTA -4.264
+ 0.3SLX-738.569
+ 0.3SLY + 1SLZ
-229.979
+ 1.1NLA
Max Mz 26128 1152 1DL25036
+ 1SIDL - 1COL(-X)-MLC
3872.71 435.641 -21.09 -1.146 93.517 776.433
Min Mz 26104 1152 1DL25043
+ 1SIDL - 1COL(-X)-MLC
3872.71 5.879 -5.409 -1.146 -16.896 -810.989
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26099 2103 1.15DL
25037
+ 1.2SIDL
6539.393
+ 1.4CL + 1.4PLB
5.66 + 1.54TLB
-13.551 + 1.54BTB
-0.319 29.537 -50.998
Min Fx 23986 2115 1.0DL
22755
+ 1.0SIDL
1710.886
+ 0.3SLX +-36.561
0.3SLY + 1SLZ
-109.609 -5.957 -856.886 -273.54
Max Fy 26128 1452 1.15DL
25036
+ 1.2SIDL
4477.757
- 1.5COL(-X)-MLC
653.863 -21.848 -1.675 107.67 1165.215
Min Fy 24048 2186 1.0DL
22786
+ 1.0SIDL
3639.008
+ 0.3CL +-357.059
0.3PLA + 0.3PLB
-95.756
+ 0.3TLA-3.538
+ 0.3TLB-105.468
- 0.3BTA - 0.3BTB
-80.419
- 1SLX - 0.3SLY -
Max Fz 24015 3154 1.0DL
22784
+ 1.0SIDL
5595.693
+ 0.3CL +104.982
0.3PLA + 0.3TLA
364.31
- 0.3BTA5.324
- 0.3SLX239.749
- 0.3SLY - 115.645
1SLZ - 1.54NLA
Min Fz 26161 3178 1.0DL
25069
+ 1.0SIDL
2415.694
+ 0.3CL +-103.957
0.3PLB + -366.766
0.3TLB - 0.3BTB
-5.559
- 0.3SLX -8.884
0.3SLY - 1SLZ
-5.096
- 1.54NLB
Max Mx 23953 3147 1.0DL
22721
+ 1.0SIDL
4980.348
+ 0.3CL + 0.3PLA
40.278+ 0.3TLA
116.13
+ 0.3BTA 6.13
+ 0.3SLX
707.296
+ 0.3SLY 224.606
+ 1SLZ + 1.54NLA
Min Mx 23953 3171 1.0DL
22722
+ 1.0SIDL
2772.919
+ 0.3CL + -39.541
0.3PLB + 0.3TLB
-91.952
+ 0.3BTB
-6.407+ 0.3SLX
-854.795
+ 0.3SLY-282.131
+ 1SLZ + 1.54NLB
Max My 23990 3171 1.0DL
22758
+ 1.0SIDL
5354.969
+ 0.3CL + 0.3PLB
10.407+ 0.3TLB
33.575
+ 0.3BTB
5.332+ 0.3SLX
944.684
+ 0.3SLY +291.243
1SLZ + 1.54NLB
Min My 26135 3147 1.0DL
25074
+ 1.0SIDL
2178.618
+ 0.3CL + 0.3PLA
-2.412+ 0.3TLA
-10.418
+ 0.3BTA
-5.527
+ 0.3SLX
-959.626
+ 0.3SLY-296.915
+ 1SLZ + 1.54NLA
Max Mz 26128 1452 1.15DL
25036
+ 1.2SIDL
4477.757
- 1.5COL(-X)-MLC
653.863 -21.848 -1.675 107.67 1165.215
Min Mz 26104 1452 1.15DL
25043
+ 1.2SIDL
4477.757
- 1.5COL(-X)-MLC
8.81 -6.592 -1.675 -13.188 -1217.29

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 16 16

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2179 1005 1178 0.853 OK
Minima 2416 10.29 1236 0.008 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 84.58 OK
Minima -50.75 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 7.414 OK 51.58 OK
Minima 5.059 OK 36.67 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.766 m
Hence de = 0.744 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 654 kN
Corresponding axial compressive force, N = 4478 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 3217 mm2
Effective area of tensile steel = 50% of total steel = As = 0.0016 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.240 %
Horizontal shear force, Vu = 654 kN
Shear stress (vv = Vu /(bv . dv) = 977.27 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.459 Mpa
= 459 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 426.930 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/Ac) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.29
Modified shear strength of concrete (n s vc ) = 548.63 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 286.95 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.78 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 210 mm
Provided spacing 200 mm
OK
Shear reinforcement 13mm dia @ 200mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghav
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMNS C38


Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghav
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMNS C38

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 2
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32091 1005 1DL31120
+ 1SIDL 3587.408
+ 1CL + 1PLA + 7.622
1PLB + 1.1TLA
5.693
+ 1.1TLB
-0.017
+ 1.1BTA-56.097
+ 1.1BTB -76.067
Min Fx 32122 1001 1DL31152
+ 1SIDL 1902.335
+ 1CL + 1PLA + -1.26
1.1TLA + 1.1BTA
28.81 0.11 -164.899 -45.925
Max Fy 32108 1005 1DL31119
+ 1SIDL 3587.408
+ 1CL + 1PLA + 26.39
1PLB + 1.1TLA2.72
+ 1.1TLB
-0.017
+ 1.1BTA-68.005
+ 1.1BTB -17.787
Min Fy 32108 1006 1DL31119
+ 1SIDL 3576.768
+ 1CL + 1PLA -34.714
+ 1PLB + 1.1TLA
5.314
+ 1.1TLB0.048
- 1.1BTA - 1.1BTB
-76.3 -2.264
Max Fz 32139 1004 1DL31151
+ 1SIDL +2224.51
1CL + 1PLB +-8.508
1.1TLB - 1.1BTB
40.987 0.025 -308.647 37.442
Min Fz 32137 1004 1DL31167
+ 1SIDL +2224.51
1CL + 1PLB + 1.419
1.1TLB - 1.1BTB
-4.074 0.025 22.403 0.712
Max Mx 32122 1001 1DL31152
+ 1SIDL 1902.335
+ 1CL + 1PLA + -1.26
1.1TLA + 1.1BTA
28.81 0.11 -164.899 -45.925
Min Mx 32122 1002 1DL31152
+ 1SIDL 1918.704
+ 1CL + 1PLA + -0.33
1.1TLA - 1.1BTA
30.32 -0.098 -167.023 53.41
Max My 32132 1004 1DL31163
+ 1SIDL +2224.51
1CL + 1PLB + 4.317
1.1TLB - 1.1BTB
1.762 0.025 31.369 12.584
Min My 32139 1004 1DL31151
+ 1SIDL +2224.51
1CL + 1PLB +-8.508
1.1TLB - 1.1BTB
40.987 0.025 -308.647 37.442
Max Mz 32122 1006 1DL31152
+ 1SIDL 2181.412
+ 1CL + 1PLA + 0.232
1PLB + 1.1TLA
32.933
+ 1.1TLB
-0.077
- 1.1BTA-185.467
- 1.1BTB 103.2
Min Mz 32122 1005 1DL31152
+ 1SIDL 2164.737
+ 1CL + 1PLA +-1.634
1PLB + 1.1TLA
31.39
+ 1.1TLB0.083
+ 1.1BTA-183.314
+ 1.1BTB -96.222

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32091 3078 1DL31121
+ 1SIDL 4610.377
+ 0.3CL + 0.3PLB
26.067
+ 0.3TLB255.441
- 0.3BTB3.156
- 0.3SLX - 0.3SLY
31.199- 1SLZ222.902
- 1.1NLB
Min Fx 32122 1015 1DL31153
+ 1SIDL-1178.668
+ 0.3SLX + 0.3SLY
-3.927
+ 1SLZ-248.233 -3.458 -230.224 -237.806
Max Fy 32108 1152 1DL31119
+ 1SIDL 2599.756
- 1COL(-X)-MLC383.153 7.408 -1.1 -62.846 447.225
Min Fy 32108 1086 1DL31119
+ 1SIDL 2350.206
+ 0.3CL + 0.3PLA
-268.435
+ 0.3PLB
-160.011
+ 0.3TLA +-1.766
0.3TLB - 0.3BTA
-566.889 - 0.3BTB
-120.112
- 1SLX - 0.3SLY - 0.3
Max Fz 32139 3071 1DL31151
+ 1SIDL 4597.107
+ 0.3CL + 0.3PLB
36.377
+ 0.3TLB493.933
+ 0.3BTB3.255
+ 0.3SLX1349.806
+ 0.3SLY + 1SLZ
173.59
+ 1.1NLB
Min Fz 32108 1015 1DL31138
+ 1SIDL +988.731
0.3SLX + 0.3SLY
-84.344
+ 1SLZ-452.529 -3.042 -1042.474 -97.041
Max Mx 32122 3047 1DL31152
+ 1SIDL + 0.3CL
4470.8
+ 0.3PLA
3.008
+ 0.3TLA288.413
+ 0.3BTA 3.577
+ 0.3SLX255.436
+ 0.3SLY + 1SLZ
231.963
+ 1.1NLA
Min Mx 32122 3054 1DL31152
+ 1SIDL-1069.253
+ 0.3CL + 0.3PLA
-3.942
+ 0.3TLA -243.45
- 0.3BTA-3.619
- 0.3SLX-531.543
- 0.3SLY - 1SLZ
-226.483
- 1.1NLA
Max My 32108 1015 1DL31119
+ 1SIDL 4323.334
+ 0.3SLX + 0.3SLY
79.999
+ 1SLZ 445.172 3 1434.484 42.368
Min My 32139 2078 1DL31151
+ 1SIDL +-987.973
0.3CL + 0.3PLB
-38.836
+ 0.3TLB
-439.611
- 0.3BTB -3.45
- 0.3SLX-1803.977
- 0.3SLY - 1SLZ
-174.292
- 1.1LLB
Max Mz 32140 1086 1DL31152
+ 1SIDL 2730.297
+ 0.3CL + 0.3PLA27.36
+ 0.3PLB139.882
+ 0.3TLA + 0.3TLB
1.79 - 0.3BTA
-1.915
- 0.3BTB
805.854
- 1SLX - 0.3SLY - 0.3
Min Mz 32095 1152 1DL31125
+ 1SIDL 2599.756
- 1COL(-X)-MLC3.399 5.081 -1.1 -10.707 -823.932
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghav
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32122 3171 1.0DL
31152
+ 1.0SIDL
5462.105
+ 0.3CL + 0.3PLB
3.907 + 375.781
0.3TLB + 0.3BTB
4.251+ 0.3SLX
362.559
+ 0.3SLY305.462
+ 1SLZ + 1.54NLB
Min Fx 32122 2115 1.0DL
31153
+ 1.0SIDL
-2037.228
+ 0.3SLX + -4.799
0.3SLY + 1SLZ
-330.207 -4.511 -267.619 -311.866
Max Fy 32108 1452 1.15DL
31119
+ 1.2SIDL
2970.375
- 1.5COL(-X)-MLC
575.493 12.405 -1.643 -84.685 672.489
Min Fy 32108 2186 1.0DL
31119
+ 1.0SIDL
2173.54
+ 0.3CL -347.426
+ 0.3PLA + 0.3PLB
-208.033
+ 0.3TLA
-2.308
+ 0.3TLB-724.657
- 0.3BTA - -146.965
0.3BTB - 1SLX - 0.3SLY
Max Fz 32139 3171 1.0DL
31151
+ 1.0SIDL
5462.105
+ 0.3CL + 0.3PLB
47.296 + 637.733
0.3TLB + 0.3BTB
4.251+ 0.3SLX
1829.963
+ 0.3SLY229.814
+ 1SLZ + 1.54NLB
Min Fz 32108 3147 1.0DL
31138
+ 1.0SIDL
646.019
+ 0.3CL -106.175
+ 0.3PLA + -590.878
0.3TLA + 0.3BTA
-3.772+ 0.3SLX
-1354.304
+ 0.3SLY
-131.155
+ 1SLZ + 1.54NLA
Max Mx 32122 3147 1.0DL
31152
+ 1.0SIDL
5322.925
+ 0.3CL + 0.3PLA
3.88 + 0.3TLA
369.797+ 0.3BTA
4.687+ 0.3SLX
375.622
+ 0.3SLY306.699
+ 1SLZ + 1.54NLA
Min Mx 32122 3154 1.0DL
31152
+ 1.0SIDL
-1921.378
+ 0.3CL + 0.3PLA
-4.814 + -324.834
0.3TLA - 0.3BTA-4.73
- 0.3SLX
-651.73
- 0.3SLY-301.219
- 1SLZ - 1.54NLA
Max My 32108 2115 1.0DL
31119
+ 1.0SIDL
4834.906
+ 0.3SLX 105.055
+ 0.3SLY + 1SLZ
582.625 3.927 1881.248 53.346
Min My 32139 2378 1.0DL
31151
+ 1.0SIDL
-1843.483
+ 0.3CL +-49.729
0.3PLB + -582.081
0.3TLB - 0.3BTB
-4.507- 0.3SLX
-2288.65
- 0.3SLY -230.639
- 1SLZ - 1.54LLB
Max Mz 32140 2186 1.0DL
31152
+ 1.0SIDL
3021.488
+ 0.3CL + 0.3PLA
35.95 + 0.3PLB
174.842
+ 0.3TLA2.353
+ 0.3TLB -40.548
0.3BTA -1045.055
0.3BTB - 1SLX - 0.3SLY
Min Mz 32095 1452 1.15DL
31125
+ 1.2SIDL
2970.375
- 1.5COL(-X)-MLC
5.176 6.606 -1.643 -7.829 -1237.167

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 36 16
Bundled
2nd Layer 36 16

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -1843 2300 3339 0.689 OK
Minima 5462 474.1 4056 0.117 OK
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghav
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 99.77 OK
Minima -259.4 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 4.741 OK 29.97 OK
Minima -0.2267 OK 3.061 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghav
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 18.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32106 1005 1DL31135
+ 1SIDL 3587.408
+ 1CL + 1PLA +-3.845
1PLB + 1.1TLA
-0.002
+ 1.1TLB
-0.017
+ 1.1BTA +3.331
1.1BTB -6.024
Min Fx 32137 1001 1DL31167
+ 1SIDL 1902.335
+ 1CL + 1PLA +-0.851
1.1TLA + -3.035
1.1BTA 0.11 18.087 0.39
Max Fy 32106 1006 1DL31135
+ 1SIDL 3576.768
+ 1CL + 1PLA + 4.913
1PLB + 1.1TLA
-0.323
+ 1.1TLB0.048
- 1.1BTA - 1.1BTB
4.312 8.919
Min Fy 32106 1005 1DL31135
+ 1SIDL 3587.408
+ 1CL + 1PLA +-3.845
1PLB + 1.1TLA
-0.002
+ 1.1TLB
-0.017
+ 1.1BTA +3.331
1.1BTB -6.024
Max Fz 32150 1004 1DL31179
+ 1SIDL +2224.51
1CL + 1PLB +-0.264
1.1TLB - 1.1BTB
0.19 0.025 -0.36 -0.407
Min Fz 32137 1004 1DL31167
+ 1SIDL +2224.51
1CL + 1PLB + 1.419
1.1TLB - 1.1BTB
-4.074 0.025 22.403 0.712
Max Mx 32137 1001 1DL31167
+ 1SIDL 1902.335
+ 1CL + 1PLA +-0.851
1.1TLA + -3.035
1.1BTA 0.11 18.087 0.39
Min Mx 32137 1002 1DL31167
+ 1SIDL 1918.704
+ 1CL + 1PLA + 1.44
1.1TLA - 1.1BTA
-3.36 -0.098 19.103 0.78
Max My 32137 1004 1DL31167
+ 1SIDL +2224.51
1CL + 1PLB + 1.419
1.1TLB - 1.1BTB
-4.074 0.025 22.403 0.712
Min My 32148 1004 1DL31178
+ 1SIDL +2224.51
1CL + 1PLB +-0.433
1.1TLB - 1.1BTB
-0.236 0.025 -0.417 -0.77
Max Mz 32106 1006 1DL31135
+ 1SIDL 3576.768
+ 1CL + 1PLA + 4.913
1PLB + 1.1TLA
-0.323
+ 1.1TLB0.048
- 1.1BTA - 1.1BTB
4.312 8.919
Min Mz 32106 1005 1DL31135
+ 1SIDL 3587.408
+ 1CL + 1PLA +-3.845
1PLB + 1.1TLA
-0.002
+ 1.1TLB
-0.017
+ 1.1BTA +3.331
1.1BTB -6.024

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32106 3078 1DL31136
+ 1SIDL 4610.377
+ 0.3CL + 0.3PLB
12.551
+ 0.3TLB55.99
- 0.3BTB3.156
- 0.3SLX -116.876
0.3SLY - 1SLZ11.092
- 1.1NLB
Min Fx 32137 1015 1DL31168
+ 1SIDL-1178.668
+ 0.3SLX + 0.3SLY
-5.889
+ 1SLZ -58.846 -3.458 -112.28 -4.563
Max Fy 32106 1086 1DL31136
+ 1SIDL 3513.628
+ 0.3CL + 0.3PLA37.98
+ 0.3PLB19.978
+ 0.3TLA + 0.3TLB
1.766 - 0.3BTA
42.962- 0.3BTB
31.488
- 1SLX - 0.3SLY - 0.3
Min Fy 32106 1152 1DL31135
+ 1SIDL 2599.756
- 1COL(-X)-MLC-51.845 -0.696 -1.1 4.323 -114.831
Max Fz 32106 3047 1DL31135
+ 1SIDL 4488.405
+ 0.3CL + 0.3PLA
11.375
+ 0.3TLA56.133
+ 0.3BTA 3.147
+ 0.3SLX171.274
+ 0.3SLY + 1SLZ
21.569
+ 1.1NLA
Min Fz 32137 3071 1DL31168
+ 1SIDL +-979.587
0.3CL + 0.3PLB
-6.176
+ 0.3TLB -59.871
+ 0.3BTB-3.597
+ 0.3SLX-109.249
+ 0.3SLY + 1SLZ
-4.252
+ 1.1NLB
Max Mx 32137 3047 1DL31167
+ 1SIDL + 0.3CL
4470.8
+ 0.3PLA
5.913
+ 0.3TLA55.418
+ 0.3BTA 3.577
+ 0.3SLX192.706
+ 0.3SLY + 1SLZ
3.335
+ 1.1NLA
Min Mx 32137 3054 1DL31167
+ 1SIDL-1069.253
+ 0.3CL + 0.3PLA-5.54
+ 0.3TLA -59.678
- 0.3BTA-3.619
- 0.3SLX-164.671
- 0.3SLY - 1SLZ-2.637
- 1.1NLA
Max My 32137 3071 1DL31167
+ 1SIDL 4597.107
+ 0.3CL + 0.3PLB5.883
+ 0.3TLB 54.503
+ 0.3BTB3.255
+ 0.3SLX195.888
+ 0.3SLY + 1SLZ3.307
+ 1.1NLB
Min My 32106 1022 1DL31135
+ 1SIDL - 988.731
0.3SLX - 0.3SLY
-11.294
- 1SLZ -54.762 -3.042 -170.784 -20.813
Max Mz 32106 1007 1DL31135
+ 1SIDL 3237.744
+ 1SLX + 0.3SLY36.709
+ 0.3SLZ 20.27 1.745 60.941 66.968
Min Mz 32106 1152 1DL31135
+ 1SIDL 2599.756
- 1COL(-X)-MLC-51.845 -0.696 -1.1 4.323 -114.831
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghav
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32137 3171 1.0DL
31167
+ 1.0SIDL
5462.105
+ 0.3CL + 0.3PLB
7.724 + 0.3TLB
71.904+ 0.3BTB
4.251+ 0.3SLX
251.371
+ 0.3SLY + 4.115
1SLZ + 1.54NLB
Min Fx 32137 2115 1.0DL
31168
+ 1.0SIDL
-2037.228
+ 0.3SLX + -7.734
0.3SLY + 1SLZ
-76.374 -4.511 -149.838 -5.945
Max Fy 32106 2186 1.0DL
31136
+ 1.0SIDL
3690.294
+ 0.3CL + 0.3PLA
49.174 + 0.3PLB
25.902
+ 0.3TLA2.308
+ 0.3TLB -55.377
0.3BTA - 0.3BTB
40.552- 1SLX - 0.3SLY
Min Fy 32106 1452 1.15DL
31135
+ 1.2SIDL
2970.375
- 1.5COL(-X)-MLC
-77.867 -1.282 -1.643 6.442 -172.505
Max Fz 32106 3147 1.0DL
31135
+ 1.0SIDL
5003.766
+ 0.3CL + 0.3PLA
14.92 + 0.3TLA
73.238
+ 0.3BTA
4.125+ 0.3SLX
223.203
+ 0.3SLY 28.089
+ 1SLZ + 1.54NLA
Min Fz 32137 3171 1.0DL
31168
+ 1.0SIDL
-1831.709
+ 0.3CL + 0.3PLB
-8.025 + 0.3TLB
-77.526+ 0.3BTB
-4.707+ 0.3SLX
-146.536
+ 0.3SLY +-5.632
1SLZ + 1.54NLB
Max Mx 32137 3147 1.0DL
31167
+ 1.0SIDL
5322.925
+ 0.3CL + 0.3PLA
7.762 + 0.3TLA
73.073
+ 0.3BTA
4.687+ 0.3SLX
247.395
+ 0.3SLY +4.146
1SLZ + 1.54NLA
Min Mx 32137 3154 1.0DL
31167
+ 1.0SIDL
-1921.378
+ 0.3CL + 0.3PLA
-7.389 + 0.3TLA
-77.333
- 0.3BTA
-4.73
- 0.3SLX
-219.36
- 0.3SLY - 1SLZ
-3.448
- 1.54NLA
Max My 32137 3171 1.0DL
31167
+ 1.0SIDL
5462.105
+ 0.3CL + 0.3PLB
7.724 + 0.3TLB
71.904+ 0.3BTB
4.251+ 0.3SLX
251.371
+ 0.3SLY + 4.115
1SLZ + 1.54NLB
Min My 32106 2122 1.0DL
31135
+ 1.0SIDL477.16
- 0.3SLX --14.831
0.3SLY - 1SLZ
-71.744 -3.97 -223.088 -27.32
Max Mz 32106 2107 1.0DL
31135
+ 1.0SIDL
3414.41
+1SLX + 0.3SLY
47.904
+ 0.3SLZ26.194 2.287 79.279 87.186
Min Mz 32106 1452 1.15DL
31135
+ 1.2SIDL
2970.375
- 1.5COL(-X)-MLC
-77.867 -1.282 -1.643 6.442 -172.505

ODE MDE
Maximum Tension Force (kN) -1178.67 -2037.23
Skin Friction (kN) 1724.67
Final Axial Load (kN) 0.00 -312.56

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -196.7 219.4 442.4 0.496 OK
Minima 3690 68.64 1470 0.047 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghav
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 50.86 OK
Minima -8.874 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 4.541 OK 32.24 OK
Minima 2.183 OK 15.95 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.756 m
Hence de = 0.741 m and dv = 0.667 m
Horizontal resultant shear force at the section, Vu = 639 kN
Corresponding axial compressive force, N = 5462 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 32572 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0163 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 2.443 %
Horizontal shear force, Vu = 639 kN
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghav
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 959.35 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.995 Mpa
= 995 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.931
Allowable shear stress in concrete, s vc = 925.923 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.35
Modified shear strength of concrete (n s vc ) = 1247.89 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = -192.33 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 266.63 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghava
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR C39


Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghava
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR C39

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 2
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32162 1003 1DL31198
+ 1SIDL 3490.837
+ 1CL + 1PLB +21.881
1.1TLB + -32.33
1.1BTB -0.068 188.782 11.253
Min Fx 32193 1002 1DL31229
+ 1SIDL 1798.021
+ 1CL + 1PLA +-5.411
1.1TLA - -58.166
1.1BTA -0.014 396.38 40.529
Max Fy 32162 1005 1DL24889
+ 1SIDL 3404.799
+ 1CL + 1PLA +39.583
1PLB + 1.1TLA
-38.548
+ 1.1TLB0.012
+ 1.1BTA239.677
+ 1.1BTB 44.685
Min Fy 32162 1006 1DL24889
+ 1SIDL 3415.452
+ 1CL + 1PLA -31.094
+ 1PLB + 1.1TLA
-35.932
+ 1.1TLB
-0.059
- 1.1BTA229.582
- 1.1BTB -9.302
Max Fz 32208 1005 1DL31245
+ 1SIDL 2052.052
+ 1CL + 1PLA +-3.281
1PLB + 1.1TLA
7.134
+ 1.1TLB-0.09
+ 1.1BTA-39.545
+ 1.1BTB -3.41
Min Fz 32193 1005 1DL31229
+ 1SIDL 2052.051
+ 1CL + 1PLA +15.906
1PLB + 1.1TLA
-67.616
+ 1.1TLB-0.09
+ 1.1BTA464.715
+ 1.1BTB -64.206
Max Mx 32162 1001 1DL24889
+ 1SIDL 2906.292
+ 1CL + 1PLA +21.755
1.1TLA + -35.467
1.1BTA 0.103 211.44 30.859
Min Mx 32193 1003 1DL31229
+ 1SIDL 2041.957
+ 1CL + 1PLB + 8.792
1.1TLB + 1.1BTB
-61.6 -0.12 444.479 -29.398
Max My 32193 1005 1DL31229
+ 1SIDL 2052.051
+ 1CL + 1PLA +15.906
1PLB + 1.1TLA
-67.616
+ 1.1TLB-0.09
+ 1.1BTA464.715
+ 1.1BTB -64.206
Min My 32203 1005 1DL31241
+ 1SIDL 2052.052
+ 1CL + 1PLA +-8.347
1PLB + 1.1TLA
-2.481
+ 1.1TLB-0.09
+ 1.1BTA-57.245
+ 1.1BTB -27.291
Max Mz 32194 1006 1DL31231
+ 1SIDL 2037.594
+ 1CL + 1PLA + 2.954
1PLB + 1.1TLA
-49.068
+ 1.1TLB0.025
- 1.1BTA218.662
- 1.1BTB 100.746
Min Mz 32194 1005 1DL31231
+ 1SIDL 2052.052
+ 1CL + 1PLA +-1.321
1PLB + 1.1TLA
-50.497
+ 1.1TLB-0.09
+ 1.1BTA220.667
+ 1.1BTB -100.159

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32163 3071 1DL31199
+ 1SIDL 6085.896
+ 0.3CL + 0.3PLB
32.053
+ 0.3TLB234.448
+ 0.3BTB +3.41
0.3SLX383.738
+ 0.3SLY + 1SLZ
167.996
+ 1.1NLB
Min Fx 32162 1022 1DL24889
+ 1SIDL --535.647
0.3SLX - 0.3SLY
-90.372
- 1SLZ -522.194 -3.581 -1713.979 -94.476
Max Fy 32162 1152 1DL24889
+ 1SIDL 2735.111
- 1COL(-X)-MLC448.415 -17.485 -0.605 137.567 930.915
Min Fy 32162 1086 1DL24889
+ 1SIDL 1798.494
+ 0.3CL + 0.3PLA
-304.219
+ 0.3PLB
-200.703
+ 0.3TLA +-1.936
0.3TLB - 0.3BTA
-461.77- 0.3BTB
-319.027
- 1SLX - 0.3SLY - 0.3
Max Fz 32162 3071 1DL24889
+ 1SIDL 6085.896
+ 0.3CL + 0.3PLB
101.836
+ 0.3TLB465.511
+ 0.3BTB +3.41
0.3SLX2077.889
+ 0.3SLY + 1SLZ
125.594
+ 1.1NLB
Min Fz 32193 3078 1DL31229
+ 1SIDL +-252.163
0.3CL + 0.3PLB
-38.167
+ 0.3TLB
-556.037
- 0.3BTB-3.349
- 0.3SLX-1551.879
- 0.3SLY - 1SLZ
-149.523
- 1.1NLB
Max Mx 32162 3047 1DL24889
+ 1SIDL 5883.227
+ 0.3CL + 0.3PLA
101.638
+ 0.3TLA460.048
+ 0.3BTA 3.654
+ 0.3SLX 2093.196
+ 0.3SLY + 1SLZ
125.446
+ 1.1NLA
Min Mx 32162 3071 1DL31198
+ 1SIDL +-267.976
0.3CL + 0.3PLB
-85.149
+ 0.3TLB
-520.983
+ 0.3BTB-3.688
+ 0.3SLX
-1292.352
+ 0.3SLY + 1SLZ
-29.657
+ 1.1NLB
Max My 32193 1095 1DL31229
+ 1SIDL 3742.103
+ 0.3CL + 0.3PLA
42.827
+ 0.3PLB443.089
+ 0.3TLA + 0.3TLB
3.378 + 2327.898
0.3BTA + 0.3BTB149.511
+ 0.3SLX + 0.3SLY
Min My 32162 3054 1DL24889
+ 1SIDL +-435.099
0.3CL + 0.3PLA
-94.787
+ 0.3TLA
-521.018
- 0.3BTA-3.684
- 0.3SLX -1716.597
- 0.3SLY - 1SLZ
-96.775
- 1.1NLA
Max Mz 32162 1152 1DL24889
+ 1SIDL 2735.111
- 1COL(-X)-MLC448.415 -17.485 -0.605 137.567 930.915
Min Mz 32167 1152 1DL31204
+ 1SIDL 2735.111
- 1COL(-X)-MLC9.219 -9.556 -0.605 12.706 -828.331
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghava
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32175 3171 1.0DL
31211
+ 1.0SIDL
7069.718
+ 0.3CL + 0.3PLB
25.458 + 103.024
0.3TLB + 0.3BTB
4.459+ 0.3SLX
487.531
+ 0.3SLY +92.026
1SLZ + 1.54NLB
Min Fx 32175 2115 1.0DL
31212
+ 1.0SIDL
-1513.031
+ 0.3SLX +-27.562
0.3SLY + 1SLZ
-97.798 -4.669 -426.855 -73.641
Max Fy 32175 2186 1.0DL
31212
+ 1.0SIDL
4272.848
+ 0.3CL + 0.3PLA
88.554 + 0.3PLB
37.393
+ 0.3TLA2.44
+ 0.3TLB118.878
- 0.3BTA - 0.3BTB
231.659- 1SLX - 0.3SLY
Min Fy 32175 1452 1.15DL
31211
+ 1.2SIDL
3179.316
- 1.5COL(-X)-MLC
-133.045 0.573 -0.896 -12.054 -537.842
Max Fz 32206 3147 1.0DL
31243
+ 1.0SIDL
4299.612
+ 0.3CL + 0.3PLA
16.097 + 0.3TLA
106.266+ 0.3BTA
4.594+ 0.3SLX
470.056
+ 0.3SLY 38.838
+ 1SLZ + 1.54NLA
Min Fz 32175 3171 1.0DL
31212
+ 1.0SIDL
-1238.925
+ 0.3CL +-28.741
0.3PLB + 0.3TLB
-98.312+ 0.3BTB
-4.816+ 0.3SLX
-425.607
+ 0.3SLY-76.714
+ 1SLZ + 1.54NLB
Max Mx 32175 3147 1.0DL
31211
+ 1.0SIDL
6854.176
+ 0.3CL + 0.3PLA
25.519 + 0.3TLA
104.313+ 0.3BTA
4.782+ 0.3SLX
481.674
+ 0.3SLY +92.24
1SLZ + 1.54NLA
Min Mx 32175 3171 1.0DL
31212
+ 1.0SIDL
-1238.925
+ 0.3CL +-28.741
0.3PLB + 0.3TLB
-98.312+ 0.3BTB
-4.816+ 0.3SLX
-425.607
+ 0.3SLY-76.714
+ 1SLZ + 1.54NLB
Max My 32175 3171 1.0DL
31211
+ 1.0SIDL
7069.718
+ 0.3CL + 0.3PLB
25.458 + 103.024
0.3TLB + 0.3BTB
4.459+ 0.3SLX
487.531
+ 0.3SLY +92.026
1SLZ + 1.54NLB
Min My 32206 3178 1.0DL
31243
+ 1.0SIDL
-863.876
+ 0.3CL +-16.518
0.3PLB + 0.3TLB
-96.208- 0.3BTB
-4.363- 0.3SLX
-558.324
- 0.3SLY - -40.927
1SLZ - 1.54NLB
Max Mz 32175 2107 1.0DL
31211
+ 1.0SIDL
4042.58
+1SLX + 0.3SLY
86.394
+ 0.3SLZ37.202 2.446 151.862 312.605
Min Mz 32175 1452 1.15DL
31211
+ 1.2SIDL
3179.316
- 1.5COL(-X)-MLC
-133.045 0.573 -0.896 -12.054 -537.842

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 32 16
Bundled
2nd Layer 32 16

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -863.9 559.8 2856 0.196 OK
Minima 4273 260.4 3480 0.075 OK
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghava
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 162.7 OK
Minima -284.4 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 6.095 OK 36.55 OK
Minima -1.745 OK -5.19 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.020 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghava
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 18.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32178 1003 1DL31214
+ 1SIDL 3490.837
+ 1CL + 1PLB +-2.665
1.1TLB + 1.1BTB
3.388 -0.068 -15.31 -5.329
Min Fx 32209 1002 1DL31246
+ 1SIDL 1798.022
+ 1CL + 1PLA + 0.813
1.1TLA - 1.1BTA
6.082 -0.014 -27.735 -0.763
Max Fy 32178 1006 1DL31214
+ 1SIDL 3415.453
+ 1CL + 1PLA + 3.898
1PLB + 1.1TLA
3.806
+ 1.1TLB
-0.059
- 1.1BTA -16.473
- 1.1BTB 6.075
Min Fy 32178 1005 1DL31214
+ 1SIDL + 1CL
3404.8
+ 1PLA +-4.858
1PLB + 1.1TLA
4.104
+ 1.1TLB0.012
+ 1.1BTA-17.386
+ 1.1BTB -9.152
Max Fz 32209 1005 1DL31246
+ 1SIDL 2052.052
+ 1CL + 1PLA +-2.214
1PLB + 1.1TLA
7.057
+ 1.1TLB-0.09
+ 1.1BTA-32.411
+ 1.1BTB -0.129
Min Fz 32222 1005 1DL31258
+ 1SIDL 2052.052
+ 1CL + 1PLA + 1PLB
0.44+ 1.1TLA
-0.508
+ 1.1TLB-0.09
+ 1.1BTA +0.878
1.1BTB 0.673
Max Mx 32178 1001 1DL31214
+ 1SIDL 2906.292
+ 1CL + 1PLA + -2.65
1.1TLA + 1.1BTA
3.805 0.103 -15.605 -5.302
Min Mx 32209 1003 1DL31246
+ 1SIDL 2041.958
+ 1CL + 1PLB +-1.205
1.1TLB + 1.1BTB
6.362 -0.12 -30.439 -0.334
Max My 32219 1005 1DL31256
+ 1SIDL 2052.052
+ 1CL + 1PLA + 0.809
1PLB + 1.1TLA
0.577
+ 1.1TLB-0.09
+ 1.1BTA +1.343
1.1BTB 2.035
Min My 32209 1005 1DL31246
+ 1SIDL 2052.052
+ 1CL + 1PLA +-2.214
1PLB + 1.1TLA
7.057
+ 1.1TLB-0.09
+ 1.1BTA-32.411
+ 1.1BTB -0.129
Max Mz 32178 1006 1DL31214
+ 1SIDL 3415.453
+ 1CL + 1PLA + 3.898
1PLB + 1.1TLA
3.806
+ 1.1TLB
-0.059
- 1.1BTA -16.473
- 1.1BTB 6.075
Min Mz 32178 1005 1DL31214
+ 1SIDL + 1CL
3404.8
+ 1PLA +-4.858
1PLB + 1.1TLA
4.104
+ 1.1TLB0.012
+ 1.1BTA-17.386
+ 1.1BTB -9.152

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32178 3071 1DL31214
+ 1SIDL 6085.896
+ 0.3CL + 0.3PLB10.49
+ 0.3TLB 59.178
+ 0.3BTB +3.41
0.3SLX158.854
+ 0.3SLY + 1SLZ
19.205
+ 1.1NLB
Min Fx 32178 1015 1DL31215
+ 1SIDL +-535.646
0.3SLX + 0.3SLY
-11.838
+ 1SLZ -53.18 -3.581 -125.578 -10.879
Max Fy 32178 1086 1DL31215
+ 1SIDL 3944.621
+ 0.3CL + 0.3PLA
37.464
+ 0.3PLB22.628
+ 0.3TLA + 0.3TLB
1.861 - 0.3BTA
29.186- 0.3BTB
31.482
- 1SLX - 0.3SLY - 0.3
Min Fy 32178 1152 1DL31214
+ 1SIDL 2735.111
- 1COL(-X)-MLC-53.673 1.769 -0.605 -9.133 -122.028
Max Fz 32209 3078 1DL31247
+ 1SIDL +3748.35
0.3CL + 0.3PLB
5.365
+ 0.3TLB 62.797
- 0.3BTB3.509
- 0.3SLX - 0.3SLY
96.826- 1SLZ -4.984
1.1NLB
Min Fz 32178 3071 1DL31215
+ 1SIDL +-267.976
0.3CL + 0.3PLB
-12.482
+ 0.3TLB -53.341
+ 0.3BTB-3.688
+ 0.3SLX-125.635
+ 0.3SLY + 1SLZ
-11.407
+ 1.1NLB
Max Mx 32178 3047 1DL31214
+ 1SIDL 5883.228
+ 0.3CL + 0.3PLA
10.514
+ 0.3TLA59.819
+ 0.3BTA 3.654
+ 0.3SLX157.196
+ 0.3SLY + 1SLZ
19.247
+ 1.1NLA
Min Mx 32178 3071 1DL31215
+ 1SIDL +-267.976
0.3CL + 0.3PLB
-12.482
+ 0.3TLB -53.341
+ 0.3BTB-3.688
+ 0.3SLX-125.635
+ 0.3SLY + 1SLZ
-11.407
+ 1.1NLB
Max My 32178 3071 1DL31214
+ 1SIDL 6085.896
+ 0.3CL + 0.3PLB10.49
+ 0.3TLB 59.178
+ 0.3BTB +3.41
0.3SLX158.854
+ 0.3SLY + 1SLZ
19.205
+ 1.1NLB
Min My 32209 3078 1DL31246
+ 1SIDL +-252.162
0.3CL + 0.3PLB
-5.121
+ 0.3TLB -50.938
- 0.3BTB-3.349
- 0.3SLX -202.144
- 0.3SLY - 1SLZ-2.113
- 1.1NLB
Max Mz 32178 1007 1DL31214
+ 1SIDL 3714.353
+ 1SLX + 0.3SLY36.308
+ 0.3SLZ 22.394 1.866 46.252 66.779
Min Mz 32178 1152 1DL31214
+ 1SIDL 2735.111
- 1COL(-X)-MLC-53.673 1.769 -0.605 -9.133 -122.028
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghava
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32178 3071 1DL31214
+ 1SIDL 7063.282
+ 0.3CL + 0.3PLB
14.016
+ 0.3TLB76.45
+ 0.3BTB4.498
+ 0.3SLX211.564
+ 0.3SLY + 1SLZ
25.761
+ 1.1NLB
Min Fx 32178 1015 1DL31215
+ 1SIDL-1513.031
+ 0.3SLX + 0.3SLY
-15.365
+ 1SLZ -70.452 -4.669 -161.015 -13.922
Max Fy 32178 1086 1DL31215
+ 1SIDL 4272.848
+ 0.3CL + 0.3PLA
48.748
+ 0.3PLB28.504
+ 0.3TLA + 0.3TLB
2.44 - 0.3BTA
41.321- 0.3BTB
41.033
- 1SLX - 0.3SLY - 0.3
Min Fy 32178 1152 1DL31214
+ 1SIDL 2735.111
- 1COL(-X)-MLC-53.673 1.769 -0.605 -9.133 -122.028
Max Fz 32209 3078 1DL31247
+ 1SIDL +4364.05
0.3CL + 0.3PLB
6.976
+ 0.3TLB 80.258
- 0.3BTB -4.56
0.3SLX -133.039
0.3SLY - 1SLZ -6.693
1.1NLB
Min Fz 32178 3071 1DL31215
+ 1SIDL-1245.361
+ 0.3CL + 0.3PLB
-16.009
+ 0.3TLB -70.614
+ 0.3BTB-4.776
+ 0.3SLX-161.072
+ 0.3SLY + 1SLZ
-14.45
+ 1.1NLB
Max Mx 32178 3047 1DL31214
+ 1SIDL 6860.613
+ 0.3CL + 0.3PLA
14.041
+ 0.3TLA77.092
+ 0.3BTA 4.742
+ 0.3SLX209.906
+ 0.3SLY + 1SLZ
25.803
+ 1.1NLA
Min Mx 32178 3071 1DL31215
+ 1SIDL-1245.361
+ 0.3CL + 0.3PLB
-16.009
+ 0.3TLB -70.614
+ 0.3BTB-4.776
+ 0.3SLX-161.072
+ 0.3SLY + 1SLZ
-14.45
+ 1.1NLB
Max My 32178 3071 1DL31214
+ 1SIDL 7063.282
+ 0.3CL + 0.3PLB
14.016
+ 0.3TLB76.45
+ 0.3BTB4.498
+ 0.3SLX211.564
+ 0.3SLY + 1SLZ
25.761
+ 1.1NLB
Min My 32209 3078 1DL31246
+ 1SIDL +-867.863
0.3CL + 0.3PLB
-6.732
+ 0.3TLB -68.398
- 0.3BTB - -4.4
0.3SLX -255.818
- 0.3SLY - 1SLZ --2.49
1.1NLB
Max Mz 32178 1007 1DL31214
+ 1SIDL +4042.58
1SLX + 0.3SLY
47.591
+ 0.3SLZ 28.27 2.446 64.263 87.579
Min Mz 32178 1152 1DL31214
+ 1SIDL 2735.111
- 1COL(-X)-MLC-53.673 1.769 -0.605 -9.133 -122.028

ODE MDE
Maximum Tension Force (kN) -535.65 -1513.03
Skin Friction (kN) 1724.67
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 255.8 515 0.497 OK
Minima 4273 58.24 1556 0.037 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghava
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 62.23 OK
Minima -71.47 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 4.497 OK 31.8 OK
Minima 1.957 OK 14.52 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.758 m
Hence de = 0.741 m and dv = 0.667 m
Horizontal resultant shear force at the section, Vu = 133 kN
Corresponding axial compressive force, N = 3179 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 25736 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0129 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 1.929 %
Horizontal shear force, Vu = 133 kN
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared Raghava
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 199.42 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.920 Mpa
= 920 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 855.570 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.20
Modified shear strength of concrete (n s vc ) = 1028.74 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = -553.28 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 266.86 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C40


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C40

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.2 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26231 1003 1DL25169
+ 1SIDL 5237.813
+ 1CL + 1PLB + 7.299
1.1TLB + -8.739
1.1BTB 0.203 15.207 -58.351
Min Fx 26231 1002 1DL25169
+ 1SIDL 4709.022
+ 1CL + 1PLA +-7.549
1.1TLA - 1.1BTA
-8.26 0.137 -17.287 63.447
Max Fy 26260 1005 1DL25168
+ 1SIDL 5218.681
+ 1CL + 1PLA +36.479
1PLB + 1.1TLA
-17.963
+ 1.1TLB0.428
+ 1.1BTA +43.84
1.1BTB -34.256
Min Fy 26260 1006 1DL25168
+ 1SIDL 5212.761
+ 1CL + 1PLA + 1PLB
-36.9+ 1.1TLA
-16.852
+ 1.1TLB0.085
- 1.1BTA -46.482
1.1BTB 39.483
Max Fz 26243 1001 1DL25181
+ 1SIDL +4711.83
1CL + 1PLA +-6.751
1.1TLA + 1.1BTA
4.883 0.523 -30.067 -35.647
Min Fz 26260 1005 1DL25168
+ 1SIDL 5218.681
+ 1CL + 1PLA +36.479
1PLB + 1.1TLA
-17.963
+ 1.1TLB0.428
+ 1.1BTA +43.84
1.1BTB -34.256
Max Mx 26231 1001 1DL25169
+ 1SIDL +4711.83
1CL + 1PLA + 6.767
1.1TLA + -8.626
1.1BTA 0.523 -21.437 -58.718
Min Mx 26231 1006 1DL25169
+ 1SIDL 5212.761
+ 1CL + 1PLA +-14.32
1PLB + 1.1TLA
-9.933
+ 1.1TLB0.085
- 1.1BTA - 1.1BTB
3.257 125.497
Max My 26260 1004 1DL25168
+ 1SIDL + 1CL
5234.7
+ 1PLB -18.546
+ 1.1TLB - -13.557
1.1BTB 0.246 51.858 21.431
Min My 26237 1001 1DL25176
+ 1SIDL +4711.83
1CL + 1PLA +-2.707
1.1TLA + -0.359
1.1BTA 0.523 -48.146 -66.732
Max Mz 26234 1006 1DL25173
+ 1SIDL 5212.761
+ 1CL + 1PLA +-0.861
1PLB + 1.1TLA
-5.189
+ 1.1TLB0.085
- 1.1BTA -26.513
- 1.1BTB 154.078
Min Mz 26234 1005 1DL25173
+ 1SIDL 5218.681
+ 1CL + 1PLA + 1.207
1PLB + 1.1TLA
-5.107
+ 1.1TLB0.428
+ 1.1BTA +-32.14
1.1BTB -149.076

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26231 2078 1DL25170
+ 1SIDL +4506.04
0.3CL + 0.3PLB
37.987
+ 0.3TLB120.563
- 0.3BTB7.014
- 0.3SLX1071.922
- 0.3SLY - 1SLZ349.092
- 1.1LLB
Min Fx 26231 1015 1DL25170
+ 1SIDL 3961.779
+ 0.3SLX + 0.3SLY
-39.929
+ 1SLZ-136.163 -6.661 -1079.66 -325.955
Max Fy 26260 1079 1DL25168
+ 1SIDL 4467.273
+ 0.3CL + 0.3PLA
311.831
+ 0.3PLB89.861
+ 0.3TLA + 0.3TLB
4.178 + 0.3BTA
131.099 + 0.3BTB
227.045
+ 1SLX + 0.3SLY +
Min Fy 26260 1086 1DL25168
+ 1SIDL 4339.317
+ 0.3CL + 0.3PLA
-312.269
+ 0.3PLB -118.9
+ 0.3TLA +-3.782
0.3TLB - 0.3BTA
-55.605- 0.3BTB
-223.179
- 1SLX - 0.3SLY - 0.3
Max Fz 26260 3071 1DL25168
+ 1SIDL 4504.164
+ 0.3CL + 0.3PLB
100.847
+ 0.3TLB300.087
+ 0.3BTB7.007
+ 0.3SLX277.749
+ 0.3SLY + 1SLZ85.159
+ 1.1NLB
Min Fz 26260 3047 1DL25199
+ 1SIDL 4158.656
+ 0.3CL + 0.3PLA
-91.461
+ 0.3TLA
-327.832
+ 0.3BTA-6.554
+ 0.3SLX-527.658
+ 0.3SLY + -182.718
1SLZ + 1.1NLA
Max Mx 26231 2047 1DL25169
+ 1SIDL 4345.038
+ 0.3CL + 0.3PLA
41.736
+ 0.3TLA120.343
+ 0.3BTA 7.113
+ 0.3SLX942.058
+ 0.3SLY + 1SLZ
277.343
+ 1.1LLA
Min Mx 26231 1102 1DL25169
+ 1SIDL 4307.936
+ 0.3CL + 0.3PLA
-43.833
+ 0.3PLB
-136.845
+ 0.3TLA + 0.3TLB
-6.68 - 0.3BTA
-948.52- 0.3BTB
-256.071
- 0.3SLX - 0.3SLY - 1
Max My 26235 3071 1DL25173
+ 1SIDL 4504.164
+ 0.3CL + 0.3PLB
4.288
+ 0.3TLB6.314
+ 0.3BTB7.007
+ 0.3SLX1195.973
+ 0.3SLY + 1SLZ
351.184
+ 1.1NLB
Min My 26234 3047 1DL25173
+ 1SIDL 4158.656
+ 0.3CL + 0.3PLA + -60.3TLA
-21.582
+ 0.3BTA-6.554
+ 0.3SLX
-1244.151
+ 0.3SLY + -388.175
1SLZ + 1.1NLA
Max Mz 26234 1086 1DL25173
+ 1SIDL 4465.659
+ 0.3CL + 0.3PLA
14.571
+ 0.3PLB + 0.3TLA
2.99 + 0.3TLB
4.084 - 0.3BTA
372.135- 0.3BTB
1236.309
- 1SLX - 0.3SLY - 0.3
Min Mz 26234 1079 1DL25173
+ 1SIDL 4340.931
+ 0.3CL + 0.3PLA
-14.329
+ 0.3PLB -11.59
+ 0.3TLA +-3.688
0.3TLB + 0.3BTA
-420.951+ 0.3BTB
-1232.171
+ 1SLX + 0.3SLY +
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26231 2103 1.15DL
25169
+ 1.2SIDL
6319.412
+ 1.4CL +10.222
1.4PLB + 1.54TLB
-10.305 + 1.54BTB
0.243 21.119 -82.206
Min Fx 26231 2115 1.0DL
25170
+ 1.0SIDL
3936.961
+ 0.3SLX +-52.213
0.3SLY + 1SLZ
-175.575 -8.757 -1410.166 -427.113
Max Fy 26260 1452 1.15DL
25168
+ 1.2SIDL
4737.458
- 1.5COL(-X)-MLC
718.613 -4.793 -4.702 48.041 846.199
Min Fy 26260 2186 1.0DL
25168
+ 1.0SIDL
4322.55
+ 0.3CL -405.422
+ 0.3PLA + 0.3PLB
-150.839
+ 0.3TLA
-4.983
+ 0.3TLB-82.854
- 0.3BTA - -295.512
0.3BTB - 1SLX - 0.3SLY
Max Fz 26260 3171 1.0DL
25168
+ 1.0SIDL
4529.015
+ 0.3CL +130.435
0.3PLB + 0.3TLB
396.64+ 0.3BTB 9.1+ 0.3SLX
349.715
+ 0.3SLY112.126
+ 1SLZ + 1.54NLB
Min Fz 26260 3147 1.0DL
25199
+ 1.0SIDL
4133.804
+ 0.3CL -121.048
+ 0.3PLA + -424.385
0.3TLA + 0.3BTA
-8.647+ 0.3SLX
-694.444
+ 0.3SLY
-236.327
+ 1SLZ + 1.54NLA
Max Mx 26231 2347 1.0DL
25169
+ 1.0SIDL
4368.732
+ 0.3CL + 0.3PLA
54.015 + 0.3TLA
159.693+ 0.3BTA
9.213+ 0.3SLX
1233.605
+ 0.3SLY367.301
+ 1SLZ + 1.54LLA
Min Mx 26231 2354 1.0DL
25169
+ 1.0SIDL
4137.09
+ 0.3CL + 0.3PLA
-54.26 + -175.516
0.3TLA - 0.3BTA
-8.777
- 0.3SLX
-1243.796
- 0.3SLY --362.98
1SLZ - 1.54LLA
Max My 26235 3171 1.0DL
25173
+ 1.0SIDL
4529.015
+ 0.3CL + 0.3PLB
5.62 + 0.3TLB
9.152+ 0.3BTB 9.1+ 0.3SLX
1571.531
+ 0.3SLY465.273
+ 1SLZ + 1.54NLB
Min My 26234 3147 1.0DL
25173
+ 1.0SIDL
4133.804
+ 0.3CL + 0.3PLA
-7.886 + 0.3TLA
-26.92
+ 0.3BTA
-8.647+ 0.3SLX
-1619.709
+ 0.3SLY
-502.264
+ 1SLZ + 1.54NLA
Max Mz 26234 2186 1.0DL
25173
+ 1.0SIDL
4482.426
+ 0.3CL + 0.3PLA
19.092 + 0.3PLB5.078
+ 0.3TLA5.286
+ 0.3TLB494.222
- 0.3BTA -1604.355
0.3BTB - 1SLX - 0.3SLY
Min Mz 26237 1452 1.15DL
25176
+ 1.2SIDL
4737.458
- 1.5COL(-X)-MLC
13.458 -3.416 -4.702 5.249 -2046.854

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 16 24
2nd Layer

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 4737 2047 2495 0.820 OK
Minima 6319 84.88 2783 0.031 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 77.54 OK
Minima -40.39 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 5.385 OK 37.17 OK
Minima 3.589 OK 26.32 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 15.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26243 1003 1DL25181
+ 1SIDL 5237.813
+ 1CL + 1PLB +-6.935
1.1TLB + 1.1BTB
2.373 0.203 -19.832 -37.016
Min Fx 26243 1002 1DL25181
+ 1SIDL 4709.022
+ 1CL + 1PLA + 7.388
1.1TLA - 1.1BTA
4.45 0.137 -27.856 39.174
Max Fy 26243 1006 1DL25181
+ 1SIDL 5212.761
+ 1CL + 1PLA +14.374
1PLB + 1.1TLA
3.675
+ 1.1TLB0.085
- 1.1BTA -26.578
- 1.1BTB 75.793
Min Fy 26243 1005 1DL25181
+ 1SIDL 5218.681
+ 1CL + 1PLA -13.996
+ 1PLB + 1.1TLA
4.173
+ 1.1TLB0.428
+ 1.1BTA-29.041
+ 1.1BTB -74.335
Max Fz 26243 1001 1DL25181
+ 1SIDL +4711.83
1CL + 1PLA +-6.751
1.1TLA + 1.1BTA
4.883 0.523 -30.067 -35.647
Min Fz 28823 1001 1DL27807
+ 1SIDL +4711.83
1CL + 1PLA + 0.599
1.1TLA + -0.363
1.1BTA 0.523 0.612 0.983
Max Mx 26243 1001 1DL25181
+ 1SIDL +4711.83
1CL + 1PLA +-6.751
1.1TLA + 1.1BTA
4.883 0.523 -30.067 -35.647
Min Mx 26243 1006 1DL25181
+ 1SIDL 5212.761
+ 1CL + 1PLA +14.374
1PLB + 1.1TLA
3.675
+ 1.1TLB0.085
- 1.1BTA -26.578
- 1.1BTB 75.793
Max My 28820 1001 1DL27805
+ 1SIDL +4711.83
1CL + 1PLA + 0.163
1.1TLA + 1.1BTA
0.143 0.523 1.127 2.125
Min My 26243 1001 1DL25181
+ 1SIDL +4711.83
1CL + 1PLA +-6.751
1.1TLA + 1.1BTA
4.883 0.523 -30.067 -35.647
Max Mz 26243 1006 1DL25181
+ 1SIDL 5212.761
+ 1CL + 1PLA +14.374
1PLB + 1.1TLA
3.675
+ 1.1TLB0.085
- 1.1BTA -26.578
- 1.1BTB 75.793
Min Mz 26243 1005 1DL25181
+ 1SIDL 5218.681
+ 1CL + 1PLA -13.996
+ 1PLB + 1.1TLA
4.173
+ 1.1TLB0.428
+ 1.1BTA-29.041
+ 1.1BTB -74.335

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26243 2078 1DL25182
+ 1SIDL +4506.04
0.3CL + 0.3PLB
37.366
+ 0.3TLB117.995
- 0.3BTB7.014
- 0.3SLX -491.326
0.3SLY - 1SLZ164.63
- 1.1LLB
Min Fx 26243 1015 1DL25182
+ 1SIDL 3961.779
+ 0.3SLX + 0.3SLY
-35.126
+ 1SLZ-112.414 -6.661 -526.697 -155.39
Max Fy 26243 1086 1DL25182
+ 1SIDL 4465.659
+ 0.3CL + 0.3PLA
117.157
+ 0.3PLB41.194
+ 0.3TLA + 0.3TLB
4.084 - 0.3BTA
149.463- 0.3BTB
511.744
- 1SLX - 0.3SLY - 0.3
Min Fy 26243 1079 1DL25182
+ 1SIDL 4340.931
+ 0.3CL + 0.3PLA
-116.835
+ 0.3PLB-34.655
+ 0.3TLA +-3.688
0.3TLB + 0.3BTA
-189.295+ 0.3BTB
-510.744
+ 1SLX + 0.3SLY +
Max Fz 26243 3047 1DL25181
+ 1SIDL +4347.76
0.3CL + 0.3PLA
33.557
+ 0.3TLA119.443
+ 0.3BTA 7.108
+ 0.3SLX597.443
+ 0.3SLY + 1SLZ
181.931
+ 1.1NLA
Min Fz 26243 3071 1DL25182
+ 1SIDL +4315.06
0.3CL + 0.3PLB
-37.068
+ 0.3TLB
-113.093
+ 0.3BTB-6.655
+ 0.3SLX-524.339
+ 0.3SLY + 1SLZ
-163.782
+ 1.1NLB
Max Mx 26243 2047 1DL25181
+ 1SIDL 4345.038
+ 0.3CL + 0.3PLA33.55
+ 0.3TLA119.127
+ 0.3BTA 7.113
+ 0.3SLX +599.19
0.3SLY + 1SLZ
181.891
+ 1.1LLA
Min Mx 26243 1102 1DL25181
+ 1SIDL 4307.936
+ 0.3CL + 0.3PLA
-31.243
+ 0.3PLB
-112.193
+ 0.3TLA + 0.3TLB
-6.68 - 0.3BTA
-646.763- 0.3BTB
-169.958
- 0.3SLX - 0.3SLY - 1
Max My 26243 3071 1DL25181
+ 1SIDL 4504.164
+ 0.3CL + 0.3PLB
33.478
+ 0.3TLB117.697
+ 0.3BTB7.007
+ 0.3SLX605.794
+ 0.3SLY + 1SLZ
181.375
+ 1.1NLB
Min My 26243 3078 1DL25181
+ 1SIDL 4314.043
+ 0.3CL + 0.3PLB
-33.161
+ 0.3TLB
-112.061
- 0.3BTB-6.631
- 0.3SLX -647.533
- 0.3SLY - 1SLZ
-180.106
- 1.1NLB
Max Mz 26243 1007 1DL25181
+ 1SIDL 4119.502
+ 1SLX + 0.3SLY
113.275
+ 0.3SLZ 40.973 4.103 185.94 608.372
Min Mz 26243 1014 1DL25181
+ 1SIDL - 3993.16
1SLX - 0.3SLY
-112.98
- 0.3SLZ -35.011 -3.763 -228.252 -607.135
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26243 2103 1.15DL
25181
+ 1.2SIDL
6319.412
+ 1.4CL +-9.746
1.4PLB + 1.54TLB
2.577 + 1.54BTB
0.243 -22.468 -51.98
Min Fx 26243 2115 1.0DL
25182
+ 1.0SIDL
3936.961
+ 0.3SLX +-46.003
0.3SLY + 1SLZ
-147.985 -8.757 -683.241 -203.426
Max Fy 26243 2186 1.0DL
25182
+ 1.0SIDL
4482.426
+ 0.3CL +152.057
0.3PLA + 0.3PLB
52.88
+ 0.3TLA5.286
+ 0.3TLB201.273
- 0.3BTA - 0.3BTB
664.313- 1SLX - 0.3SLY
Min Fy 26243 1452 1.15DL
25181
+ 1.2SIDL
4737.458
- 1.5COL(-X)-MLC
-207.597 -0.514 -4.702 -3.222 -1274.861
Max Fz 26243 3147 1.0DL
25181
+ 1.0SIDL
4372.543
+ 0.3CL + 0.3PLA
44.44 + 0.3TLA
155.223+ 0.3BTA
9.206+ 0.3SLX
788.442
+ 0.3SLY240.865
+ 1SLZ + 1.54NLA
Min Fz 26243 3171 1.0DL
25182
+ 1.0SIDL
4290.276
+ 0.3CL +-47.951
0.3PLB + -148.874
0.3TLB + 0.3BTB
-8.753+ 0.3SLX
-679.978
+ 0.3SLY-211.846
+ 1SLZ + 1.54NLB
Max Mx 26243 2347 1.0DL
25181
+ 1.0SIDL
4368.732
+ 0.3CL + 0.3PLA
44.43 + 0.3TLA
154.781+ 0.3BTA
9.213+ 0.3SLX
790.887
+ 0.3SLY240.809
+ 1SLZ + 1.54LLA
Min Mx 26243 2354 1.0DL
25181
+ 1.0SIDL
4137.09
+ 0.3CL +-44.033
0.3PLA + -147.855
0.3TLA - 0.3BTA
-8.777
- 0.3SLX
-837.652
- 0.3SLY-238.887
- 1SLZ - 1.54LLA
Max My 26243 3171 1.0DL
25181
+ 1.0SIDL
4529.015
+ 0.3CL + 0.3PLB
44.351 + 153.058
0.3TLB + 0.3BTB 9.1+ 0.3SLX
799.021
+ 0.3SLY240.244
+ 1SLZ + 1.54NLB
Min My 26243 3178 1.0DL
25181
+ 1.0SIDL
4289.192
+ 0.3CL +-44.033
0.3PLB + -147.422
0.3TLB - 0.3BTB
-8.723- 0.3SLX
-840.761
- 0.3SLY -238.975
- 1SLZ - 1.54NLB
Max Mz 26243 2107 1.0DL
25181
+ 1.0SIDL
4136.269
+1SLX + 0.3SLY
148.174+ 0.3SLZ52.659 5.304 249.435 795.837
Min Mz 26243 1452 1.15DL
25181
+ 1.2SIDL
4737.458
- 1.5COL(-X)-MLC
-207.597 -0.514 -4.702 -3.222 -1274.861

ODE MDE
Maximum Tension Force (kN) 3961.78 3936.961
Skin Friction (kN) 1722.67
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 24

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 4737 1275 2495 0.511 OK
Minima 6319 56.64 2783 0.020 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 52.9 OK
Minima -2.381 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 4.952 OK 34.71 OK
Minima 3.783 OK 27.42 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.966 m
Hence de = 0.907 m and dv = 0.817 m
Horizontal resultant shear force at the section, Vu = 719 kN
Corresponding axial compressive force, N = 4737 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 4825 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0024 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.246 %
Horizontal shear force, Vu = 719 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 733.23 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.463 Mpa
= 463 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 409.522 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.21
Modified shear strength of concrete (n s vc ) = 495.29 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 233.20 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 392.03 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C41, C44


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C41, C44

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.2 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26264 1004 1DL25202
+ 1SIDL 6659.642
+ 1CL + 1PLB -16.892
+ 1.1TLB - -13.765
1.1BTB 1.149 31.406 50.092
Min Fx 26561 1001 1DL25499
+ 1SIDL 4234.218
+ 1CL + 1PLA + 3.114
1.1TLA + -7.554
1.1BTA 0.956 -21.482 -64.965
Max Fy 26590 1005 1DL25498
+ 1SIDL 4677.055
+ 1CL + 1PLA +28.877
1PLB + 1.1TLA
-10.855
+ 1.1TLB0.931
+ 1.1BTA +19.332
1.1BTB -62.69
Min Fy 26293 1006 1DL25201
+ 1SIDL 6642.208
+ 1CL + 1PLA -52.448
+ 1PLB + 1.1TLA
-23.874
+ 1.1TLB1.038
- 1.1BTA -76.902
1.1BTB -14.791
Max Fz 26277 1002 1DL25215
+ 1SIDL + 1CL
5921.2
+ 1PLA + 9.193
1.1TLA - 1.1BTA
5.669 1.062 -33.399 46.488
Min Fz 26293 1002 1DL25201
+ 1SIDL + 1CL
5921.2
+ 1PLA -30.502
+ 1.1TLA - -24.051
1.1BTA 1.062 57.403 -21.038
Max Mx 26264 1001 1DL25202
+ 1SIDL +5835.87
1CL + 1PLA + 0.092
1.1TLA + -13.364
1.1BTA 1.453 -3.239 -69.157
Min Mx 26561 1006 1DL25499
+ 1SIDL 4786.288
+ 1CL + 1PLA -17.144
+ 1PLB + 1.1TLA
-5.157
+ 1.1TLB0.371
- 1.1BTA - -5.164
1.1BTB 120.806
Max My 26293 1004 1DL25201
+ 1SIDL 6659.642
+ 1CL + 1PLB -34.045
+ 1.1TLB - 1.1BTB
-20.75 1.149 86.413 -33.544
Min My 26270 1002 1DL25209
+ 1SIDL + 1CL
5921.2
+ 1PLA + 0.596
1.1TLA - 1.1BTA
-2.732 1.062 -55.539 93.514
Max Mz 26268 1006 1DL25207
+ 1SIDL 6642.208
+ 1CL + 1PLA +-2.632
1PLB + 1.1TLA
-6.609
+ 1.1TLB1.038
- 1.1BTA -36.657
- 1.1BTB 173.431
Min Mz 26563 1005 1DL25502
+ 1SIDL 4677.055
+ 1CL + 1PLA + 1.286
1PLB + 1.1TLA
-3.471
+ 1.1TLB0.931
+ 1.1BTA-21.736
+ 1.1BTB -143.878

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26264 2070 1DL25203
+ 1SIDL 8323.005
+ 0.3CL + 0.3PLB
74.916
+ 0.3TLB47.85
- 0.3BTB3.942
- 0.3SLX -383.587
1SLY - 0.3SLZ
445.658
- 1.1LLB
Min Fx 26264 1023 1DL25203
+ 1SIDL 2588.857
+ 0.3SLX + 1SLY
-92.813
+ 0.3SLZ -71.199 -1.939 -374.113 -431.279
Max Fy 26293 1152 1DL25201
+ 1SIDL 5217.631
- 1COL(-X)-MLC
466.363 -17.231 -3.836 56.859 508.479
Min Fy 26293 1086 1DL25201
+ 1SIDL 4269.261
+ 0.3CL + 0.3PLA
-348.915
+ 0.3PLB
-124.153
+ 0.3TLA +-3.053
0.3TLB - 0.3BTA
-73.719- 0.3BTB
-363.174
- 1SLX - 0.3SLY - 0.3
Max Fz 26590 3071 1DL25498
+ 1SIDL 4284.748
+ 0.3CL + 0.3PLB
90.513
+ 0.3TLB332.798
+ 0.3BTB7.261
+ 0.3SLX148.408
+ 0.3SLY + 1SLZ
67.434
+ 1.1NLB
Min Fz 26590 3047 1DL25529
+ 1SIDL 3533.526
+ 0.3CL + 0.3PLA
-91.467
+ 0.3TLA
-351.558
+ 0.3BTA-6.098
+ 0.3SLX-453.951
+ 0.3SLY + -199.638
1SLZ + 1.1NLA
Max Mx 26264 3071 1DL25202
+ 1SIDL 7008.009
+ 0.3CL + 0.3PLB
47.389
+ 0.3TLB114.722
+ 0.3BTB8.529
+ 0.3SLX1000.481
+ 0.3SLY + 1SLZ
313.648
+ 1.1NLB
Min Mx 26264 3078 1DL25202
+ 1SIDL 4293.432
+ 0.3CL + 0.3PLB
-63.759
+ 0.3TLB
-138.778
- 0.3BTB-6.465
- 0.3SLX -964.686
- 0.3SLY - 1SLZ
-334.338
- 1.1NLB
Max My 26566 3071 1DL25504
+ 1SIDL 4284.748
+ 0.3CL + 0.3PLB
7.868
+ 0.3TLB 18.258
+ 0.3BTB7.261
+ 0.3SLX1227.404
+ 0.3SLY + 1SLZ
351.764
+ 1.1NLB
Min My 26565 3047 1DL25504
+ 1SIDL 3533.526
+ 0.3CL + 0.3PLA
-6.277
+ 0.3TLA-5.105
+ 0.3BTA-6.098
+ 0.3SLX
-1269.605
+ 0.3SLY + -375.782
1SLZ + 1.1NLA
Max Mz 26268 1086 1DL25207
+ 1SIDL 7045.348
+ 0.3CL + 0.3PLA
14.015
+ 0.3PLB +2.987
0.3TLA + 0.3TLB
5.068 - 0.3BTA
347.355- 0.3BTB
1265.28
- 1SLX - 0.3SLY - 0.3
Min Mz 26270 1152 1DL25209
+ 1SIDL 5217.631
- 1COL(-X)-MLC5.542 -3.192 -3.836 -32.776 -1346.498
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26264 2370 1.0DL
25203
+ 1.0SIDL
8961.068
+ 0.3CL + 0.3PLB
97.48 + 0.3TLB
64.488- 0.3BTB
4.816- 0.3SLX
496.446
- 1SLY - 0.3SLZ
569.739- 1.54LLB
Min Fx 26264 2123 1.0DL
25203
+ 1.0SIDL
1953.958
+ 0.3SLX-115.391
+ 1SLY + 0.3SLZ
-87.824 -2.818 -486.022 -555.382
Max Fy 26293 1452 1.15DL
25201
+ 1.2SIDL
5993.269
- 1.5COL(-X)-MLC
703.829 -19.413 -6.098 64.185 777.335
Min Fy 26293 2186 1.0DL
25201
+ 1.0SIDL
3901.068
+ 0.3CL -447.797
+ 0.3PLA + 0.3PLB
-155.441
+ 0.3TLA
-4.298
+ 0.3TLB-112.127
- 0.3BTA - -456.441
0.3BTB - 1SLX - 0.3SLY
Max Fz 26590 3171 1.0DL
25498
+ 1.0SIDL
4366.36
+ 0.3CL +118.546
0.3PLB + 437.913
0.3TLB + 0.3BTB
9.329+ 0.3SLX
186.584
+ 0.3SLY +95.035
1SLZ + 1.54NLB
Min Fz 26590 3147 1.0DL
25529
+ 1.0SIDL
3451.911
+ 0.3CL + 0.3PLA
-119.5 + -456.673
0.3TLA + 0.3BTA
-8.167+ 0.3SLX
-595.55
+ 0.3SLY
-254.257
+ 1SLZ + 1.54NLA
Max Mx 26264 3171 1.0DL
25202
+ 1.0SIDL
7372.151
+ 0.3CL + 0.3PLB
62.717 + 153.287
0.3TLB + 0.3BTB
10.851+ 0.3SLX
1302.392
+ 0.3SLY415.079
+ 1SLZ + 1.54NLB
Min Mx 26264 3178 1.0DL
25202
+ 1.0SIDL
3929.29
+ 0.3CL +-79.088
0.3PLB + -177.343
0.3TLB - 0.3BTB
-8.787- 0.3SLX
-1266.597
- 0.3SLY -435.769
- 1SLZ - 1.54NLB
Max My 26566 3171 1.0DL
25504
+ 1.0SIDL
4366.36
+ 0.3CL + 0.3PLB
10.826 + 0.3TLB
24.211+ 0.3BTB
9.329+ 0.3SLX
1611.48
+ 0.3SLY463.968
+ 1SLZ + 1.54NLB
Min My 26565 3147 1.0DL
25504
+ 1.0SIDL
3451.911
+ 0.3CL + 0.3PLA
-7.651 + 0.3TLA
-5.953
+ 0.3BTA
-8.167+ 0.3SLX
-1653.681
+ 0.3SLY
-487.986
+ 1SLZ + 1.54NLA
Max Mz 26268 2186 1.0DL
25207
+ 1.0SIDL
7413.541
+ 0.3CL + 0.3PLA
18.686 + 0.3PLB
5.258
+ 0.3TLA6.313
+ 0.3TLB -463.42
0.3BTA -1636.415
0.3BTB - 1SLX - 0.3SLY
Min Mz 26270 1452 1.15DL
25209
+ 1.2SIDL
5993.269
- 1.5COL(-X)-MLC
9.144 -3.606 -6.098 -36.87 -2027.684

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 19 18

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 3452 1724 2212 0.779 OK
Minima 4366 209.4 2443 0.086 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 85.77 OK
Minima -53.73 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 6.726 OK 46.56 OK
Minima 3.194 OK 23.8 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.9645 m
Hence de = 0.907 m and dv = 0.816 m
Horizontal resultant shear force at the section, Vu = 704 kN
Corresponding axial compressive force, N = 5993 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 5104 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0026 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.260 %
Horizontal shear force, Vu = 704 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 718.78 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.472 Mpa
= 472 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 417.369 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.26
Modified shear strength of concrete (n s vc ) = 527.96 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 186.93 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 391.83 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C42, C43


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C42, C43

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.2 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26495 1003 1DL25433
+ 1SIDL 6272.422
+ 1CL + 1PLB + 7.558
1.1TLB + -9.654
1.1BTB 1.315 21.357 -58.519
Min Fx 26528 1002 1DL25466
+ 1SIDL 5319.405
+ 1CL + 1PLA +-3.675
1.1TLA - -14.303
1.1BTA 0.997 -6.039 69.887
Max Fy 26557 1005 1DL25465
+ 1SIDL 5925.517
+ 1CL + 1PLA +42.031
1PLB + 1.1TLA
-21.464
+ 1.1TLB2.456
+ 1.1BTA +61.452
1.1BTB -15.415
Min Fy 26524 1006 1DL25432
+ 1SIDL 6133.466
+ 1CL + 1PLA -33.407
+ 1PLB + 1.1TLA
-18.607
+ 1.1TLB0.927
- 1.1BTA -55.245
1.1BTB 53.148
Max Fz 26541 1002 1DL25479
+ 1SIDL 5319.405
+ 1CL + 1PLA + 5.888
1.1TLA - 1.1BTA
6.052 0.997 -35.319 23.983
Min Fz 26557 1002 1DL25465
+ 1SIDL 5319.405
+ 1CL + 1PLA -13.118
+ 1.1TLA - -25.305
1.1BTA 0.997 58.157 40.953
Max Mx 26528 1005 1DL25466
+ 1SIDL 5925.517
+ 1CL + 1PLA +17.866
1PLB + 1.1TLA
-12.769
+ 1.1TLB2.456
+ 1.1BTA + 1.1BTB
6.26 -115.198
Min Mx 26495 1006 1DL25433
+ 1SIDL 6133.466
+ 1CL + 1PLA -12.049
+ 1PLB + 1.1TLA
-11.174
+ 1.1TLB0.927
- 1.1BTA - 1.1BTB
7.278 129.958
Max My 26557 1004 1DL25465
+ 1SIDL 5880.832
+ 1CL + 1PLB -12.673
+ 1.1TLB - -19.006
1.1BTB 1.561 73.984 42.456
Min My 26534 1002 1DL25473
+ 1SIDL 5319.405
+ 1CL + 1PLA + 4.179
1.1TLA - 1.1BTA
-2.699 0.997 -59.434 62.51
Max Mz 26497 1006 1DL25436
+ 1SIDL 6133.466
+ 1CL + 1PLA +-2.837
1PLB + 1.1TLA
-7.488
+ 1.1TLB0.927
- 1.1BTA -20.588
- 1.1BTB 151.838
Min Mz 26532 1005 1DL25471
+ 1SIDL 5925.517
+ 1CL + 1PLA + 0.006
1PLB + 1.1TLA
-5.349
+ 1.1TLB2.456
+ 1.1BTA-37.589
+ 1.1BTB -155.42

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26495 3071 1DL25433
+ 1SIDL 6325.393
+ 0.3CL + 0.3PLB
39.137
+ 0.3TLB125.011
+ 0.3BTB7.965
+ 0.3SLX956.192
+ 0.3SLY + 1SLZ
285.897
+ 1.1NLB
Min Fx 26495 1015 1DL25434
+ 1SIDL 3888.265
+ 0.3SLX + 0.3SLY
-34.78
+ 1SLZ-143.468 -5.671 -1072.132 -330.564
Max Fy 26557 1152 1DL25465
+ 1SIDL - 4782.52
1COL(-X)-MLC
480.125 -11.657 -1.308 48.179 561.134
Min Fy 26557 1086 1DL25465
+ 1SIDL 4509.773
+ 0.3CL + 0.3PLA
-307.691
+ 0.3PLB
-125.123
+ 0.3TLA +-3.357
0.3TLB - 0.3BTA
-50.457- 0.3BTB
-218.424
- 1SLX - 0.3SLY - 0.3
Max Fz 26524 3071 1DL25432
+ 1SIDL 6325.393
+ 0.3CL + 0.3PLB
97.317
+ 0.3TLB307.379
+ 0.3BTB7.965
+ 0.3SLX250.122
+ 0.3SLY + 1SLZ95.16
+ 1.1NLB
Min Fz 26524 3047 1DL25463
+ 1SIDL 4117.809
+ 0.3CL + 0.3PLA
-84.289
+ 0.3TLA -340.71
+ 0.3BTA-5.644
+ 0.3SLX-484.776
+ 0.3SLY + -184.698
1SLZ + 1.1NLA
Max Mx 26528 1095 1DL25466
+ 1SIDL 5260.635
+ 0.3CL + 0.3PLA
44.033
+ 0.3PLB118.172
+ 0.3TLA + 0.3TLB
8.55 + 0.3BTA
958.46 + 0.3BTB
265.314
+ 0.3SLX + 0.3SLY
Min Mx 26528 2054 1DL25466
+ 1SIDL 4518.084
+ 0.3CL + 0.3PLA
-37.938
+ 0.3TLA
-141.527
- 0.3BTA-5.759
- 0.3SLX-944.977
- 0.3SLY - 1SLZ
-271.766
- 1.1LLA
Max My 26499 3071 1DL25437
+ 1SIDL 6325.393
+ 0.3CL + 0.3PLB
5.023
+ 0.3TLB1.885
+ 0.3BTB7.965
+ 0.3SLX1210.359
+ 0.3SLY + 1SLZ
348.307
+ 1.1NLB
Min My 26499 3047 1DL25438
+ 1SIDL 4117.809
+ 0.3CL + 0.3PLA
-4.207
+ 0.3TLA -10.589
+ 0.3BTA-5.644
+ 0.3SLX-1256.98
+ 0.3SLY + -385.934
1SLZ + 1.1NLA
Max Mz 26531 1086 1DL25470
+ 1SIDL 5379.689
+ 0.3CL + 0.3PLA
14.776
+ 0.3PLB +2.866
0.3TLA + 0.3TLB
5.841 - 0.3BTA
360.756 - 0.3BTB
1237.156
- 1SLX - 0.3SLY - 0.3
Min Mz 26534 1152 1DL25473
+ 1SIDL - 4782.52
1COL(-X)-MLC8.659 -2.921 -1.308 -17.844 -1369.446
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26495 2103 1.15DL
25433
+ 1.2SIDL
7558.216
+ 1.4CL +10.244
1.4PLB + 1.54TLB
-11.111 + 1.54BTB
1.578 28.043 -82.927
Min Fx 26495 2115 1.0DL
25434
+ 1.0SIDL
3582.868
+ 0.3SLX +-45.864
0.3SLY + 1SLZ
-184.648 -7.734 -1401.9 -433.258
Max Fy 26557 1452 1.15DL
25465
+ 1.2SIDL
5574.486
- 1.5COL(-X)-MLC
719.443 -11.079 -2.399 52.945 838.346
Min Fy 26557 2186 1.0DL
25465
+ 1.0SIDL
4379.182
+ 0.3CL -400.486
+ 0.3PLA + 0.3PLB
-157.314
+ 0.3TLA
-4.765
+ 0.3TLB-82.943
- 0.3BTA - -292.992
0.3BTB - 1SLX - 0.3SLY
Max Fz 26524 3171 1.0DL
25432
+ 1.0SIDL
6632.874
+ 0.3CL + 0.3PLB
125.24 + 406.909
0.3TLB + 0.3BTB
10.071+ 0.3SLX
310.33
+ 0.3SLY123.213
+ 1SLZ + 1.54NLB
Min Fz 26524 3147 1.0DL
25463
+ 1.0SIDL
3810.328
+ 0.3CL -112.212
+ 0.3PLA + 0.3TLA
-440.24
+ 0.3BTA
-7.751+ 0.3SLX
-643.315
+ 0.3SLY
-240.266
+ 1SLZ + 1.54NLA
Max Mx 26528 3171 1.0DL
25466
+ 1.0SIDL
5347.755
+ 0.3CL + 0.3PLB
53.766 + 159.168
0.3TLB + 0.3BTB
10.685+ 0.3SLX
1262.296
+ 0.3SLY372.798
+ 1SLZ + 1.54NLB
Min Mx 26528 2354 1.0DL
25466
+ 1.0SIDL
4438.412
+ 0.3CL +-49.638
0.3PLA + -181.295
0.3TLA - 0.3BTA
-7.892
- 0.3SLX
-1237.006
- 0.3SLY-362.314
- 1SLZ - 1.54LLA
Max My 26499 3171 1.0DL
25437
+ 1.0SIDL
6632.874
+ 0.3CL + 0.3PLB
6.41 + 0.3TLB
3.718+ 0.3BTB
10.071+ 0.3SLX
1589.967
+ 0.3SLY462.115
+ 1SLZ + 1.54NLB
Min My 26498 3147 1.0DL
25437
+ 1.0SIDL
3810.328
+ 0.3CL + 0.3PLA
-3.51 + 0.3TLA
-32.537
+ 0.3BTA
-7.751+ 0.3SLX
-1636.53
+ 0.3SLY
-503.109
+ 1SLZ + 1.54NLA
Max Mz 26531 2186 1.0DL
25470
+ 1.0SIDL
5510.28
+ 0.3CL + 0.3PLA
18.961 + 0.3PLB
5.602
+ 0.3TLA7.25
+ 0.3TLB480.529
- 0.3BTA -1606.572
0.3BTB - 1SLX - 0.3SLY
Min Mz 26534 1452 1.15DL
25473
+ 1.2SIDL
5574.486
- 1.5COL(-X)-MLC
12.78 -3.338 -2.399 -13.77 -2053.156

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 19 18

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 5574 2053 2693 0.763 OK
Minima 7558 87.55 2963 0.030 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 79.64 OK
Minima -33.72 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 6.151 OK 42.65 OK
Minima 4.084 OK 29.9 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.9645 m
Hence de = 0.907 m and dv = 0.816 m
Horizontal resultant shear force at the section, Vu = 720 kN
Corresponding axial compressive force, N = 5574 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 5104 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0026 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.260 %
Horizontal shear force, Vu = 720 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 734.53 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.472 Mpa
= 472 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 417.369 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.25
Modified shear strength of concrete (n s vc ) = 520.23 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 209.93 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 391.83 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C45


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C45

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.2 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32239 1003 1DL31283
+ 1SIDL +7009.652
1CL + 1PLB + 2.196
1.1TLB + 1.1BTB
36.862 -0.307 -246.086 34.466
Min Fx 32239 1002 1DL31283
+ 1SIDL +6164.758
1CL + 1PLA + 1.416
1.1TLA - 1.1BTA
30.82 -0.106 -247.378 22.221
Max Fy 32244 1004 1DL31288
+ 1SIDL +7000.384
1CL + 1PLB + 1.1TLB
2.97 - 1.1BTB
27.288 -0.235 -80.851 21.343
Min Fy 32265 1004 1DL31308
+ 1SIDL +7000.384
1CL + 1PLB +-0.304
1.1TLB - 1.1BTB
-2.185 -0.235 5.187 -0.9
Max Fz 32256 1003 1DL31282
+ 1SIDL +7009.652
1CL + 1PLB + 0.458
1.1TLB + 1.1BTB
39.885 -0.307 -363.91 37.879
Min Fz 32261 1003 1DL31304
+ 1SIDL +7009.652
1CL + 1PLB + 0.023
1.1TLB + 1.1BTB
-4.262 -0.307 19.684 -1.571
Max Mx 32239 1001 1DL31283
+ 1SIDL +6175.932
1CL + 1PLA + 1.406
1.1TLA + 31.139
1.1BTA -0.07 -245.957 22.069
Min Mx 32239 1003 1DL31283
+ 1SIDL +7009.652
1CL + 1PLB + 2.196
1.1TLB + 1.1BTB
36.862 -0.307 -246.086 34.466
Max My 32252 1003 1DL31297
+ 1SIDL +7009.652
1CL + 1PLB + 1.315
1.1TLB + 1.1BTB
0.995 -0.307 34.943 0.984
Min My 32256 1005 1DL31282
+ 1SIDL +6922.627
1CL + 1PLA + 1PLB
0.446+ 1.1TLA
37.838
+ 1.1TLB-0.257
+ 1.1BTA-372.185
+ 1.1BTB 36.888
Max Mz 32256 1004 1DL31282
+ 1SIDL +7000.384
1CL + 1PLB + 1.1TLB
0.46 - 1.1BTB
39.714 -0.235 -363.271 38.072
Min Mz 32261 1004 1DL31305
+ 1SIDL +7000.384
1CL + 1PLB + 0.023
1.1TLB - 1.1BTB
-4.242 -0.235 15.395 -1.602

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32239 2070 1DL31284
+ 1SIDL +8723.11
0.3CL + 0.3PLB
19.504
+ 0.3TLB 95.472
- 0.3BTB -0.728
0.3SLX - 1SLY
148.349
- 0.3SLZ286.647
- 1.1LLB
Min Fx 32239 1023 1DL31284
+ 1SIDL +2790.49
0.3SLX + 1SLY
-15.629
+ 0.3SLZ -36.68 -1.086 -510.515 -229.696
Max Fy 32244 1151 1DL31288
+ 1SIDL +5551.305
1COL(X)-MLC83.885 22.1 -0.194 -68.652 602.851
Min Fy 32244 2039 1DL31289
+ 1SIDL +2971.445
0.3CL + 0.3PLA
-21.235
+ 0.3TLA + 5.77
0.3BTA -1.051
+ 0.3SLX-469.058
+ 1SLY + 0.3SLZ
-131.376
+ 1.1LLA
Max Fz 32256 3071 1DL31282
+ 1SIDL +7848.401
0.3CL + 0.3PLB2.096
+ 0.3TLB354.963
+ 0.3BTB 1.999
+ 0.3SLX +-99.664
0.3SLY + 1SLZ
173.288
+ 1.1NLB
Min Fz 32256 3047 1DL31301
+ 1SIDL +3848.686
0.3CL + 0.3PLA
-1.319
+ 0.3TLA
-293.844
+ 0.3BTA -2.342
+ 0.3SLX-787.959
+ 0.3SLY + 1SLZ
-107.776
+ 1.1NLA
Max Mx 32239 3054 1DL31284
+ 1SIDL +7601.535
0.3CL + 0.3PLA9.815
+ 0.3TLA166.308
- 0.3BTA - 2.056
0.3SLX - 0.3SLY
847.29- 1SLZ144.252
- 1.1NLA
Min Mx 32239 3078 1DL31283
+ 1SIDL +4089.968
0.3CL + 0.3PLB
-6.089
+ 0.3TLB
-106.699
- 0.3BTB --2.39
0.3SLX-1131.362
- 0.3SLY - 1SLZ-95.574
- 1.1NLB
Max My 32245 3071 1DL31289
+ 1SIDL +7848.401
0.3CL + 0.3PLB
13.442
+ 0.3TLB60.38
+ 0.3BTB 1.999
+ 0.3SLX1121.451
+ 0.3SLY + 1SLZ83.628
+ 1.1NLB
Min My 32241 3047 1DL31286
+ 1SIDL +3848.686
0.3CL + 0.3PLA
-7.856
+ 0.3TLA-28.086
+ 0.3BTA -2.342
+ 0.3SLX-1304.076
+ 0.3SLY + 1SLZ
-77.859
+ 1.1NLA
Max Mz 32256 1151 1DL31282
+ 1SIDL +5551.305
1COL(X)-MLC13.004 31.187 -0.194 -293.836 1075.361
Min Mz 32256 1046 1DL31282
+ 1SIDL +2982.294
0.3CL + 0.3PLA-3.29
+ 0.3TLA
-104.706
- 0.3BTA --1.068
0.3SLX --509.175
1SLY - 0.3SLZ-272.043

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32239 2370 1.0DL
31284
+ 1.0SIDL
9388.763
+ 0.3CL + 0.3PLB
23.772+ 0.3TLB
113.458- 0.3BTB
0.998
- 0.3SLX
250.077
- 1SLY - 0.3SLZ
349.375
- 1.54LLB
Min Fx 32239 2123 1.0DL
31284
+ 1.0SIDL
2130.396
+ 0.3SLX +-19.894
1SLY + 0.3SLZ
-54.671 -1.36 -611.46 -292.377
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Max Fy 32244 1451 1.15DL


31288
+ 1.2SIDL
6392.697
+ 1.5COL(X)-MLC
124.941 25.459 -0.233 -76.294 897.904
Min Fy 32244 2339 1.0DL
31289
+ 1.0SIDL
2305.792
+ 0.3CL + -26.979
0.3PLA + 0.3TLA
1.272
+ 0.3BTA
-1.322
+ 0.3SLX
-590.782
+ 1SLY +-166.909
0.3SLZ + 1.54LLA
Max Fz 32256 3171 1.0DL
31282
+ 1.0SIDL
8368.88
+ 0.3CL + 0.3PLB
2.54+ 0.3TLB
453.821+ 0.3BTB
2.68+ 0.3SLX-37.47
+ 0.3SLY +210.033
1SLZ + 1.54NLB
Min Fz 32256 3147 1.0DL
31301
+ 1.0SIDL
3328.209
+ 0.3CL + 0.3PLA
-1.764+ 0.3TLA
-392.702+ 0.3BTA
-3.023
+ 0.3SLX
-943.293
+ 0.3SLY-144.075
+ 1SLZ + 1.54NLA
Max Mx 32239 3154 1.0DL
31284
+ 1.0SIDL
8122.011
+ 0.3CL + 0.3PLA
11.945+ 0.3TLA
208.131
- 0.3BTA
2.738
- 0.3SLX
1166.923
- 0.3SLY - 175.556
1SLZ - 1.54NLA
Min Mx 32239 3178 1.0DL
31283
+ 1.0SIDL
3569.489
+ 0.3CL + 0.3PLB
-8.219+ -148.522
0.3TLB - 0.3BTB
-3.071
- 0.3SLX
-1412.656
- 0.3SLY --129.008
1SLZ - 1.54NLB
Max My 32244 3171 1.0DL
31288
+ 1.0SIDL
8368.88
+ 0.3CL + 0.3PLB
16.384+ 0.3TLB
56.356
+ 0.3BTB
2.68+ 0.3SLX
1484.887
+ 0.3SLY +117.746
1SLZ + 1.54NLB
Min My 32242 3147 1.0DL
31287
+ 1.0SIDL
3328.209
+ 0.3CL + -11.024
0.3PLA + 0.3TLA
-6.127
+ 0.3BTA
-3.023
+ 0.3SLX
-1670.552
+ 0.3SLY +-93.058
1SLZ + 1.54NLA
Max Mz 32256 1451 1.15DL
31282
+ 1.2SIDL
6392.697
+ 1.5COL(X)-MLC
19.369 36.788 -0.233 -338.83 1601.673
Min Mz 32256 2146 1.0DL
31282
+ 1.0SIDL2322.2
+ 0.3CL + 0.3PLA
-4.179+ 0.3TLA
-142.823
- 0.3BTA
-1.342
- 0.3SLX
-560.011
- 1SLY - 0.3SLZ
-345.618

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 19 16
2nd Layer

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 3328 1673 2023 0.827 OK
Minima 8369 213.4 2905 0.073 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 84.92 OK
Minima -40.6 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 8.145 OK 55.09 OK
Minima 3.831 OK 29.93 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.9645 m
Hence de = 0.907 m and dv = 0.816 m
Horizontal resultant shear force at the section, Vu = 454 kN
Corresponding axial compressive force, N = 8369 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 4536 mm2
Effective area of tensile steel = 50% of total steel = As = 0.0023 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.232 %
Horizontal shear force, Vu = 454 kN
Shear stress (vv = Vu /(bv . dv) = 463.29 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.454 Mpa
= 454 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 401.301 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/Ac) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.37
Modified shear strength of concrete (n s vc ) = 549.78 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = -84.72 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 391.83 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C46


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C46

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.2 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32272 1005 1DL31317
+ 1SIDL +5707.853
1CL + 1PLA + 1PLB
2.052+ 1.1TLA
69.141
+ 1.1TLB 0.528
+ 1.1BTA-438.791
+ 1.1BTB 32.216
Min Fx 32272 1002 1DL31317
+ 1SIDL +5239.664
1CL + 1PLA + 1.703
1.1TLA - 1.1BTA
62.48 0.359 -420.175 26.737
Max Fy 32277 1005 1DL31322
+ 1SIDL +5707.853
1CL + 1PLA + 1PLB
2.762+ 1.1TLA
49.741
+ 1.1TLB 0.528
+ 1.1BTA-132.355
+ 1.1BTB 19.849
Min Fy 32298 1005 1DL31342
+ 1SIDL +5707.853
1CL + 1PLA +-0.282
1PLB + 1.1TLA
-3.903
+ 1.1TLB 0.528
+ 1.1BTA + 1.1BTB
9.053 -0.837
Max Fz 32289 1003 1DL31316
+ 1SIDL +5696.943
1CL + 1PLB + 0.413
1.1TLB + 1.1BTB
80.345 0.319 -657.93 34.189
Min Fz 32293 1003 1DL31337
+ 1SIDL +5696.943
1CL + 1PLB + 0.115
1.1TLB + 1.1BTB
-8.94 0.319 45.594 -1.302
Max Mx 32272 1001 1DL31317
+ 1SIDL +5311.591
1CL + 1PLA + 1.868
1.1TLA + 63.535
1.1BTA 0.67 -422.681 29.314
Min Mx 32272 1006 1DL31317
+ 1SIDL +5563.545
1CL + 1PLA + 1PLB
1.721+ 1.1TLA
67.351
+ 1.1TLB0.216
- 1.1BTA -431.082
- 1.1BTB 27.007
Max My 32284 1003 1DL31330
+ 1SIDL +5696.943
1CL + 1PLB + 1.1TLB
1.39 + 1.1BTB
2.016 0.319 74.379 2.075
Min My 32289 1005 1DL31316
+ 1SIDL +5707.853
1CL + 1PLA + 1PLB
0.428+ 1.1TLA
77.017
+ 1.1TLB 0.528
+ 1.1BTA-663.937
+ 1.1BTB 35.406
Max Mz 32289 1005 1DL31316
+ 1SIDL +5707.853
1CL + 1PLA + 1PLB
0.428+ 1.1TLA
77.017
+ 1.1TLB 0.528
+ 1.1BTA-663.937
+ 1.1BTB 35.406
Min Mz 32294 1005 1DL31339
+ 1SIDL +5707.853
1CL + 1PLA + 1PLB
0.022+ 1.1TLA
-8.313
+ 1.1TLB 0.528
+ 1.1BTA + 1.1BTB
28.15 -1.49

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32272 1005 1DL31317
+ 1SIDL +5707.853
1CL + 1PLA + 1PLB
2.052+ 1.1TLA
69.141
+ 1.1TLB 0.528
+ 1.1BTA-438.791
+ 1.1BTB 32.216
Min Fx 32272 1015 1DL31318
+ 1SIDL +3828.992
0.3SLX + 0.3SLY
-3.111
+ 1SLZ -78.704 -5.794 -1308.753 -45.727
Max Fy 32277 1152 1DL31322
+ 1SIDL -4640.705
1COL(-X)-MLC 86.087 40.247 -3.4 -126.292 618.674
Min Fy 32277 1007 1DL31323
+ 1SIDL +3874.355
1SLX + 0.3SLY
-12.733
+ 0.3SLZ 29.234 -2.748 -424.235 -78.771
Max Fz 32289 3071 1DL31316
+ 1SIDL +5584.606
0.3CL + 0.3PLB1.249
+ 0.3TLB383.582
+ 0.3BTB 6.626
+ 0.3SLX -391.492
+ 0.3SLY + 1SLZ103.27
+ 1.1NLB
Min Fz 32289 1015 1DL31335
+ 1SIDL +3828.992
0.3SLX + 0.3SLY
-0.649
+ 1SLZ-253.401 -5.794 -941.377 -53.023
Max Mx 32272 3054 1DL31318
+ 1SIDL +5450.981
0.3CL + 0.3PLA5.909
+ 0.3TLA191.64
- 0.3BTA - 6.639
0.3SLX - 711.742
0.3SLY - 1SLZ 86.841
- 1.1NLA
Min Mx 32272 3078 1DL31317
+ 1SIDL +4152.904
0.3CL + 0.3PLB
-2.965
+ 0.3TLB -75.161
- 0.3BTB-5.952
- 0.3SLX-1264.886
- 0.3SLY - 1SLZ-46.547
- 1.1NLB
Max My 32279 3071 1DL31324
+ 1SIDL +5584.606
0.3CL + 0.3PLB7.589
+ 0.3TLB 99.863
+ 0.3BTB 6.626
+ 0.3SLX1097.596
+ 0.3SLY + 1SLZ41.827
+ 1.1NLB
Min My 32273 3047 1DL31319
+ 1SIDL +4058.622
0.3CL + 0.3PLA
-3.376
+ 0.3TLA-35.937
+ 0.3BTA -5.855
+ 0.3SLX-1366.343
+ 0.3SLY + 1SLZ
-40.015
+ 1.1NLA
Max Mz 32289 1152 1DL31316
+ 1SIDL -4640.705
1COL(-X)-MLC 13.345 56.405 -3.4 -534.967 1103.585
Min Mz 32289 1014 1DL31316
+ 1SIDL -3874.355
1SLX - 0.3SLY-1.974
- 0.3SLZ -41.241 -2.748 -624.339 -163.223

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32272 2105 1.15DL
31317
+ 1.2SIDL
6858.742
+ 1.4CL + 1.4PLA
2.538 + 1.4PLB
83.088
+ 1.54TLA
0.653
+ 1.54TLB
-527.571
+ 1.54BTA39.832
+ 1.54BTB
Min Fx 32272 2115 1.0DL
31318
+ 1.0SIDL
3622.832
+ 0.3SLX + 0.3SLY
-4.414 + 1SLZ
-119.712 -7.685 -1621.992 -64.876
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Max Fy 32277 1452 1.15DL


31322
+ 1.2SIDL
5375.704
- 1.5COL(-X)-MLC
128.498 46.584 -5.219 -153.014 923.462
Min Fy 32277 2107 1.0DL
31323
+ 1.0SIDL
3682.494
+1SLX + 0.3SLY
-17.13
+ 0.3SLZ26.185 -3.697 -534.629 -105.975
Max Fz 32289 3171 1.0DL
31316
+ 1.0SIDL
5792.345
+ 0.3CL + 0.3PLB
1.52+ 0.3TLB
481.142+ 0.3BTB
8.579+ 0.3SLX
-339.04
+ 0.3SLY +125.715
1SLZ + 1.54NLB
Min Fz 32289 3147 1.0DL
31335
+ 1.0SIDL
3850.88
+ 0.3CL + 0.3PLA
-0.887+ 0.3TLA
-350.642
+ 0.3BTA
-7.808
+ 0.3SLX
-1119.661
+ 0.3SLY +-72.486
1SLZ + 1.54NLA
Max Mx 32272 3154 1.0DL
31318
+ 1.0SIDL
5658.724
+ 0.3CL + 0.3PLA
7.21+ 0.3TLA
232.977
- 0.3BTA
8.592
- 0.3SLX
1027.735
- 0.3SLY - 105.962
1SLZ - 1.54NLA
Min Mx 32272 3178 1.0DL
31317
+ 1.0SIDL
3945.165
+ 0.3CL + 0.3PLB
-4.266+ -116.499
0.3TLB - 0.3BTB
-7.905
- 0.3SLX
-1541.28
- 0.3SLY - 1SLZ
-66.97
- 1.54NLB
Max My 32278 3171 1.0DL
31323
+ 1.0SIDL
5792.345
+ 0.3CL + 0.3PLB
9.751+ 0.3TLB
85.925
+ 0.3BTB
8.579+ 0.3SLX
1449.368
+ 0.3SLY + 1SLZ
60.67+ 1.54NLB
Min My 32274 3147 1.0DL
31320
+ 1.0SIDL
3850.88
+ 0.3CL + 0.3PLA
-5.283+ 0.3TLA
-18.977
+ 0.3BTA
-7.808
+ 0.3SLX
-1723.297
+ 0.3SLY +-52.365
1SLZ + 1.54NLA
Max Mz 32289 1452 1.15DL
31316
+ 1.2SIDL
5375.704
- 1.5COL(-X)-MLC
19.92 63.183 -5.219 -618.406 1647.262
Min Mz 32289 2114 1.0DL
31316
+ 1.0SIDL
3682.494
- 1SLX - 0.3SLY
-2.656
- 0.3SLZ-72.546 -3.697 -653.333 -219.593

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 19 16
2nd Layer

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 3851 1724 2170 0.795 OK
Minima 5792 361.6 2598 0.139 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 77.78 OK
Minima -42.15 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 8.735 OK 56.79 OK
Minima 1.118 OK 13.58 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.9645 m
Hence de = 0.907 m and dv = 0.816 m
Horizontal resultant shear force at the section, Vu = 481 kN
Corresponding axial compressive force, N = 5792 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 4536 mm2
Effective area of tensile steel = 50% of total steel = As = 0.0023 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.232 %
Horizontal shear force, Vu = 481 kN
Shear stress (vv = Vu /(bv . dv) = 491.18 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.454 Mpa
= 454 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 401.301 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/Ac) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.26
Modified shear strength of concrete (n s vc ) = 504.06 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = -12.62 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 391.83 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C47, C48


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C47, C48

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 2
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32494 1004 1DL31564
+ 1SIDL 4269.101
+ 1CL + 1PLB +-9.199
1.1TLB - 1.1BTB
-54.68 0.627 259.327 29.165
Min Fx 32420 1001 1DL31481
+ 1SIDL 1245.162
+ 1CL + 1PLA +-3.167
1.1TLA + -67.104
1.1BTA 0.604 290.023 -48.882
Max Fy 32406 1005 1DL31449
+ 1SIDL 3878.411
+ 1CL + 1PLA +36.918
1PLB + 1.1TLA
-75.095
+ 1.1TLB0.517
+ 1.1BTA460.765
+ 1.1BTB 33.374
Min Fy 32511 1006 1DL31563
+ 1SIDL 4216.584
+ 1CL + 1PLA -40.909
+ 1PLB + 1.1TLA
-74.842
+ 1.1TLB 0.58
- 1.1BTA472.249
- 1.1BTB -37.085
Max Fz 32434 1006 1DL31495
+ 1SIDL + 1CL1352
+ 1PLA + 1.735
1PLB + 1.1TLA
10.071
+ 1.1TLB0.526
- 1.1BTA -56.727
- 1.1BTB -2.085
Min Fz 32437 1006 1DL31480
+ 1SIDL + 1CL1352
+ 1PLA +-1.921
1PLB + 1.1TLA
-93.978
+ 1.1TLB0.526
- 1.1BTA586.267
- 1.1BTB 111.053
Max Mx 32494 1001 1DL31564
+ 1SIDL 3801.566
+ 1CL + 1PLA + 1.1TLA
5.2 + -52.294
1.1BTA 0.687 234.209 -29.745
Min Mx 32389 1003 1DL31450
+ 1SIDL 3937.706
+ 1CL + 1PLB + 7.652
1.1TLB + -55.44
1.1BTB 0.449 251.31 -25.003
Max My 32437 1006 1DL31480
+ 1SIDL + 1CL1352
+ 1PLA +-1.921
1PLB + 1.1TLA
-93.978
+ 1.1TLB0.526
- 1.1BTA586.267
- 1.1BTB 111.053
Min My 32429 1006 1DL31491
+ 1SIDL + 1CL1352
+ 1PLA + 1PLB
6.91+ 1.1TLA
-4.083
+ 1.1TLB0.526
- 1.1BTA -80.748
- 1.1BTB 14.686
Max Mz 32543 1006 1DL31615
+ 1SIDL 1682.981
+ 1CL + 1PLA + 3.348
1PLB + 1.1TLA
-76.773
+ 1.1TLB 0.63
- 1.1BTA396.384
- 1.1BTB 113.093
Min Mz 32437 1005 1DL31499
+ 1SIDL 1346.808
+ 1CL + 1PLA + 2.115
1PLB + 1.1TLA
-92.713
+ 1.1TLB0.513
+ 1.1BTA489.767
+ 1.1BTB -106.128

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32494 3071 1DL31564
+ 1SIDL 5997.056
+ 0.3CL + 0.3PLB
40.878
+ 0.3TLB202.3
+ 0.3BTB4.799
+ 0.3SLX520.096
+ 0.3SLY + 1SLZ
132.411
+ 1.1NLB
Min Fx 32420 1015 1DL31482
+ 1SIDL-1163.492
+ 0.3SLX + 0.3SLY
-16.724
+ 1SLZ-316.284 -3.454 97.48 -234.143
Max Fy 32406 1152 1DL31449
+ 1SIDL 2828.645
- 1COL(-X)-MLC466.582 -65.713 -1.898 369.703 927.517
Min Fy 32511 1086 1DL31563
+ 1SIDL 2823.092
+ 0.3CL + 0.3PLA
-325.144
+ 0.3PLB
-203.772
+ 0.3TLA +-1.658
0.3TLB - 0.3BTA
-78.906- 0.3BTB
-336.469
- 1SLX - 0.3SLY - 0.3
Max Fz 32437 1015 1DL31480
+ 1SIDL 3316.518
+ 0.3SLX + 0.3SLY
6.191
+ 1SLZ 389.107 4.357 1965.845 266.235
Min Fz 32437 3078 1DL31480
+ 1SIDL +-1072.26
0.3CL + 0.3PLB
-6.387
+ 0.3TLB
-538.714
- 0.3BTB-3.519
- 0.3SLX-1032.373
- 0.3SLY - 1SLZ
-246.957
- 1.1NLB
Max Mx 32525 3054 1DL31597
+ 1SIDL 3697.709
+ 0.3CL + 0.3PLA
15.127
+ 0.3TLA204.431
- 0.3BTA -4.924
0.3SLX -303.354
0.3SLY - 1SLZ260.434
- 1.1NLA
Min Mx 32525 3078 1DL31596
+ 1SIDL +-839.672
0.3CL + 0.3PLB
-13.438
+ 0.3TLB
-316.873
- 0.3BTB-3.806
- 0.3SLX - -90.179
0.3SLY - 1SLZ
-239.873
- 1.1NLB
Max My 32437 1095 1DL31480
+ 1SIDL 3397.149
+ 0.3CL + 0.3PLA6.764
+ 0.3PLB382.406
+ 0.3TLA + 0.3TLB
4.378 + 2007.989
0.3BTA + 0.3BTB 237.262
+ 0.3SLX + 0.3SLY
Min My 32437 1022 1DL31480
+ 1SIDL-1163.492
- 0.3SLX - 0.3SLY
-6.142
- 1SLZ -529.981 -3.454 -1081.628 -261.605
Max Mz 32406 1152 1DL31449
+ 1SIDL 2828.645
- 1COL(-X)-MLC466.582 -65.713 -1.898 369.703 927.517
Min Mz 32437 1079 1DL31499
+ 1SIDL +450.555
0.3CL + 0.3PLA
-17.943
+ 0.3PLB
-221.521
+ 0.3TLA +-1.745
0.3TLB + 0.3BTA
69.422 + 0.3BTB
-886.279
+ 1SLX + 0.3SLY +
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32494 3171 1.0DL
31564
+ 1.0SIDL
6732.349
+ 0.3CL + 0.3PLB
53.22 + 278.966
0.3TLB + 0.3BTB
6.128+ 0.3SLX
611.983
+ 0.3SLY175.488
+ 1SLZ + 1.54NLB
Min Fx 32420 2115 1.0DL
31482
+ 1.0SIDL
-1853.055
+ 0.3SLX +-21.906
0.3SLY + 1SLZ
-396.8 -4.657 69.252 -306.853
Max Fy 32406 1452 1.15DL
31449
+ 1.2SIDL
3198.865
- 1.5COL(-X)-MLC
699.906 -78.63 -2.999 432.613 1390.612
Min Fy 32511 2186 1.0DL
31563
+ 1.0SIDL
2583.372
+ 0.3CL -421.009
+ 0.3PLA + 0.3PLB
-247.308
+ 0.3TLA
-2.334
+ 0.3TLB-221.373
- 0.3BTA - -431.132
0.3BTB - 1SLX - 0.3SLY
Max Fz 32437 2115 1.0DL
31480
+ 1.0SIDL
4006.081
+ 0.3SLX + 0.3SLY
8.048 + 1SLZ
530.626 5.56 2434.692 347.423
Min Fz 32437 3178 1.0DL
31480
+ 1.0SIDL
-1755.354
+ 0.3CL + 0.3PLB
-8.24 + -681.575
0.3TLB - 0.3BTB
-4.762- 0.3SLX
-1496.853
- 0.3SLY - -328.28
1SLZ - 1.54NLB
Max Mx 32525 3154 1.0DL
31597
+ 1.0SIDL
4399.149
+ 0.3CL + 0.3PLA
19.509 + 0.3TLA
284.578- 0.3BTA
6.282
- 0.3SLX333.78
- 0.3SLY -335.551
1SLZ - 1.54NLA
Min Mx 32525 3178 1.0DL
31596
+ 1.0SIDL
-1541.113
+ 0.3CL + 0.3PLB
-17.82 + -397.019
0.3TLB - 0.3BTB
-5.165- 0.3SLX
-198.977
- 0.3SLY -319.362
- 1SLZ - 1.54NLB
Max My 32437 3147 1.0DL
31480
+ 1.0SIDL
4079.051
+ 0.3CL + 0.3PLA
8.371 + 0.3TLA
520.746+ 0.3BTA
5.468+ 0.3SLX
2477.483
+ 0.3SLY332.545
+ 1SLZ + 1.54NLA
Min My 32437 2122 1.0DL
31480
+ 1.0SIDL
-1853.055
- 0.3SLX - 0.3SLY
-7.999 - 1SLZ-671.5 -4.657 -1550.476 -342.792
Max Mz 32406 1452 1.15DL
31449
+ 1.2SIDL
3198.865
- 1.5COL(-X)-MLC
699.906 -78.63 -2.999 432.613 1390.612
Min Mz 32499 1452 1.15DL
31570
+ 1.2SIDL
3594.874
- 1.5COL(-X)-MLC
16.833 -29.623 -2.875 -25.563 -1259.879

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 40 16

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 4079 2500 2975 0.840 OK
Minima -1853 314.6 1997 0.158 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 151 OK
Minima -270.1 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 8.776 OK 54.77 OK
Minima -1.748 OK -36.79 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.090 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 19.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32510 1004 1DL31580
+ 1SIDL 4269.101
+ 1CL + 1PLB + 2.299
1.1TLB - 1.1BTB
6.782 0.627 -27.761 3.573
Min Fx 32436 1001 1DL31497
+ 1SIDL 1245.162
+ 1CL + 1PLA +-0.146
1.1TLA + 1.1BTA
8.772 0.604 -33.643 2.118
Max Fy 32510 1006 1DL31580
+ 1SIDL 4216.584
+ 1CL + 1PLA + 4.197
1PLB + 1.1TLA
7.457
+ 1.1TLB 0.58
- 1.1BTA - -29.41
1.1BTB 6.251
Min Fy 32405 1005 1DL31466
+ 1SIDL 3878.411
+ 1CL + 1PLA +-3.787
1PLB + 1.1TLA
7.489
+ 1.1TLB0.517
+ 1.1BTA-28.928
+ 1.1BTB -5.637
Max Fz 32436 1006 1DL31497
+ 1SIDL + 1CL1352
+ 1PLA + 0.259
1PLB + 1.1TLA
9.367
+ 1.1TLB0.526
- 1.1BTA - -36.63
1.1BTB -4.72
Min Fz 32448 1002 1DL31508
+ 1SIDL +1252.24
1CL + 1PLA +-0.144
1.1TLA - 1.1BTA
-0.713 0.516 1.226 -0.214
Max Mx 32510 1001 1DL31580
+ 1SIDL 3801.566
+ 1CL + 1PLA + -1.51
1.1TLA + 1.1BTA
6.705 0.687 -26.341 -1.82
Min Mx 32405 1003 1DL31466
+ 1SIDL 3937.706
+ 1CL + 1PLB +-1.924
1.1TLB + 1.1BTB
7.061 0.449 -27.971 -2.961
Max My 32445 1002 1DL31506
+ 1SIDL +1252.24
1CL + 1PLA +-0.359
1.1TLA - 1.1BTA
0.726 0.516 1.941 -0.729
Min My 32436 1006 1DL31497
+ 1SIDL + 1CL1352
+ 1PLA + 0.259
1PLB + 1.1TLA
9.367
+ 1.1TLB0.526
- 1.1BTA - -36.63
1.1BTB -4.72
Max Mz 32510 1006 1DL31580
+ 1SIDL 4216.584
+ 1CL + 1PLA + 4.197
1PLB + 1.1TLA
7.457
+ 1.1TLB 0.58
- 1.1BTA - -29.41
1.1BTB 6.251
Min Mz 32405 1005 1DL31466
+ 1SIDL 3878.411
+ 1CL + 1PLA +-3.787
1PLB + 1.1TLA
7.489
+ 1.1TLB0.517
+ 1.1BTA-28.928
+ 1.1BTB -5.637

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32510 3071 1DL31580
+ 1SIDL 5997.056
+ 0.3CL + 0.3PLB9.989
+ 0.3TLB 49.991
+ 0.3BTB4.799
+ 0.3SLX +89.569
0.3SLY + 1SLZ15.856
+ 1.1NLB
Min Fx 32436 1015 1DL31498
+ 1SIDL-1163.492
+ 0.3SLX + 0.3SLY
-0.771
+ 1SLZ -39.518 -3.454 -93.445 -11.932
Max Fy 32510 1086 1DL31581
+ 1SIDL 4384.449
+ 0.3CL + 0.3PLA33.34
+ 0.3PLB20.535
+ 0.3TLA + 0.3TLB
2.741 - 0.3BTA 4.322
- 0.3BTB18.089
- 1SLX - 0.3SLY - 0.3
Min Fy 32405 1152 1DL31466
+ 1SIDL 2828.645
- 1COL(-X)-MLC-47.588 6.572 -1.898 -23.825 -93.719
Max Fz 32436 3078 1DL31498
+ 1SIDL +3407.75
0.3CL + 0.3PLB
0.802
+ 0.3TLB 54.429
- 0.3BTB4.292
- 0.3SLX - 0.3SLY
50.036- 1SLZ11.067
- 1.1NLB
Min Fz 32436 1015 1DL31498
+ 1SIDL-1163.492
+ 0.3SLX + 0.3SLY
-0.771
+ 1SLZ -39.518 -3.454 -93.445 -11.932
Max Mx 32541 3054 1DL31613
+ 1SIDL 3697.709
+ 0.3CL + 0.3PLA1.457
+ 0.3TLA52.491
- 0.3BTA -4.924
0.3SLX - 0.3SLY
51.607 - 1SLZ10.576
- 1.1NLA
Min Mx 32541 3078 1DL31612
+ 1SIDL +-839.672
0.3CL + 0.3PLB
-1.227
+ 0.3TLB -38.406
- 0.3BTB-3.806
- 0.3SLX - -147.69
0.3SLY - 1SLZ-10.718
- 1.1NLB
Max My 32436 1015 1DL31497
+ 1SIDL 3316.518
+ 0.3SLX + 0.3SLY
0.769
+ 1SLZ 53.556 4.357 91.851 11.07
Min My 32436 3078 1DL31497
+ 1SIDL +-1072.26
0.3CL + 0.3PLB
-0.738
+ 0.3TLB -38.645
- 0.3BTB-3.519
- 0.3SLX -150.172
- 0.3SLY - 1SLZ-11.905
- 1.1NLB
Max Mz 32510 1007 1DL31580
+ 1SIDL 4122.713
+ 1SLX + 0.3SLY32.275
+ 0.3SLZ 19.948 2.719 14.93 49.538
Min Mz 32405 1152 1DL31466
+ 1SIDL 2828.645
- 1COL(-X)-MLC-47.588 6.572 -1.898 -23.825 -93.719
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32510 3171 1.0DL
31580
+ 1.0SIDL
6732.349
+ 0.3CL + 0.3PLB
13.107 + 0.3TLB
63.513+ 0.3BTB
6.128+ 0.3SLX
124.424
+ 0.3SLY +20.652
1SLZ + 1.54NLB
Min Fx 32436 2115 1.0DL
31498
+ 1.0SIDL
-1853.055
+ 0.3SLX + -1.004
0.3SLY + 1SLZ
-53.849 -4.657 -115.874 -15.57
Max Fy 32510 2186 1.0DL
31581
+ 1.0SIDL
4624.168
+ 0.3CL + 0.3PLA
43.171 + 0.3PLB
24.945
+ 0.3TLA3.417
+ 0.3TLB -11.143
0.3BTA - 0.3BTB
23.232- 1SLX - 0.3SLY
Min Fy 32405 1452 1.15DL
31466
+ 1.2SIDL
3198.865
- 1.5COL(-X)-MLC
-71.386 7.869 -2.999 -28.074 -140.553
Max Fz 32436 3178 1.0DL
31498
+ 1.0SIDL
4103.782
+ 0.3CL + 0.3PLB
1.035 + 0.3TLB
68.897- 0.3BTB
5.456- 0.3SLX
72.255
- 0.3SLY - 1SLZ
14.711
- 1.54NLB
Min Fz 32436 2115 1.0DL
31498
+ 1.0SIDL
-1853.055
+ 0.3SLX + -1.004
0.3SLY + 1SLZ
-53.849 -4.657 -115.874 -15.57
Max Mx 32541 3154 1.0DL
31613
+ 1.0SIDL
4399.149
+ 0.3CL + 0.3PLA
1.867 + 0.3TLA
66.421
- 0.3BTA
6.282
- 0.3SLX74.019
- 0.3SLY - 1SLZ
14.061- 1.54NLA
Min Mx 32541 3178 1.0DL
31612
+ 1.0SIDL
-1541.113
+ 0.3CL + 0.3PLB
-1.637 + 0.3TLB
-52.337- 0.3BTB
-5.165- 0.3SLX
-184.324
- 0.3SLY - -13.815
1SLZ - 1.54NLB
Max My 32436 2115 1.0DL
31497
+ 1.0SIDL
4006.081
+ 0.3SLX + 0.3SLY
1.002 + 1SLZ67.887 5.56 128.611 14.503
Min My 32436 3178 1.0DL
31497
+ 1.0SIDL
-1755.354
+ 0.3CL + 0.3PLB
-0.972 + 0.3TLB
-52.84- 0.3BTB
-4.762- 0.3SLX
-187.277
- 0.3SLY - -15.333
1SLZ - 1.54NLB
Max Mz 32405 2107 1.0DL
31466
+ 1.0SIDL
4089.451
+1SLX + 0.3SLY
41.612+ 0.3SLZ23.783 3.019 23.095 64.599
Min Mz 32405 1452 1.15DL
31466
+ 1.2SIDL
3198.865
- 1.5COL(-X)-MLC
-71.386 7.869 -2.999 -28.074 -140.553

ODE MDE
Maximum Tension Force (kN) -1163.49 -1853.06
Skin Friction (kN) 2420.67
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


19 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 187.9 697.1 0.270 OK
Minima 4624 25.79 1725 0.015 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 57.47 OK
Minima -7.953 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 5.524 OK 38.97 OK
Minima 1.2 OK 9.156 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.754 m
Hence de = 0.740 m and dv = 0.666 m
Horizontal resultant shear force at the section, Vu = 704 kN
Corresponding axial compressive force, N = 3199 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 20106 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0101 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 1.509 %
Horizontal shear force, Vu = 704 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 1057.51 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.847 Mpa
= 847 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.931
Allowable shear stress in concrete, s vc = 788.777 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.20
Modified shear strength of concrete (n s vc ) = 949.41 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 72.00 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 266.40 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C49 & C50


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C49 & C50

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 2
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32650 1004 1DL31740
+ 1SIDL 4334.635
+ 1CL + 1PLB +-14.02
1.1TLB - -43.176
1.1BTB 0.694 210.306 24.211
Min Fx 32599 1001 1DL31678
+ 1SIDL 1378.639
+ 1CL + 1PLA +-2.067
1.1TLA + -48.048
1.1BTA 0.486 224.044 -49.722
Max Fy 32585 1005 1DL31645
+ 1SIDL + 1CL
3618.9
+ 1PLA +36.059
1PLB + 1.1TLA
-48.94
+ 1.1TLB0.571
+ 1.1BTA314.289
+ 1.1BTB 23.656
Min Fy 32667 1006 1DL31739
+ 1SIDL 4269.433
+ 1CL + 1PLA + 1PLB
-49.1+ 1.1TLA
-58.522
+ 1.1TLB0.594
- 1.1BTA375.974
- 1.1BTB -60.637
Max Fz 32696 1006 1DL31787
+ 1SIDL 1819.357
+ 1CL + 1PLA + 1.803
1PLB + 1.1TLA
8.822
+ 1.1TLB0.582
- 1.1BTA -42.912
- 1.1BTB -1.652
Min Fz 32698 1006 1DL31771
+ 1SIDL 1819.357
+ 1CL + 1PLA +-8.733
1PLB + 1.1TLA
-84.205
+ 1.1TLB0.582
- 1.1BTA553.846
- 1.1BTB 99.851
Max Mx 32650 1004 1DL31740
+ 1SIDL 4334.635
+ 1CL + 1PLB +-14.02
1.1TLB - -43.176
1.1BTB 0.694 210.306 24.211
Min Mx 32599 1003 1DL31678
+ 1SIDL 1566.142
+ 1CL + 1PLB +-2.089
1.1TLB + -55.262
1.1BTB 0.419 267.124 -49.719
Max My 32698 1006 1DL31771
+ 1SIDL 1819.357
+ 1CL + 1PLA +-8.733
1PLB + 1.1TLA
-84.205
+ 1.1TLB0.582
- 1.1BTA553.846
- 1.1BTB 99.851
Min My 32690 1006 1DL31782
+ 1SIDL 1819.357
+ 1CL + 1PLA + 8.393
1PLB + 1.1TLA
-5.281
+ 1.1TLB0.582
- 1.1BTA -69.327
- 1.1BTB 23.854
Max Mz 32699 1006 1DL31791
+ 1SIDL 1819.357
+ 1CL + 1PLA + 0.823
1PLB + 1.1TLA
-73.593
+ 1.1TLB0.582
- 1.1BTA389.888
- 1.1BTB 112.021
Min Mz 32617 1005 1DL31697
+ 1SIDL 1567.708
+ 1CL + 1PLA +-1.821
1PLB + 1.1TLA
-61.747
+ 1.1TLB0.434
+ 1.1BTA327.094
+ 1.1BTB -102.171

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32650 3071 1DL31740
+ 1SIDL 6616.291
+ 0.3CL + 0.3PLB
33.408
+ 0.3TLB179.669
+ 0.3BTB5.585
+ 0.3SLX408.419
+ 0.3SLY + 1SLZ
136.626
+ 1.1NLB
Min Fx 32599 1015 1DL31679
+ 1SIDL +-604.752
0.3SLX + 0.3SLY
-11.773
+ 1SLZ-276.831 -3.669 118.282 -240.427
Max Fy 32585 1079 1DL31645
+ 1SIDL 4089.979
+ 0.3CL + 0.3PLA
303.131
+ 0.3PLB92.145
+ 0.3TLA + 0.3TLB
2.781 + 0.3BTA
677.415 + 0.3BTB
242.281
+ 1SLX + 0.3SLY +
Min Fy 32667 1086 1DL31739
+ 1SIDL 2839.937
+ 0.3CL + 0.3PLA
-325.262
+ 0.3PLB
-183.258
+ 0.3TLA +-1.791
0.3TLB - 0.3BTA
-106.161- 0.3BTB
-307.195
- 1SLX - 0.3SLY - 0.3
Max Fz 32585 3054 1DL31664
+ 1SIDL 6091.141
+ 0.3CL + 0.3PLA
91.185
+ 0.3TLA369.118
- 0.3BTA -5.333
0.3SLX1040.255
- 0.3SLY - 1SLZ65.987
- 1.1NLA
Min Fz 32616 3078 1DL31677
+ 1SIDL +-495.817
0.3CL + 0.3PLB
-16.836
+ 0.3TLB
-479.016
- 0.3BTB -3.76
- 0.3SLX -931.421
- 0.3SLY - 1SLZ
-225.015
- 1.1NLB
Max Mx 32650 3071 1DL31740
+ 1SIDL 6616.291
+ 0.3CL + 0.3PLB
33.408
+ 0.3TLB179.669
+ 0.3BTB5.585
+ 0.3SLX408.419
+ 0.3SLY + 1SLZ
136.626
+ 1.1NLB
Min Mx 32650 3047 1DL31741
+ 1SIDL +862.152
0.3CL + 0.3PLA
-44.443
+ 0.3TLA
-254.728
+ 0.3BTA-4.471
+ 0.3SLX +99.712
0.3SLY + -198.694
1SLZ + 1.1NLA
Max My 32698 1095 1DL31771
+ 1SIDL 3540.813
+ 0.3CL + 0.3PLA
15.837
+ 0.3PLB332.83
+ 0.3TLA + 0.3TLB
4.736 + 1787.353
0.3BTA + 0.3BTB 214.46
+ 0.3SLX + 0.3SLY
Min My 32585 3054 1DL31645
+ 1SIDL +-229.603
0.3CL + 0.3PLA
-96.935
+ 0.3TLA
-440.325
- 0.3BTA-4.039
- 0.3SLX-1006.164
- 0.3SLY - 1SLZ
-80.456
- 1.1NLA
Max Mz 32700 1086 1DL31791
+ 1SIDL 2276.406
+ 0.3CL + 0.3PLA
13.654
+ 0.3PLB +48.97
0.3TLA + 0.3TLB
2.774 - 0.3BTA
545.992- 0.3BTB
857.025
- 1SLX - 0.3SLY - 0.3
Min Mz 32618 1079 1DL31697
+ 1SIDL +747.336
0.3CL + 0.3PLA
-14.502
+ 0.3PLB
-170.694
+ 0.3TLA +-1.755
0.3TLB + 0.3BTA
83.784+ 0.3BTB
-846.73
+ 1SLX + 0.3SLY +
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32650 3171 1.0DL
31740
+ 1.0SIDL
7477.714
+ 0.3CL + 0.3PLB
45.181 + 246.402
0.3TLB + 0.3BTB
7.147+ 0.3SLX
475.289
+ 0.3SLY183.458
+ 1SLZ + 1.54NLB
Min Fx 32568 2115 1.0DL
31647
+ 1.0SIDL
-1306.165
+ 0.3SLX +-47.327
0.3SLY + 1SLZ
-321.356 -5.643 74.667 -245.155
Max Fy 32585 1452 1.15DL
31645
+ 1.2SIDL
3054.268
- 1.5COL(-X)-MLC
663.703 -67.149 -1.902 348.76 1148.245
Min Fy 32667 2186 1.0DL
31739
+ 1.0SIDL
2549.07
+ 0.3CL -418.157
+ 0.3PLA + 0.3PLB
-223.535
+ 0.3TLA
-2.506
+ 0.3TLB-233.796
- 0.3BTA - -383.069
0.3BTB - 1SLX - 0.3SLY
Max Fz 32585 3154 1.0DL
31664
+ 1.0SIDL
7074.54
+ 0.3CL +119.757
0.3PLA + 0.3TLA
494.774- 0.3BTA
6.838
- 0.3SLX
1293.759
- 0.3SLY - 1SLZ
81.119
- 1.54NLA
Min Fz 32616 3178 1.0DL
31677
+ 1.0SIDL
-1061.239
+ 0.3CL +-21.821
0.3PLB + -608.521
0.3TLB - 0.3BTB
-5.069- 0.3SLX
-1334.415
- 0.3SLY -298.928
- 1SLZ - 1.54NLB
Max Mx 32650 3171 1.0DL
31740
+ 1.0SIDL
7477.714
+ 0.3CL + 0.3PLB
45.181 + 246.402
0.3TLB + 0.3BTB
7.147+ 0.3SLX
475.289
+ 0.3SLY183.458
+ 1SLZ + 1.54NLB
Min Mx 32650 3147 1.0DL
31741
+ 1.0SIDL 0.733
+ 0.3CL +-56.216
0.3PLA + -321.461
0.3TLA + 0.3BTA
-6.033+ 0.3SLX
90.577
+ 0.3SLY
-256.341
+ 1SLZ + 1.54NLA
Max My 32698 2195 1.0DL
31771
+ 1.0SIDL
4131.946
+ 0.3CL + 0.3PLA
20.974 + 0.3PLB
456.335
+ 0.3TLA6.04
+ 0.3TLB2186.477
+ 0.3BTA + 288.182
0.3BTB + 0.3SLX + 0.3
Min My 32585 3154 1.0DL
31645
+ 1.0SIDL
-1188.466
+ 0.3CL -125.641
+ 0.3PLA + -563.115
0.3TLA - 0.3BTA
-5.414
- 0.3SLX
-1391.531
- 0.3SLY-104.336
- 1SLZ - 1.54NLA
Max Mz 32585 1452 1.15DL
31645
+ 1.2SIDL
3054.268
- 1.5COL(-X)-MLC
663.703 -67.149 -1.902 348.76 1148.245
Min Mz 32573 1452 1.15DL
31652
+ 1.2SIDL
3054.268
- 1.5COL(-X)-MLC
5.781 -21.894 -1.902 -33.4 -1249.408

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 32 18
2nd Layer

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -1188 1395 1549 0.901 OK
Minima 0.733 271.9 1868 0.146 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 148.2 OK
Minima -267.2 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 8.341 OK 53.16 OK
Minima -1.602 OK -21.75 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.060 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 15.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32662 1004 1DL31752
+ 1SIDL 4334.635
+ 1CL + 1PLB + 6.658
1.1TLB - 1.1BTB
3.577 0.694 -40.905 27.785
Min Fx 32611 1001 1DL31690
+ 1SIDL 1378.639
+ 1CL + 1PLA +-2.185
1.1TLA + 1.1BTA
4.575 0.486 -47.087 -4.259
Max Fy 32662 1006 1DL31752
+ 1SIDL 4269.433
+ 1CL + 1PLA +11.041
1PLB + 1.1TLA
4.583
+ 1.1TLB0.594
- 1.1BTA -45.682
- 1.1BTB 44.268
Min Fy 32580 1005 1DL31658
+ 1SIDL + 1CL
3618.9
+ 1PLA +-8.698
1PLB + 1.1TLA
3.836
+ 1.1TLB0.571
+ 1.1BTA-38.206
+ 1.1BTB -32.996
Max Fz 32696 1006 1DL31787
+ 1SIDL 1819.357
+ 1CL + 1PLA + 1.803
1PLB + 1.1TLA
8.822
+ 1.1TLB0.582
- 1.1BTA -42.912
- 1.1BTB -1.652
Min Fz 32709 1006 1DL31799
+ 1SIDL 1819.357
+ 1CL + 1PLA +-0.407
1PLB + 1.1TLA
-0.569
+ 1.1TLB0.582
- 1.1BTA - 1.1BTB
1.003 -0.618
Max Mx 32662 1004 1DL31752
+ 1SIDL 4334.635
+ 1CL + 1PLB + 6.658
1.1TLB - 1.1BTB
3.577 0.694 -40.905 27.785
Min Mx 32611 1003 1DL31690
+ 1SIDL 1566.142
+ 1CL + 1PLB +-2.177
1.1TLB + 1.1BTB
4.7 0.419 -52.676 -4.221
Max My 32707 1006 1DL31798
+ 1SIDL 1819.357
+ 1CL + 1PLA +-0.735
1PLB + 1.1TLA
0.105
+ 1.1TLB0.582
- 1.1BTA - 1.1BTB
1.398 -1.204
Min My 32693 1006 1DL31784
+ 1SIDL 1819.357
+ 1CL + 1PLA + 5.088
1PLB + 1.1TLA
6.231
+ 1.1TLB0.582
- 1.1BTA - -65.43
1.1BTB 10.453
Max Mz 32662 1006 1DL31752
+ 1SIDL 4269.433
+ 1CL + 1PLA +11.041
1PLB + 1.1TLA
4.583
+ 1.1TLB0.594
- 1.1BTA -45.682
- 1.1BTB 44.268
Min Mz 32580 1005 1DL31658
+ 1SIDL + 1CL
3618.9
+ 1PLA +-8.698
1PLB + 1.1TLA
3.836
+ 1.1TLB0.571
+ 1.1BTA-38.206
+ 1.1BTB -32.996

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32662 3071 1DL31752
+ 1SIDL 6616.291
+ 0.3CL + 0.3PLB
23.947
+ 0.3TLB 69.793
+ 0.3BTB5.585
+ 0.3SLX300.688
+ 0.3SLY + 1SLZ
95.528
+ 1.1NLB
Min Fx 32611 1015 1DL31691
+ 1SIDL +-604.752
0.3SLX + 0.3SLY
-10.845
+ 1SLZ -66.774 -3.669 -324.251 -10.195
Max Fy 32662 1086 1DL31753
+ 1SIDL 4761.468
+ 0.3CL + 0.3PLA
76.321
+ 0.3PLB26.377
+ 0.3TLA + 0.3TLB
2.897 - 0.3BTA
57.474- 0.3BTB
219.562
- 1SLX - 0.3SLY - 0.3
Min Fy 32580 1079 1DL31659
+ 1SIDL 2033.488
+ 0.3CL + 0.3PLA
-72.536
+ 0.3PLB -19.61
+ 0.3TLA +-1.757
0.3TLB + 0.3BTA
-119.893+ 0.3BTB
-204.379
+ 1SLX + 0.3SLY +
Max Fz 32611 3078 1DL31691
+ 1SIDL +3223.92
0.3CL + 0.3PLB
11.316
+ 0.3TLB 75.609
- 0.3BTB4.399
- 0.3SLX -242.703
0.3SLY - 1SLZ10.097
- 1.1NLB
Min Fz 32580 3071 1DL31659
+ 1SIDL + 0.3CL
-46.94
+ 0.3PLB
-23.625
+ 0.3TLB -67.57
+ 0.3BTB-4.025
+ 0.3SLX-303.255
+ 0.3SLY + 1SLZ
-67.75
+ 1.1NLB
Max Mx 32662 3071 1DL31752
+ 1SIDL 6616.291
+ 0.3CL + 0.3PLB
23.947
+ 0.3TLB 69.793
+ 0.3BTB5.585
+ 0.3SLX300.688
+ 0.3SLY + 1SLZ
95.528
+ 1.1NLB
Min Mx 32662 3047 1DL31753
+ 1SIDL +862.152
0.3CL + 0.3PLA
-21.82
+ 0.3TLA -63.152
+ 0.3BTA-4.471
+ 0.3SLX-301.935
+ 0.3SLY + 1SLZ
-60.069
+ 1.1NLA
Max My 32580 3071 1DL31658
+ 1SIDL 6273.806
+ 0.3CL + 0.3PLB
20.895
+ 0.3TLB 72.415
+ 0.3BTB5.346
+ 0.3SLX319.409
+ 0.3SLY + 1SLZ
80.047
+ 1.1NLB
Min My 32611 3078 1DL31690
+ 1SIDL +-495.817
0.3CL + 0.3PLB
-10.283
+ 0.3TLB -65.927
- 0.3BTB -3.76
- 0.3SLX -405.366
- 0.3SLY - 1SLZ - 1.1NLB
-20
Max Mz 32662 1007 1DL31752
+ 1SIDL 4560.993
+ 1SLX + 0.3SLY73.922
+ 0.3SLZ 25.989 2.876 79.685 286.853
Min Mz 32580 1014 1DL31658
+ 1SIDL 1797.092
- 1SLX - 0.3SLY
-70.224
- 0.3SLZ -19.898 -1.786 -143.115 -268.235
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32662 3171 1.0DL
31752
+ 1.0SIDL
7477.714
+ 0.3CL + 0.3PLB
30.978 + 0.3TLB
90.057+ 0.3BTB
7.147+ 0.3SLX
404.197
+ 0.3SLY122.686
+ 1SLZ + 1.54NLB
Min Fx 32580 2115 1.0DL
31659
+ 1.0SIDL
-1306.165
+ 0.3SLX +-29.311
0.3SLY + 1SLZ
-88.583 -5.643 -388.899 -83.935
Max Fy 32662 2186 1.0DL
31753
+ 1.0SIDL
5052.335
+ 0.3CL + 0.3PLA
98.393 + 0.3PLB
33.239
+ 0.3TLA3.612
+ 0.3TLB -85.114
0.3BTA - 0.3BTB
282.221- 1SLX - 0.3SLY
Min Fy 32580 1452 1.15DL
31658
+ 1.2SIDL
3054.268
- 1.5COL(-X)-MLC
-139.967 7.592 -1.902 -54.343 -590.722
Max Fz 32611 3178 1.0DL
31691
+ 1.0SIDL
3802.508
+ 0.3CL + 0.3PLB
14.631 + 0.3TLB
97.607- 0.3BTB
5.597- 0.3SLX
329.558
- 0.3SLY - 1SLZ
13.09
- 1.54NLB
Min Fz 32580 3171 1.0DL
31659
+ 1.0SIDL
-1005.789
+ 0.3CL +-30.429
0.3PLB + 0.3TLB
-89.326+ 0.3BTB
-5.401+ 0.3SLX
-387.458
+ 0.3SLY +-87.02
1SLZ + 1.54NLB
Max Mx 32662 3171 1.0DL
31752
+ 1.0SIDL
7477.714
+ 0.3CL + 0.3PLB
30.978 + 0.3TLB
90.057+ 0.3BTB
7.147+ 0.3SLX
404.197
+ 0.3SLY122.686
+ 1SLZ + 1.54NLB
Min Mx 32662 3147 1.0DL
31753
+ 1.0SIDL 0.733
+ 0.3CL + 0.3PLA
-28.85 + 0.3TLA
-83.416
+ 0.3BTA
-6.033+ 0.3SLX
-384.646
+ 0.3SLY-80.199
+ 1SLZ + 1.54NLA
Max My 32580 3171 1.0DL
31658
+ 1.0SIDL
7257.218
+ 0.3CL + 0.3PLB
27.731 + 0.3TLB
93.669+ 0.3BTB
6.851+ 0.3SLX
427.331
+ 0.3SLY +106.24
1SLZ + 1.54NLB
Min My 32611 3178 1.0DL
31690
+ 1.0SIDL
-1061.239
+ 0.3CL +-13.614
0.3PLB + 0.3TLB
-87.418- 0.3BTB
-5.069- 0.3SLX
-516.244
- 0.3SLY - -26.327
1SLZ - 1.54NLB
Max Mz 32662 2107 1.0DL
31752
+ 1.0SIDL
4851.859
+1SLX + 0.3SLY
95.994+ 0.3SLZ32.851 3.591 114.185 371.577
Min Mz 32580 1452 1.15DL
31658
+ 1.2SIDL
3054.268
- 1.5COL(-X)-MLC
-139.967 7.592 -1.902 -54.343 -590.722

ODE MDE
Maximum Tension Force (kN) -604.75 -1306.17
Skin Friction (kN) 1722.67
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 18

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 516.9 572.7 0.903 OK
Minima 5052 294.8 1688 0.175 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 75.37 OK
Minima -251.8 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 5.915 OK 41.16 OK
Minima 1.239 OK 9.667 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.758 m
Hence de = 0.741 m and dv = 0.667 m
Horizontal resultant shear force at the section, Vu = 667 kN
Corresponding axial compressive force, N = 3054 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 14476 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0072 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 1.085 %
Horizontal shear force, Vu = 667 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 999.91 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.759 Mpa
= 759 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 706.257 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.19
Modified shear strength of concrete (n s vc ) = 843.58 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 104.29 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 266.86 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C51


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C51

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 2
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32720 1003 1DL31816
+ 1SIDL 3489.025
+ 1CL + 1PLB +20.072
1.1TLB + -28.263
1.1BTB -0.109 156.819 -12.494
Min Fx 32751 1002 1DL31848
+ 1SIDL +1310.08
1CL + 1PLA + 4.579
1.1TLA - -43.446
1.1BTA -0.054 211.713 40.515
Max Fy 32737 1005 1DL31815
+ 1SIDL 3453.294
+ 1CL + 1PLA +56.599
1PLB + 1.1TLA
-34.898
+ 1.1TLB
-0.058
+ 1.1BTA +258.38
1.1BTB 90.771
Min Fy 32730 1005 1DL31826
+ 1SIDL 3453.294
+ 1CL + 1PLA -13.039
+ 1PLB + 1.1TLA
-1.297
+ 1.1TLB
-0.058
+ 1.1BTA-25.675
+ 1.1BTB -76.422
Max Fz 32766 1006 1DL31863
+ 1SIDL 1390.089
+ 1CL + 1PLA + 0.544
1PLB + 1.1TLA
5.559
+ 1.1TLB
-0.057
- 1.1BTA -28.902
- 1.1BTB -3.972
Min Fz 32768 1005 1DL31847
+ 1SIDL 1427.103
+ 1CL + 1PLA +10.084
1PLB + 1.1TLA
-54.93
+ 1.1TLB
-0.132
+ 1.1BTA397.098
+ 1.1BTB -94.897
Max Mx 32720 1001 1DL31816
+ 1SIDL 3090.959
+ 1CL + 1PLA +20.486
1.1TLA + -27.753
1.1BTA 0.096 140.465 -11.815
Min Mx 32751 1003 1DL31848
+ 1SIDL 1411.506
+ 1CL + 1PLB + -0.69
1.1TLB + -44.64
1.1BTB -0.154 237.923 -59.874
Max My 32768 1005 1DL31847
+ 1SIDL 1427.103
+ 1CL + 1PLA +10.084
1PLB + 1.1TLA
-54.93
+ 1.1TLB
-0.132
+ 1.1BTA397.098
+ 1.1BTB -94.897
Min My 32761 1006 1DL31859
+ 1SIDL 1390.089
+ 1CL + 1PLA + 4.606
1PLB + 1.1TLA
-1.242
+ 1.1TLB
-0.057
- 1.1BTA -43.202
- 1.1BTB 5.814
Max Mz 32768 1006 1DL31847
+ 1SIDL 1390.089
+ 1CL + 1PLA + 0.193
1PLB + 1.1TLA
-54.577
+ 1.1TLB
-0.057
- 1.1BTA387.045
- 1.1BTB 101.12
Min Mz 32751 1005 1DL31848
+ 1SIDL 1427.103
+ 1CL + 1PLA +-3.278
1PLB + 1.1TLA
-46.366
+ 1.1TLB
-0.132
+ 1.1BTA239.111
+ 1.1BTB -109.722

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32720 3071 1DL31816
+ 1SIDL 6478.099
+ 0.3CL + 0.3PLB
51.685
+ 0.3TLB196.925
+ 0.3BTB5.155
+ 0.3SLX371.198
+ 0.3SLY + 1SLZ
178.594
+ 1.1NLB
Min Fx 32751 3054 1DL31848
+ 1SIDL + -540.85
0.3CL + 0.3PLA
-10.863
+ 0.3TLA
-270.032
- 0.3BTA-4.313
- 0.3SLX - 0.3SLY
-73.94 - 1SLZ
-247.052
- 1.1NLA
Max Fy 32737 1079 1DL31815
+ 1SIDL 4550.205
+ 0.3CL + 0.3PLA
309.35
+ 0.3PLB108.927
+ 0.3TLA + 0.3TLB
2.597 + 0.3BTA
698.286 + 0.3BTB
280.462
+ 1SLX + 0.3SLY +
Min Fy 32737 1086 1DL31815
+ 1SIDL 1656.601
+ 0.3CL + 0.3PLA
-260.606
+ 0.3PLB
-174.025
+ 0.3TLA +-2.647
0.3TLB - 0.3BTA
-227.923 - 0.3BTB
-118.079
- 1SLX - 0.3SLY - 0.3
Max Fz 32737 3071 1DL31815
+ 1SIDL 6478.099
+ 0.3CL + 0.3PLB
119.595
+ 0.3TLB372.895
+ 0.3BTB5.155
+ 0.3SLX1459.609
+ 0.3SLY + 1SLZ
174.059
+ 1.1NLB
Min Fz 32768 3047 1DL31866
+ 1SIDL + -499.18
0.3CL + 0.3PLA-9.62
+ 0.3TLA
-465.692
+ 0.3BTA-4.609
+ 0.3SLX-597.953
+ 0.3SLY + -275.197
1SLZ + 1.1NLA
Max Mx 32720 3054 1DL31817
+ 1SIDL 6338.282
+ 0.3CL + 0.3PLA
48.847
+ 0.3TLA196.891
- 0.3BTA -5.175
0.3SLX - 0.3SLY
156.54 - 1SLZ208.972
- 1.1NLA
Min Mx 32720 3078 1DL31816
+ 1SIDL +-226.689
0.3CL + 0.3PLB
-23.845
+ 0.3TLB-250.68
- 0.3BTB-5.198
- 0.3SLX - -87.907
0.3SLY - 1SLZ
-140.469
- 1.1NLB
Max My 32768 3047 1DL31847
+ 1SIDL 3097.982
+ 0.3CL + 0.3PLA21.02
+ 0.3TLA357.352
+ 0.3BTA 4.247
+ 0.3SLX1686.43
+ 0.3SLY + 1SLZ
233.846
+ 1.1NLA
Min My 32737 3054 1DL31815
+ 1SIDL +-268.514
0.3CL + 0.3PLA
-70.978
+ 0.3TLA
-427.985
- 0.3BTA-4.844
- 0.3SLX-1023.189
- 0.3SLY - 1SLZ-11.454
- 1.1NLA
Max Mz 32770 1086 1DL31867
+ 1SIDL 1991.337
+ 0.3CL + 0.3PLA
15.126
+ 0.3PLB74.546
+ 0.3TLA + 0.3TLB
2.529 - 0.3BTA
489.938 - 0.3BTB
838.532
- 1SLX - 0.3SLY - 0.3
Min Mz 32770 1079 1DL31867
+ 1SIDL +621.663
0.3CL + 0.3PLA
-7.696
+ 0.3PLB
-171.627
+ 0.3TLA + 0.3TLB
-2.64 + 0.3BTA
31.462 + 0.3BTB
-851.765
+ 1SLX + 0.3SLY +
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32720 3171 1.0DL
31816
+ 1.0SIDL
7506.95
+ 0.3CL + 0.3PLB
62.408 + 265.329
0.3TLB + 0.3BTB
6.764+ 0.3SLX
439.054
+ 0.3SLY229.647
+ 1SLZ + 1.54NLB
Min Fx 32720 3147 1.0DL
31817
+ 1.0SIDL
-1356.697
+ 0.3CL +-31.468
0.3PLA + -319.195
0.3TLA + 0.3BTA
-6.781+ 0.3SLX
51.623
+ 0.3SLY
-257.845
+ 1SLZ + 1.54NLA
Max Fy 32737 1452 1.15DL
31815
+ 1.2SIDL
3428.61
- 1.5COL(-X)-MLC
680.941 -71.516 -3.261 379.607 1213.399
Min Fy 32737 2186 1.0DL
31815
+ 1.0SIDL
1223.059
+ 0.3CL -345.201
+ 0.3PLA + 0.3PLB
-216.262
+ 0.3TLA
-3.445
+ 0.3TLB-364.443
- 0.3BTA - 0.3BTB
-171.71- 1SLX - 0.3SLY
Max Fz 32737 3171 1.0DL
31815
+ 1.0SIDL
7506.95
+ 0.3CL +146.938
0.3PLB + 496.684
0.3TLB + 0.3BTB
6.764+ 0.3SLX
1830.385
+ 0.3SLY198.256
+ 1SLZ + 1.54NLB
Min Fz 32768 3147 1.0DL
31866
+ 1.0SIDL
-1043.724
+ 0.3CL +-14.178
0.3PLA + -593.118
0.3TLA + 0.3BTA
-6.03+ 0.3SLX
-869.829
+ 0.3SLY
-354.436
+ 1SLZ + 1.54NLA
Max Mx 32720 3154 1.0DL
31817
+ 1.0SIDL
7367.135
+ 0.3CL + 0.3PLA
59.569 + 0.3TLA
265.296
- 0.3BTA
6.784
- 0.3SLX
168.527
- 0.3SLY -268.125
1SLZ - 1.54NLA
Min Mx 32720 3178 1.0DL
31816
+ 1.0SIDL
-1255.541
+ 0.3CL +-34.568
0.3PLB + -319.084
0.3TLB - 0.3BTB
-6.807- 0.3SLX
-155.763
- 0.3SLY -191.522
- 1SLZ - 1.54NLB
Max My 32768 3147 1.0DL
31847
+ 1.0SIDL
3658.106
+ 0.3CL + 0.3PLA
25.614 + 0.3TLA
481.065
+ 0.3BTA5.54+ 0.3SLX
2093.802
+ 0.3SLY308.909
+ 1SLZ + 1.54NLA
Min My 32737 3154 1.0DL
31815
+ 1.0SIDL
-1264.034
+ 0.3CL +-98.524
0.3PLA + -548.156
0.3TLA - 0.3BTA
-6.307
- 0.3SLX
-1404.738
- 0.3SLY --35.921
1SLZ - 1.54NLA
Max Mz 32737 1452 1.15DL
31815
+ 1.2SIDL
3428.61
- 1.5COL(-X)-MLC
680.941 -71.516 -3.261 379.607 1213.399
Min Mz 32725 1452 1.15DL
31822
+ 1.2SIDL
3428.61
- 1.5COL(-X)-MLC
9.168 -24.066 -3.261 -32.307 -1267.73

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 32 18
2nd Layer

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -1264 1405 1528 0.920 OK
Minima 7367 316.7 2562 0.124 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 139.6 OK
Minima -266.3 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 6.436 OK 41.36 OK
Minima -2.075 OK -7.939 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.025 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 15.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32732 1003 1DL31828
+ 1SIDL 3489.025
+ 1CL + 1PLB +-8.214
1.1TLB + 1.1BTB
1.204 -0.109 -23.773 -36.303
Min Fx 32763 1002 1DL31860
+ 1SIDL +1310.08
1CL + 1PLA + 0.703
1.1TLA - 1.1BTA
3.594 -0.054 -41.146 -1.482
Max Fy 32732 1006 1DL31828
+ 1SIDL 3311.495
+ 1CL + 1PLA + 3.796
1PLB + 1.1TLA
2.003
+ 1.1TLB
-0.078
- 1.1BTA -26.862
- 1.1BTB 7.369
Min Fy 32732 1005 1DL31828
+ 1SIDL 3453.294
+ 1CL + 1PLA -12.138
+ 1PLB + 1.1TLA
1.768
+ 1.1TLB
-0.058
+ 1.1BTA-26.444
+ 1.1BTB -50.542
Max Fz 32766 1006 1DL31863
+ 1SIDL 1390.089
+ 1CL + 1PLA + 0.544
1PLB + 1.1TLA
5.559
+ 1.1TLB
-0.057
- 1.1BTA -28.902
- 1.1BTB -3.972
Min Fz 32779 1002 1DL31875
+ 1SIDL +1310.08
1CL + 1PLA +-0.052
1.1TLA - 1.1BTA
-0.332 -0.054 0.594 -0.072
Max Mx 32732 1001 1DL31828
+ 1SIDL 3090.959
+ 1CL + 1PLA +-8.328
1.1TLA + 1.1BTA
1.985 0.096 -25.465 -36.904
Min Mx 32763 1003 1DL31860
+ 1SIDL 1411.506
+ 1CL + 1PLB +-3.301
1.1TLB + 1.1BTB
2.481 -0.154 -39.08 -8.206
Max My 32777 1002 1DL31874
+ 1SIDL +1310.08
1CL + 1PLA +-0.157
1.1TLA - 1.1BTA
0.125 -0.054 0.801 -0.171
Min My 32763 1005 1DL31860
+ 1SIDL 1427.103
+ 1CL + 1PLA +-5.299
1PLB + 1.1TLA
3.053
+ 1.1TLB
-0.132
+ 1.1BTA-41.847
+ 1.1BTB -11.594
Max Mz 32732 1006 1DL31828
+ 1SIDL 3311.495
+ 1CL + 1PLA + 3.796
1PLB + 1.1TLA
2.003
+ 1.1TLB
-0.078
- 1.1BTA -26.862
- 1.1BTB 7.369
Min Mz 32732 1005 1DL31828
+ 1SIDL 3453.294
+ 1CL + 1PLA -12.138
+ 1PLB + 1.1TLA
1.768
+ 1.1TLB
-0.058
+ 1.1BTA-26.444
+ 1.1BTB -50.542

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32732 3071 1DL31828
+ 1SIDL 6478.099
+ 0.3CL + 0.3PLB
16.445
+ 0.3TLB 69.791
+ 0.3BTB5.155
+ 0.3SLX323.204
+ 0.3SLY + 1SLZ
58.405
+ 1.1NLB
Min Fx 32763 3054 1DL31860
+ 1SIDL + -540.85
0.3CL + 0.3PLA
-11.039
+ 0.3TLA --67.4
0.3BTA-4.313
- 0.3SLX-386.483
- 0.3SLY - 1SLZ
-23.015
- 1.1NLA
Max Fy 32732 1086 1DL31829
+ 1SIDL 4511.532
+ 0.3CL + 0.3PLA
65.289
+ 0.3PLB25.737
+ 0.3TLA + 0.3TLB
2.592 - 0.3BTA
74.094
- 0.3BTB
175.202
- 1SLX - 0.3SLY - 0.3
Min Fy 32732 1079 1DL31829
+ 1SIDL 1695.274
+ 0.3CL + 0.3PLA
-73.364
+ 0.3PLB-22.112
+ 0.3TLA +-2.641
0.3TLB + 0.3BTA
-120.068+ 0.3BTB
-208.691
+ 1SLX + 0.3SLY +
Max Fz 32763 3047 1DL31860
+ 1SIDL 3097.982
+ 0.3CL + 0.3PLA8.557
+ 0.3TLA73.435
+ 0.3BTA 4.247
+ 0.3SLX310.228
+ 0.3SLY + 1SLZ
13.828
+ 1.1NLA
Min Fz 32732 3071 1DL31829
+ 1SIDL +-128.697
0.3CL + 0.3PLB
-26.613
+ 0.3TLB -68.14
+ 0.3BTB-4.865
+ 0.3SLX-293.614
+ 0.3SLY + 1SLZ
-80.995
+ 1.1NLB
Max Mx 32732 3054 1DL31829
+ 1SIDL 6338.282
+ 0.3CL + 0.3PLA
18.576
+ 0.3TLA70.124
- 0.3BTA -5.175
0.3SLX -254.519
0.3SLY - 1SLZ47.589
- 1.1NLA
Min Mx 32732 3078 1DL31828
+ 1SIDL +-226.689
0.3CL + 0.3PLB
-24.543
+ 0.3TLB-66.612
- 0.3BTB-5.198
- 0.3SLX -370.767
- 0.3SLY - 1SLZ
-100.064
- 1.1NLB
Max My 32732 3071 1DL31828
+ 1SIDL 6478.099
+ 0.3CL + 0.3PLB
16.445
+ 0.3TLB 69.791
+ 0.3BTB5.155
+ 0.3SLX323.204
+ 0.3SLY + 1SLZ
58.405
+ 1.1NLB
Min My 32763 3078 1DL31860
+ 1SIDL + -479.32
0.3CL + 0.3PLB
-11.072
+ 0.3TLB-66.161
- 0.3BTB-4.619
- 0.3SLX -393.505
- 0.3SLY - 1SLZ-23.068
- 1.1NLB
Max Mz 32732 1007 1DL31828
+ 1SIDL 4412.485
+ 1SLX + 0.3SLY63.181
+ 0.3SLZ 25.665 2.608 96.962 232.914
Min Mz 32732 1014 1DL31828
+ 1SIDL 1557.554
- 1SLX - 0.3SLY
-71.126
- 0.3SLZ -22.12 -2.631 -144.884 -273.717
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32732 3171 1.0DL
31828
+ 1.0SIDL
7506.95
+ 0.3CL + 0.3PLB
23.022 + 0.3TLB
90.555+ 0.3BTB
6.764+ 0.3SLX
429.49
+ 0.3SLY +83.542
1SLZ + 1.54NLB
Min Fx 32732 3147 1.0DL
31829
+ 1.0SIDL
-1356.697
+ 0.3CL +-33.335
0.3PLA + 0.3TLA
-87.107
+ 0.3BTA
-6.781+ 0.3SLX
-384.89
+ 0.3SLY
-100.053
+ 1SLZ + 1.54NLA
Max Fy 32732 2186 1.0DL
31829
+ 1.0SIDL
4945.074
+ 0.3CL + 0.3PLA
85.923 + 0.3PLB
32.918
+ 0.3TLA3.389
+ 0.3TLB103.085
- 0.3BTA - 0.3BTB
232.17- 1SLX - 0.3SLY
Min Fy 32732 1452 1.15DL
31828
+ 1.2SIDL
3428.61
- 1.5COL(-X)-MLC
-142.605 7.856 -3.261 -57.687 -605.241
Max Fz 32763 3147 1.0DL
31860
+ 1.0SIDL
3658.106
+ 0.3CL + 0.3PLA
11.732 + 0.3TLA
95.058
+ 0.3BTA5.54+ 0.3SLX
416.111
+ 0.3SLY 19.679
+ 1SLZ + 1.54NLA
Min Fz 32732 3171 1.0DL
31829
+ 1.0SIDL
-1124.218
+ 0.3CL +-33.145
0.3PLB + 0.3TLB
-89.539+ 0.3BTB
-6.327+ 0.3SLX
-376.029
+ 0.3SLY-99.435
+ 1SLZ + 1.54NLB
Max Mx 32732 3154 1.0DL
31829
+ 1.0SIDL
7367.135
+ 0.3CL + 0.3PLA
25.154 + 0.3TLA
90.889
- 0.3BTA
6.784
- 0.3SLX
339.413
- 0.3SLY - 1SLZ
66.168
- 1.54NLA
Min Mx 32732 3178 1.0DL
31828
+ 1.0SIDL
-1255.541
+ 0.3CL +-31.121
0.3PLB + 0.3TLB
-87.377- 0.3BTB
-6.807- 0.3SLX
-477.053
- 0.3SLY -125.201
- 1SLZ - 1.54NLB
Max My 32732 3171 1.0DL
31828
+ 1.0SIDL
7506.95
+ 0.3CL + 0.3PLB
23.022 + 0.3TLB
90.555+ 0.3BTB
6.764+ 0.3SLX
429.49
+ 0.3SLY +83.542
1SLZ + 1.54NLB
Min My 32763 3178 1.0DL
31860
+ 1.0SIDL
-1023.865
+ 0.3CL +-14.268
0.3PLB + 0.3TLB
-87.143- 0.3BTB
-6.04- 0.3SLX
-502.575
- 0.3SLY - -28.961
1SLZ - 1.54NLB
Max Mz 32732 2107 1.0DL
31828
+ 1.0SIDL
4846.027
+1SLX + 0.3SLY
83.815
+ 0.3SLZ
32.847 3.405 133.111 310.504
Min Mz 32732 1452 1.15DL
31828
+ 1.2SIDL
3428.61
- 1.5COL(-X)-MLC
-142.605 7.856 -3.261 -57.687 -605.241

ODE MDE
Maximum Tension Force (kN) -540.85 -1356.7
Skin Friction (kN) 1722.67
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 18

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 503.4 572.7 0.879 OK
Minima 4945 254 1679 0.151 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 74.84 OK
Minima -241 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 4.84 OK 33.59 OK
Minima 1.215 OK 9.388 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.758 m
Hence de = 0.741 m and dv = 0.667 m
Horizontal resultant shear force at the section, Vu = 685 kN
Corresponding axial compressive force, N = 3429 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 14476 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0072 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 1.085 %
Horizontal shear force, Vu = 685 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 1026.28 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.759 Mpa
= 759 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 706.257 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.22
Modified shear strength of concrete (n s vc ) = 860.41 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 110.66 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 266.86 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C52, C54, C58, C59, C60


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C52, C54, C58, C59, C60

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13500 1003 1DL11562
+ 1SIDL 2451.323
+ 1CL + 1PLB + 6.987
1.1TLB + 29.203
1.1BTB 0.689 -43.066 -28.781
Min Fx 13302 1001 1DL11364
+ 1SIDL 1532.648
+ 1CL + 1PLA + 6.512
1.1TLA + 19.365
1.1BTA 0.611 -56.488 -30.42
Max Fy 13595 1005 1DL11627
+ 1SIDL 1873.365
+ 1CL + 1PLA + 35.01
1PLB + 1.1TLA
45.817
+ 1.1TLB0.731
+ 1.1BTA
-158.718
+ 1.1BTB 18.199
Min Fy 13397 1006 1DL11429
+ 1SIDL 2287.186
+ 1CL + 1PLA -33.758
+ 1PLB + 1.1TLA
43.765
+ 1.1TLB0.211
- 1.1BTA -167.98
- 1.1BTB -3.511
Max Fz 13529 1003 1DL11561
+ 1SIDL 2451.323
+ 1CL + 1PLB +18.029
1.1TLB + 50.777
1.1BTB 0.689 -172.684 13.176
Min Fz 13578 1004 1DL11640
+ 1SIDL 1864.358
+ 1CL + 1PLB + 3.368
1.1TLB - 1.1BTB
-8.439 0.593 42.998 9.878
Max Mx 32455 1001 1DL31520
+ 1SIDL +2204.05
1CL + 1PLA + 5.356
1.1TLA + 21.858
1.1BTA 1.017 -45.914 -30.571
Min Mx 13302 1006 1DL11364
+ 1SIDL 1780.664
+ 1CL + 1PLA +-9.414
1PLB + 1.1TLA
23.56
+ 1.1TLB 0.03
- 1.1BTA -49.784
- 1.1BTB 76.229
Max My 13572 1004 1DL11635
+ 1SIDL 1864.358
+ 1CL + 1PLB + 4.339
1.1TLB - 1.1BTB
5.419 0.593 69.374 32.414
Min My 13529 1005 1DL11561
+ 1SIDL 2442.662
+ 1CL + 1PLA + 33.54
1PLB + 1.1TLA
47.589
+ 1.1TLB0.895
+ 1.1BTA
-172.877
+ 1.1BTB 12.491
Max Mz 32457 1006 1DL31523
+ 1SIDL 2309.859
+ 1CL + 1PLA +-1.578
1PLB + 1.1TLA
16.411
+ 1.1TLB0.734
- 1.1BTA -17.269
1.1BTB 95.308
Min Mz 13305 1005 1DL11368
+ 1SIDL 1585.628
+ 1CL + 1PLA + 0.182
1PLB + 1.1TLA
12.997
+ 1.1TLB0.642
+ 1.1BTA +18.658
1.1BTB -88.96

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13368 3071 1DL11430
+ 1SIDL 2675.302
+ 0.3CL + 0.3PLB
31.328
+ 0.3TLB105.558
+ 0.3BTB4.273
+ 0.3SLX537.921
+ 0.3SLY + 1SLZ
163.573
+ 1.1NLB
Min Fx 13302 1007 1DL11365
+ 1SIDL +533.775
1SLX + 0.3SLY
-92.295
+ 0.3SLZ -9.8 -1.992 -237.349 -635.941
Max Fy 13331 1152 1DL11363
+ 1SIDL 1004.973
- 1COL(-X)-MLC
456.889 37.681 -3.005 -124.398 838.987
Min Fy 13397 1086 1DL11429
+ 1SIDL +1697.79
0.3CL + 0.3PLA
-277.961
+ 0.3PLB-45.754
+ 0.3TLA +-1.905
0.3TLB - 0.3BTA
-160.513- 0.3BTB
-71.903
- 1SLX - 0.3SLY - 0.3
Max Fz 13595 3071 1DL11627
+ 1SIDL 2351.846
+ 0.3CL + 0.3PLB
90.365
+ 0.3TLB 292.35
+ 0.3BTB5.544
+ 0.3SLX +-72.43
0.3SLY + 1SLZ
32.125
+ 1.1NLB
Min Fz 32472 3047 1DL31538
+ 1SIDL 1484.079
+ 0.3CL + 0.3PLA
-80.803
+ 0.3TLA
-219.574
+ 0.3BTA-4.648
+ 0.3SLX-312.197
+ 0.3SLY + 1SLZ
-76.931
+ 1.1NLA
Max Mx 32455 3071 1DL31520
+ 1SIDL 2586.515
+ 0.3CL + 0.3PLB
30.543
+ 0.3TLB108.577
+ 0.3BTB6.209
+ 0.3SLX509.647
+ 0.3SLY + 1SLZ
174.935
+ 1.1NLB
Min Mx 13500 3078 1DL11562
+ 1SIDL 1696.708
+ 0.3CL + 0.3PLB
-29.277
+ 0.3TLB-59.771
- 0.3BTB - -4.9
0.3SLX -612.559
- 0.3SLY - 1SLZ
-163.829
- 1.1NLB
Max My 13372 3071 1DL11434
+ 1SIDL 2675.302
+ 0.3CL + 0.3PLB6.46
+ 0.3TLB 35.449
+ 0.3BTB4.273
+ 0.3SLX735.443
+ 0.3SLY + 1SLZ
216.367
+ 1.1NLB
Min My 13370 3047 1DL11433
+ 1SIDL 1430.542
+ 0.3CL + 0.3PLA
-8.408
+ 0.3TLA-1.791
+ 0.3BTA-3.502
+ 0.3SLX-715.826
+ 0.3SLY + -235.053
1SLZ + 1.1NLA
Max Mz 13331 1152 1DL11363
+ 1SIDL 1004.973
- 1COL(-X)-MLC
456.889 37.681 -3.005 -124.398 838.987
Min Mz 13307 1152 1DL11370
+ 1SIDL 1004.973
- 1COL(-X)-MLC8.427 5.752 -3.005 47.259 -840.674
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13500 2103 1.15DL
11562
+ 1.2SIDL
2919.159
+ 1.4CL + 1.4PLB
9.448 + 1.54TLB
35.638 + 1.54BTB
0.807 -50.806 -41.767
Min Fx 13302 2107 1.0DL
11365
+ 1.0SIDL
252.839
+1SLX + -121.015
0.3SLY + 0.3SLZ
-18.272 -2.685 -303.954 -832.933
Max Fy 13331 1452 1.15DL
11363
+ 1.2SIDL
1001.627
- 1.5COL(-X)-MLC
684.911 46.346 -4.603 -146.493 1256.101
Min Fy 13397 2186 1.0DL
11429
+ 1.0SIDL
1587.681
+ 0.3CL -360.344
+ 0.3PLA + 0.3PLB
-70.761
+ 0.3TLA
-2.579
+ 0.3TLB-166.884
- 0.3BTA - 0.3BTB
-92.409- 1SLX - 0.3SLY
Max Fz 13595 3171 1.0DL
11627
+ 1.0SIDL
2564.443
+ 0.3CL +115.424
0.3PLB + 370.605
0.3TLB + 0.3BTB
7.092+ 0.3SLX
-54.991
+ 0.3SLY +35.016
1SLZ + 1.54NLB
Min Fz 32472 3147 1.0DL
31538
+ 1.0SIDL
1319.459
+ 0.3CL -106.705
+ 0.3PLA + -297.569
0.3TLA + 0.3BTA
-6.339+ 0.3SLX
-381.394
+ 0.3SLY
-100.071
+ 1SLZ + 1.54NLA
Max Mx 13500 3154 1.0DL
11563
+ 1.0SIDL
2753.172
+ 0.3CL + 0.3PLA
38.297 + 0.3TLA
130.576
- 0.3BTA
7.912
- 0.3SLX
829.397
- 0.3SLY - 1SLZ
289.38
- 1.54NLA
Min Mx 13500 3178 1.0DL
11562
+ 1.0SIDL
1552.457
+ 0.3CL +-38.265
0.3PLB + 0.3TLB
-85.226- 0.3BTB
-6.618- 0.3SLX
-789.102
- 0.3SLY -219.394
- 1SLZ - 1.54NLB
Max My 13372 3171 1.0DL
11434
+ 1.0SIDL
2862.556
+ 0.3CL + 0.3PLB
8.616 + 0.3TLB
43.542+ 0.3BTB
5.473+ 0.3SLX
955.51
+ 0.3SLY285.931
+ 1SLZ + 1.54NLB
Min My 13370 3147 1.0DL
11433
+ 1.0SIDL
1243.288
+ 0.3CL +-10.925
0.3PLA + 0.3TLA
-6.578
+ 0.3BTA
-4.703+ 0.3SLX
-938.531
+ 0.3SLY +-304.7
1SLZ + 1.54NLA
Max Mz 13331 1452 1.15DL
11363
+ 1.2SIDL
1001.627
- 1.5COL(-X)-MLC
684.911 46.346 -4.603 -146.493 1256.101
Min Mz 13307 1452 1.15DL
11370
+ 1.2SIDL
1001.627
- 1.5COL(-X)-MLC
12.485 6.479 -4.603 60.729 -1260.874

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 25 16

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Eff. N M Mu M/Mu Governing Neutral Neutral M/Mu
[kN] [kNm] [kNm]
Maxima 1002 1265 1399 0.904 OK
Minima 2919 65.78 2062 0.032 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 78.08 OK
Minima -194.7 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 4.595 OK 29.83 OK
Minima 0.7213 OK 7.91 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 12.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13511 1003 1DL11573
+ 1SIDL 2451.323
+ 1CL + 1PLB +-4.665
1.1TLB + -8.189
1.1BTB 0.689 51.404 -21.132
Min Fx 13313 1001 1DL11375
+ 1SIDL 1532.648
+ 1CL + 1PLA +-4.597
1.1TLA + -3.497
1.1BTA 0.611 27.776 -20.509
Max Fy 13379 1006 1DL11441
+ 1SIDL 2287.186
+ 1CL + 1PLA + 9.507
1PLB + 1.1TLA
-6.359
+ 1.1TLB0.211
- 1.1BTA -43.161
1.1BTB 40.832
Min Fy 13577 1005 1DL11639
+ 1SIDL 1873.365
+ 1CL + 1PLA +-9.328
1PLB + 1.1TLA
-7.283
+ 1.1TLB0.731
+ 1.1BTA +46.209
1.1BTB -41.477
Max Fz 28552 1004 1DL27536
+ 1SIDL 1864.358
+ 1CL + 1PLB + -0.37
1.1TLB - 1.1BTB
0.815 0.593 -1.96 -0.793
Min Fz 13578 1004 1DL11640
+ 1SIDL 1864.358
+ 1CL + 1PLB + 3.368
1.1TLB - 1.1BTB
-8.439 0.593 42.998 9.878
Max Mx 32466 1001 1DL31531
+ 1SIDL +2204.05
1CL + 1PLA +-4.165
1.1TLA + -5.182
1.1BTA 1.017 35.384 -18.122
Min Mx 13313 1006 1DL11375
+ 1SIDL 1780.664
+ 1CL + 1PLA + 8.878
1PLB + 1.1TLA
-5.565
+ 1.1TLB 0.03
- 1.1BTA -38.073
1.1BTB 36.937
Max My 13511 1003 1DL11573
+ 1SIDL 2451.323
+ 1CL + 1PLB +-4.665
1.1TLB + -8.189
1.1BTB 0.689 51.404 -21.132
Min My 28549 1004 1DL27534
+ 1SIDL 1864.358
+ 1CL + 1PLB +-0.374
1.1TLB - 1.1BTB
-0.179 0.593 -3.105 -1.663
Max Mz 13379 1006 1DL11441
+ 1SIDL 2287.186
+ 1CL + 1PLA + 9.507
1PLB + 1.1TLA
-6.359
+ 1.1TLB0.211
- 1.1BTA -43.161
1.1BTB 40.832
Min Mz 13577 1005 1DL11639
+ 1SIDL 1873.365
+ 1CL + 1PLA +-9.328
1PLB + 1.1TLA
-7.283
+ 1.1TLB0.731
+ 1.1BTA +46.209
1.1BTB -41.477

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13379 3071 1DL11441
+ 1SIDL 2675.302
+ 0.3CL + 0.3PLB
22.538
+ 0.3TLB 65.694
+ 0.3BTB4.273
+ 0.3SLX341.165
+ 0.3SLY + 1SLZ98.961
+ 1.1NLB
Min Fx 13313 1007 1DL11376
+ 1SIDL +533.775
1SLX + 0.3SLY
-73.412
+ 0.3SLZ -27.319 -1.992 -51.206 -245.689
Max Fy 13379 1086 1DL11442
+ 1SIDL 2412.933
+ 0.3CL + 0.3PLA
76.761
+ 0.3PLB17.846
+ 0.3TLA + 0.3TLB
2.51 - 0.3BTA
105.576- 0.3BTB256.96
- 1SLX - 0.3SLY - 0.3
Min Fy 13313 1152 1DL11375
+ 1SIDL 1004.973
- 1COL(-X)-MLC-99.776 -6.214 -3.005 38.371 -505.294
Max Fz 13313 3047 1DL11375
+ 1SIDL 2211.358
+ 0.3CL + 0.3PLA21.76
+ 0.3TLA67.224
+ 0.3BTA 4.166
+ 0.3SLX327.225
+ 0.3SLY + 1SLZ
94.146
+ 1.1NLA
Min Fz 13379 3071 1DL11442
+ 1SIDL 1466.034
+ 0.3CL + 0.3PLB
-24.18
+ 0.3TLB -77.208
+ 0.3BTB-3.433
+ 0.3SLX-200.265
+ 0.3SLY + 1SLZ
-81.124
+ 1.1NLB
Max Mx 32466 3071 1DL31531
+ 1SIDL 2586.515
+ 0.3CL + 0.3PLB
22.758
+ 0.3TLB 63.956
+ 0.3BTB6.209
+ 0.3SLX +341.59
0.3SLY + 1SLZ98.068
+ 1.1NLB
Min Mx 13511 3078 1DL11573
+ 1SIDL 1696.708
+ 0.3CL + 0.3PLB
-22.451
+ 0.3TLB -75.565
- 0.3BTB - -4.9
0.3SLX -259.756
- 0.3SLY - 1SLZ-98.157
- 1.1NLB
Max My 13577 3071 1DL11639
+ 1SIDL 2351.846
+ 0.3CL + 0.3PLB
21.503
+ 0.3TLB 62.953
+ 0.3BTB5.544
+ 0.3SLX344.325
+ 0.3SLY + 1SLZ89.912
+ 1.1NLB
Min My 13379 1022 1DL11441
+ 1SIDL 1350.311
- 0.3SLX - 0.3SLY
-22.921
- 1SLZ -76.108 -3.522 -271.808 -99.772
Max Mz 13379 1007 1DL11441
+ 1SIDL 2312.516
+ 1SLX + 0.3SLY74.289
+ 0.3SLZ 18.351 2.538 130.325 323.236
Min Mz 13313 1152 1DL11375
+ 1SIDL 1004.973
- 1COL(-X)-MLC-99.776 -6.214 -3.005 38.371 -505.294
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13511 2103 1.15DL
11573
+ 1.2SIDL
2919.159
+ 1.4CL +-6.505
1.4PLB + 1.54TLB
-10.114 + 1.54BTB
0.807 63.127 -29.219
Min Fx 13313 2107 1.0DL
11376
+ 1.0SIDL
252.839
+1SLX + 0.3SLY
-96.026+ 0.3SLZ-34.47 -2.685 -74.466 -321.156
Max Fy 13379 2186 1.0DL
11442
+ 1.0SIDL
2523.042
+ 0.3CL + 0.3PLA
99.54 + 0.3PLB
24.931
+ 0.3TLA3.184
+ 0.3TLB128.802
- 0.3BTA - 0.3BTB
333.136- 1SLX - 0.3SLY
Min Fy 13313 1452 1.15DL
11375
+ 1.2SIDL
1001.627
- 1.5COL(-X)-MLC
-149.63 -7.88 -4.603 47.584 -757.569
Max Fz 13379 3147 1.0DL
11441
+ 1.0SIDL
2825.268
+ 0.3CL + 0.3PLA
29.71 + 0.3TLA
89.309+ 0.3BTA
5.363+ 0.3SLX
427.667
+ 0.3SLY130.332
+ 1SLZ + 1.54NLA
Min Fz 13379 3171 1.0DL
11442
+ 1.0SIDL
1280.575
+ 0.3CL + 0.3PLB
-31.37 + 0.3TLB
-99.375+ 0.3BTB
-4.592+ 0.3SLX
-271.368
+ 0.3SLY-105.359
+ 1SLZ + 1.54NLB
Max Mx 13511 3154 1.0DL
11574
+ 1.0SIDL
2753.172
+ 0.3CL + 0.3PLA
31.978 + 0.3TLA85.26
- 0.3BTA
7.912
- 0.3SLX330.9
- 0.3SLY -104.901
1SLZ - 1.54NLA
Min Mx 13511 3178 1.0DL
11573
+ 1.0SIDL
1552.457
+ 0.3CL +-29.724
0.3PLB + 0.3TLB
-96.884- 0.3BTB
-6.618- 0.3SLX
-352.053
- 0.3SLY -129.547
- 1SLZ - 1.54NLB
Max My 13577 3171 1.0DL
11639
+ 1.0SIDL
2564.443
+ 0.3CL + 0.3PLB
28.676 + 0.3TLB
84.251+ 0.3BTB
7.092+ 0.3SLX
438.499
+ 0.3SLY120.554
+ 1SLZ + 1.54NLB
Min My 13379 2122 1.0DL
11441
+ 1.0SIDL
1163.954
- 0.3SLX - 0.3SLY
-30.12 - 1SLZ
-98.141 -4.702 -365.366 -131.225
Max Mz 13379 2107 1.0DL
11441
+ 1.0SIDL
2422.625
+1SLX + 0.3SLY
97.068+ 0.3SLZ
25.437 3.212 160.629 422.189
Min Mz 13313 1452 1.15DL
11375
+ 1.2SIDL
1001.627
- 1.5COL(-X)-MLC
-149.63 -7.88 -4.603 47.584 -757.569

ODE MDE
Maximum Tension Force (kN) 533.78 252.839
Skin Friction (kN) 0.00
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 18

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1002 759.1 853.9 0.889 OK
Minima 2919 69.57 1346 0.052 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 50.88 OK
Minima -86.76 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 3.597 OK 24.73 OK
Minima 1.561 OK 11.75 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

2.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7615 m
Hence de = 0.742 m and dv = 0.668 m
Horizontal resultant shear force at the section, Vu = 686 kN
Corresponding axial compressive force, N = 1002 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 7854 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0039 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.588 %
Horizontal shear force, Vu = 686 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 1027.42 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.619 Mpa
= 619 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 575.517 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.06
Modified shear strength of concrete (n s vc ) = 612.22 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 277.42 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.26 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 217 mm
Provided spacing 200 mm
OK
Shear reinforcement 13mm dia @ 200mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared RAGHAV
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C53


Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared RAGHAV
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C53

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 4
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32974 1005 1DL32087
+ 1SIDL 1914.456
+ 1CL + 1PLA +20.643
1PLB + 1.1TLA
7.841
+ 1.1TLB
-29.664
+ 1.1BTA-34.134
+ 1.1BTB -52.109
Min Fx 33373 1005 1DL32274
+ 1SIDL +562.406
1CL + 1PLA +19.448
1PLB + 1.1TLA
12.359
+ 1.1TLB
-14.92
+ 1.1BTA-35.298
+ 1.1BTB -10.422
Max Fy 33012 1005 1DL32107
+ 1SIDL +689.033
1CL + 1PLA +60.213
1PLB + 1.1TLA
24.706
+ 1.1TLB
-28.045
+ 1.1BTA-135.333
+ 1.1BTB 156.521
Min Fy 32991 1006 1DL32086
+ 1SIDL 1196.162
+ 1CL + 1PLA-116.773
+ 1PLB + 1.1TLA
21.234
+ 1.1TLB
-10.073
- 1.1BTA-118.082
- 1.1BTB -499.176
Max Fz 33012 1004 1DL32107
+ 1SIDL 1452.267
+ 1CL + 1PLB -68.994
+ 1.1TLB - 1.1BTB
34.997 -13.296 -179.379 -313.236
Min Fz 33010 1004 1DL32123
+ 1SIDL 1452.267
+ 1CL + 1PLB +11.194
1.1TLB - 1.1BTB
-5.232 -13.296 31.337 62.243
Max Mx 13335 1006 1DL11397
+ 1SIDL +611.423
1CL + 1PLA -53.011
+ 1PLB + 1.1TLA
9.558
+ 1.1TLB
-3.356
- 1.1BTA -27.962
- 1.1BTB -94.838
Min Mx 32974 1005 1DL32087
+ 1SIDL 1914.456
+ 1CL + 1PLA +20.643
1PLB + 1.1TLA
7.841
+ 1.1TLB
-29.664
+ 1.1BTA-34.134
+ 1.1BTB -52.109
Max My 33004 1004 1DL32118
+ 1SIDL 1452.267
+ 1CL + 1PLB + 1.315
1.1TLB - 1.1BTB
0.663 -13.296 49.21 106.472
Min My 33012 1004 1DL32107
+ 1SIDL 1452.267
+ 1CL + 1PLB -68.994
+ 1.1TLB - 1.1BTB
34.997 -13.296 -179.379 -313.236
Max Mz 32982 1006 1DL32096
+ 1SIDL 1196.162
+ 1CL + 1PLA +-4.432
1PLB + 1.1TLA
2.744
+ 1.1TLB
-10.073
- 1.1BTA -26.689
1.1BTB 191.697
Min Mz 32991 1006 1DL32086
+ 1SIDL 1196.162
+ 1CL + 1PLA-116.773
+ 1PLB + 1.1TLA
21.234
+ 1.1TLB
-10.073
- 1.1BTA-118.082
- 1.1BTB -499.176

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32995 1102 1DL32109
+ 1SIDL 6484.977
+ 0.3CL + 0.3PLA
147.901
+ 0.3PLB354.726
+ 0.3TLA 116.635
+ 0.3TLB - 0.3BTA
34.958- 0.3BTB147.78
- 0.3SLX - 0.3SLY - 1
Min Fx 32995 1095 1DL32109
+ 1SIDL-4301.751
+ 0.3CL + 0.3PLA
-181.886
+ 0.3PLB
-325.195
+ 0.3TLA-150.064
+ 0.3TLB + 0.3BTA
-117.02 + 0.3BTB
-263.113
+ 0.3SLX + 0.3SLY
Max Fy 33012 1152 1DL32107
+ 1SIDL-2376.378
- 1COL(-X)-MLC
719.733 45.364 -123.96 -165.268 2652.956
Min Fy 33012 1086 1DL32107
+ 1SIDL-3650.531
+ 0.3CL + 0.3PLA
-755.352
+ 0.3PLB
-179.844
+ 0.3TLA-121.433
+ 0.3TLB - 0.3BTA
-794.825 - 0.3BTB
-2855.445
- 1SLX - 0.3SLY - 0.3
Max Fz 32991 3071 1DL32086
+ 1SIDL 5963.013
+ 0.3CL + 0.3PLB
198.889
+ 0.3TLB619.206
+ 0.3BTB
116.089
+ 0.3SLX1954.798
+ 0.3SLY + 1SLZ
643.958
+ 1.1NLB
Min Fz 32991 3047 1DL32105
+ 1SIDL-3039.566
+ 0.3CL + 0.3PLA
-243.746
+ 0.3TLA
-599.958
+ 0.3BTA
-153.154
+ 0.3SLX-1453.66
+ 0.3SLY + -720.491
1SLZ + 1.1NLA
Max Mx 32974 1102 1DL32088
+ 1SIDL 5848.109
+ 0.3CL + 0.3PLA
101.967
+ 0.3PLB383.976
+ 0.3TLA 119.151
+ 0.3TLB - 0.3BTA
72.551- 0.3BTB0.877
- 0.3SLX - 0.3SLY - 1
Min Mx 32974 1095 1DL32088
+ 1SIDL-3008.322
+ 0.3CL + 0.3PLA
-152.633
+ 0.3PLB
-368.073
+ 0.3TLA-154.016
+ 0.3TLB + 0.3BTA
-118.091 + 0.3BTB
-164.166
+ 0.3SLX + 0.3SLY
Max My 32991 3047 1DL32086
+ 1SIDL 6012.762
+ 0.3CL + 0.3PLA
199.321
+ 0.3TLA607.798
+ 0.3BTA114.67
+ 0.3SLX 1994.561
+ 0.3SLY + 1SLZ
646.444
+ 1.1NLA
Min My 32991 2078 1DL32086
+ 1SIDL-3174.462
+ 0.3CL + 0.3PLB
-265.751
+ 0.3TLB
-588.615
- 0.3BTB
-149.49
- 0.3SLX-2105.692
- 0.3SLY - 1SLZ
-1042.572
- 1.1LLB
Max Mz 33012 1152 1DL32107
+ 1SIDL-2376.378
- 1COL(-X)-MLC
719.733 45.364 -123.96 -165.268 2652.956
Min Mz 33012 1086 1DL32107
+ 1SIDL-3650.531
+ 0.3CL + 0.3PLA
-755.352
+ 0.3PLB
-179.844
+ 0.3TLA-121.433
+ 0.3TLB - 0.3BTA
-794.825 - 0.3BTB
-2855.445
- 1SLX - 0.3SLY - 0.3
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared RAGHAV
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 32995 1102 1DL32109
+ 1SIDL 8108.435
+ 0.3CL + 0.3PLA
203.259
+ 0.3PLB459.017
+ 0.3TLA +156.35
0.3TLB - 0.3BTA
53.935- 0.3BTB
213.633
- 0.3SLX - 0.3SLY - 1
Min Fx 32995 1095 1DL32109
+ 1SIDL-5925.208
+ 0.3CL + 0.3PLA
-237.244
+ 0.3PLB
-429.486
+ 0.3TLA-189.779
+ 0.3TLB + 0.3BTA
-135.997+ 0.3BTB
-328.966
+ 0.3SLX + 0.3SLY
Max Fy 33012 1079 1DL32107
+ 1SIDL 7334.843
+ 0.3CL + 0.3PLA
930.003
+ 0.3PLB281.252
+ 0.3TLA 120.576
+ 0.3TLB + 0.3BTA
779.665 + 0.3BTB
3395.888
+ 1SLX + 0.3SLY +
Min Fy 33012 1086 1DL32107
+ 1SIDL-5151.617
+ 0.3CL + 0.3PLA
-974.284
+ 0.3PLB
-241.017
+ 0.3TLA-154.005
+ 0.3TLB --1001.221
0.3BTA - 0.3BTB
-3667.951
- 1SLX - 0.3SLY - 0.3
Max Fz 32991 3071 1DL32086
+ 1SIDL 7357.965
+ 0.3CL + 0.3PLB
266.71
+ 0.3TLB 805.14
+ 0.3BTB
156.712
+ 0.3SLX2578.393
+ 0.3SLY + 1SLZ
889.548
+ 1.1NLB
Min Fz 32991 3047 1DL32105
+ 1SIDL-4434.519
+ 0.3CL + 0.3PLA
-311.567
+ 0.3TLA
-785.892
+ 0.3BTA
-193.777
+ 0.3SLX-1890.763
+ 0.3SLY + 1SLZ
-898.09
+ 1.1NLA
Max Mx 32974 1102 1DL32088
+ 1SIDL 7243.061
+ 0.3CL + 0.3PLA
145.008
+ 0.3PLB499.372
+ 0.3TLA 159.774
+ 0.3TLB - 0.3BTA
100.127- 0.3BTB26.758
- 0.3SLX - 0.3SLY - 1
Min Mx 32974 1095 1DL32088
+ 1SIDL-4403.274
+ 0.3CL + 0.3PLA
-195.674
+ 0.3PLB
-483.468
+ 0.3TLA-194.639
+ 0.3TLB + 0.3BTA
-145.666 + 0.3BTB
-190.046
+ 0.3SLX + 0.3SLY
Max My 32991 3047 1DL32086
+ 1SIDL 7407.715
+ 0.3CL + 0.3PLA
267.142
+ 0.3TLA793.733
+ 0.3BTA155.293
+ 0.3SLX 2618.156
+ 0.3SLY + 1SLZ
892.034
+ 1.1NLA
Min My 32991 2078 1DL32086
+ 1SIDL-4569.415
+ 0.3CL + 0.3PLB
-333.572
+ 0.3TLB
-774.549
- 0.3BTB
-190.113
- 0.3SLX-2729.287
- 0.3SLY - 1SLZ
-1288.162
- 1.1LLB
Max Mz 33012 1079 1DL32107
+ 1SIDL 7334.843
+ 0.3CL + 0.3PLA
930.003
+ 0.3PLB281.252
+ 0.3TLA 120.576
+ 0.3TLB + 0.3BTA
779.665 + 0.3BTB
3395.888
+ 1SLX + 0.3SLY +
Min Mz 33012 1086 1DL32107
+ 1SIDL-5151.617
+ 0.3CL + 0.3PLA
-974.284
+ 0.3PLB
-241.017
+ 0.3TLA-154.005
+ 0.3TLB --1001.221
0.3BTA - 0.3BTB
-3667.951
- 1SLX - 0.3SLY - 0.3

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 36 16
Bundled
2nd Layer 36 16

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -4147 2048 2796 0.732 OK
Minima 8362 1221 3884 0.314 OK
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared RAGHAV
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 112.3 OK
Minima -260.2 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 3.387 OK 21.37 OK
Minima -0.2571 OK 0.4406 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.002 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared RAGHAV
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 20.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 33018 1005 1DL32130
+ 1SIDL 1914.456
+ 1CL + 1PLA +-5.042
1PLB + 1.1TLA
-1.161
+ 1.1TLB
-29.664
+ 1.1BTA +3.821
1.1BTB -7.204
Min Fx 33395 1005 1DL32295
+ 1SIDL +562.406
1CL + 1PLA + 1PLB
-1.67+ 1.1TLA
-1.061
+ 1.1TLB
-14.92
+ 1.1BTA +1.117
1.1BTB 1.086
Max Fy 33018 1006 1DL32130
+ 1SIDL 1196.162
+ 1CL + 1PLA +13.689
1PLB + 1.1TLA
-2.431
+ 1.1TLB
-10.073
- 1.1BTA - 1.1BTB
7.46 35.034
Min Fy 33027 1005 1DL32139
+ 1SIDL +689.033
1CL + 1PLA +-7.274
1PLB + 1.1TLA
-2.833
+ 1.1TLB
-28.045
+ 1.1BTA +8.598
1.1BTB -14.04
Max Fz 33400 1003 1DL32300
+ 1SIDL + 1CL
710.57
+ 1PLB + 0.253
1.1TLB + 1.1BTB
0.349 -11.946 -0.877 0.548
Min Fz 33027 1004 1DL32139
+ 1SIDL 1452.267
+ 1CL + 1PLB + 8.049
1.1TLB - 1.1BTB
-4.039 -13.296 11.688 21.43
Max Mx 28484 1006 1DL27468
+ 1SIDL +611.423
1CL + 1PLA + 4.552
1PLB + 1.1TLA
-0.821
+ 1.1TLB
-3.356
- 1.1BTA - 1.1BTB
0.893 2.354
Min Mx 33018 1005 1DL32130
+ 1SIDL 1914.456
+ 1CL + 1PLA +-5.042
1PLB + 1.1TLA
-1.161
+ 1.1TLB
-29.664
+ 1.1BTA +3.821
1.1BTB -7.204
Max My 33027 1004 1DL32139
+ 1SIDL 1452.267
+ 1CL + 1PLB + 8.049
1.1TLB - 1.1BTB
-4.039 -13.296 11.688 21.43
Min My 33397 1003 1DL32298
+ 1SIDL + 1CL
710.57
+ 1PLB + 0.229
1.1TLB + -0.254
1.1BTB -11.946 -1.23 1.123
Max Mz 33018 1006 1DL32130
+ 1SIDL 1196.162
+ 1CL + 1PLA +13.689
1PLB + 1.1TLA
-2.431
+ 1.1TLB
-10.073
- 1.1BTA - 1.1BTB
7.46 35.034
Min Mz 33027 1005 1DL32139
+ 1SIDL +689.033
1CL + 1PLA +-7.274
1PLB + 1.1TLA
-2.833
+ 1.1TLB
-28.045
+ 1.1BTA +8.598
1.1BTB -14.04

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 33027 1102 1DL32140
+ 1SIDL 6484.977
+ 0.3CL + 0.3PLA37.35
+ 0.3PLB63.493
+ 0.3TLA 116.635
+ 0.3TLB - 0.3BTA
82.255- 0.3BTB57.034
- 0.3SLX - 0.3SLY - 1
Min Fx 33027 1095 1DL32140
+ 1SIDL-4301.751
+ 0.3CL + 0.3PLA
-32.336
+ 0.3PLB-68.104
+ 0.3TLA-150.064
+ 0.3TLB + 0.3BTA
-72.817 + 0.3BTB
-45.46
+ 0.3SLX + 0.3SLY
Max Fy 33027 1086 1DL32140
+ 1SIDL 6088.126
+ 0.3CL + 0.3PLA
89.346
+ 0.3PLB21.535
+ 0.3TLA +92.896
0.3TLB - 0.3BTA
34.088- 0.3BTB122.37
- 1SLX - 0.3SLY - 0.3
Min Fy 33027 1152 1DL32139
+ 1SIDL-2376.378
- 1COL(-X)-MLC-85.277 -5.379 -123.96 12.467 -199.025
Max Fz 33018 3047 1DL32130
+ 1SIDL 6012.762
+ 0.3CL + 0.3PLA
28.741
+ 0.3TLA71.554
+ 0.3BTA114.67
+ 0.3SLX160.962
+ 0.3SLY + 1SLZ
70.032
+ 1.1NLA
Min Fz 33018 3071 1DL32131
+ 1SIDL-3089.316
+ 0.3CL + 0.3PLB
-23.758
+ 0.3TLB -73.755
+ 0.3BTB
-151.735
+ 0.3SLX -83.991
+ 0.3SLY + 1SLZ
-27.684
+ 1.1NLB
Max Mx 33018 1102 1DL32131
+ 1SIDL 5848.109
+ 0.3CL + 0.3PLA
32.626
+ 0.3PLB70.571
+ 0.3TLA 119.151
+ 0.3TLB - 0.3BTA
90.04
- 0.3BTB46.237
- 0.3SLX - 0.3SLY - 1
Min Mx 33018 1095 1DL32131
+ 1SIDL-3008.322
+ 0.3CL + 0.3PLA
-25.03
+ 0.3PLB-73.035
+ 0.3TLA-154.016
+ 0.3TLB + 0.3BTA
-84.911 + 0.3BTB
-29.277
+ 0.3SLX + 0.3SLY
Max My 33018 3071 1DL32130
+ 1SIDL 5963.013
+ 0.3CL + 0.3PLB28.79
+ 0.3TLB 70.197
+ 0.3BTB
116.089
+ 0.3SLX164.025
+ 0.3SLY + 1SLZ70.187
+ 1.1NLB
Min My 33018 1022 1DL32130
+ 1SIDL-3164.741
- 0.3SLX - 0.3SLY
-22.705
- 1SLZ -72.967 -150.288 -156.079 -49.236
Max Mz 33027 1007 1DL32139
+ 1SIDL 5933.585
+ 1SLX + 0.3SLY86.439
+ 0.3SLZ 21.876 91.475 59.005 204.886
Min Mz 33027 1152 1DL32139
+ 1SIDL-2376.378
- 1COL(-X)-MLC-85.277 -5.379 -123.96 12.467 -199.025
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared RAGHAV
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 33027 2202 1.0DL
32140
+ 1.0SIDL
8108.435
+ 0.3CL + 0.3PLA
47.237 + 0.3PLB
83.732
+ 0.3TLA
156.35
+ 0.3TLB105.971
- 0.3BTA - 0.3BTB
71.708- 0.3SLX - 0.3SL
Min Fx 33027 2195 1.0DL
32140
+ 1.0SIDL
-5925.208
+ 0.3CL +-42.223
0.3PLA + 0.3PLB
-88.343
+ 0.3TLA
-189.779
+ 0.3TLB-96.533
+ 0.3BTA + 0.3BTB
-60.134+ 0.3SLX + 0.3
Max Fy 33027 2186 1.0DL
32140
+ 1.0SIDL
7589.212
+ 0.3CL +115.274
0.3PLA + 0.3PLB
28.83
+ 0.3TLA
125.467
+ 0.3TLB -42.951
0.3BTA - 0.3BTB
157.202- 1SLX - 0.3SLY
Min Fy 33027 1452 1.15DL
32139
+ 1.2SIDL
-3937.102
- 1.5COL(-X)-MLC
-128.741 -7.364 -180.441 16.571 -301.284
Max Fz 33018 3147 1.0DL
32130
+ 1.0SIDL
7414.99
+ 0.3CL + 0.3PLA
36.785 + 0.3TLA
93.845
+ 0.3BTA
155.053+ 0.3SLX
209.625
+ 0.3SLY 88.604
+ 1SLZ + 1.54NLA
Min Fz 33018 3171 1.0DL
32131
+ 1.0SIDL
-4491.543
+ 0.3CL +-31.803
0.3PLB + 0.3TLB
-96.046+ -192.118
0.3BTB + 0.3SLX
-110.63
+ 0.3SLY-38.218
+ 1SLZ + 1.54NLB
Max Mx 33018 2202 1.0DL
32131
+ 1.0SIDL
7243.061
+ 0.3CL + 0.3PLA
40.672 + 0.3PLB
92.734
+ 0.3TLA
159.774
+ 0.3TLB116.828
- 0.3BTA - 0.3BTB
56.77- 0.3SLX - 0.3SL
Min Mx 33018 2195 1.0DL
32131
+ 1.0SIDL
-4403.274
+ 0.3CL +-33.076
0.3PLA + 0.3PLB
-95.199
+ 0.3TLA
-194.639
+ 0.3TLB +-111.7
0.3BTA + 0.3BTB
-39.81+ 0.3SLX + 0.3
Max My 33018 3171 1.0DL
32130
+ 1.0SIDL
7350.689
+ 0.3CL + 0.3PLB
36.837 + 0.3TLB
92.233+ 0.3BTB
156.952+ 0.3SLX
213.244
+ 0.3SLY +88.761
1SLZ + 1.54NLB
Min My 33018 2122 1.0DL
32130
+ 1.0SIDL
-4559.694
- 0.3SLX - 0.3SLY
-30.75 - 1SLZ
-95.131 -190.911 -205.019 -67.81
Max Mz 33027 2107 1.0DL
32139
+ 1.0SIDL
7434.67
+1SLX + 0.3SLY
112.367+ 0.3SLZ
29.171 124.046 75.105 265.644
Min Mz 33027 1452 1.15DL
32139
+ 1.2SIDL
-3937.102
- 1.5COL(-X)-MLC
-128.741 -7.364 -180.441 16.571 -301.284

ODE MDE
Maximum Tension Force (kN) -4301.75 -5925.21
Skin Friction (kN) 1722.67
Final Axial Load (kN) -2579.08 -4202.54

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


25 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 7435 276.1 1781 0.155 OK
Minima 7243 129.9 1790 0.073 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared RAGHAV
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 61.3 OK
Minima -226.6 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 2.375 OK 16.8 OK
Minima 0.6569 OK 4.729 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.756 m
Hence de = 0.741 m and dv = 0.667 m
Horizontal resultant shear force at the section, Vu = 1004 kN
Corresponding axial compressive force, N = 0 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 32572 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0163 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 2.443 %
Horizontal shear force, Vu = 1004 kN
Project JMRT
Client TWJO
Job Design of Stations
Station LEBAK BULUS Prepared RAGHAV
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 1505.68 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.995 Mpa
= 995 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.931
Allowable shear stress in concrete, s vc = 925.923 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.00
Modified shear strength of concrete (n s vc ) = 925.92 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 386.45 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 266.63 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 155 mm
Provided spacing 150 mm
OK
Shear reinforcement 13mm dia @ 150mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C55 & 56


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C55 & 56

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13434 1004 1DL11496
+ 1SIDL 2333.276
+ 1CL + 1PLB +-9.996
1.1TLB - 1.1BTB
10.727 0.383 30.05 25.091
Min Fx 13401 1001 1DL11463
+ 1SIDL 2169.376
+ 1CL + 1PLA + 6.734
1.1TLA + 1.1BTA
8.395 0.589 1.619 -24.976
Max Fy 13430 1005 1DL11462
+ 1SIDL 2235.465
+ 1CL + 1PLA +36.588
1PLB + 1.1TLA
20.266
+ 1.1TLB0.682
+ 1.1BTA-34.849
+ 1.1BTB 34.855
Min Fy 13463 1006 1DL11495
+ 1SIDL +2314.81
1CL + 1PLA -42.985
+ 1PLB + 1.1TLA
22.91
+ 1.1TLB0.195
- 1.1BTA -37.063
- 1.1BTB -51.108
Max Fz 13463 1004 1DL11495
+ 1SIDL 2333.276
+ 1CL + 1PLB -23.375
+ 1.1TLB - 1.1BTB
25.554 0.383 -30.409 -30.433
Min Fz 13444 1004 1DL11506
+ 1SIDL 2333.276
+ 1CL + 1PLB + 5.711
1.1TLB - 1.1BTB
-6.375 0.383 35.625 32.309
Max Mx 13401 1005 1DL11463
+ 1SIDL 2235.465
+ 1CL + 1PLA +14.749
1PLB + 1.1TLA
9.261
+ 1.1TLB0.682
+ 1.1BTA +14.006
1.1BTB -50.976
Min Mx 13434 1006 1DL11496
+ 1SIDL +2314.81
1CL + 1PLA -18.041
+ 1PLB + 1.1TLA
10.306
+ 1.1TLB0.195
- 1.1BTA -17.969
1.1BTB 50.587
Max My 13438 1004 1DL11501
+ 1SIDL 2333.276
+ 1CL + 1PLB +-0.499
1.1TLB - 1.1BTB
0.281 0.383 54.666 48.717
Min My 13463 1002 1DL11495
+ 1SIDL 2214.616
+ 1CL + 1PLA -22.979
+ 1.1TLA - 18.148
1.1BTA 0.237 -40.397 -29.459
Max Mz 13438 1006 1DL11501
+ 1SIDL +2314.81
1CL + 1PLA +-0.468
1PLB + 1.1TLA
1.158
+ 1.1TLB0.195
- 1.1BTA -44.193
1.1BTB 91.975
Min Mz 13404 1005 1DL11467
+ 1SIDL 2235.465
+ 1CL + 1PLA + 2.143
1PLB + 1.1TLA
2.611
+ 1.1TLB0.682
+ 1.1BTA +36.864
1.1BTB -82.94

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13434 2078 1DL11497
+ 1SIDL +2493.98
0.3CL + 0.3PLB
38.907
+ 0.3TLB 53.488
- 0.3BTB3.812
- 0.3SLX -828.709
0.3SLY - 1SLZ
175.819
- 1.1LLB
Min Fx 13434 1015 1DL11497
+ 1SIDL 1537.664
+ 0.3SLX + 0.3SLY
-44.721
+ 1SLZ -36.958 -3.084 -777.776 -165.746
Max Fy 13463 1152 1DL11495
+ 1SIDL 1983.903
- 1COL(-X)-MLC
490.504 17.294 -1.387 -27.255 1121.26
Min Fy 13463 1086 1DL11495
+ 1SIDL 1885.311
+ 0.3CL + 0.3PLA
-336.668
+ 0.3PLB-64.239
+ 0.3TLA +-1.816
0.3TLB - 0.3BTA
-293.276- 0.3BTB
-396.895
- 1SLX - 0.3SLY - 0.3
Max Fz 13463 3071 1DL11495
+ 1SIDL 2492.292
+ 0.3CL + 0.3PLB
104.221
+ 0.3TLB212.074
+ 0.3BTB3.927
+ 0.3SLX528.882
+ 0.3SLY + 1SLZ
117.206
+ 1.1NLB
Min Fz 13463 3047 1DL11526
+ 1SIDL 1612.789
+ 0.3CL + 0.3PLA
-100.138
+ 0.3TLA
-174.696
+ 0.3BTA-3.111
+ 0.3SLX-696.799
+ 0.3SLY + 1SLZ
-24.867
+ 1.1NLA
Max Mx 13434 3071 1DL11496
+ 1SIDL 2492.292
+ 0.3CL + 0.3PLB
43.265
+ 0.3TLB 53.489
+ 0.3BTB3.927
+ 0.3SLX +817.25
0.3SLY + 1SLZ
116.302
+ 1.1NLB
Min Mx 13434 3078 1DL11496
+ 1SIDL 1647.846
+ 0.3CL + 0.3PLB
-46.877
+ 0.3TLB -36.191
- 0.3BTB-3.158
- 0.3SLX -779.958
- 0.3SLY - 1SLZ
-118.762
- 1.1NLB
Max My 13435 3071 1DL11497
+ 1SIDL 2492.292
+ 0.3CL + 0.3PLB
28.859
+ 0.3TLB 32.437
+ 0.3BTB3.927
+ 0.3SLX831.247
+ 0.3SLY + 1SLZ
157.698
+ 1.1NLB
Min My 13464 3047 1DL11496
+ 1SIDL 1612.789
+ 0.3CL + 0.3PLA
-58.822
+ 0.3TLA -73.248
+ 0.3BTA-3.111
+ 0.3SLX-787.191
+ 0.3SLY + -132.605
1SLZ + 1.1NLA
Max Mz 13430 1152 1DL11462
+ 1SIDL 1836.889
- 1COL(-X)-MLC
490.389 16.516 -1.316 -23.164 1122.083
Min Mz 13440 1152 1DL11503
+ 1SIDL 1983.903
- 1COL(-X)-MLC10.062 -0.744 -1.387 32.877 -824.396
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13434 2104 1.15DL
11496
+ 1.2SIDL
2777.051
+ 1.4CL -13.549
+ 1.4PLB + 1.54TLB
13.07 - 1.54BTB
0.447 38.557 35.503
Min Fx 13434 2115 1.0DL
11497
+ 1.0SIDL
1413.061
+ 0.3SLX +-57.919
0.3SLY + 1SLZ
-48.914 -4.138 -1023.053 -216.889
Max Fy 13463 1452 1.15DL
11495
+ 1.2SIDL
2290.514
- 1.5COL(-X)-MLC
736.901 19.853 -2.206 -31.194 1685.297
Min Fy 13463 2186 1.0DL
11495
+ 1.0SIDL
1835.318
+ 0.3CL -436.116
+ 0.3PLA + 0.3PLB
-87.232
+ 0.3TLA
-2.467
+ 0.3TLB-364.046
- 0.3BTA - 0.3BTB
-512.54- 1SLX - 0.3SLY
Max Fz 13463 1453 1.15DL
11495
+ 1.2SIDL
2181.888
+ 1.5COL(Z)-MLC
-0.943 299.847 -0.757 -149.102 -9.147
Min Fz 13463 3147 1.0DL
11526
+ 1.0SIDL
1487.39
+ 0.3CL -131.568
+ 0.3PLA + 0.3TLA
-231.54
+ 0.3BTA
-4.198+ 0.3SLX
-900.941
+ 0.3SLY-30.441
+ 1SLZ + 1.54NLA
Max Mx 13434 3171 1.0DL
11496
+ 1.0SIDL
2617.691
+ 0.3CL + 0.3PLB
56.429 + 0.3TLB
65.485+ 0.3BTB
5.014+ 0.3SLX
1061.158
+ 0.3SLY154.619
+ 1SLZ + 1.54NLB
Min Mx 13434 3178 1.0DL
11496
+ 1.0SIDL
1522.447
+ 0.3CL +-60.042
0.3PLB + 0.3TLB
-48.187- 0.3BTB
-4.246- 0.3SLX
-1023.865
- 0.3SLY -157.079
- 1SLZ - 1.54NLB
Max My 13435 3171 1.0DL
11497
+ 1.0SIDL
2617.691
+ 0.3CL + 0.3PLB
37.699 + 0.3TLB
38.765+ 0.3BTB
5.014+ 0.3SLX
1078.256
+ 0.3SLY208.968
+ 1SLZ + 1.54NLB
Min My 13434 3147 1.0DL
11497
+ 1.0SIDL
1487.39
+ 0.3CL +-55.598
0.3PLA + 0.3TLA
-48.728
+ 0.3BTA
-4.198+ 0.3SLX
-1031.44
+ 0.3SLY
-226.103
+ 1SLZ + 1.54NLA
Max Mz 13463 1452 1.15DL
11495
+ 1.2SIDL
2290.514
- 1.5COL(-X)-MLC
736.901 19.853 -2.206 -31.194 1685.297
Min Mz 13440 1452 1.15DL
11503
+ 1.2SIDL
2290.514
- 1.5COL(-X)-MLC
15.187 -0.863 -2.206 37.771 -1238.273

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 29 16
2nd Layer

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2291 1686 1830 0.921 OK
Minima 2777 52.42 1907 0.027 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 97.82 OK
Minima -171.6 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 3.677 OK 24.51 OK
Minima 1.768 OK 14.27 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 14.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13445 1004 1DL11507
+ 1SIDL 2333.276
+ 1CL + 1PLB + 5.561
1.1TLB - 1.1BTB
-6.183 0.383 29.25 26.598
Min Fx 13412 1001 1DL11474
+ 1SIDL 2169.376
+ 1CL + 1PLA +-4.305
1.1TLA + -3.323
1.1BTA 0.589 17.941 -19.742
Max Fy 13445 1006 1DL11507
+ 1SIDL +2314.81
1CL + 1PLA +10.403
1PLB + 1.1TLA
-5.186
+ 1.1TLB0.195
- 1.1BTA -25.637
1.1BTB 49.203
Min Fy 13412 1005 1DL11474
+ 1SIDL 2235.465
+ 1CL + 1PLA + 1PLB
-9.17+ 1.1TLA
-4.512
+ 1.1TLB0.682
+ 1.1BTA +22.555
1.1BTB -42.399
Max Fz 28515 1004 1DL27499
+ 1SIDL 2333.276
+ 1CL + 1PLB +-0.556
1.1TLB - 1.1BTB
0.621 0.383 -1.973 -1.774
Min Fz 13445 1004 1DL11507
+ 1SIDL 2333.276
+ 1CL + 1PLB + 5.561
1.1TLB - 1.1BTB
-6.183 0.383 29.25 26.598
Max Mx 13412 1005 1DL11474
+ 1SIDL 2235.465
+ 1CL + 1PLA + 1PLB
-9.17+ 1.1TLA
-4.512
+ 1.1TLB0.682
+ 1.1BTA +22.555
1.1BTB -42.399
Min Mx 13445 1006 1DL11507
+ 1SIDL +2314.81
1CL + 1PLA +10.403
1PLB + 1.1TLA
-5.186
+ 1.1TLB0.195
- 1.1BTA -25.637
1.1BTB 49.203
Max My 13445 1004 1DL11507
+ 1SIDL 2333.276
+ 1CL + 1PLB + 5.561
1.1TLB - 1.1BTB
-6.183 0.383 29.25 26.598
Min My 28512 1004 1DL27497
+ 1SIDL 2333.276
+ 1CL + 1PLB + 0.198
1.1TLB - 1.1BTB
-0.197 0.383 -2.764 -2.465
Max Mz 13445 1006 1DL11507
+ 1SIDL +2314.81
1CL + 1PLA +10.403
1PLB + 1.1TLA
-5.186
+ 1.1TLB0.195
- 1.1BTA -25.637
1.1BTB 49.203
Min Mz 13412 1005 1DL11474
+ 1SIDL 2235.465
+ 1CL + 1PLA + 1PLB
-9.17+ 1.1TLA
-4.512
+ 1.1TLB0.682
+ 1.1BTA +22.555
1.1BTB -42.399

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13445 2078 1DL11508
+ 1SIDL +2493.98
0.3CL + 0.3PLB
26.732
+ 0.3TLB 61.159
- 0.3BTB3.812
- 0.3SLX -203.384
0.3SLY - 1SLZ
100.204
- 1.1LLB
Min Fx 13445 1015 1DL11508
+ 1SIDL 1537.664
+ 0.3SLX + 0.3SLY
-24.213
+ 1SLZ -69.863 -3.084 -169.707 -89.588
Max Fy 13445 1086 1DL11508
+ 1SIDL 2244.868
+ 0.3CL + 0.3PLA
81.606
+ 0.3PLB19.543
+ 0.3TLA + 0.3TLB
2.448 - 0.3BTA
94.478- 0.3BTB
303.976
- 1SLX - 0.3SLY - 0.3
Min Fy 13445 1152 1DL11507
+ 1SIDL 1983.903
- 1COL(-X)-MLC-99.066 -3.941 -1.387 19.395 -529.277
Max Fz 13445 3047 1DL11507
+ 1SIDL 2453.576
+ 0.3CL + 0.3PLA
24.027
+ 0.3TLA62.341
+ 0.3BTA 3.771
+ 0.3SLX269.485
+ 0.3SLY + 1SLZ
114.282
+ 1.1NLA
Min Fz 13445 3071 1DL11508
+ 1SIDL 1651.505
+ 0.3CL + 0.3PLB
-25.474
+ 0.3TLB -70.831
+ 0.3BTB-2.955
+ 0.3SLX-166.719
+ 0.3SLY + 1SLZ
-94.235
+ 1.1NLB
Max Mx 13445 3071 1DL11507
+ 1SIDL 2492.292
+ 0.3CL + 0.3PLB
24.112
+ 0.3TLB 60.983
+ 0.3BTB3.927
+ 0.3SLX274.522
+ 0.3SLY + 1SLZ114.7
+ 1.1NLB
Min Mx 13445 3078 1DL11507
+ 1SIDL 1647.846
+ 0.3CL + 0.3PLB-22.9
+ 0.3TLB -70.181
- 0.3BTB-3.158
- 0.3SLX -229.879
- 0.3SLY - 1SLZ
-107.694
- 1.1NLB
Max My 13445 3071 1DL11507
+ 1SIDL 2492.292
+ 0.3CL + 0.3PLB
24.112
+ 0.3TLB 60.983
+ 0.3BTB3.927
+ 0.3SLX274.522
+ 0.3SLY + 1SLZ114.7
+ 1.1NLB
Min My 13445 1022 1DL11507
+ 1SIDL 1537.664
- 0.3SLX - 0.3SLY
-24.213
- 1SLZ -69.863 -3.084 -231.565 -113.8
Max Mz 13445 1007 1DL11507
+ 1SIDL 2137.836
+ 1SLX + 0.3SLY78.924
+ 0.3SLZ 19.911 2.489 120.753 373.078
Min Mz 13445 1152 1DL11507
+ 1SIDL 1983.903
- 1COL(-X)-MLC-99.066 -3.941 -1.387 19.395 -529.277
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13445 2104 1.15DL
11507
+ 1.2SIDL
2777.051
+ 1.4CL + 1.4PLB
7.64 + 1.54TLB
-7.669 - 1.54BTB
0.447 36.077 36.39
Min Fx 13445 2115 1.0DL
11508
+ 1.0SIDL
1413.061
+ 0.3SLX +-31.853
0.3SLY + 1SLZ
-89.838 -4.138 -224.72 -118.04
Max Fy 13445 2186 1.0DL
11508
+ 1.0SIDL
2294.862
+ 0.3CL +105.769
0.3PLA + 0.3PLB
26.525
+ 0.3TLA +3.1
0.3TLB116.116
- 0.3BTA - 0.3BTB
393.804- 1SLX - 0.3SLY
Min Fy 13445 1452 1.15DL
11507
+ 1.2SIDL
2290.514
- 1.5COL(-X)-MLC
-148.801 -4.528 -2.206 22.271 -795.104
Max Fz 13445 3147 1.0DL
11507
+ 1.0SIDL
2577.383
+ 0.3CL + 0.3PLA
31.648 + 0.3TLA
82.448
+ 0.3BTA
4.791
+ 0.3SLX
343.986
+ 0.3SLY150.282
+ 1SLZ + 1.54NLA
Min Fz 13445 3171 1.0DL
11508
+ 1.0SIDL
1527.698
+ 0.3CL +-33.095
0.3PLB + 0.3TLB
-90.938+ 0.3BTB
-3.975+ 0.3SLX
-221.397
+ 0.3SLY-122.614
+ 1SLZ + 1.54NLB
Max Mx 13445 3171 1.0DL
11507
+ 1.0SIDL
2617.691
+ 0.3CL + 0.3PLB
31.772 + 0.3TLB
80.825+ 0.3BTB
5.014+ 0.3SLX
349.958
+ 0.3SLY150.883
+ 1SLZ + 1.54NLB
Min Mx 13445 3178 1.0DL
11507
+ 1.0SIDL
1522.447
+ 0.3CL + 0.3PLB
-30.56 + 0.3TLB
-90.023- 0.3BTB
-4.246- 0.3SLX
-305.316
- 0.3SLY -143.877
- 1SLZ - 1.54NLB
Max My 13445 1453 1.15DL
11507
+ 1.2SIDL
2181.888
+ 1.5COL(Z)-MLC
-0.065 -80.138 -0.757 355.631 0.599
Min My 13445 2122 1.0DL
11507
+ 1.0SIDL
1413.061
- 0.3SLX --31.853
0.3SLY - 1SLZ
-89.838 -4.138 -306.534 -149.891
Max Mz 13445 2107 1.0DL
11507
+ 1.0SIDL
2187.829
+1SLX + 0.3SLY
103.087 + 0.3SLZ
26.892 3.14 149.351 487.07
Min Mz 13445 1452 1.15DL
11507
+ 1.2SIDL
2290.514
- 1.5COL(-X)-MLC
-148.801 -4.528 -2.206 22.271 -795.104

ODE MDE
Maximum Tension Force (kN) 1537.66 1413.061
Skin Friction (kN) 0.00
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


19 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2291 795.4 1287 0.618 OK
Minima 2777 51.25 1394 0.037 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 39.48 OK
Minima -1.926 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 3.391 OK 23.26 OK
Minima 2.278 OK 17.1 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7595 m
Hence de = 0.742 m and dv = 0.668 m
Horizontal resultant shear force at the section, Vu = 737 kN
Corresponding axial compressive force, N = 2291 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 10568 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0053 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.792 %
Horizontal shear force, Vu = 737 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 1104.24 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.683 Mpa
= 683 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 635.693 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.15
Modified shear strength of concrete (n s vc ) = 728.39 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 250.91 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.03 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C57


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMN C57

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13467 1003 1DL11529
+ 1SIDL 2132.343
+ 1CL + 1PLB + 3.831
1.1TLB + 28.809
1.1BTB 0.131 -44.431 -34.703
Min Fx 13467 1002 1DL11529
+ 1SIDL 2064.948
+ 1CL + 1PLA +-6.579
1.1TLA - 1.1BTA
26.62 0.487 -62.431 38.064
Max Fy 13496 1005 1DL11528
+ 1SIDL 2130.209
+ 1CL + 1PLA +28.144
1PLB + 1.1TLA
47.476
+ 1.1TLB0.342
+ 1.1BTA-175.825
+ 1.1BTB -7.523
Min Fy 13496 1006 1DL11528
+ 1SIDL 2115.522
+ 1CL + 1PLA -34.291
+ 1PLB + 1.1TLA
46.779
+ 1.1TLB0.286
- 1.1BTA-175.449
- 1.1BTB -3.253
Max Fz 13496 1003 1DL11528
+ 1SIDL 2132.343
+ 1CL + 1PLB +12.734
1.1TLB + 1.1BTB
49.8 0.131 -171.759 -6.396
Min Fz 13479 1003 1DL11541
+ 1SIDL 2132.343
+ 1CL + 1PLB +-3.488
1.1TLB + -8.085
1.1BTB 0.131 42.329 -11.996
Max Mx 13467 1001 1DL11529
+ 1SIDL +2072.36
1CL + 1PLA + 3.699
1.1TLA + 26.767
1.1BTA 0.622 -61.217 -34.139
Min Mx 13467 1003 1DL11529
+ 1SIDL 2132.343
+ 1CL + 1PLB + 3.831
1.1TLB + 28.809
1.1BTB 0.131 -44.431 -34.703
Max My 13474 1003 1DL11537
+ 1SIDL 2132.343
+ 1CL + 1PLB +-3.817
1.1TLB + 1.1BTB
0.698 0.131 66.422 -28.605
Min My 13496 1005 1DL11528
+ 1SIDL 2130.209
+ 1CL + 1PLA +28.144
1PLB + 1.1TLA
47.476
+ 1.1TLB0.342
+ 1.1BTA-175.825
+ 1.1BTB -7.523
Max Mz 13469 1006 1DL11532
+ 1SIDL 2115.522
+ 1CL + 1PLA +-2.514
1PLB + 1.1TLA
18.513
+ 1.1TLB0.286
- 1.1BTA -14.868
1.1BTB 95.598
Min Mz 13469 1005 1DL11532
+ 1SIDL 2130.209
+ 1CL + 1PLA + 1.165
1PLB + 1.1TLA
18.592
+ 1.1TLB0.342
+ 1.1BTA +16.601
1.1BTB -85.347

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13467 1003 1DL11529
+ 1SIDL 2132.343
+ 1CL + 1PLB + 3.831
1.1TLB + 28.809
1.1BTB 0.131 -44.431 -34.703
Min Fx 13467 1015 1DL11530
+ 1SIDL 1610.583
+ 0.3SLX + 0.3SLY
-29.577
+ 1SLZ -25.286 -4.923 -740.021 -203.789
Max Fy 13496 1152 1DL11528
+ 1SIDL 1881.158
- 1COL(-X)-MLC
438.729 36.068 -0.872 -139.775 767.987
Min Fy 13496 1086 1DL11528
+ 1SIDL + 0.3CL
1776.9
+ 0.3PLA
-269.336
+ 0.3PLB-33.353
+ 0.3TLA +-2.265
0.3TLB - 0.3BTA
-374.393- 0.3BTB
-33.745
- 1SLX - 0.3SLY - 0.3
Max Fz 13496 1153 1DL11528
+ 1SIDL 1816.914
+ 1COL(Z)-MLC0.374 250.01 -1.558 -527.638 -2.728
Min Fz 13496 1015 1DL11559
+ 1SIDL 1610.583
+ 0.3SLX + 0.3SLY
-84.843
+ 1SLZ-139.662 -4.923 -695.885 -76.153
Max Mx 13467 3054 1DL11530
+ 1SIDL 2102.712
+ 0.3CL + 0.3PLA
26.192
+ 0.3TLA69.181
- 0.3BTA -5.699
0.3SLX - 0.3SLY
701.46 - 1SLZ
220.874
- 1.1NLA
Min Mx 13467 3078 1DL11529
+ 1SIDL 1701.489
+ 0.3CL + 0.3PLB
-31.082
+ 0.3TLB -23.129
- 0.3BTB-5.071
- 0.3SLX -757.817
- 0.3SLY - 1SLZ
-167.099
- 1.1NLB
Max My 13469 3071 1DL11531
+ 1SIDL 2122.526
+ 0.3CL + 0.3PLB
6.218
+ 0.3TLB 51.739
+ 0.3BTB5.599
+ 0.3SLX711.626
+ 0.3SLY + 1SLZ
213.979
+ 1.1NLB
Min My 13497 3047 1DL11529
+ 1SIDL 1685.679
+ 0.3CL + 0.3PLA
-42.894
+ 0.3TLA -52.762
+ 0.3BTA-4.955
+ 0.3SLX-762.543
+ 0.3SLY + -186.895
1SLZ + 1.1NLA
Max Mz 13496 1152 1DL11528
+ 1SIDL 1881.158
- 1COL(-X)-MLC
438.729 36.068 -0.872 -139.775 767.987
Min Mz 13472 1152 1DL11535
+ 1SIDL 1881.158
- 1COL(-X)-MLC4.642 7.403 -0.872 36.957 -822.315
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13467 2103 1.15DL
11529
+ 1.2SIDL
2530.441
+ 1.4CL + 1.4PLB
5.582 + 1.54TLB
35.074 + 1.54BTB
0.109 -52.194 -49.002
Min Fx 13467 2115 1.0DL
11530
+ 1.0SIDL
1547.93
+ 0.3SLX +-38.401
0.3SLY + 1SLZ
-37.493 -6.523 -960.418 -267.429
Max Fy 13496 1452 1.15DL
11528
+ 1.2SIDL
2184.973
- 1.5COL(-X)-MLC
658.781 41.773 -1.412 -163.85 1153.04
Min Fy 13496 2186 1.0DL
11528
+ 1.0SIDL
1738.003
+ 0.3CL -349.049
+ 0.3PLA + 0.3PLB
-53.508
+ 0.3TLA
-3.046
+ 0.3TLB-435.645
- 0.3BTA - 0.3BTB
-42.847- 1SLX - 0.3SLY
Max Fz 13496 1453 1.15DL
11528
+ 1.2SIDL
2088.607
+ 1.5COL(Z)-MLC
1.249 362.686 -2.441 -745.645 -3.032
Min Fz 13496 2115 1.0DL
11559
+ 1.0SIDL
1547.93
+ 0.3SLX-110.363
+ 0.3SLY + 1SLZ
-191.397 -6.523 -873.573 -99.172
Max Mx 13467 3154 1.0DL
11530
+ 1.0SIDL
2165.708
+ 0.3CL + 0.3PLA
34.99 + 0.3TLA
81.439
- 0.3BTA7.35
- 0.3SLX
923.558
- 0.3SLY -284.698
1SLZ - 1.54NLA
Min Mx 13467 3178 1.0DL
11529
+ 1.0SIDL
1638.492
+ 0.3CL + 0.3PLB
-39.88 + 0.3TLB
-35.387- 0.3BTB
-6.721- 0.3SLX
-975.791
- 0.3SLY - -222.25
1SLZ - 1.54NLB
Max My 13469 3171 1.0DL
11531
+ 1.0SIDL
2185.522
+ 0.3CL + 0.3PLB
8.18 + 0.3TLB
61.643+ 0.3BTB
7.249+ 0.3SLX
930.28
+ 0.3SLY282.711
+ 1SLZ + 1.54NLB
Min My 13497 3147 1.0DL
11529
+ 1.0SIDL
1622.682
+ 0.3CL +-56.322
0.3PLA + 0.3TLA
-75.517
+ 0.3BTA
-6.606+ 0.3SLX
-980.517
+ 0.3SLY
-242.046
+ 1SLZ + 1.54NLA
Max Mz 13496 1452 1.15DL
11528
+ 1.2SIDL
2184.973
- 1.5COL(-X)-MLC
658.781 41.773 -1.412 -163.85 1153.04
Min Mz 13472 1452 1.15DL
11535
+ 1.2SIDL
2184.973
- 1.5COL(-X)-MLC
6.957 8.754 -1.412 42.016 -1234.819

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 22 16
2nd Layer

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2185 1236 1406 0.879 OK
Minima 2530 71.6 1481 0.048 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 74.36 OK
Minima -109 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 4.295 OK 27.64 OK
Minima 0.8698 OK 9.249 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 12.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13476 1003 1DL11538
+ 1SIDL 2132.343
+ 1CL + 1PLB +-4.326
1.1TLB + -5.733
1.1BTB 0.131 63.239 -24.361
Min Fx 13476 1002 1DL11538
+ 1SIDL 2064.948
+ 1CL + 1PLA + 5.539
1.1TLA - 1.1BTA
-3.421 0.487 50.036 33.376
Max Fy 13476 1006 1DL11538
+ 1SIDL 2115.522
+ 1CL + 1PLA +10.485
1PLB + 1.1TLA
-4.583
+ 1.1TLB0.286
- 1.1BTA -57.106
1.1BTB 62.268
Min Fy 13476 1005 1DL11538
+ 1SIDL 2130.209
+ 1CL + 1PLA +-9.185
1PLB + 1.1TLA
-4.778
+ 1.1TLB0.342
+ 1.1BTA +58.321
1.1BTB -52.765
Max Fz 28525 1003 1DL27509
+ 1SIDL 2132.343
+ 1CL + 1PLB + 0.372
1.1TLB + 1.1BTB
0.774 0.131 -1.876 0.819
Min Fz 13479 1003 1DL11541
+ 1SIDL 2132.343
+ 1CL + 1PLB +-3.488
1.1TLB + -8.085
1.1BTB 0.131 42.329 -11.996
Max Mx 13476 1001 1DL11538
+ 1SIDL +2072.36
1CL + 1PLA +-4.232
1.1TLA + -3.577
1.1BTA 0.622 50.926 -23.769
Min Mx 13476 1003 1DL11538
+ 1SIDL 2132.343
+ 1CL + 1PLB +-4.326
1.1TLB + -5.733
1.1BTB 0.131 63.239 -24.361
Max My 13476 1003 1DL11538
+ 1SIDL 2132.343
+ 1CL + 1PLB +-4.326
1.1TLB + -5.733
1.1BTB 0.131 63.239 -24.361
Min My 28522 1003 1DL27507
+ 1SIDL 2132.343
+ 1CL + 1PLB + 0.279
1.1TLB + -0.241
1.1BTB 0.131 -2.909 1.619
Max Mz 13476 1006 1DL11538
+ 1SIDL 2115.522
+ 1CL + 1PLA +10.485
1PLB + 1.1TLA
-4.583
+ 1.1TLB0.286
- 1.1BTA -57.106
1.1BTB 62.268
Min Mz 13476 1005 1DL11538
+ 1SIDL 2130.209
+ 1CL + 1PLA +-9.185
1PLB + 1.1TLA
-4.778
+ 1.1TLB0.342
+ 1.1BTA +58.321
1.1BTB -52.765

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13476 1003 1DL11538
+ 1SIDL 2132.343
+ 1CL + 1PLB +-4.326
1.1TLB + -5.733
1.1BTB 0.131 63.239 -24.361
Min Fx 13476 1015 1DL11539
+ 1SIDL 1610.583
+ 0.3SLX + 0.3SLY
-24.672
+ 1SLZ -72.004 -4.923 -251.248 -122.048
Max Fy 13476 1086 1DL11539
+ 1SIDL +2039.85
0.3CL + 0.3PLA81.95
+ 0.3PLB18.414
+ 0.3TLA + 0.3TLB
2.861 - 0.3BTA
152.135- 0.3BTB
405.964
- 1SLX - 0.3SLY - 0.3
Min Fy 13477 1152 1DL11539
+ 1SIDL 1881.158
- 1COL(-X)-MLC-98.106 -4.53 -0.872 40.02 -585.568
Max Fz 13476 3047 1DL11538
+ 1SIDL 2103.018
+ 0.3CL + 0.3PLA
24.228
+ 0.3TLA65.333
+ 0.3BTA 5.484
+ 0.3SLX402.758
+ 0.3SLY + 1SLZ
145.317
+ 1.1NLA
Min Fz 13476 3071 1DL11539
+ 1SIDL 1705.187
+ 0.3CL + 0.3PLB
-25.91
+ 0.3TLB -73.055
+ 0.3BTB-4.84
+ 0.3SLX-244.398
+ 0.3SLY + 1SLZ
-127.919
+ 1.1NLB
Max Mx 13476 3054 1DL11539
+ 1SIDL 2102.712
+ 0.3CL + 0.3PLA
27.006
+ 0.3TLA64.564
- 0.3BTA -5.699
0.3SLX -334.363
0.3SLY - 1SLZ
134.576
- 1.1NLA
Min Mx 13476 3078 1DL11538
+ 1SIDL 1701.489
+ 0.3CL + 0.3PLB
-23.324
+ 0.3TLB -72.233
- 0.3BTB-5.071
- 0.3SLX -312.093
- 0.3SLY - 1SLZ
-138.718
- 1.1NLB
Max My 13476 3071 1DL11538
+ 1SIDL 2122.526
+ 0.3CL + 0.3PLB
24.316
+ 0.3TLB 63.909
+ 0.3BTB5.599
+ 0.3SLX410.245
+ 0.3SLY + 1SLZ
145.834
+ 1.1NLB
Min My 13476 1022 1DL11538
+ 1SIDL 1610.583
- 0.3SLX - 0.3SLY
-24.672
- 1SLZ -72.004 -4.923 -315.933 -146.719
Max Mz 13476 1007 1DL11538
+ 1SIDL 1950.728
+ 1SLX + 0.3SLY79.204
+ 0.3SLZ 18.736 2.859 173.853 471.73
Min Mz 13476 1152 1DL11538
+ 1SIDL 1881.158
- 1COL(-X)-MLC-92.861 -3.278 -0.872 43.298 -678.429
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13476 2103 1.15DL
11538
+ 1.2SIDL
2530.441
+ 1.4CL +-6.166
1.4PLB + 1.54TLB
-7.146 + 1.54BTB
0.109 77.735 -34.881
Min Fx 13476 2115 1.0DL
11539
+ 1.0SIDL
1547.93
+ 0.3SLX +-32.416
0.3SLY + 1SLZ
-93.023 -6.523 -338.87 -160.473
Max Fy 13476 2186 1.0DL
11539
+ 1.0SIDL
2078.747
+ 0.3CL +106.247
0.3PLA + 0.3PLB
25.172
+ 0.3TLA3.642
+ 0.3TLB183.542
- 0.3BTA - 0.3BTB
526.194- 1SLX - 0.3SLY
Min Fy 13477 1452 1.15DL
11539
+ 1.2SIDL
2184.973
- 1.5COL(-X)-MLC
-147.319 -5.156 -1.412 46.142 -879.285
Max Fz 13476 3147 1.0DL
11538
+ 1.0SIDL
2165.329
+ 0.3CL + 0.3PLA
31.949 + 0.3TLA
86.515
+ 0.3BTA
7.034+ 0.3SLX
510.558
+ 0.3SLY191.349
+ 1SLZ + 1.54NLA
Min Fz 13476 3171 1.0DL
11539
+ 1.0SIDL
1642.876
+ 0.3CL +-33.631
0.3PLB + 0.3TLB
-94.236+ 0.3BTB
-6.39+ 0.3SLX
-331.389
+ 0.3SLY-166.23
+ 1SLZ + 1.54NLB
Max Mx 13476 3154 1.0DL
11539
+ 1.0SIDL
2165.708
+ 0.3CL + 0.3PLA
34.773 + 0.3TLA
85.422
- 0.3BTA7.35
- 0.3SLX
422.617
- 0.3SLY -173.114
1SLZ - 1.54NLA
Min Mx 13476 3178 1.0DL
11538
+ 1.0SIDL
1638.492
+ 0.3CL + 0.3PLB
-31.09 + 0.3TLB
-93.09- 0.3BTB
-6.721- 0.3SLX
-421.482
- 0.3SLY -185.021
- 1SLZ - 1.54NLB
Max My 13476 1453 1.15DL
11538
+ 1.2SIDL
2088.607
+ 1.5COL(Z)-MLC
-0.561 -70.47 -2.441 542.809 -2.78
Min My 13476 2122 1.0DL
11538
+ 1.0SIDL
1547.93
- 0.3SLX --32.416
0.3SLY - 1SLZ
-93.023 -6.523 -424.527 -192.886
Max Mz 13476 2107 1.0DL
11538
+ 1.0SIDL
1989.625
+1SLX + 0.3SLY
103.501 + 0.3SLZ25.494 3.64 211.976 616.257
Min Mz 13476 1452 1.15DL
11538
+ 1.2SIDL
2184.973
- 1.5COL(-X)-MLC
-139.445 -3.684 -1.412 49.826 -1018.73

ODE MDE
Maximum Tension Force (kN) 1610.58 1547.93
Skin Friction (kN) 0.00
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2185 1020 1136 0.898 OK
Minima 2530 85.21 1219 0.070 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 65.84 OK
Minima -64.82 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 3.466 OK 23.3 OK
Minima 1.789 OK 14.24 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.763 m
Hence de = 0.743 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 660 kN
Corresponding axial compressive force, N = 2185 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 6082 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0030 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.455 %
Horizontal shear force, Vu = 660 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 987.32 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.568 Mpa
= 568 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 528.304 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.14
Modified shear strength of concrete (n s vc ) = 601.79 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 257.76 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.43 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR PG1B


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR PG1B

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 27007 1006 1DL25968
+ 1SIDL +647.147
1CL + 1PLA -49.184
+ 1PLB + 1.1TLA
1.326
+ 1.1TLB-4.42
- 1.1BTA - 1.1BTB
2.523 62.706
Min Fx 26982 1006 1DL25939
+ 1SIDL +547.639
1CL + 1PLA +15.106
1PLB + 1.1TLA
2.079
+ 1.1TLB5.434
- 1.1BTA - 1.1BTB
8.275 185.009
Max Fy 26999 1005 1DL25938
+ 1SIDL +610.857
1CL + 1PLA +89.843
1PLB + 1.1TLA
5.584
+ 1.1TLB5.553
+ 1.1BTA +-3.344
1.1BTB 143.828
Min Fy 27024 1006 1DL25967
+ 1SIDL +647.147
1CL + 1PLA -105.87
+ 1PLB + 1.1TLA
2.979
+ 1.1TLB-4.42
- 1.1BTA - -4.614
1.1BTB -193.476
Max Fz 26999 1004 1DL25938
+ 1SIDL +563.707
1CL + 1PLB +24.075
1.1TLB - 1.1BTB
6.46 5.65 -2.463 190.929
Min Fz 26991 1004 1DL25948
+ 1SIDL +563.707
1CL + 1PLB + 3.362
1.1TLB - 1.1BTB
-1.87 5.65 11.429 -13.007
Max Mx 26982 1004 1DL25939
+ 1SIDL +563.707
1CL + 1PLB +21.508
1.1TLB - 1.1BTB
2.345 5.65 12.38 120.259
Min Mx 27007 1004 1DL25968
+ 1SIDL +633.538
1CL + 1PLB -43.155
+ 1.1TLB - 1.1BTB
1.477 -4.433 4.934 -1.439
Max My 26985 1004 1DL25943
+ 1SIDL +563.707
1CL + 1PLB +16.804
1.1TLB - 1.1BTB
0.04 5.65 16.8 43.538
Min My 27024 1001 1DL25967
+ 1SIDL +603.724
1CL + 1PLA -38.906
+ 1.1TLA + 1.1BTA
1.309 -3.418 -6.082 -242.573
Max Mz 26999 1006 1DL25938
+ 1SIDL +547.639
1CL + 1PLA + 1PLB
1.78+ 1.1TLA
5.321
+ 1.1TLB5.434
- 1.1BTA - -4.127
1.1BTB 206.487
Min Mz 27024 1005 1DL25967
+ 1SIDL + 1CL
591.76
+ 1PLA -18.945
+ 1PLB + 1.1TLA
2.672
+ 1.1TLB
-4.219
+ 1.1BTA +-5.534
1.1BTB -260.945

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26982 1079 1DL25939
+ 1SIDL +790.001
0.3CL + 0.3PLA
127.492
+ 0.3PLB +6.191
0.3TLA + 0.3TLB
6.487 + 0.3BTA
78.773 + 0.3BTB
1036.752
+ 1SLX + 0.3SLY +
Min Fx 26982 1007 1DL25940
+ 1SIDL +254.839
1SLX + 0.3SLY
-79.149
+ 0.3SLZ -2.885 2.109 -66.794 -1102.638
Max Fy 26999 1079 1DL25938
+ 1SIDL +790.001
0.3CL + 0.3PLA
402.186
+ 0.3PLB23.889
+ 0.3TLA + 0.3TLB
6.487 + 0.3BTA
27.428 + 0.3BTB
388.378
+ 1SLX + 0.3SLY +
Min Fy 27024 1086 1DL25967
+ 1SIDL +350.498
0.3CL + 0.3PLA
-409.247
+ 0.3PLB-14.138
+ 0.3TLA +-4.828
0.3TLB - 0.3BTA
-34.95
- 0.3BTB
-450.511
- 1SLX - 0.3SLY - 0.3
Max Fz 26999 3071 1DL25938
+ 1SIDL +616.782
0.3CL + 0.3PLB
159.67
+ 0.3TLB 66.319
+ 0.3BTB9.122
+ 0.3SLX +92.079
0.3SLY + 1SLZ
221.678
+ 1.1NLB
Min Fz 26999 3047 1DL25957
+ 1SIDL +449.073
0.3CL + 0.3PLA
-70.826
+ 0.3TLA-57.43
+ 0.3BTA +-0.33
0.3SLX-155.156
+ 0.3SLY + 1SLZ
-94.434
+ 1.1NLA
Max Mx 26982 3071 1DL25939
+ 1SIDL +616.782
0.3CL + 0.3PLB
58.346
+ 0.3TLB 15.854
+ 0.3BTB9.122
+ 0.3SLX234.391
+ 0.3SLY + 1SLZ
361.748
+ 1.1NLB
Min Mx 27007 3078 1DL25968
+ 1SIDL +497.966
0.3CL + 0.3PLB
-63.035
+ 0.3TLB -9.125
- 0.3BTB -5.85
- 0.3SLX -195.098
- 0.3SLY - 1SLZ
-358.558
- 1.1NLB
Max My 26984 3071 1DL25941
+ 1SIDL +616.782
0.3CL + 0.3PLB
16.276
+ 0.3TLB4.823
+ 0.3BTB9.122
+ 0.3SLX255.023
+ 0.3SLY + 1SLZ
364.954
+ 1.1NLB
Min My 26983 3047 1DL25941
+ 1SIDL +449.073
0.3CL + 0.3PLA
4.767
+ 0.3TLA +-2.76
0.3BTA +-0.33
0.3SLX-234.459
+ 0.3SLY + -393.738
1SLZ + 1.1NLA
Max Mz 27009 1086 1DL25971
+ 1SIDL +789.859
0.3CL + 0.3PLA
-18.984
+ 0.3PLB +2.189
0.3TLA +-2.223
0.3TLB - 0.3BTA
71.464- 0.3BTB
1224.853
- 1SLX - 0.3SLY - 0.3
Min Mz 26984 1079 1DL25942
+ 1SIDL +285.036
0.3CL + 0.3PLA
14.671
+ 0.3PLB -0.905
+ 0.3TLA + 0.3TLB
2.553 + 0.3BTA
-63.988 + 0.3BTB
-1221.18
+ 1SLX + 0.3SLY +
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26982 1452 1.15DL
25939
+ 1.2SIDL
956.883
- 1.5COL(-X)-MLC
175.539 0.448 0.966 -11.114 -1508.974
Min Fx 26982 2107 1.0DL
25940
+ 1.0SIDL
176.958
+1SLX + -110.204
0.3SLY + 0.3SLZ-4.258 1.506 -90.001 -1449.637
Max Fy 26999 1452 1.15DL
25938
+ 1.2SIDL
956.883
- 1.5COL(-X)-MLC
571.237 -0.794 0.966 -10.174 -234.742
Min Fy 27024 2186 1.0DL
25967
+ 1.0SIDL
282.732
+ 0.3CL -515.618
+ 0.3PLA + 0.3PLB
-19.214
+ 0.3TLA
-5.223
+ 0.3TLB --44.48
0.3BTA - -533.214
0.3BTB - 1SLX - 0.3SLY
Max Fz 26999 3171 1.0DL
25938
+ 1.0SIDL
642.499
+ 0.3CL +195.062
0.3PLB + 0.3TLB
85.338+ 0.3BTB
10.541+ 0.3SLX
121.318
+ 0.3SLY245.835
+ 1SLZ + 1.54NLB
Min Fz 26999 3147 1.0DL
25957
+ 1.0SIDL
423.355
+ 0.3CL -106.218
+ 0.3PLA + 0.3TLA
-76.448+ 0.3BTA
-1.748+ 0.3SLX
-203.461
+ 0.3SLY
-154.084
+ 1SLZ + 1.54NLA
Max Mx 26982 3171 1.0DL
25939
+ 1.0SIDL
642.499
+ 0.3CL + 0.3PLB
68.578 + 0.3TLB
20.201+ 0.3BTB
10.541+ 0.3SLX 304.2
+ 0.3SLY464.185
+ 1SLZ + 1.54NLB
Min Mx 27007 3178 1.0DL
25968
+ 1.0SIDL
476.844
+ 0.3CL +-72.344
0.3PLB + 0.3TLB
-12.285- 0.3BTB
-6.564- 0.3SLX
-256.063
- 0.3SLY -457.272
- 1SLZ - 1.54NLB
Max My 26984 3171 1.0DL
25941
+ 1.0SIDL
642.499
+ 0.3CL + 0.3PLB
16.496 + 0.3TLB6.141+ 0.3BTB
10.541+ 0.3SLX
330.318
+ 0.3SLY482.299
+ 1SLZ + 1.54NLB
Min My 26983 3147 1.0DL
25941
+ 1.0SIDL
423.355
+ 0.3CL + 0.3PLA
0.133 + 0.3TLA
-3.922+ 0.3BTA
-1.748+ 0.3SLX
-309.755
+ 0.3SLY
-511.083
+ 1SLZ + 1.54NLA
Max Mz 27009 2186 1.0DL
25971
+ 1.0SIDL
857.625
+ 0.3CL +-18.587
0.3PLA + 0.3PLB2.707
+ 0.3TLA
-1.828
+ 0.3TLB -92.306
0.3BTA -1584.049
0.3BTB - 1SLX - 0.3SLY
Min Mz 26984 1452 1.15DL
25942
+ 1.2SIDL
956.883
- 1.5COL(-X)-MLC
16.4 0.846 0.966 -9.14 -1787.73

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


st
1 Layer 36 16
2nd Layer

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 956.9 1788 2056 0.869 OK
Minima 956.9 235 2056 0.114 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 90.98 OK
Minima -249.9 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 3.009 OK 17.08 OK
Minima -1.672 OK -7.533 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.021 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 14.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 27018 1006 1DL25979
+ 1SIDL +647.147
1CL + 1PLA +23.154
1PLB + 1.1TLA
-0.682
+ 1.1TLB-4.42
- 1.1BTA - 1.1BTB
3.345 117.142
Min Fx 26993 1006 1DL25950
+ 1SIDL +547.639
1CL + 1PLA + 1PLB
7.03+ 1.1TLA
-1.368
+ 1.1TLB5.434
- 1.1BTA - 1.1BTB
6.222 10.188
Max Fy 27018 1006 1DL25979
+ 1SIDL +647.147
1CL + 1PLA +23.154
1PLB + 1.1TLA
-0.682
+ 1.1TLB-4.42
- 1.1BTA - 1.1BTB
3.345 117.142
Min Fy 26993 1005 1DL25950
+ 1SIDL +610.857
1CL + 1PLA -20.392
+ 1PLB + 1.1TLA
-1.472
+ 1.1TLB5.553
+ 1.1BTA +6.589
1.1BTB -100.626
Max Fz 29001 1004 1DL27985
+ 1SIDL +563.707
1CL + 1PLB +-0.184
1.1TLB - 1.1BTB
0.182 5.65 -0.559 -0.004
Min Fz 26993 1004 1DL25950
+ 1SIDL +563.707
1CL + 1PLB + 0.098
1.1TLB - 1.1BTB
-1.754 5.65 7.707 -17.849
Max Mx 26993 1004 1DL25950
+ 1SIDL +563.707
1CL + 1PLB + 0.098
1.1TLB - 1.1BTB
-1.754 5.65 7.707 -17.849
Min Mx 27018 1004 1DL25979
+ 1SIDL +633.538
1CL + 1PLB +16.407
1.1TLB - 1.1BTB
-0.907 -4.433 4.208 90.022
Max My 26993 1004 1DL25950
+ 1SIDL +563.707
1CL + 1PLB + 0.098
1.1TLB - 1.1BTB
-1.754 5.65 7.707 -17.849
Min My 28998 1004 1DL27983
+ 1SIDL +563.707
1CL + 1PLB +-1.315
1.1TLB - 1.1BTB
-0.013 5.65 -0.825 -1.318
Max Mz 27018 1006 1DL25979
+ 1SIDL +647.147
1CL + 1PLA +23.154
1PLB + 1.1TLA
-0.682
+ 1.1TLB-4.42
- 1.1BTA - 1.1BTB
3.345 117.142
Min Mz 26993 1005 1DL25950
+ 1SIDL +610.857
1CL + 1PLA -20.392
+ 1PLB + 1.1TLA
-1.472
+ 1.1TLB5.553
+ 1.1BTA +6.589
1.1BTB -100.626

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26993 1079 1DL25950
+ 1SIDL +790.001
0.3CL + 0.3PLA
100.022
+ 0.3PLB + 0.3TLA
5.39 + 0.3TLB
6.487 + 0.3BTA
30.637 + 0.3BTB
388.933
+ 1SLX + 0.3SLY +
Min Fx 26993 1007 1DL25951
+ 1SIDL +254.839
1SLX + 0.3SLY
-114.615
+ 0.3SLZ -7.678 2.109 -14.873 -362.802
Max Fy 27018 1086 1DL25980
+ 1SIDL +789.859
0.3CL + 0.3PLA
119.923
+ 0.3PLB +5.295
0.3TLA +-2.223
0.3TLB - 0.3BTA
18.086- 0.3BTB
382.743
- 1SLX - 0.3SLY - 0.3
Min Fy 26993 1079 1DL25951
+ 1SIDL +285.036
0.3CL + 0.3PLA
-118.797
+ 0.3PLB -7.794
+ 0.3TLA + 0.3TLB
2.553 + 0.3BTA
-14.473 + 0.3BTB
-376.742
+ 1SLX + 0.3SLY +
Max Fz 26993 3047 1DL25950
+ 1SIDL +616.236
0.3CL + 0.3PLA
28.249
+ 0.3TLA19.946
+ 0.3BTA 8.621
+ 0.3SLX +83.808
0.3SLY + 1SLZ
99.274
+ 1.1NLA
Min Fz 26993 3071 1DL25951
+ 1SIDL +449.619
0.3CL + 0.3PLB
-43.149
+ 0.3TLB-22.282
+ 0.3BTB0.172
+ 0.3SLX -53.975
+ 0.3SLY + 1SLZ
-147.004
+ 1.1NLB
Max Mx 26993 3071 1DL25950
+ 1SIDL +616.782
0.3CL + 0.3PLB
28.159
+ 0.3TLB 19.356
+ 0.3BTB9.122
+ 0.3SLX +86.123
0.3SLY + 1SLZ98.819
+ 1.1NLB
Min Mx 27018 3078 1DL25979
+ 1SIDL +497.966
0.3CL + 0.3PLB
-23.814
+ 0.3TLB-18.004
- 0.3BTB -5.85
- 0.3SLX - -63.162
0.3SLY - 1SLZ-75.529
- 1.1NLB
Max My 26993 3071 1DL25950
+ 1SIDL +616.782
0.3CL + 0.3PLB
28.159
+ 0.3TLB 19.356
+ 0.3BTB9.122
+ 0.3SLX +86.123
0.3SLY + 1SLZ98.819
+ 1.1NLB
Min My 26993 1054 1DL25950
+ 1SIDL +440.369
0.3CL + 0.3PLA
-39.275
+ 0.3TLA-21.845
- 0.3BTA-0.261
- 0.3SLX --75.052
0.3SLY - 1SLZ
-174.411
Max Mz 27018 1007 1DL25979
+ 1SIDL +757.951
1SLX + 0.3SLY
115.558
+ 0.3SLZ 5.363 -1.845 24.095 483.496
Min Mz 26993 1152 1DL25950
+ 1SIDL - 756.297
1COL(-X)-MLC
-115.621 0.145 1.596 0.087 -480.574
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26993 1452 1.15DL
25950
+ 1.2SIDL
956.883
- 1.5COL(-X)-MLC
-171.609 0.598 0.966 -1.574 -708.544
Min Fx 26993 2107 1.0DL
25951
+ 1.0SIDL
176.958
+1SLX + -148.366
0.3SLY + 0.3SLZ-9.708 1.506 -20.62 -465.47
Max Fy 27018 2186 1.0DL
25980
+ 1.0SIDL
857.625
+ 0.3CL +153.299
0.3PLA + 0.3PLB7.087
+ 0.3TLA
-1.828
+ 0.3TLB -23.027
0.3BTA - 0.3BTB
483.633- 1SLX - 0.3SLY
Min Fy 26993 1452 1.15DL
25950
+ 1.2SIDL
956.883
- 1.5COL(-X)-MLC
-171.609 0.598 0.966 -1.574 -708.544
Max Fz 26993 3147 1.0DL
25950
+ 1.0SIDL
642.053
+ 0.3CL + 0.3PLA
39.218 + 0.3TLA
26.439+ 0.3BTA
9.954+ 0.3SLX
108.103
+ 0.3SLY143.723
+ 1SLZ + 1.54NLA
Min Fz 26993 3171 1.0DL
25951
+ 1.0SIDL
423.801
+ 0.3CL +-54.117
0.3PLB + 0.3TLB
-28.775+ 0.3BTB
-1.161+ 0.3SLX
-71.926
+ 0.3SLY-180.486
+ 1SLZ + 1.54NLB
Max Mx 26993 3171 1.0DL
25950
+ 1.0SIDL
642.499
+ 0.3CL + 0.3PLB
39.178 + 0.3TLB 25.7+ 0.3BTB
10.541+ 0.3SLX110.99
+ 0.3SLY143.469
+ 1SLZ + 1.54NLB
Min Mx 27018 3178 1.0DL
25979
+ 1.0SIDL
476.844
+ 0.3CL + 0.3PLB
-34.21 + 0.3TLB
-23.373- 0.3BTB
-6.564- 0.3SLX
-83.547
- 0.3SLY -117.341
- 1SLZ - 1.54NLB
Max My 26993 3171 1.0DL
25950
+ 1.0SIDL
642.499
+ 0.3CL + 0.3PLB
39.178 + 0.3TLB 25.7+ 0.3BTB
10.541+ 0.3SLX110.99
+ 0.3SLY143.469
+ 1SLZ + 1.54NLB
Min My 26993 2154 1.0DL
25950
+ 1.0SIDL
414.602
+ 0.3CL +-50.268
0.3PLA + 0.3TLA
-28.263- 0.3BTA
-1.637
- 0.3SLX
-99.633
- 0.3SLY-218.961
- 1SLZ
Max Mz 27018 2107 1.0DL
25979
+ 1.0SIDL
825.717
+1SLX + 0.3SLY
148.934+ 0.3SLZ7.155 -1.45 30.827 617.763
Min Mz 26993 1452 1.15DL
25950
+ 1.2SIDL
956.883
- 1.5COL(-X)-MLC
-171.609 0.598 0.966 -1.574 -708.544

ODE MDE
Maximum Tension Force (kN) 254.84 176.958
Skin Friction (kN) 0.00
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


19 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 956.9 708.5 931.6 0.761 OK
Minima 476.8 144 780.1 0.185 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 47.38 OK
Minima -119.4 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 1.946 OK 11.87 OK
Minima -0.3546 OK -0.5042 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.002 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.756 m
Hence de = 0.741 m and dv = 0.667 m
Horizontal resultant shear force at the section, Vu = 571 kN
Corresponding axial compressive force, N = 957 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 16286 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0081 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 1.222 %
Horizontal shear force, Vu = 571 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 856.97 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.790 Mpa
= 790 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.931
Allowable shear stress in concrete, s vc = 734.905 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.06
Modified shear strength of concrete (n s vc ) = 779.67 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 51.52 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 266.63 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR GROUP PG2A


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

PILE DESIGN FOR GROUP PG2A

Grade of Concrete = C40


Grade of Reinforcement = Fe390
No. of Piles = 2
Pile Diameter = 1.2 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31670 1005 1DL30730
+ 1SIDL 2644.893
+ 1CL + 1PLA + 7.497
1PLB + 1.1TLA
5.307
+ 1.1TLB
-42.973
+ 1.1BTA-75.356
+ 1.1BTB -107.363
Min Fx 31639 1005 1DL30699
+ 1SIDL 1703.031
+ 1CL + 1PLA -11.128
+ 1PLB + 1.1TLA
21.374
+ 1.1TLB
-40.492
+ 1.1BTA
-110.033
+ 1.1BTB -165.356
Max Fy 31653 1006 1DL30713
+ 1SIDL 2540.072
+ 1CL + 1PLA +23.538
1PLB + 1.1TLA
3.895
+ 1.1TLB2.499
- 1.1BTA - -33.73
1.1BTB 146.533
Min Fy 31656 1006 1DL30698
+ 1SIDL 2540.072
+ 1CL + 1PLA -135.68
+ 1PLB + 1.1TLA
-33.754
+ 1.1TLB2.499
- 1.1BTA206.761
- 1.1BTB -564.779
Max Fz 31656 1005 1DL30698
+ 1SIDL 1703.031
+ 1CL + 1PLA +-3.224
1PLB + 1.1TLA
26.289
+ 1.1TLB
-40.492
+ 1.1BTA
-184.297
+ 1.1BTB -184.35
Min Fz 31656 1006 1DL30698
+ 1SIDL 2540.072
+ 1CL + 1PLA -135.68
+ 1PLB + 1.1TLA
-33.754
+ 1.1TLB2.499
- 1.1BTA206.761
- 1.1BTB -564.779
Max Mx 31639 1006 1DL30699
+ 1SIDL 2540.072
+ 1CL + 1PLA -89.993
+ 1PLB + 1.1TLA
-25.873
+ 1.1TLB2.499
- 1.1BTA113.236
- 1.1BTB -205.111
Min Mx 31670 1005 1DL30730
+ 1SIDL 2644.893
+ 1CL + 1PLA + 7.497
1PLB + 1.1TLA
5.307
+ 1.1TLB
-42.973
+ 1.1BTA-75.356
+ 1.1BTB -107.363
Max My 31656 1006 1DL30698
+ 1SIDL 2540.072
+ 1CL + 1PLA -135.68
+ 1PLB + 1.1TLA
-33.754
+ 1.1TLB2.499
- 1.1BTA206.761
- 1.1BTB -564.779
Min My 31656 1005 1DL30698
+ 1SIDL 1703.031
+ 1CL + 1PLA +-3.224
1PLB + 1.1TLA
26.289
+ 1.1TLB
-40.492
+ 1.1BTA
-184.297
+ 1.1BTB -184.35
Max Mz 31647 1006 1DL30708
+ 1SIDL 2540.072
+ 1CL + 1PLA +-4.069
1PLB + 1.1TLA
-5.715
+ 1.1TLB2.499
- 1.1BTA -36.726
- 1.1BTB 227.289
Min Mz 31656 1006 1DL30698
+ 1SIDL 2540.072
+ 1CL + 1PLA -135.68
+ 1PLB + 1.1TLA
-33.754
+ 1.1TLB2.499
- 1.1BTA206.761
- 1.1BTB -564.779

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31639 1102 1DL30700
+ 1SIDL 6356.956
+ 0.3CL + 0.3PLA
167.84
+ 0.3PLB323.449
+ 0.3TLA 229.483
+ 0.3TLB - 0.3BTA
517.16
- 0.3BTB
448.457
- 0.3SLX - 0.3SLY - 1
Min Fx 31639 3071 1DL30700
+ 1SIDL-2423.163
+ 0.3CL + 0.3PLB
-251.735
+ 0.3TLB
-329.534
+ 0.3BTB
-263.96
+ 0.3SLX-495.885
+ 0.3SLY + 1SLZ
-652.978
+ 1.1NLB
Max Fy 31687 1079 1DL30729
+ 1SIDL +5953.42
0.3CL + 0.3PLA
704.595
+ 0.3PLB238.841
+ 0.3TLA 176.369
+ 0.3TLB + 0.3BTA
1347.9+ 0.3BTB
2498.616
+ 1SLX + 0.3SLY +
Min Fy 31687 1086 1DL30729
+ 1SIDL +-1811.61
0.3CL + 0.3PLA
-790.371
+ 0.3PLB
-268.642
+ 0.3TLA-220.945
+ 0.3TLB --1242.585
0.3BTA - 0.3BTB
-2976.033
- 1SLX - 0.3SLY - 0.3
Max Fz 31656 3071 1DL30698
+ 1SIDL 6113.724
+ 0.3CL + 0.3PLB
269.339
+ 0.3TLB547.368
+ 0.3BTB218.97
+ 0.3SLX1728.42
+ 0.3SLY + 1287.597
1SLZ + 1.1NLB
Min Fz 31656 1102 1DL30698
+ 1SIDL-2179.931
+ 0.3CL + 0.3PLA
-386.414
+ 0.3PLB
-555.236
+ 0.3TLA-253.447
+ 0.3TLB --1679.196
0.3BTA - 0.3BTB
-1893.615
- 0.3SLX - 0.3SLY - 1
Max Mx 31639 1102 1DL30700
+ 1SIDL 6356.956
+ 0.3CL + 0.3PLA
167.84
+ 0.3PLB323.449
+ 0.3TLA 229.483
+ 0.3TLB - 0.3BTA
517.16
- 0.3BTB
448.457
- 0.3SLX - 0.3SLY - 1
Min Mx 31639 1095 1DL30700
+ 1SIDL-2408.214
+ 0.3CL + 0.3PLA
-249.651
+ 0.3PLB
-329.261
+ 0.3TLA-265.172
+ 0.3TLB + 0.3BTA
-510.549 + 0.3BTB
-665.594
+ 0.3SLX + 0.3SLY
Max My 31656 1007 1DL30698
+ 1SIDL 6154.813
+ 1SLX + 0.3SLY
555.815
+ 0.3SLZ 372.409 212.711 1954.388 1784.973
Min My 31656 1014 1DL30698
+ 1SIDL-2331.993
- 1SLX - 0.3SLY
-656.954
- 0.3SLZ -381.997 -247.312 -1912.057 -2328.81
Max Mz 31687 1079 1DL30729
+ 1SIDL +5953.42
0.3CL + 0.3PLA
704.595
+ 0.3PLB238.841
+ 0.3TLA 176.369
+ 0.3TLB + 0.3BTA
1347.9+ 0.3BTB
2498.616
+ 1SLX + 0.3SLY +
Min Mz 31687 1086 1DL30729
+ 1SIDL +-1811.61
0.3CL + 0.3PLA
-790.371
+ 0.3PLB
-268.642
+ 0.3TLA-220.945
+ 0.3TLB --1242.585
0.3BTA - 0.3BTB
-2976.033
- 1SLX - 0.3SLY - 0.3
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31639 2202 1.0DL
30700
+ 1.0SIDL
7666.496
+ 0.3CL +233.676
0.3PLA + 0.3PLB
425.268
+ 0.3TLA302.5
+ 0.3TLB663.251
- 0.3BTA - 0.3BTB
611.897- 0.3SLX - 0.3SL
Min Fx 31639 3171 1.0DL
30700
+ 1.0SIDL
-3743.25
+ 0.3CL -317.179
+ 0.3PLB + -430.579
0.3TLB + -337.432
0.3BTB + 0.3SLX
-641.374
+ 0.3SLY-815.213
+ 1SLZ + 1.54NLB
Max Fy 31687 2179 1.0DL
30729
+ 1.0SIDL
7107.673
+ 0.3CL +926.627
0.3PLA + 0.3PLB
314.615
+ 0.3TLA
238.086
+ 0.3TLB
1750.981
+ 0.3BTA +3309.342
0.3BTB + 1SLX + 0.3SL
Min Fy 31687 2186 1.0DL
30729
+ 1.0SIDL
-2965.863
+ 0.3CL +-1012.4
0.3PLA + 0.3PLB
-344.416
+ 0.3TLA
-282.662
+ 0.3TLB
-1645.666
- 0.3BTA -3786.759
- 0.3BTB - 1SLX - 0.3SLY
Max Fz 31656 3171 1.0DL
30698
+ 1.0SIDL
7412.715
+ 0.3CL +363.662
0.3PLB + 0.3TLB
715.08+ 0.3BTB
291.532+ 0.3SLX
2256.243
+ 0.3SLY
1750.619
+ 1SLZ + 1.54NLB
Min Fz 31656 2202 1.0DL
30698
+ 1.0SIDL
-3489.47
+ 0.3CL -480.214
+ 0.3PLA + 0.3PLB
-721.628
+ 0.3TLA
-326.464
+ 0.3TLB
-2210.573
- 0.3BTA -2353.601
- 0.3BTB - 0.3SLX - 0.3SL
Max Mx 31639 2202 1.0DL
30700
+ 1.0SIDL
7666.496
+ 0.3CL +233.676
0.3PLA + 0.3PLB
425.268
+ 0.3TLA302.5
+ 0.3TLB663.251
- 0.3BTA - 0.3BTB
611.897- 0.3SLX - 0.3SL
Min Mx 31639 2195 1.0DL
30700
+ 1.0SIDL
-3717.754
+ 0.3CL -315.487
+ 0.3PLA + 0.3PLB
-431.079
+ 0.3TLA
-338.189
+ 0.3TLB-656.64
+ 0.3BTA +-829.033
0.3BTB + 0.3SLX + 0.3
Max My 31656 2107 1.0DL
30698
+ 1.0SIDL
7456.993
+1SLX + 0.3SLY
740.328+ 0.3SLZ
488.031 282.431 2545.368 2403.621
Min My 31656 2114 1.0DL
30698
+ 1.0SIDL
-3634.174
- 1SLX - -841.466
0.3SLY - 0.3SLZ
-497.619 -317.031 -2503.037 -2947.457
Max Mz 31687 3155 1.0DL
30729
+ 1.0SIDL
7043.312
+ 0.3CL +922.266
0.3PLB + 317.346
0.3TLB + 0.3BTB
238.857+ 1SLX
1758.954
+ 0.3SLY 3311.159
+ 0.3SLZ + 1.54NLB
Min Mz 31687 2186 1.0DL
30729
+ 1.0SIDL
-2965.863
+ 0.3CL +-1012.4
0.3PLA + 0.3PLB
-344.416
+ 0.3TLA
-282.662
+ 0.3TLB
-1645.666
- 0.3BTA -3786.759
- 0.3BTB - 1SLX - 0.3SLY

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %

Reinforcement Provided

Dia. (mm) Nos.


40 32 16 Bundles of 2 Y40
29 16 + 1 Y29

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -2966 4129 5531 0.747 OK
Minima 7666 902.4 7018 0.129 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 114 OK
Minima -261.9 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 4.447 OK 27.87 OK
Minima -0.9265 OK -2.724 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.009 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 23.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31693 1005 1DL30752
+ 1SIDL 2644.893
+ 1CL + 1PLA + 1PLB
-1.5+ 1.1TLA
-0.394
+ 1.1TLB
-42.973
+ 1.1BTA +3.581
1.1BTB 2.23
Min Fx 31662 1005 1DL30721
+ 1SIDL 1703.031
+ 1CL + 1PLA + 0.793
1PLB + 1.1TLA
-2.439
+ 1.1TLB
-40.492
+ 1.1BTA +7.829
1.1BTB 7.76
Max Fy 31662 1006 1DL30721
+ 1SIDL 2540.072
+ 1CL + 1PLA + 11.41
1PLB + 1.1TLA3.041
+ 1.1TLB2.499
- 1.1BTA - -8.796
1.1BTB 24.161
Min Fy 31693 1005 1DL30752
+ 1SIDL 2644.893
+ 1CL + 1PLA + 1PLB
-1.5+ 1.1TLA
-0.394
+ 1.1TLB
-42.973
+ 1.1BTA +3.581
1.1BTB 2.23
Max Fz 31662 1006 1DL30721
+ 1SIDL 2540.072
+ 1CL + 1PLA + 11.41
1PLB + 1.1TLA3.041
+ 1.1TLB2.499
- 1.1BTA - -8.796
1.1BTB 24.161
Min Fz 31662 1005 1DL30721
+ 1SIDL 1703.031
+ 1CL + 1PLA + 0.793
1PLB + 1.1TLA
-2.439
+ 1.1TLB
-40.492
+ 1.1BTA +7.829
1.1BTB 7.76
Max Mx 31662 1006 1DL30721
+ 1SIDL 2540.072
+ 1CL + 1PLA + 11.41
1PLB + 1.1TLA3.041
+ 1.1TLB2.499
- 1.1BTA - -8.796
1.1BTB 24.161
Min Mx 31693 1005 1DL30752
+ 1SIDL 2644.893
+ 1CL + 1PLA + 1PLB
-1.5+ 1.1TLA
-0.394
+ 1.1TLB
-42.973
+ 1.1BTA +3.581
1.1BTB 2.23
Max My 31662 1005 1DL30721
+ 1SIDL 1703.031
+ 1CL + 1PLA + 0.793
1PLB + 1.1TLA
-2.439
+ 1.1TLB
-40.492
+ 1.1BTA +7.829
1.1BTB 7.76
Min My 31662 1006 1DL30721
+ 1SIDL 2540.072
+ 1CL + 1PLA + 11.41
1PLB + 1.1TLA3.041
+ 1.1TLB2.499
- 1.1BTA - -8.796
1.1BTB 24.161
Max Mz 31662 1006 1DL30721
+ 1SIDL 2540.072
+ 1CL + 1PLA + 11.41
1PLB + 1.1TLA3.041
+ 1.1TLB2.499
- 1.1BTA - -8.796
1.1BTB 24.161
Min Mz 31666 1006 1DL30726
+ 1SIDL 2540.072
+ 1CL + 1PLA + 0.278
1PLB + 1.1TLA0.564
+ 1.1TLB2.499
- 1.1BTA - -0.296
1.1BTB -1.238

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31662 1102 1DL30722
+ 1SIDL 6356.956
+ 0.3CL + 0.3PLA
33.355
+ 0.3PLB45.171
+ 0.3TLA 229.483
+ 0.3TLB - 0.3BTA
29.935
- 0.3BTB47.526
- 0.3SLX - 0.3SLY - 1
Min Fx 31662 3071 1DL30722
+ 1SIDL-2423.163
+ 0.3CL + 0.3PLB
-23.147
+ 0.3TLB-44.459
+ 0.3BTB
-263.96
+ 0.3SLX -31.317
+ 0.3SLY + 1SLZ
-31.895
+ 1.1NLB
Max Fy 31693 1086 1DL30753
+ 1SIDL 5737.816
+ 0.3CL + 0.3PLA
65.502
+ 0.3PLB23.482
+ 0.3TLA 186.579
+ 0.3TLB - 0.3BTA
34.003
- 0.3BTB62.108
- 1SLX - 0.3SLY - 0.3
Min Fy 31693 1079 1DL30753
+ 1SIDL-1596.006
+ 0.3CL + 0.3PLA
-57.921
+ 0.3PLB-21.033
+ 0.3TLA-231.155
+ 0.3TLB + 0.3BTA
-36.073+ 0.3BTB
-49.354
+ 1SLX + 0.3SLY +
Max Fz 31662 1102 1DL30722
+ 1SIDL 6356.956
+ 0.3CL + 0.3PLA
33.355
+ 0.3PLB45.171
+ 0.3TLA 229.483
+ 0.3TLB - 0.3BTA
29.935
- 0.3BTB47.526
- 0.3SLX - 0.3SLY - 1
Min Fz 31662 3071 1DL30722
+ 1SIDL-2423.163
+ 0.3CL + 0.3PLB
-23.147
+ 0.3TLB-44.459
+ 0.3BTB
-263.96
+ 0.3SLX -31.317
+ 0.3SLY + 1SLZ
-31.895
+ 1.1NLB
Max Mx 31662 1102 1DL30722
+ 1SIDL 6356.956
+ 0.3CL + 0.3PLA
33.355
+ 0.3PLB45.171
+ 0.3TLA 229.483
+ 0.3TLB - 0.3BTA
29.935
- 0.3BTB47.526
- 0.3SLX - 0.3SLY - 1
Min Mx 31662 1095 1DL30722
+ 1SIDL-2408.214
+ 0.3CL + 0.3PLA
-23.479
+ 0.3PLB -44.43
+ 0.3TLA-265.172
+ 0.3TLB + 0.3BTA
-30.727+ 0.3BTB
-31.602
+ 0.3SLX + 0.3SLY
Max My 31662 1079 1DL30721
+ 1SIDL 6103.632
+ 0.3CL + 0.3PLA
53.046
+ 0.3PLB32.444
+ 0.3TLA 206.305
+ 0.3TLB + 0.3BTA
83.933+ 0.3BTB + 99
1SLX + 0.3SLY +
Min My 31662 1086 1DL30721
+ 1SIDL +-2154.89
0.3CL + 0.3PLA
-43.17
+ 0.3PLB-31.703
+ 0.3TLA-241.994
+ 0.3TLB - 0.3BTA
-85.466
- 0.3BTB -73.2
- 1SLX - 0.3SLY - 0.3
Max Mz 31693 3031 1DL30752
+ 1SIDL 5878.916
+ 0.3CL + 0.3PLA
63.154
+ 0.3TLA23.104
+ 0.3BTA180.414
+ 1SLX + 0.3SLY
54.954+ 0.3SLZ
123.832
+ 1.1NLA
Min Mz 31693 1014 1DL30752
+ 1SIDL-1780.542
- 1SLX - 0.3SLY
-56.648
- 0.3SLZ -20.589 -225.162 -59.076 -105.509
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31662 2202 1.0DL
30722
+ 1.0SIDL
7666.496
+ 0.3CL + 0.3PLA
41.453 + 0.3PLB
58.666
+ 0.3TLA302.5
+ 0.3TLB -39.405
0.3BTA - 0.3BTB
59.073- 0.3SLX - 0.3SL
Min Fx 31662 3171 1.0DL
30722
+ 1.0SIDL
-3743.25
+ 0.3CL +-31.292
0.3PLB + 0.3TLB
-58.059+ -337.432
0.3BTB + 0.3SLX
-40.739
+ 0.3SLY-43.526
+ 1SLZ + 1.54NLB
Max Fy 31693 2186 1.0DL
30753
+ 1.0SIDL
6892.069
+ 0.3CL + 0.3PLA
83.826 + 0.3PLB
30.116
+ 0.3TLA
248.296
+ 0.3TLB - 0.3BTA
44.84 - 0.3BTB
78.562- 1SLX - 0.3SLY
Min Fy 31693 2179 1.0DL
30753
+ 1.0SIDL
-2750.259
+ 0.3CL +-76.245
0.3PLA + 0.3PLB
-27.667
+ 0.3TLA
-292.872
+ 0.3TLB-46.911
+ 0.3BTA + 0.3BTB
-65.807+ 1SLX + 0.3SL
Max Fz 31662 2202 1.0DL
30722
+ 1.0SIDL
7666.496
+ 0.3CL + 0.3PLA
41.453 + 0.3PLB
58.666
+ 0.3TLA302.5
+ 0.3TLB -39.405
0.3BTA - 0.3BTB
59.073- 0.3SLX - 0.3SL
Min Fz 31662 3171 1.0DL
30722
+ 1.0SIDL
-3743.25
+ 0.3CL +-31.292
0.3PLB + 0.3TLB
-58.059+ -337.432
0.3BTB + 0.3SLX
-40.739
+ 0.3SLY-43.526
+ 1SLZ + 1.54NLB
Max Mx 31662 2202 1.0DL
30722
+ 1.0SIDL
7666.496
+ 0.3CL + 0.3PLA
41.453 + 0.3PLB
58.666
+ 0.3TLA302.5
+ 0.3TLB -39.405
0.3BTA - 0.3BTB
59.073- 0.3SLX - 0.3SL
Min Mx 31662 2195 1.0DL
30722
+ 1.0SIDL
-3717.754
+ 0.3CL +-31.577
0.3PLA + 0.3PLB
-57.926
+ 0.3TLA
-338.189
+ 0.3TLB-40.197
+ 0.3BTA + 0.3BTB
-43.15+ 0.3SLX + 0.3
Max My 31662 2179 1.0DL
30721
+ 1.0SIDL
7405.813
+ 0.3CL + 0.3PLA
68.104 + 0.3PLB42.5
+ 0.3TLA
276.024
+ 0.3TLB109.134
+ 0.3BTA + 125.576
0.3BTB + 1SLX + 0.3SL
Min My 31662 2186 1.0DL
30721
+ 1.0SIDL
-3457.071
+ 0.3CL +-58.228
0.3PLA + 0.3PLB
-41.76
+ 0.3TLA
-311.713
+ 0.3TLB
-110.666
- 0.3BTA - 0.3BTB
-99.776- 1SLX - 0.3SLY
Max Mz 31693 3131 1.0DL
30752
+ 1.0SIDL
7026.127
+ 0.3CL + 0.3PLA
81.551 + 0.3TLA
29.819
+ 0.3BTA
242.544+ 1SLX72.033
+ 0.3SLY +158.794
0.3SLZ + 1.54NLA
Min Mz 31693 2114 1.0DL
30752
+ 1.0SIDL
-2934.794
- 1SLX - 0.3SLY
-74.972
- 0.3SLZ
-27.223 -286.879 -76.253 -140.275

ODE MDE
Maximum Tension Force (kN) -2423.16 -3743.25
Skin Friction (kN) 4588.00
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


19 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 159.7 780.4 0.205 OK
Minima 7666 71.02 2852 0.025 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 41.84 OK
Minima -3.941 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 2.339 OK 16.49 OK
Minima 1.406 OK 10.14 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.954 m
Hence de = 0.904 m and dv = 0.813 m
Horizontal resultant shear force at the section, Vu = 1069 kN
Corresponding axial compressive force, N = 0 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 50781 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0254 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 2.602 %
Horizontal shear force, Vu = 1069 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 1095.73 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 1.016 Mpa
= 1016 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 899.633 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.00
Modified shear strength of concrete (n s vc ) = 899.63 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 191.38 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 390.38 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

4.0 Curtailment Check


4.1 Member Forces from STAAD at 12.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31679 1005 1DL30739
+ 1SIDL 2644.893
+ 1CL + 1PLA -10.882
+ 1PLB + 1.1TLA
4.932
+ 1.1TLB
-42.973
+ 1.1BTA-19.957
+ 1.1BTB -84.566
Min Fx 31648 1005 1DL30708
+ 1SIDL 1703.031
+ 1CL + 1PLA -10.956
+ 1PLB + 1.1TLA
3.715
+ 1.1TLB
-40.492
+ 1.1BTA +21.647
1.1BTB -45.722
Max Fy 31653 1006 1DL30713
+ 1SIDL 2540.072
+ 1CL + 1PLA +23.538
1PLB + 1.1TLA
3.895
+ 1.1TLB2.499
- 1.1BTA - -33.73
1.1BTB 146.533
Min Fy 31680 1005 1DL30740
+ 1SIDL 2644.893
+ 1CL + 1PLA -11.103
+ 1PLB + 1.1TLA
4.315
+ 1.1TLB
-42.973
+ 1.1BTA-15.025
+ 1.1BTB -73.684
Max Fz 31679 1005 1DL30739
+ 1SIDL 2644.893
+ 1CL + 1PLA -10.882
+ 1PLB + 1.1TLA
4.932
+ 1.1TLB
-42.973
+ 1.1BTA-19.957
+ 1.1BTB -84.566
Min Fz 31659 1005 1DL30716
+ 1SIDL 1703.031
+ 1CL + 1PLA +-1.142
1PLB + 1.1TLA
-3.165
+ 1.1TLB
-40.492
+ 1.1BTA +17.01
1.1BTB 6.163
Max Mx 31648 1006 1DL30708
+ 1SIDL 2540.072
+ 1CL + 1PLA + 5.911
1PLB + 1.1TLA
-2.831
+ 1.1TLB2.499
- 1.1BTA -36.726
- 1.1BTB 227.289
Min Mx 31679 1005 1DL30739
+ 1SIDL 2644.893
+ 1CL + 1PLA -10.882
+ 1PLB + 1.1TLA
4.932
+ 1.1TLB
-42.973
+ 1.1BTA-19.957
+ 1.1BTB -84.566
Max My 31650 1005 1DL30711
+ 1SIDL 1703.031
+ 1CL + 1PLA +-8.354
1PLB + 1.1TLA
0.357
+ 1.1TLB
-40.492
+ 1.1BTA +27.537
1.1BTB -16.772
Min My 31679 1002 1DL30739
+ 1SIDL 2036.269
+ 1CL + 1PLA + 1.014
1.1TLA - 1.1BTA
0.926 -13.109 -46.195 150.723
Max Mz 31648 1006 1DL30708
+ 1SIDL 2540.072
+ 1CL + 1PLA + 5.911
1PLB + 1.1TLA
-2.831
+ 1.1TLB2.499
- 1.1BTA -36.726
- 1.1BTB 227.289
Min Mz 31679 1005 1DL30739
+ 1SIDL 2644.893
+ 1CL + 1PLA -10.882
+ 1PLB + 1.1TLA
4.932
+ 1.1TLB
-42.973
+ 1.1BTA-19.957
+ 1.1BTB -84.566

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31648 1102 1DL30709
+ 1SIDL 6356.956
+ 0.3CL + 0.3PLA
41.603
+ 0.3PLB74.478
+ 0.3TLA 229.483
+ 0.3TLB - 0.3BTA
991.277- 0.3BTB
566.41
- 0.3SLX - 0.3SLY - 1
Min Fx 31648 3071 1DL30709
+ 1SIDL-2423.163
+ 0.3CL + 0.3PLB
-44.207
+ 0.3TLB-75.205
+ 0.3BTB
-263.96
+ 0.3SLX
-1000.258
+ 0.3SLY + 1SLZ
-403.182
+ 1.1NLB
Max Fy 31684 1086 1DL30745
+ 1SIDL 5737.816
+ 0.3CL + 0.3PLA
146.496
+ 0.3PLB38.186
+ 0.3TLA 186.579
+ 0.3TLB - 0.3BTA
204.921- 0.3BTB
720.107
- 1SLX - 0.3SLY - 0.3
Min Fy 31684 1079 1DL30745
+ 1SIDL-1596.006
+ 0.3CL + 0.3PLA
-135.176
+ 0.3PLB-32.462
+ 0.3TLA-231.155
+ 0.3TLB + 0.3BTA
-232.152+ 0.3BTB
-643.736
+ 1SLX + 0.3SLY +
Max Fz 31652 3047 1DL30712
+ 1SIDL 6227.602
+ 0.3CL + 0.3PLA
48.784
+ 0.3TLA112.433
+ 0.3BTA222.344
+ 0.3SLX710.319
+ 0.3SLY + 1SLZ
425.194
+ 1.1NLA
Min Fz 31652 3071 1DL30713
+ 1SIDL-2423.163
+ 0.3CL + 0.3PLB
-39.533
+ 0.3TLB
-111.584
+ 0.3BTB
-263.96
+ 0.3SLX-602.331
+ 0.3SLY + 1SLZ
-284.274
+ 1.1NLB
Max Mx 31648 1102 1DL30709
+ 1SIDL 6356.956
+ 0.3CL + 0.3PLA
41.603
+ 0.3PLB74.478
+ 0.3TLA 229.483
+ 0.3TLB - 0.3BTA
991.277- 0.3BTB
566.41
- 0.3SLX - 0.3SLY - 1
Min Mx 31648 1095 1DL30709
+ 1SIDL-2408.214
+ 0.3CL + 0.3PLA
-45.619
+ 0.3PLB-74.028
+ 0.3TLA-265.172
+ 0.3TLB +-1005.938
0.3BTA + 0.3BTB
-415.09
+ 0.3SLX + 0.3SLY
Max My 31648 3071 1DL30708
+ 1SIDL 6113.724
+ 0.3CL + 0.3PLB
38.415
+ 0.3TLB 75.087
+ 0.3BTB218.97
+ 0.3SLX1072.448
+ 0.3SLY + 1SLZ
505.458
+ 1.1NLB
Min My 31648 1102 1DL30708
+ 1SIDL-2179.931
+ 0.3CL + 0.3PLA
-41.019
+ 0.3PLB-75.813
+ 0.3TLA-253.447
+ 0.3TLB --1080.703
0.3BTA - 0.3BTB
-344.834
- 0.3SLX - 0.3SLY - 1
Max Mz 31679 1007 1DL30739
+ 1SIDL 5768.885
+ 1SLX + 0.3SLY69.884
+ 0.3SLZ 48.258 182.362 307.617 1370.272
Min Mz 31679 1014 1DL30739
+ 1SIDL-1780.542
- 1SLX - 0.3SLY --73.4
0.3SLZ -46.015 -225.162 -361.669 -1275.748
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31648 2202 1.0DL
30709
+ 1.0SIDL
7666.496
+ 0.3CL + 0.3PLA
54.186 + 0.3PLB
97.586
+ 0.3TLA302.5
+ 0.3TLB
1301.048
- 0.3BTA - 0.3BTB
703.956- 0.3SLX - 0.3SL
Min Fx 31648 3171 1.0DL
30709
+ 1.0SIDL
-3743.25
+ 0.3CL +-56.757
0.3PLB + 0.3TLB
-98.496+ -337.432
0.3BTB + 0.3SLX
-1307.418
+ 0.3SLY-541.38
+ 1SLZ + 1.54NLB
Max Fy 31684 2186 1.0DL
30745
+ 1.0SIDL
6892.069
+ 0.3CL +188.391
0.3PLA + 0.3PLB
48.843
+ 0.3TLA
248.296
+ 0.3TLB -272.63
0.3BTA - 0.3BTB
922.69- 1SLX - 0.3SLY
Min Fy 31683 1452 1.15DL
30743
+ 1.2SIDL
6767.536
- 1.5COL(-X)-MLC
-181.474 2.394 -236.76 148.304 -1156.422
Max Fz 31652 3147 1.0DL
30712
+ 1.0SIDL
7547.688
+ 0.3CL + 0.3PLA
62.108 + 0.3TLA
146.859
+ 0.3BTA
295.816+ 0.3SLX
929.026
+ 0.3SLY537.351
+ 1SLZ + 1.54NLA
Min Fz 31652 3171 1.0DL
30713
+ 1.0SIDL
-3743.25
+ 0.3CL +-52.856
0.3PLB + -146.011
0.3TLB + -337.432
0.3BTB + 0.3SLX
-787.226
+ 0.3SLY-383.315
+ 1SLZ + 1.54NLB
Max Mx 31648 2202 1.0DL
30709
+ 1.0SIDL
7666.496
+ 0.3CL + 0.3PLA
54.186 + 0.3PLB
97.586
+ 0.3TLA302.5
+ 0.3TLB
1301.048
- 0.3BTA - 0.3BTB
703.956- 0.3SLX - 0.3SL
Min Mx 31648 2195 1.0DL
30709
+ 1.0SIDL
-3717.754
+ 0.3CL +-58.203
0.3PLA + 0.3PLB
-97.136
+ 0.3TLA
-338.189
+ 0.3TLB
-1315.709
+ 0.3BTA +-552.636
0.3BTB + 0.3SLX + 0.3
Max My 31648 3171 1.0DL
30708
+ 1.0SIDL
7412.715
+ 0.3CL + 0.3PLB
51.031 + 0.3TLB
98.011+ 0.3BTB
291.532+ 0.3SLX
1402.92
+ 0.3SLY642.509
+ 1SLZ + 1.54NLB
Min My 31648 3178 1.0DL
30708
+ 1.0SIDL
-3557.41
+ 0.3CL +-54.691
0.3PLB + 0.3TLB
-98.13- -328.439
0.3BTB - 0.3SLX
-1409.862
- 0.3SLY -502.951
- 1SLZ - 1.54NLB
Max Mz 31679 2107 1.0DL
30739
+ 1.0SIDL
6923.138
+1SLX + 0.3SLY
91.832
+ 0.3SLZ
62.724 244.079 409.419 1776.355
Min Mz 31679 1452 1.15DL
30739
+ 1.2SIDL
6767.536
- 1.5COL(-X)-MLC
-99.394 44.197 -236.76 46.711 -1735.704

ODE MDE
Maximum Tension Force (kN) -2423.16 -3743.25
Skin Friction (kN) 1110.67
Final Axial Load (kN) -1312.50 -2632.58

4.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


40 16

4.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -2447 1497 1984 0.755 OK
Minima 6892 962.1 4252 0.226 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 73.5 OK
Minima -218.2 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 3.226 OK 21.13 OK
Minima 0.8008 OK 7.032 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN

Design of Pile

TWJO – 1 – TCD –ST1 - 0004-Rev C Appendix J


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR COLUMN C18


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA

Column No. = C18

No. of piles n = 4
Dia of pile = 1.20 m
Size of Column = 2.00 m x 2.00 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 5.30 m x 5.30 m


2
Area of pile cap = 28.09 m
Depth of pile cap D = 1.80 m
Volume of pile cap = 50.56 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 1264.05 kN

Thickness of Earthfill over pile cap = 1.50 m


Volume of Earthfill over pile cap = 36.14 m3
Density of Earth = 20 kN/cum
Weight of Earthfill = 722.70 kN

Total weight of (Pile cap + Earthfill) = 1986.75 kN

2.0 PILE LOADS

2.1 Summary of Staad Results (Forces at Bottom of Pile Cap)---

LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-


a) ULS Loads
2378, 3131-3178,4101-4132, 5109-5124 & 6109-6124
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28078 2186 1.0DL
27062
+ 1.0SIDL
10110.82
+ 0.3CL + 0.3PLA
909.445+ 0.3PLB
368.684
+ 0.3TLA + 0.3TLB
8.498 - 0.3BTA1280.9
- 0.3BTB2698.29
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 28078 2107 1.0DL
27062
+ 1.0SIDL
-3493.39
+1SLX + 0.3SLY
-937.884
+ 0.3SLZ
-404.713 -9.132 -1077.23 -2848.574
Max Fy 28078 1452 1.15DL
27058
+ 1.2SIDL
-2279.26
- 1.5COL(-X)-MLC
1147.582 10.41 -2.336 -21.939 4644.733
Min Fy 28078 2186 1.0DL
27058
+ 1.0SIDL
-2994.65
+ 0.3CL +-958.688
0.3PLA + 0.3PLB
-407.133
+ 0.3TLA +-9.171
0.3TLB - -1430.448
0.3BTA - 0.3BTB
-3868.792
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 28078 3154 1.0DL
27062
+ 1.0SIDL
9716.021
+ 0.3CL + 0.3PLA
302.822+ 0.3TLA
942.666
- 0.3BTA 9.734
- 0.3SLX2956.525
- 0.3SLY - 1SLZ887.541
- 1.54NLA
Min Fz 28078 3147 1.0DL
27062
+ 1.0SIDL
-3075.9
+ 0.3CL + 0.3PLA
-311.43+ 0.3TLA
-980.653
+ 0.3BTA-10.475
+ 0.3SLX-2753.608
+ 0.3SLY + 1SLZ
-985.575
+ 1.54NLA
Max Mx 28078 3178 1.0DL
27062
+ 1.0SIDL
9783.425
+ 0.3CL + 0.3PLB
302.889+ 0.3TLB
927.296- 0.3BTB11.463
- 0.3SLX3005.076
- 0.3SLY - 1SLZ887.481
- 1.54NLB
Min Mx 28078 3154 1.0DL
27058
+ 1.0SIDL
-3047.43
+ 0.3CL +-332.353
0.3PLA + 0.3TLA
-964.013
- 0.3BTA-12.072
- 0.3SLX-3740.696
- 0.3SLY - 1SLZ
-1374.656
- 1.54NLA
Max My 28078 3147 1.0DL
27058
+ 1.0SIDL
9687.547
+ 0.3CL + 0.3PLA
323.744+ 0.3TLA
926.025
+ 0.3BTA 11.331
+ 0.3SLX 3981.601
+ 0.3SLY + 1SLZ
1268.014
+ 1.54NLA
Min My 28078 3154 1.0DL
27058
+ 1.0SIDL
-3047.43
+ 0.3CL +-332.353
0.3PLA + 0.3TLA
-964.013
- 0.3BTA-12.072
- 0.3SLX-3740.696
- 0.3SLY - 1SLZ
-1374.656
- 1.54NLA
Max Mz 28078 1452 1.15DL
27058
+ 1.2SIDL
-2279.26
- 1.5COL(-X)-MLC
1147.582 10.41 -2.336 -21.939 4644.733
Min Mz 28078 2186 1.0DL
27058
+ 1.0SIDL
-2994.65
+ 0.3CL +-958.688
0.3PLA + 0.3PLB
-407.133
+ 0.3TLA +-9.171
0.3TLB - -1430.448
0.3BTA - 0.3BTB
-3868.792
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28079 2179 1.0DL
27059
+ 1.0SIDL
9963.483
+ 0.3CL + 0.3PLA
972.529+ 0.3PLB
369.365
+ 0.3TLA + 0.3TLB
8.509 + 0.3BTA
1713.19 + 0.3BTB
3940.492
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 28079 2107 1.0DL
27063
+ 1.0SIDL
-3423.27
+1SLX + 0.3SLY
-917.667
+ 0.3SLZ
-407.047 -9.061 -1094.875 -2702.372
Max Fy 28079 1452 1.15DL
27059
+ 1.2SIDL
8933.73
- 1.5COL(-X)-MLC
1169.272 -4.125 -2.365 95.882 4823.064
Min Fy 28079 2186 1.0DL
27059
+ 1.0SIDL
-3206.92
+ 0.3CL +-935.813
0.3PLA + 0.3PLB
-409.007
+ 0.3TLA +-9.098
0.3TLB - 0.3BTA
-1454.62- 0.3BTB
-3680.548
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 28079 3154 1.0DL
27063
+ 1.0SIDL
9530.811
+ 0.3CL + 0.3PLA
324.375+ 0.3TLA
943.798
- 0.3BTA 8.876
- 0.3SLX2958.963
- 0.3SLY - 1SLZ
1042.418
- 1.54NLA
Min Fz 28079 3147 1.0DL
27063
+ 1.0SIDL
-2968.77
+ 0.3CL +-290.344
0.3PLA + 0.3TLA
-981.484
+ 0.3BTA-9.583
+ 0.3SLX
-2758.237
+ 0.3SLY + 1SLZ
-832.579
+ 1.54NLA
Max Mx 28079 3178 1.0DL
27063
+ 1.0SIDL
9598.976
+ 0.3CL + 0.3PLB
324.606+ 0.3TLB
928.428
- 0.3BTB10.636
- 0.3SLX3007.516
- 0.3SLY - 1SLZ1043.512
- 1.54NLB
Min Mx 28079 3154 1.0DL
27059
+ 1.0SIDL
-3220.48
+ 0.3CL +-311.602
0.3PLA + 0.3TLA
-964.405
- 0.3BTA-11.215
- 0.3SLX-3749.644
- 0.3SLY - 1SLZ
-1203.421
- 1.54NLA
Max My 28079 3147 1.0DL
27059
+ 1.0SIDL
9782.53
+ 0.3CL + 0.3PLA
345.634+ 0.3TLA
926.718
+ 0.3BTA 10.508
+ 0.3SLX3988.056
+ 0.3SLY + 1SLZ
1447.291
+ 1.54NLA
Min My 28079 3154 1.0DL
27059
+ 1.0SIDL
-3220.48
+ 0.3CL +-311.602
0.3PLA + 0.3TLA
-964.405
- 0.3BTA-11.215
- 0.3SLX-3749.644
- 0.3SLY - 1SLZ
-1203.421
- 1.54NLA
Max Mz 28079 1452 1.15DL
27059
+ 1.2SIDL
8933.73
- 1.5COL(-X)-MLC
1169.272 -4.125 -2.365 95.882 4823.064
Min Mz 28079 2186 1.0DL
27059
+ 1.0SIDL
-3206.92
+ 0.3CL +-935.813
0.3PLA + 0.3PLB
-409.007
+ 0.3TLA +-9.098
0.3TLB - 0.3BTA
-1454.62- 0.3BTB
-3680.548
- 1SLX - 0.3SLY - 0.3SLZ
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28080 2186 1.0DL
27064
+ 1.0SIDL
10300.6
+ 0.3CL + 0.3PLA
909.965+ 0.3PLB
394.182
+ 0.3TLA + 0.3TLB
8.722 - 0.3BTA
1136.344- 0.3BTB
2701.769
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 28080 2107 1.0DL
27064
+ 1.0SIDL
-3766.55
+1SLX + 0.3SLY
-938.356
+ 0.3SLZ
-387.909 -9.373 -1238.117 -2851.729
Max Fy 28080 1452 1.15DL
27060
+ 1.2SIDL
-2089.84
- 1.5COL(-X)-MLC
1147.285 17.863 0.044 -84.881 4642.31
Min Fy 28080 2186 1.0DL
27060
+ 1.0SIDL
-3262.9
+ 0.3CL + 0.3PLA
-959.18+ 0.3PLB
-387.191
+ 0.3TLA +-9.452
0.3TLB - -1639.524
0.3BTA - 0.3BTB
-3872.616
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 28080 3154 1.0DL
27064
+ 1.0SIDL
9833.419
+ 0.3CL + 0.3PLA
303.589+ 0.3TLA
965.084
- 0.3BTA 9.840
- 0.3SLX2806.746
- 0.3SLY - 1SLZ 892.29
- 1.54NLA
Min Fz 28080 3147 1.0DL
27064
+ 1.0SIDL
-3385.06
+ 0.3CL +-311.919
0.3PLA + 0.3TLA
-960.41
+ 0.3BTA-10.556
+ 0.3SLX-2911.903
+ 0.3SLY + 1SLZ
-988.333
+ 1.54NLA
Max Mx 28080 3178 1.0DL
27064
+ 1.0SIDL
9765.464
+ 0.3CL + 0.3PLB
303.819+ 0.3TLB
949.715
- 0.3BTB11.569
- 0.3SLX2855.293
- 0.3SLY - 1SLZ893.378
- 1.54NLB
Min Mx 28080 3154 1.0DL
27060
+ 1.0SIDL
-3124.02
+ 0.3CL +-333.212
0.3PLA + 0.3TLA
-943.296
- 0.3BTA-12.196
- 0.3SLX-3924.817
- 0.3SLY - 1SLZ
-1381.042
- 1.54NLA
Max My 28080 3147 1.0DL
27060
+ 1.0SIDL
9572.377
+ 0.3CL + 0.3PLA
324.882+ 0.3TLA
947.97
+ 0.3BTA 11.481
+ 0.3SLX 3814.986
+ 0.3SLY + 1SLZ
1276.668
+ 1.54NLA
Min My 28080 3154 1.0DL
27060
+ 1.0SIDL
-3124.02
+ 0.3CL +-333.212
0.3PLA + 0.3TLA
-943.296
- 0.3BTA-12.196
- 0.3SLX-3924.817
- 0.3SLY - 1SLZ
-1381.042
- 1.54NLA
Max Mz 28080 1452 1.15DL
27060
+ 1.2SIDL
-2089.84
- 1.5COL(-X)-MLC
1147.285 17.863 0.044 -84.881 4642.31
Min Mz 28080 2186 1.0DL
27060
+ 1.0SIDL
-3262.9
+ 0.3CL + 0.3PLA
-959.18+ 0.3PLB
-387.191
+ 0.3TLA +-9.452
0.3TLB - -1639.524
0.3BTA - 0.3BTB
-3872.616
- 1SLX - 0.3SLY - 0.3SLZ
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28081 2195 1.0DL
27061
+ 1.0SIDL
9737.192
+ 0.3CL + 0.3PLA
356.337+ 0.3PLB
954.683
+ 0.3TLA + 0.3TLB
9.957 + 0.3BTA3782.1
+ 0.3BTB
1487.109
+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 28081 2115 1.0DL
27065
+ 1.0SIDL
-3301.47
+ 0.3SLX +-301.553
0.3SLY + 1SLZ
-950.747 -10.439 -2923.508 -866.217
Max Fy 28081 1452 1.15DL
27061
+ 1.2SIDL
9123.151
- 1.5COL(-X)-MLC
1169.571 32.397 0.015 -202.693 4825.496
Min Fy 28081 2186 1.0DL
27061
+ 1.0SIDL
-3017.72
+ 0.3CL +-935.322
0.3PLA + 0.3PLB
-385.162
+ 0.3TLA +-9.385
0.3TLB - -1612.799
0.3BTA - 0.3BTB
-3676.727
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 28081 3154 1.0DL
27065
+ 1.0SIDL
9454.81
+ 0.3CL + 0.3PLA
323.607+ 0.3TLA
963.906
- 0.3BTA 8.990
- 0.3SLX2803.521
- 0.3SLY - 1SLZ1037.66
- 1.54NLA
Min Fz 28081 3147 1.0DL
27065
+ 1.0SIDL
-3084.52
+ 0.3CL +-289.855
0.3PLA + 0.3TLA
-959.532
+ 0.3BTA-9.671
+ 0.3SLX-2906.487
+ 0.3SLY + 1SLZ
-829.811
+ 1.54NLA
Max Mx 28081 3178 1.0DL
27065
+ 1.0SIDL
9387.612
+ 0.3CL + 0.3PLB
323.676+ 0.3TLB
948.537
- 0.3BTB10.751
- 0.3SLX2852.067
- 0.3SLY - 1SLZ
1037.606
- 1.54NLB
Min Mx 28081 3154 1.0DL
27061
+ 1.0SIDL
-3103.67
+ 0.3CL +-310.743
0.3PLA + 0.3TLA
-942.857
- 0.3BTA-11.346
- 0.3SLX-3915.101
- 0.3SLY - 1SLZ
-1197.025
- 1.54NLA
Max My 28081 3147 1.0DL
27061
+ 1.0SIDL
9473.958
+ 0.3CL + 0.3PLA
344.495+ 0.3TLA
947.23
+ 0.3BTA 10.665
+ 0.3SLX 3807.762
+ 0.3SLY + 1SLZ
1438.627
+ 1.54NLA
Min My 28081 3154 1.0DL
27061
+ 1.0SIDL
-3103.67
+ 0.3CL +-310.743
0.3PLA + 0.3TLA
-942.857
- 0.3BTA-11.346
- 0.3SLX-3915.101
- 0.3SLY - 1SLZ
-1197.025
- 1.54NLA
Max Mz 28081 1452 1.15DL
27061
+ 1.2SIDL
9123.151
- 1.5COL(-X)-MLC
1169.571 32.397 0.015 -202.693 4825.496
Min Mz 28081 2186 1.0DL
27061
+ 1.0SIDL
-3017.72
+ 0.3CL +-935.322
0.3PLA + 0.3PLB
-385.162
+ 0.3TLA +-9.385
0.3TLB - -1612.799
0.3BTA - 0.3BTB
-3676.727
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

LC 1001-1190, 2031-2078, 3031-3078, 4001-


b) SLS Loads For Stress check
4032, 5009-5024 & 6009-6024
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28078 2186 1.0DL
27062
+ 1.0SIDL
8567.016
+ 0.3CL + 0.3PLA
689.618+ 0.3PLB
277.41
+ 0.3TLA + 0.3TLB
6.427 - 0.3BTA
1005.555 - 0.3BTB
2039.029
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 28078 1452 1.15DL
27058
+ 1.2SIDL
-2279.26
- 1.5COL(-X)-MLC
1147.582 10.41 -2.336 -21.939 4644.733
Max Fy 28078 1452 1.15DL
27058
+ 1.2SIDL
-2279.26
- 1.5COL(-X)-MLC
1147.582 10.41 -2.336 -21.939 4644.733
Min Fy 28078 2186 1.0DL
27058
+ 1.0SIDL
-1450.85
+ 0.3CL +-738.861
0.3PLA + 0.3PLB
-315.858
+ 0.3TLA +-7.100
0.3TLB - 0.3BTA
-1063.93- 0.3BTB
-2989.783
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 28078 3154 1.0DL
27062
+ 1.0SIDL
8212.197
+ 0.3CL + 0.3PLA
228.272+ 0.3TLA
718.111
- 0.3BTA 7.178
- 0.3SLX2279.258
- 0.3SLY - 1SLZ661.434
- 1.54NLA
Min Fz 28078 3147 1.0DL
27062
+ 1.0SIDL
-1572.08
+ 0.3CL +-236.881
0.3PLA + 0.3TLA
-756.098
+ 0.3BTA-7.919
+ 0.3SLX
-2076.341
+ 0.3SLY + 1SLZ
-759.468
+ 1.54NLA
Max Mx 28078 3178 1.0DL
27062
+ 1.0SIDL
8279.602
+ 0.3CL + 0.3PLB
228.34+ 0.3TLB
702.741
- 0.3BTB8.907
- 0.3SLX2327.809
- 0.3SLY - 1SLZ661.375
- 1.54NLB
Min Mx 28078 3154 1.0DL
27058
+ 1.0SIDL
-1543.61
+ 0.3CL +-257.803
0.3PLA + 0.3TLA
-739.457
- 0.3BTA-9.516
- 0.3SLX-2838.919
- 0.3SLY - 1SLZ
-1074.199
- 1.54NLA
Max My 28078 3147 1.0DL
27058
+ 1.0SIDL
8183.724
+ 0.3CL + 0.3PLA
249.195+ 0.3TLA
701.47
+ 0.3BTA8.775
+ 0.3SLX3079.825
+ 0.3SLY + 1SLZ
967.557
+ 1.54NLA
Min My 28078 3154 1.0DL
27058
+ 1.0SIDL
-1543.61
+ 0.3CL +-257.803
0.3PLA + 0.3TLA
-739.457
- 0.3BTA-9.516
- 0.3SLX-2838.919
- 0.3SLY - 1SLZ
-1074.199
- 1.54NLA
Max Mz 28078 1452 1.15DL
27058
+ 1.2SIDL
-2279.26
- 1.5COL(-X)-MLC
1147.582 10.41 -2.336 -21.939 4644.733
Min Mz 28078 2186 1.0DL
27058
+ 1.0SIDL
-1450.85
+ 0.3CL +-738.861
0.3PLA + 0.3PLB
-315.858
+ 0.3TLA +-7.100
0.3TLB - 0.3BTA
-1063.93- 0.3BTB
-2989.783
- 1SLX - 0.3SLY - 0.3SLZ
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28079 1452 1.15DL
27059
+ 1.2SIDL
8933.73
- 1.5COL(-X)-MLC
1169.272 -4.125 -2.365 95.882 4823.064
Min Fx 28079 2107 1.0DL
27063
+ 1.0SIDL
-1904.37
+1SLX + 0.3SLY
-698.014
+ 0.3SLZ
-315.182 -7.004 -815.564 -2044.423
Max Fy 28079 1452 1.15DL
27059
+ 1.2SIDL
8933.73
- 1.5COL(-X)-MLC
1169.272 -4.125 -2.365 95.882 4823.064
Min Fy 28079 2186 1.0DL
27059
+ 1.0SIDL
-1688.02
+ 0.3CL + 0.3PLA
-716.16+ 0.3PLB
-317.142
+ 0.3TLA +-7.041
0.3TLB - -1083.505
0.3BTA - 0.3BTB
-2803.016
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 28079 3154 1.0DL
27063
+ 1.0SIDL
8028.291
+ 0.3CL + 0.3PLA
249.728+ 0.3TLA
719.059
- 0.3BTA 6.523
- 0.3SLX2280.468
- 0.3SLY - 1SLZ815.783
- 1.54NLA
Min Fz 28079 3147 1.0DL
27063
+ 1.0SIDL
-1466.25
+ 0.3CL +-215.696
0.3PLA + 0.3TLA
-756.746
+ 0.3BTA-7.230
+ 0.3SLX-2079.742
+ 0.3SLY + 1SLZ
-605.944
+ 1.54NLA
Max Mx 28079 3178 1.0DL
27063
+ 1.0SIDL
8096.453
+ 0.3CL + 0.3PLB
249.958+ 0.3TLB
703.689
- 0.3BTB8.283
- 0.3SLX2329.021
- 0.3SLY - 1SLZ816.877
- 1.54NLB
Min Mx 28079 3154 1.0DL
27059
+ 1.0SIDL
-1717.96
+ 0.3CL +-236.954
0.3PLA + 0.3TLA
-739.666
- 0.3BTA-8.861
- 0.3SLX-2846.445
- 0.3SLY - 1SLZ-902.31
- 1.54NLA
Max My 28079 3147 1.0DL
27059
+ 1.0SIDL
8280.008
+ 0.3CL + 0.3PLA
270.986+ 0.3TLA
701.98
+ 0.3BTA8.154
+ 0.3SLX 3084.857
+ 0.3SLY + 1SLZ
1146.181
+ 1.54NLA
Min My 28079 3154 1.0DL
27059
+ 1.0SIDL
-1717.96
+ 0.3CL +-236.954
0.3PLA + 0.3TLA
-739.666
- 0.3BTA-8.861
- 0.3SLX-2846.445
- 0.3SLY - 1SLZ-902.31
- 1.54NLA
Max Mz 28079 1452 1.15DL
27059
+ 1.2SIDL
8933.73
- 1.5COL(-X)-MLC
1169.272 -4.125 -2.365 95.882 4823.064
Min Mz 28079 2186 1.0DL
27059
+ 1.0SIDL
-1688.02
+ 0.3CL + 0.3PLA
-716.16+ 0.3PLB
-317.142
+ 0.3TLA +-7.041
0.3TLB - -1083.505
0.3BTA - 0.3BTB
-2803.016
- 1SLX - 0.3SLY - 0.3SLZ
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28080 2186 1.0DL
27064
+ 1.0SIDL
8702.498
+ 0.3CL + 0.3PLA
690.017+ 0.3PLB
302.244
+ 0.3TLA + 0.3TLB
6.591 - 0.3BTA
856.352- 0.3BTB
2041.691
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 28080 2107 1.0DL
27064
+ 1.0SIDL
-2168.44
+1SLX + 0.3SLY
-718.407
+ 0.3SLZ
-295.972 -7.241 -958.124 -2191.651
Max Fy 28080 1452 1.15DL
27060
+ 1.2SIDL
-2089.84
- 1.5COL(-X)-MLC
1147.285 17.863 0.044 -84.881 4642.31
Min Fy 28080 2186 1.0DL
27060
+ 1.0SIDL
-1664.79
+ 0.3CL +-739.231
0.3PLA + 0.3PLB
-295.254
+ 0.3TLA +-7.320
0.3TLB - -1267.679
0.3BTA - 0.3BTB
-2992.659
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 28080 3154 1.0DL
27064
+ 1.0SIDL
8306.719
+ 0.3CL + 0.3PLA
228.844+ 0.3TLA
740.325
- 0.3BTA 7.257
- 0.3SLX2128.049
- 0.3SLY - 1SLZ664.957
- 1.54NLA
Min Fz 28080 3147 1.0DL
27064
+ 1.0SIDL
-1858.36
+ 0.3CL +-237.173
0.3PLA + 0.3TLA
-735.65
+ 0.3BTA-7.972
+ 0.3SLX-2233.206
+ 0.3SLY + 1SLZ +-761
1.54NLA
Max Mx 28080 3178 1.0DL
27064
+ 1.0SIDL
8238.764
+ 0.3CL + 0.3PLB
229.074+ 0.3TLB
724.955
- 0.3BTB8.986
- 0.3SLX2176.596
- 0.3SLY - 1SLZ666.045
- 1.54NLB
Min Mx 28080 3154 1.0DL
27060
+ 1.0SIDL
-1597.32
+ 0.3CL +-258.466
0.3PLA + 0.3TLA
-718.536
- 0.3BTA-9.612
- 0.3SLX-3021.403
- 0.3SLY - 1SLZ
-1079.134
- 1.54NLA
Max My 28080 3147 1.0DL
27060
+ 1.0SIDL
8045.677
+ 0.3CL + 0.3PLA
250.137+ 0.3TLA
723.21
+ 0.3BTA8.897
+ 0.3SLX 2911.571
+ 0.3SLY + 1SLZ
974.761
+ 1.54NLA
Min My 28080 3154 1.0DL
27060
+ 1.0SIDL
-1597.32
+ 0.3CL +-258.466
0.3PLA + 0.3TLA
-718.536
- 0.3BTA-9.612
- 0.3SLX-3021.403
- 0.3SLY - 1SLZ
-1079.134
- 1.54NLA
Max Mz 28080 1452 1.15DL
27060
+ 1.2SIDL
-2089.84
- 1.5COL(-X)-MLC
1147.285 17.863 0.044 -84.881 4642.31
Min Mz 28080 2186 1.0DL
27060
+ 1.0SIDL
-1664.79
+ 0.3CL +-739.231
0.3PLA + 0.3PLB
-295.254
+ 0.3TLA +-7.320
0.3TLB - -1267.679
0.3BTA - 0.3BTB
-2992.659
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28081 1452 1.15DL
27061
+ 1.2SIDL
9123.151
- 1.5COL(-X)-MLC
1169.571 32.397 0.015 -202.693 4825.496
Min Fx 28081 2115 1.0DL
27065
+ 1.0SIDL
-1821.71
+ 0.3SLX +-227.101
0.3SLY + 1SLZ
-726.182 -8.056 -2246.224 -640.81
Max Fy 28081 1452 1.15DL
27061
+ 1.2SIDL
9123.151
- 1.5COL(-X)-MLC
1169.571 32.397 0.015 -202.693 4825.496
Min Fy 28081 2186 1.0DL
27061
+ 1.0SIDL +-1553
0.3CL +-715.791
0.3PLA + 0.3PLB
-293.853
+ 0.3TLA +-7.265
0.3TLB - -1246.151
0.3BTA - 0.3BTB
-2800.142
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 28081 3154 1.0DL
27065
+ 1.0SIDL
7975.039
+ 0.3CL + 0.3PLA
249.156+ 0.3TLA
739.34
- 0.3BTA 6.607
- 0.3SLX2126.236
- 0.3SLY - 1SLZ812.254
- 1.54NLA
Min Fz 28081 3147 1.0DL
27065
+ 1.0SIDL
-1604.75
+ 0.3CL +-215.403
0.3PLA + 0.3TLA
-734.967
+ 0.3BTA-7.288
+ 0.3SLX-2229.202
+ 0.3SLY + 1SLZ
-604.404
+ 1.54NLA
Max Mx 28081 3178 1.0DL
27065
+ 1.0SIDL
7907.843
+ 0.3CL + 0.3PLB
249.224+ 0.3TLB
723.971
- 0.3BTB8.368
- 0.3SLX2174.782
- 0.3SLY - 1SLZ812.199
- 1.54NLB
Min Mx 28081 3154 1.0DL
27061
+ 1.0SIDL
-1623.9
+ 0.3CL +-236.291
0.3PLA + 0.3TLA
-718.291
- 0.3BTA-8.963
- 0.3SLX-3013.288
- 0.3SLY - 1SLZ
-897.368
- 1.54NLA
Max My 28081 3147 1.0DL
27061
+ 1.0SIDL
7994.188
+ 0.3CL + 0.3PLA
270.044+ 0.3TLA
722.665
+ 0.3BTA8.282
+ 0.3SLX 2905.949
+ 0.3SLY + 1SLZ
1138.97
+ 1.54NLA
Min My 28081 3154 1.0DL
27061
+ 1.0SIDL
-1623.9
+ 0.3CL +-236.291
0.3PLA + 0.3TLA
-718.291
- 0.3BTA-8.963
- 0.3SLX-3013.288
- 0.3SLY - 1SLZ
-897.368
- 1.54NLA
Max Mz 28081 1452 1.15DL
27061
+ 1.2SIDL
9123.151
- 1.5COL(-X)-MLC
1169.571 32.397 0.015 -202.693 4825.496
Min Mz 28081 2186 1.0DL
27061
+ 1.0SIDL +-1553
0.3CL +-715.791
0.3PLA + 0.3PLB
-293.853
+ 0.3TLA +-7.265
0.3TLB - -1246.151
0.3BTA - 0.3BTB
-2800.142
- 1SLX - 0.3SLY - 0.3SLZ

c) SLS Loads For crack width check LC 1001-1006


Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28078 1006 1DL 27058
+ 1SIDL +4840.654
1CL + 1PLA +-79.967
1PLB + 1.1TLA
-25.293
+ 1.1TLB - 1.1BTA
-0.448 - 1.1BTB
173.081 -350.253
Min Fx 28078 1003 1DL 27058
+ 1SIDL +3551.219
1CL + 1PLB + 32.973
1.1TLB + -22.528
1.1BTB -0.205 158.644 80.617
Max Fy 28078 1005 1DL 27058
+ 1SIDL +3822.243
1CL + 1PLA + 73.064
1PLB + 1.1TLA
-30.871
+ 1.1TLB + -0.274
1.1BTA + 1.1BTB
188.264 228.615
Min Fy 28078 1006 1DL 27058
+ 1SIDL +4840.654
1CL + 1PLA +-79.967
1PLB + 1.1TLA
-25.293
+ 1.1TLB - 1.1BTA
-0.448 - 1.1BTB
173.081 -350.253
Max Fz 28078 1002 1DL 27058
+ 1SIDL +4213.662
1CL + 1PLA +-43.636
1.1TLA - -21.266
1.1BTA -0.790 132.915 -210.59
Min Fz 28078 1005 1DL 27058
+ 1SIDL +3822.243
1CL + 1PLA + 73.064
1PLB + 1.1TLA
-30.871
+ 1.1TLB + -0.274
1.1BTA + 1.1BTB
188.264 228.615
Max Mx 28078 1004 1DL 27058
+ 1SIDL +4081.612
1CL + 1PLB +-43.528
1.1TLB - -23.123
1.1BTB 0.127 164.044 -208.893
Min Mx 28078 1002 1DL 27058
+ 1SIDL +4213.662
1CL + 1PLA +-43.636
1.1TLA - -21.266
1.1BTA -0.790 132.915 -210.59
Max My 28078 1005 1DL 27058
+ 1SIDL +3822.243
1CL + 1PLA + 73.064
1PLB + 1.1TLA
-30.871
+ 1.1TLB + -0.274
1.1BTA + 1.1BTB
188.264 228.615
Min My 28078 1002 1DL 27062
+ 1SIDL +4213.662
1CL + 1PLA +-43.636
1.1TLA - -21.266
1.1BTA -0.790 111.648 -166.954
Max Mz 28078 1005 1DL 27058
+ 1SIDL +3822.243
1CL + 1PLA + 73.064
1PLB + 1.1TLA
-30.871
+ 1.1TLB + -0.274
1.1BTA + 1.1BTB
188.264 228.615
Min Mz 28078 1006 1DL 27058
+ 1SIDL +4840.654
1CL + 1PLA +-79.967
1PLB + 1.1TLA
-25.293
+ 1.1TLB - 1.1BTA
-0.448 - 1.1BTB
173.081 -350.253
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28079 1005 1DL 27059
+ 1SIDL +4796.116
1CL + 1PLA +101.798
1PLB + 1.1TLA
-32.26
+ 1.1TLB + -0.239
1.1BTA + 1.1BTB
199.558 464.809
Min Fx 28079 1004 1DL 27059
+ 1SIDL +3525.989
1CL + 1PLB +-18.224
1.1TLB - -22.148
1.1BTB 0.147 156.071 -0.892
Max Fy 28079 1005 1DL 27059
+ 1SIDL +4796.116
1CL + 1PLA +101.798
1PLB + 1.1TLA
-32.26
+ 1.1TLB + -0.239
1.1BTA + 1.1BTB
199.558 464.809
Min Fy 28079 1006 1DL 27059
+ 1SIDL +3769.247
1CL + 1PLA +-51.084
1PLB + 1.1TLA
-23.47
+ 1.1TLB - 1.1BTA
-0.428 - 1.1BTB
158.188 -112.819
Max Fz 28079 1002 1DL 27059
+ 1SIDL + 3659.54
1CL + 1PLA +-17.707
1.1TLA - -20.293
1.1BTA -0.773 124.953 2.555
Min Fz 28079 1005 1DL 27059
+ 1SIDL +4796.116
1CL + 1PLA +101.798
1PLB + 1.1TLA
-32.26
+ 1.1TLB + -0.239
1.1BTA + 1.1BTB
199.558 464.809
Max Mx 28079 1004 1DL 27059
+ 1SIDL +3525.989
1CL + 1PLB +-18.224
1.1TLB - -22.148
1.1BTB 0.147 156.071 -0.892
Min Mx 28079 1002 1DL 27059
+ 1SIDL + 3659.54
1CL + 1PLA +-17.707
1.1TLA - -20.293
1.1BTA -0.773 124.953 2.555
Max My 28079 1005 1DL 27059
+ 1SIDL +4796.116
1CL + 1PLA +101.798
1PLB + 1.1TLA
-32.26
+ 1.1TLB + -0.239
1.1BTA + 1.1BTB
199.558 464.809
Min My 28079 1002 1DL 27063
+ 1SIDL + 3659.54
1CL + 1PLA +-17.707
1.1TLA - -20.293
1.1BTA -0.773 104.661 20.262
Max Mz 28079 1005 1DL 27059
+ 1SIDL +4796.116
1CL + 1PLA +101.798
1PLB + 1.1TLA
-32.26
+ 1.1TLB + -0.239
1.1BTA + 1.1BTB
199.558 464.809
Min Mz 28079 1006 1DL 27059
+ 1SIDL +3769.247
1CL + 1PLA +-51.084
1PLB + 1.1TLA
-23.47
+ 1.1TLB - 1.1BTA
-0.428 - 1.1BTB
158.188 -112.819
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28080 1006 1DL 27060
+ 1SIDL +4819.438
1CL + 1PLA +-80.014
1PLB + 1.1TLA
5.461
+ 1.1TLB - 1.1BTA
-0.583 - 1.1BTB
-79.645 -350.652
Min Fx 28080 1001 1DL 27060
+ 1SIDL +3459.726
1CL + 1PLA + 33.359
1.1TLA + 1.1BTA
-2.618 -0.190 -50.628 82.565
Max Fy 28080 1005 1DL 27060
+ 1SIDL +3723.571
1CL + 1PLA + 73.125
1PLB + 1.1TLA
-3.586
+ 1.1TLB + -0.095
1.1BTA + 1.1BTB
-36.166 229.086
Min Fy 28080 1006 1DL 27060
+ 1SIDL +4819.438
1CL + 1PLA +-80.014
1PLB + 1.1TLA
5.461
+ 1.1TLB - 1.1BTA
-0.583 - 1.1BTB
-79.645 -350.652
Max Fz 28080 1006 1DL 27060
+ 1SIDL +4819.438
1CL + 1PLA +-80.014
1PLB + 1.1TLA
5.461
+ 1.1TLB - 1.1BTA
-0.583 - 1.1BTB
-79.645 -350.652
Min Fz 28080 1005 1DL 27060
+ 1SIDL +3723.571
1CL + 1PLA + 73.125
1PLB + 1.1TLA
-3.586
+ 1.1TLB + -0.095
1.1BTA + 1.1BTB
-36.166 229.086
Max Mx 28080 1004 1DL 27060
+ 1SIDL +4163.301
1CL + 1PLB +-43.809
1.1TLB - 1.1BTB
3.437 0.063 -54.259 -211.223
Min Mx 28080 1002 1DL 27060
+ 1SIDL +4029.363
1CL + 1PLA +-43.291
1.1TLA - 1.1BTA
5.291 -0.853 -85.365 -207.764
Max My 28080 1005 1DL 27060
+ 1SIDL +3723.571
1CL + 1PLA + 73.125
1PLB + 1.1TLA
-3.586
+ 1.1TLB + -0.095
1.1BTA + 1.1BTB
-36.166 229.086
Min My 28080 1002 1DL 27060
+ 1SIDL +4029.363
1CL + 1PLA +-43.291
1.1TLA - 1.1BTA
5.291 -0.853 -85.365 -207.764
Max Mz 28080 1005 1DL 27060
+ 1SIDL +3723.571
1CL + 1PLA + 73.125
1PLB + 1.1TLA
-3.586
+ 1.1TLB + -0.095
1.1BTA + 1.1BTB
-36.166 229.086
Min Mz 28080 1006 1DL 27060
+ 1SIDL +4819.438
1CL + 1PLA +-80.014
1PLB + 1.1TLA
5.461
+ 1.1TLB - 1.1BTA
-0.583 - 1.1BTB
-79.645 -350.652
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28081 1005 1DL 27061
+ 1SIDL +4697.444
1CL + 1PLA +101.738
1PLB + 1.1TLA
-2.197
+ 1.1TLB + -0.059
1.1BTA + 1.1BTB
-47.459 464.339
Min Fx 28081 1002 1DL 27061
+ 1SIDL + 3475.24
1CL + 1PLA +-18.052
1.1TLA - 1.1BTA
4.317 -0.837 -77.404 -0.272
Max Fy 28081 1005 1DL 27061
+ 1SIDL +4697.444
1CL + 1PLA +101.738
1PLB + 1.1TLA
-2.197
+ 1.1TLB + -0.059
1.1BTA + 1.1BTB
-47.459 464.339
Min Fy 28081 1006 1DL 27061
+ 1SIDL + 3748.03
1CL + 1PLA +-51.037
1PLB + 1.1TLA
3.638
+ 1.1TLB - 1.1BTA
-0.563 - 1.1BTB
-64.752 -112.42
Max Fz 28081 1002 1DL 27061
+ 1SIDL + 3475.24
1CL + 1PLA +-18.052
1.1TLA - 1.1BTA
4.317 -0.837 -77.404 -0.272
Min Fz 28081 1005 1DL 27061
+ 1SIDL +4697.444
1CL + 1PLA +101.738
1PLB + 1.1TLA
-2.197
+ 1.1TLB + -0.059
1.1BTA + 1.1BTB
-47.459 464.339
Max Mx 28081 1004 1DL 27061
+ 1SIDL +3607.677
1CL + 1PLB +-17.943
1.1TLB - 1.1BTB
2.462 0.083 -46.286 1.438
Min Mx 28081 1002 1DL 27061
+ 1SIDL + 3475.24
1CL + 1PLA +-18.052
1.1TLA - 1.1BTA
4.317 -0.837 -77.404 -0.272
Max My 28081 1004 1DL 27065
+ 1SIDL +3607.677
1CL + 1PLB +-17.943
1.1TLB - 1.1BTB
2.462 0.083 -43.825 19.38
Min My 28081 1002 1DL 27061
+ 1SIDL + 3475.24
1CL + 1PLA +-18.052
1.1TLA - 1.1BTA
4.317 -0.837 -77.404 -0.272
Max Mz 28081 1005 1DL 27061
+ 1SIDL +4697.444
1CL + 1PLA +101.738
1PLB + 1.1TLA
-2.197
+ 1.1TLB + -0.059
1.1BTA + 1.1BTB
-47.459 464.339
Min Mz 28081 1006 1DL 27061
+ 1SIDL + 3748.03
1CL + 1PLA +-51.037
1PLB + 1.1TLA
3.638
+ 1.1TLB - 1.1BTA
-0.563 - 1.1BTB
-64.752 -112.42

2.2 Pile Loads

ULS
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 10111 9963 10301 9737


Min Fx -3493 -3423 -3767 -3301
Max Fy -2279 8934 -2090 9123
Min Fy -2995 -3207 -3263 -3018
Max Fz 9716 9531 9833 9455
Min Fz -3076 -2969 -3385 -3085
Max Mx 9783 9599 9765 9388
Min Mx -3047 -3220 -3124 -3104
Max My 9688 9783 9572 9474
Min My -3047 -3220 -3124 -3104
Max Mz -2279 8934 -2090 9123
Min Mz -2995 -3207 -3263 -3018
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

SLS Stress Check


Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 8567 8934 8702 9123


Min Fx -2279 -1904 -2168 -1822
Max Fy -2279 8934 -2090 9123
Min Fy -1451 -1688 -1665 -1553
Max Fz 8212 8028 8307 7975
Min Fz -1572 -1466 -1858 -1605
Max Mx 8280 8096 8239 7908
Min Mx -1544 -1718 -1597 -1624
Max My 8184 8280 8046 7994
Min My -1544 -1718 -1597 -1624
Max Mz -2279 8934 -2090 9123
Min Mz -1451 -1688 -1665 -1553

SLS Crack Width Check


Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 4841 4796 4819 4697


Min Fx 3551 3526 3460 3475
Max Fy 3822 4796 3724 4697
Min Fy 4841 3769 4819 3748
Max Fz 4214 3660 4819 3475
Min Fz 3822 4796 3724 4697
Max Mx 4082 3526 4163 3608
Min Mx 4214 3660 4029 3475
Max My 3822 4796 3724 3608
Min My 4214 3660 4029 3475
Max Mz 3822 4796 3724 4697
Min Mz 4841 3769 4819 3748

3.1 Moment at Bottom Face:

Lever arm Z = Pile Centre to column face

Z = 0.80 m

Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or


2.0 m (P1+P2)xZ or (P3+P4)xZ, whichever
column is maximum

P kN
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = 510.276 kN.m
Design Moment, M = M 1 - M2

Case M1 (kN.m) M = (M1 - M2) (kN.m)


ULS 16329.600 15742.782
SLS Stress Check 14445.600 13935.324
SLS Crack Width Check 7728.000 7217.724

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
2
K = Mu/bd fcu = 0.020 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1709.00 mm
Hence, z = 0.95 d = 1623.55 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table
23, pg. 37 of the Design Manual.
Ast = 28578.009 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


29 120 0 0 0 0

= 28716.101 mm2 OK

3.2 Moment at Top Face:

Lever arm Z = Pile Centre to column face

P kN Z = 0.80 m
2.0 m
column Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or
(P1+P2)xZ or (P3+P4)xZ, whichever
is minimum

Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = -510.276 kN.m
Design Moment, M = M 1 + M2

Case M1 (kN.m) M = (M1 + M2) (kN.m)


ULS -5808.000 -6394.818
SLS Stress Check -3557.600 -4067.876
SLS Crack Width Check 0.000 0.000
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
2
K = Mu/bd fcu = 0.008 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1709.00 mm
Hence, z = 0.95 d = 1623.55 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table
23, pg. 37 of the Design Manual.
Ast = 11608.567 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 120 0 0 0 0

= 21357.103 mm2 OK

3.3 Moment Capacity, Stress and Crack Width Check from Oasys

a) Moment Capacity Check:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 15740 17970 0.8758 OK
Minima
1 0.0 15740 17970 0.8758 OK

b) Stress Check:
Permissible stresses
Concrete 0.5fck 25.000 MPa
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
1 9.208 OK 1 45.86 OK
1 9.208 OK 1 45.86 OK
Minima Minima
1 -0.5861 OK 1 -242.2 OK
1 -0.5861 OK 1 -242.2 OK

c) Crack Width Check:


Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.153 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

3.4 Minimum Reinforcement


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3999.06 mm2/m
At bottom face, Provided = 5418 mm2/m
Astprovided > Astmin OK
At top face, Provided = 4030 mm2/m
Astprovided > Astmin OK

4.0 Shear Check


Total pile reaction, V1 = 20412 kN
As per Cl. 3.11.4.3, pg. 82, BS 8110-1: 1997, critical section for shear should be located 20% of the pile diameter inside
the face of the pile.
Distance of critical section for shear check from column face = 0.440 m
Factored weight per unit length due to soil and pile cap = 351.502 kN/m
Hence, downward reaction due to soil and pile cap weight,
V2 = weight per unit length x (length of pile cap - 0.5 x column size - distance of critical section)
V2 = 636 kN
Net reaction, Vu = V1 - V2 = 19776 kN
Width of pile cap available b = 5.300 m
Effective depth of pile cap d = 1.709 m
Area of tensile steel provided As = 28716 mm2
= 0.029 m2
Percentage of tensile steel provided 100As/(b.d) = 0.317 %
Shear stress = Vu /(b.d) = 2183.31 kN/sqm
Grade of concrete = C50
Design shear resistance is calculated as per Cl. 3.11.4.4, pg. 82, BS 8110-1: 1997.
Shear strength of concrete, vc = 0.35 MPa
= 350 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 0.440 m
Therefore, vc,1 = 2.72 MPa
= 2719 kN/sqm
Vus = Vu - vc,1 b d = -4850.87 kN
Requirement of shear reinforcement = Not Required
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

5.0 Check for punching shear


Total pile load = 40112 kN
From section 1.0 above, factored weight of pile cap + earthfill = 1987 kN
Hence, net punching shear force = 38125 kN
Effective depth of pile cap = 1.709 m
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997, punching shear shall be checked at the perimeter of the column.
Shear perimeter = 8.000 m
Shearing Area = 13.672 m2
Punching Shear stress = 2788.564 kN/m2
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997,
Allowable punching shear stress = lesser of 0.8 fcu or 5 N/mm2 = 5.00 N/mm2
= 5000.000 kN/m2
OK
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997, since the pile spacing is not greater than 3 times the pile diameter, no
additional punching shear check is required.
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR COLUMN C20 & C22


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA

Column No. = C20 & C22

No. of piles n = 4
Dia of pile = 1.20 m
Size of Column = 2.00 m x 2.00 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 5.30 m x 5.30 m


2
Area of pile cap = 28.09 m
Depth of pile cap D = 1.80 m
Volume of pile cap = 50.56 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 1264.05 kN

Thickness of Earthfill over pile cap = 1.50 m


Volume of Earthfill over pile cap = 36.14 m3
Density of Earth = 20 kN/cum
Weight of Earthfill = 722.70 kN

Total weight of (Pile cap + Earthfill) = 1986.75 kN

2.0 PILE LOADS

2.1 Summary of Staad Results (Forces at Bottom of Pile Cap)---

LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-


a) ULS Loads
2378, 3131-3178,4101-4132, 5109-5124 & 6109-6124
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30774 2202 1.0DL
29834
+ 1.0SIDL
10093.36
+ 0.3CL + 0.3PLA
299.305+ 0.3PLB
946.391
+ 0.3TLA + 0.3TLB
9.840 - 0.3BTA
3021.167- 0.3BTB881.42
- 0.3SLX - 0.3SLY - 1SLZ
Min Fx 30774 2115 1.0DL
29834
+ 1.0SIDL
-3328.76
+ 0.3SLX +-333.212
0.3SLY + 1SLZ
-981.044 -10.399 -2823.896 -1056.647
Max Fy 30774 1452 1.15DL
29830
+ 1.2SIDL
-2176.49
- 1.5COL(-X)-MLC
1173.57 8.882 -2.426 -16.317 4771.3
Min Fy 30774 2186 1.0DL
29830
+ 1.0SIDL
-2712.03
+ 0.3CL +-994.789
0.3PLA + 0.3PLB
-393.157
+ 0.3TLA +-8.987
0.3TLB - -1384.672
0.3BTA - 0.3BTB
-4048.169
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30774 3154 1.0DL
29834
+ 1.0SIDL
9865.928
+ 0.3CL + 0.3PLA
310.462+ 0.3TLA
955.045
- 0.3BTA 9.251
- 0.3SLX2987.719
- 0.3SLY - 1SLZ915.085
- 1.54NLA
Min Fz 30774 3178 1.0DL
29830
+ 1.0SIDL
-2913.63
+ 0.3CL +-344.768
0.3PLB + -990.949
0.3TLB - 0.3BTB-9.787
- 0.3SLX-3722.168
- 0.3SLY - 1SLZ
-1437.903
- 1.54NLB
Max Mx 30774 3147 1.0DL
29830
+ 1.0SIDL
9810.981
+ 0.3CL + 0.3PLA
333.189+ 0.3TLA
940.428
+ 0.3BTA 10.591
+ 0.3SLX 4018.661
+ 0.3SLY + 1SLZ
1312.583
+ 1.54NLA
Min Mx 30774 3171 1.0DL
29834
+ 1.0SIDL
-3124.76
+ 0.3CL +-322.285
0.3PLB + -977.734
0.3TLB + 0.3BTB
-11.064
+ 0.3SLX
-2823.911
+ 0.3SLY + -1028.817
1SLZ + 1.54NLB
Max My 30774 3147 1.0DL
29830
+ 1.0SIDL
9810.981
+ 0.3CL + 0.3PLA
333.189+ 0.3TLA
940.428
+ 0.3BTA 10.591
+ 0.3SLX 4018.661
+ 0.3SLY + 1SLZ
1312.583
+ 1.54NLA
Min My 30774 3154 1.0DL
29830
+ 1.0SIDL
-2947.49
+ 0.3CL +-344.929
0.3PLA + 0.3TLA
-974.174
- 0.3BTA-11.038
- 0.3SLX-3798.563
- 0.3SLY - 1SLZ
-1438.645
- 1.54NLA
Max Mz 30774 1452 1.15DL
29830
+ 1.2SIDL
-2176.49
- 1.5COL(-X)-MLC
1173.57 8.882 -2.426 -16.317 4771.3
Min Mz 30774 2186 1.0DL
29830
+ 1.0SIDL
-2712.03
+ 0.3CL +-994.789
0.3PLA + 0.3PLB
-393.157
+ 0.3TLA +-8.987
0.3TLB - -1384.672
0.3BTA - 0.3BTB
-4048.169
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30775 2179 1.0DL
29831
+ 1.0SIDL
10236.99
+ 0.3CL +1006.697
0.3PLA + 0.3PLB
357.846
+ 0.3TLA + 0.3TLB
8.411 + 1660.991
0.3BTA + 0.3BTB
4112.859
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 30775 2107 1.0DL
29835
+ 1.0SIDL
-3525.47
+1SLX + 0.3SLY
-952.634
+ 0.3SLZ
-394.075 -8.877 -1062.642 -2842.628
Max Fy 30775 1452 1.15DL
29831
+ 1.2SIDL
9028.888
- 1.5COL(-X)-MLC
1195.929 -5.382 -2.453 99.24 4955.127
Min Fy 30775 2186 1.0DL
29831
+ 1.0SIDL
-3196.74
+ 0.3CL +-972.018
0.3PLA + 0.3PLB
-395.421
+ 0.3TLA +-8.927
0.3TLB - -1411.883
0.3BTA - 0.3BTB
-3860.701
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30775 3154 1.0DL
29835
+ 1.0SIDL
9763.828
+ 0.3CL + 0.3PLA
332.966+ 0.3TLA
956.277
- 0.3BTA 8.540
- 0.3SLX2991.788
- 0.3SLY - 1SLZ
1076.606
- 1.54NLA
Min Fz 30775 3178 1.0DL
29831
+ 1.0SIDL
-3149.59
+ 0.3CL +-323.151
0.3PLB + -991.524
0.3TLB - 0.3BTB-9.048
- 0.3SLX-3732.198
- 0.3SLY - 1SLZ
-1259.37
- 1.54NLB
Max Mx 30775 3147 1.0DL
29831
+ 1.0SIDL
9984.638
+ 0.3CL + 0.3PLA
355.929+ 0.3TLA
941.248
+ 0.3BTA9.911
+ 0.3SLX 4026.665
+ 0.3SLY + 1SLZ
1498.658
+ 1.54NLA
Min Mx 30775 3171 1.0DL
29835
+ 1.0SIDL
-3087.66
+ 0.3CL +-300.887
0.3PLB + -978.719
0.3TLB + 0.3BTB
-10.352
+ 0.3SLX
-2829.773
+ 0.3SLY + 1SLZ
-873.328
+ 1.54NLB
Max My 30775 3147 1.0DL
29831
+ 1.0SIDL
9984.638
+ 0.3CL + 0.3PLA
355.929+ 0.3TLA
941.248
+ 0.3BTA9.911
+ 0.3SLX 4026.665
+ 0.3SLY + 1SLZ
1498.658
+ 1.54NLA
Min My 30775 3154 1.0DL
29831
+ 1.0SIDL
-3184.23
+ 0.3CL +-323.309
0.3PLA + 0.3TLA
-974.749
- 0.3BTA-10.333
- 0.3SLX-3808.596
- 0.3SLY - 1SLZ
-1260.06
- 1.54NLA
Max Mz 30775 1452 1.15DL
29831
+ 1.2SIDL
9028.888
- 1.5COL(-X)-MLC
1195.929 -5.382 -2.453 99.24 4955.127
Min Mz 30775 2186 1.0DL
29831
+ 1.0SIDL
-3196.74
+ 0.3CL +-972.018
0.3PLA + 0.3PLB
-395.421
+ 0.3TLA +-8.927
0.3TLB - -1411.883
0.3BTA - 0.3BTB
-3860.701
- 1SLX - 0.3SLY - 0.3SLZ
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30776 2186 1.0DL
29836
+ 1.0SIDL
10214.36
+ 0.3CL + 0.3PLA
938.455+ 0.3PLB
383.086
+ 0.3TLA + 0.3TLB
8.678 - 0.3BTA
1088.553- 0.3BTB
2809.797
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 30776 2107 1.0DL
29836
+ 1.0SIDL
-3565.01
+1SLX + 0.3SLY
-972.223
+ 0.3SLZ
-374.478 -9.263 -1203.646 -2984.042
Max Fy 30776 1452 1.15DL
29832
+ 1.2SIDL
-2026.84
- 1.5COL(-X)-MLC
1173.354 17.195 0.008 -86.359 4769.537
Min Fy 30776 2186 1.0DL
29832
+ 1.0SIDL
-2954.7
+ 0.3CL + 0.3PLA
-995.1+ 0.3PLB
-372.331
+ 0.3TLA +-9.356
0.3TLB - -1601.121
0.3BTA - 0.3BTB
-4050.423
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30776 3154 1.0DL
29836
+ 1.0SIDL
9890.848
+ 0.3CL + 0.3PLA
310.974+ 0.3TLA
978.161
- 0.3BTA 9.384
- 0.3SLX2832.383
- 0.3SLY - 1SLZ917.691
- 1.54NLA
Min Fz 30776 3178 1.0DL
29832
+ 1.0SIDL
-3063.48
+ 0.3CL +-345.124
0.3PLB + -969.444
0.3TLB - 0.3BTB-9.945
- 0.3SLX-3912.143
- 0.3SLY - 1SLZ
-1439.907
- 1.54NLB
Max Mx 30776 3147 1.0DL
29832
+ 1.0SIDL
9669.457
+ 0.3CL + 0.3PLA
333.939+ 0.3TLA
963.13
+ 0.3BTA 10.771
+ 0.3SLX 3845.198
+ 0.3SLY + 1SLZ
1317.783
+ 1.54NLA
Min Mx 30776 3154 1.0DL
29832
+ 1.0SIDL
-3029.56
+ 0.3CL +-345.279
0.3PLA + 0.3TLA
-952.671
- 0.3BTA-11.196
- 0.3SLX-3988.519
- 0.3SLY - 1SLZ
-1440.574
- 1.54NLA
Max My 30776 3147 1.0DL
29832
+ 1.0SIDL
9669.457
+ 0.3CL + 0.3PLA
333.939+ 0.3TLA
963.13
+ 0.3BTA 10.771
+ 0.3SLX 3845.198
+ 0.3SLY + 1SLZ
1317.783
+ 1.54NLA
Min My 30776 3154 1.0DL
29832
+ 1.0SIDL
-3029.56
+ 0.3CL +-345.279
0.3PLA + 0.3TLA
-952.671
- 0.3BTA-11.196
- 0.3SLX-3988.519
- 0.3SLY - 1SLZ
-1440.574
- 1.54NLA
Max Mz 30776 1452 1.15DL
29832
+ 1.2SIDL
-2026.84
- 1.5COL(-X)-MLC
1173.354 17.195 0.008 -86.359 4769.537
Min Mz 30776 2186 1.0DL
29832
+ 1.0SIDL
-2954.7
+ 0.3CL + 0.3PLA
-995.1+ 0.3PLB
-372.331
+ 0.3TLA +-9.356
0.3TLB - -1601.121
0.3BTA - 0.3BTB
-4050.423
- 1SLX - 0.3SLY - 0.3SLZ
Pile 4
` Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30777 2195 1.0DL
29833
+ 1.0SIDL
9967.451
+ 0.3CL + 0.3PLA
367.534+ 0.3PLB
967.936
+ 0.3TLA + 0.3TLB
9.422 + 3817.476
0.3BTA + 0.3BTB1544.554
+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 30777 2115 1.0DL
29837
+ 1.0SIDL
-3389.54
+ 0.3SLX +-313.635
0.3SLY + 1SLZ
-961.385 -9.821 -2964.414 -915.155
Max Fy 30777 1452 1.15DL
29833
+ 1.2SIDL
9178.541
- 1.5COL(-X)-MLC
1196.147 31.457 -0.019 -201.908 4956.898
Min Fy 30777 2186 1.0DL
29833
+ 1.0SIDL
-3058.02
+ 0.3CL + 0.3PLA
-971.7+ 0.3PLB
-370.06
+ 0.3TLA +-9.301
0.3TLB - -1573.801
0.3BTA - 0.3BTB
-3858.322
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30777 3154 1.0DL
29837
+ 1.0SIDL
9642.315
+ 0.3CL + 0.3PLA
332.426+ 0.3TLA
976.927
- 0.3BTA 8.679
- 0.3SLX2828.276
- 0.3SLY - 1SLZ
1073.555
- 1.54NLA
Min Fz 30777 3178 1.0DL
29833
+ 1.0SIDL
-3153.01
+ 0.3CL +-322.767
0.3PLB + -968.866
0.3TLB - 0.3BTB-9.212
- 0.3SLX-3902.075
- 0.3SLY - 1SLZ
-1256.923
- 1.54NLB
Max Mx 30777 3147 1.0DL
29833
+ 1.0SIDL
9696.681
+ 0.3CL + 0.3PLA
355.151+ 0.3TLA
962.308
+ 0.3BTA 10.097
+ 0.3SLX 3837.157
+ 0.3SLY + 1SLZ
1493.014
+ 1.54NLA
Min Mx 30777 3154 1.0DL
29833
+ 1.0SIDL
-3119.86
+ 0.3CL +-322.931
0.3PLA + 0.3TLA
-952.093
- 0.3BTA-10.498
- 0.3SLX-3978.449
- 0.3SLY - 1SLZ
-1257.687
- 1.54NLA
Max My 30777 3147 1.0DL
29833
+ 1.0SIDL
9696.681
+ 0.3CL + 0.3PLA
355.151+ 0.3TLA
962.308
+ 0.3BTA 10.097
+ 0.3SLX 3837.157
+ 0.3SLY + 1SLZ
1493.014
+ 1.54NLA
Min My 30777 3154 1.0DL
29833
+ 1.0SIDL
-3119.86
+ 0.3CL +-322.931
0.3PLA + 0.3TLA
-952.093
- 0.3BTA-10.498
- 0.3SLX-3978.449
- 0.3SLY - 1SLZ
-1257.687
- 1.54NLA
Max Mz 30777 1452 1.15DL
29833
+ 1.2SIDL
9178.541
- 1.5COL(-X)-MLC
1196.147 31.457 -0.019 -201.908 4956.898
Min Mz 30777 2186 1.0DL
29833
+ 1.0SIDL
-3058.02
+ 0.3CL + 0.3PLA
-971.7+ 0.3PLB
-370.06
+ 0.3TLA +-9.301
0.3TLB - -1573.801
0.3BTA - 0.3BTB
-3858.322
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

LC 1001-1190, 2031-2078, 3031-3078, 4001-


b) SLS Loads For Stress check
4032, 5009-5024 & 6009-6024
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30774 1102 1DL 29834
+ 1SIDL +8583.803
0.3CL + 0.3PLA
222.297
+ 0.3PLB719.188
+ 0.3TLA + 0.3TLB
7.457
- 0.3BTA
2334.894
- 0.3BTB - 0.3SLX
645.656- 0.3SLY - 1SLZ
Min Fx 30774 1015 1DL 29834
+ 1SIDL + 0.3SLX
-1819.2+ 0.3SLY
-256.203
+ 1SLZ -753.842 -8.016 -2137.621 -820.883
Max Fy 30774 1152 1DL 29830
+ 1SIDL --743.351
1COL(-X)-MLC 781.1 2.127 -1.678 14.056 3167.647
Min Fy 30774 1086 1DL 29830
+ 1SIDL +-1204.59
0.3CL + 0.3PLA
-767.243
+ 0.3PLB-304.942
+ 0.3TLA + 0.3TLB
-6.946
- 0.3BTA
-1030.106
- 0.3BTB -3131.263
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30774 3054 1DL 29834
+ 1SIDL +8366.966
0.3CL + 0.3PLA
233.471
+ 0.3TLA 725.956
- 0.3BTA - 0.3SLX
7.040 - 0.3SLY
2307.013
- 1SLZ - 1.1NLA
679.324
Min Fz 30774 3078 1DL 29830
+ 1SIDL +-1414.68
0.3CL + 0.3PLB
-267.775
+ 0.3TLB-761.859
- 0.3BTB - 0.3SLX
-7.575 - 0.3SLY
-2816.188
- 1SLZ --1125.336
1.1NLB
Max Mx 30774 3047 1DL 29830
+ 1SIDL +8290.821
0.3CL + 0.3PLA
256.164
+ 0.3TLA 715.112
+ 0.3BTA + 0.3SLX
8.036 + 0.3SLY
3097.771 + 1SLZ +999.984
1.1NLA
Min Mx 30774 3071 1DL 29834
+ 1SIDL +-1604.58
0.3CL + 0.3PLB
-245.261
+ 0.3TLB-752.419
+ 0.3BTB + -8.509
0.3SLX + -2132.068
0.3SLY + 1SLZ -793.057
+ 1.1NLB
Max My 30774 3047 1DL 29830
+ 1SIDL +8290.821
0.3CL + 0.3PLA
256.164
+ 0.3TLA 715.112
+ 0.3BTA + 0.3SLX
8.036 + 0.3SLY
3097.771 + 1SLZ +999.984
1.1NLA
Min My 30774 3054 1DL 29830
+ 1SIDL +-1427.33
0.3CL + 0.3PLA
-267.904
+ 0.3TLA-748.858
- 0.3BTA - 0.3SLX
-8.483 - 0.3SLY
-2877.672
- 1SLZ --1126.047
1.1NLA
Max Mz 30774 1152 1DL 29830
+ 1SIDL --743.351
1COL(-X)-MLC 781.1 2.127 -1.678 14.056 3167.647
Min Mz 30774 1086 1DL 29830
+ 1SIDL +-1204.59
0.3CL + 0.3PLA
-767.243
+ 0.3PLB-304.942
+ 0.3TLA + 0.3TLB
-6.946
- 0.3BTA
-1030.106
- 0.3BTB -3131.263
- 1SLX - 0.3SLY - 0.3SLZ
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30775 1079 1DL 29831
+ 1SIDL +8687.033
0.3CL + 0.3PLA
779.069
+ 0.3PLB268.963
+ 0.3TLA + 0.3TLB
6.381
+ 0.3BTA1301.01
+ 0.3BTB3195.343
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 30775 1007 1DL 29835
+ 1SIDL +-1975.51
1SLX + 0.3SLY
-725.006
+ 0.3SLZ -305.192 -6.847 -791.463 -2152.678
Max Fy 30775 1152 1DL 29831
+ 1SIDL -6720.411
1COL(-X)-MLC800.508 -7.358 -1.692 90.894 3327.207
Min Fy 30775 1086 1DL 29831
+ 1SIDL +-1646.78
0.3CL + 0.3PLA
-744.39
+ 0.3PLB-306.538
+ 0.3TLA + 0.3TLB
-6.897
- 0.3BTA
-1051.902
- 0.3BTB -2943.185
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30775 3054 1DL 29835
+ 1SIDL +8248.541
0.3CL + 0.3PLA255.9
+ 0.3TLA 726.974
- 0.3BTA - 0.3SLX
6.499 - 0.3SLY
2309.562
- 1SLZ - 1.1NLA
840.534
Min Fz 30775 3078 1DL 29831
+ 1SIDL +-1634.32
0.3CL + 0.3PLB
-246.084
+ 0.3TLB-762.221
- 0.3BTB - 0.3SLX
-7.007 - 0.3SLY
-2824.483
- 1SLZ - -946.388
1.1NLB
Max Mx 30775 3047 1DL 29831
+ 1SIDL +8447.812
0.3CL + 0.3PLA
278.767
+ 0.3TLA 715.719
+ 0.3BTA + 0.3SLX
7.519 + 0.3SLY
3104.038 + 1SLZ1185.143
+ 1.1NLA
Min Mx 30775 3071 1DL 29835
+ 1SIDL +-1550.81
0.3CL + 0.3PLB
-223.726
+ 0.3TLB -753.19
+ 0.3BTB + -7.960
0.3SLX + -2136.408
0.3SLY + 1SLZ -636.818
+ 1.1NLB
Max My 30775 3047 1DL 29831
+ 1SIDL +8447.812
0.3CL + 0.3PLA
278.767
+ 0.3TLA 715.719
+ 0.3BTA + 0.3SLX
7.519 + 0.3SLY
3104.038 + 1SLZ1185.143
+ 1.1NLA
Min My 30775 3054 1DL 29831
+ 1SIDL + 0.3CL
-1647.4
+ 0.3PLA
-246.147
+ 0.3TLA-749.22
- 0.3BTA - 0.3SLX
-7.941 - 0.3SLY
-2885.968
- 1SLZ - 1.1NLA
-946.545
Max Mz 30775 1152 1DL 29831
+ 1SIDL -6720.411
1COL(-X)-MLC800.508 -7.358 -1.692 90.894 3327.207
Min Mz 30775 1086 1DL 29831
+ 1SIDL +-1646.78
0.3CL + 0.3PLA
-744.39
+ 0.3PLB-306.538
+ 0.3TLA + 0.3TLB
-6.897
- 0.3BTA
-1051.902
- 0.3BTB -2943.185
- 1SLX - 0.3SLY - 0.3SLZ
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30776 1086 1DL 29836
+ 1SIDL +8662.478
0.3CL + 0.3PLA
710.82
+ 0.3PLB294.211
+ 0.3TLA + 0.3TLB
6.557
- 0.3BTA817.423
- 0.3BTB -2119.803
1SLX - 0.3SLY - 0.3SLZ
Min Fx 30776 1007 1DL 29836
+ 1SIDL +-2013.12
1SLX + 0.3SLY
-744.588
+ 0.3SLZ -285.603 -7.142 -932.516 -2294.047
Max Fy 30776 1152 1DL 29832
+ 1SIDL --657.198
1COL(-X)-MLC780.972 12.179 -0.053 -69.715 3166.604
Min Fy 30776 1086 1DL 29832
+ 1SIDL +-1402.82
0.3CL + 0.3PLA
-767.465
+ 0.3PLB-283.456
+ 0.3TLA + 0.3TLB
-7.235
- 0.3BTA
-1241.198
- 0.3BTB -3132.854
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30776 3054 1DL 29836
+ 1SIDL + 8357.52
0.3CL + 0.3PLA
233.91
+ 0.3TLA748.88
- 0.3BTA - 0.3SLX
7.138 - 0.3SLY
2150.311
- 1SLZ - 1.1NLA
681.661
Min Fz 30776 3078 1DL 29832
+ 1SIDL +-1530.17
0.3CL + 0.3PLB
-268.059
+ 0.3TLB-740.163
- 0.3BTB - 0.3SLX
-7.699 - 0.3SLY
-3004.603
- 1SLZ --1126.964
1.1NLB
Max Mx 30776 3047 1DL 29832
+ 1SIDL +8157.626
0.3CL + 0.3PLA
256.78
+ 0.3TLA 737.623
+ 0.3BTA + 0.3SLX
8.181 + 0.3SLY
2922.749+ 1SLZ +1004.31
1.1NLA
Min Mx 30776 3054 1DL 29832
+ 1SIDL +-1517.73
0.3CL + 0.3PLA
-268.12
+ 0.3TLA-727.164
- 0.3BTA - 0.3SLX
-8.606 - 0.3SLY
-3066.069
- 1SLZ --1127.101
1.1NLA
Max My 30776 3047 1DL 29832
+ 1SIDL +8157.626
0.3CL + 0.3PLA
256.78
+ 0.3TLA 737.623
+ 0.3BTA + 0.3SLX
8.181 + 0.3SLY
2922.749+ 1SLZ +1004.31
1.1NLA
Min My 30776 3054 1DL 29832
+ 1SIDL +-1517.73
0.3CL + 0.3PLA
-268.12
+ 0.3TLA-727.164
- 0.3BTA - 0.3SLX
-8.606 - 0.3SLY
-3066.069
- 1SLZ --1127.101
1.1NLA
Max Mz 30776 1152 1DL 29832
+ 1SIDL --657.198
1COL(-X)-MLC780.972 12.179 -0.053 -69.715 3166.604
Min Mz 30776 1086 1DL 29832
+ 1SIDL +-1402.82
0.3CL + 0.3PLA
-767.465
+ 0.3PLB-283.456
+ 0.3TLA + 0.3TLB
-7.235
- 0.3BTA
-1241.198
- 0.3BTB -3132.854
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30777 1095 1DL 29833
+ 1SIDL + 0.3CL
8463.9
+ 0.3PLA
290.53
+ 0.3PLB740.756
+ 0.3TLA + 0.3TLB
7.169
+ 0.3BTA
2904.226
+ 0.3BTB1232.038
+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 30777 1015 1DL 29837
+ 1SIDL +-1885.99
0.3SLX + 0.3SLY
-236.631
+ 1SLZ -734.205 -7.568 -2278.303 -679.455
Max Fy 30777 1152 1DL 29833
+ 1SIDL -6806.564
1COL(-X)-MLC800.637 21.663 -0.067 -146.548 3328.256
Min Fy 30777 1086 1DL 29833
+ 1SIDL +-1554.97
0.3CL + 0.3PLA
-744.163
+ 0.3PLB-281.855
+ 0.3TLA + 0.3TLB
-7.190
- 0.3BTA
-1219.318
- 0.3BTB -2941.498
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30777 3054 1DL 29837
+ 1SIDL +8128.187
0.3CL + 0.3PLA
255.44
+ 0.3TLA747.86
- 0.3BTA - 0.3SLX
6.602 - 0.3SLY
2147.733
- 1SLZ - 1.1NLA
837.857
Min Fz 30777 3078 1DL 29833
+ 1SIDL + 0.3CL
-1638.9
+ 0.3PLB
-245.779
+ 0.3TLB-739.799
- 0.3BTB - 0.3SLX
-7.135 - 0.3SLY
-2996.279
- 1SLZ - -944.421
1.1NLB
Max Mx 30777 3047 1DL 29833
+ 1SIDL +8203.707
0.3CL + 0.3PLA
278.13
+ 0.3TLA 737.015
+ 0.3BTA + 0.3SLX
7.668 + 0.3SLY
2916.452+ 1SLZ1180.479
+ 1.1NLA
Min Mx 30777 3054 1DL 29833
+ 1SIDL +-1626.89
0.3CL + 0.3PLA
-245.91
+ 0.3TLA -726.8
- 0.3BTA - 0.3SLX
-8.070 - 0.3SLY
-3057.744
- 1SLZ - 1.1NLA
-945.152
Max My 30777 3047 1DL 29833
+ 1SIDL +8203.707
0.3CL + 0.3PLA
278.13
+ 0.3TLA 737.015
+ 0.3BTA + 0.3SLX
7.668 + 0.3SLY
2916.452+ 1SLZ1180.479
+ 1.1NLA
Min My 30777 3054 1DL 29833
+ 1SIDL +-1626.89
0.3CL + 0.3PLA
-245.91
+ 0.3TLA -726.8
- 0.3BTA - 0.3SLX
-8.070 - 0.3SLY
-3057.744
- 1SLZ - 1.1NLA
-945.152
Max Mz 30777 1152 1DL 29833
+ 1SIDL -6806.564
1COL(-X)-MLC800.637 21.663 -0.067 -146.548 3328.256
Min Mz 30777 1086 1DL 29833
+ 1SIDL +-1554.97
0.3CL + 0.3PLA
-744.163
+ 0.3PLB-281.855
+ 0.3TLA + 0.3TLB
-7.190
- 0.3BTA
-1219.318
- 0.3BTB -2941.498
- 1SLX - 0.3SLY - 0.3SLZ

c) SLS Loads For crack width check LC 1001-1006


Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30774 1006 1DL 29830
+ 1SIDL +5230.707
1CL + 1PLA + 1PLB
-89.31+ 1.1TLA
-22.387
+ 1.1TLB - 1.1BTA
-0.445 - 1.1BTB
161.233 -402.404
Min Fx 30774 1003 1DL 29830
+ 1SIDL +3893.695
1CL + 1PLB + 34.855
1.1TLB + 1.1BTB
-28.05 -0.502 188.55 86.185
Max Fy 30774 1005 1DL 29830
+ 1SIDL +4255.434
1CL + 1PLA + 76.421
1PLB + 1.1TLA
-27.53
+ 1.1TLB + -0.217
1.1BTA + 1.1BTB
175.859 240.906
Min Fy 30774 1006 1DL 29830
+ 1SIDL +5230.707
1CL + 1PLA + 1PLB
-89.31+ 1.1TLA
-22.387
+ 1.1TLB - 1.1BTA
-0.445 - 1.1BTB
161.233 -402.404
Max Fz 30774 1002 1DL 29830
+ 1SIDL +4538.703
1CL + 1PLA +-48.157
1.1TLA - -14.917
1.1BTA -0.395 103.214 -237.74
Min Fz 30774 1004 1DL 29830
+ 1SIDL +4395.454
1CL + 1PLB +-47.981
1.1TLB - -28.073
1.1BTB -0.225 191.541 -235.439
Max Mx 30774 1001 1DL 29830
+ 1SIDL +4065.188
1CL + 1PLA + 34.737
1.1TLA + -20.083
1.1BTA 0.110 120.831 83.947
Min Mx 30774 1003 1DL 29830
+ 1SIDL +3893.695
1CL + 1PLB + 34.855
1.1TLB + 1.1BTB
-28.05 -0.502 188.55 86.185
Max My 30774 1004 1DL 29830
+ 1SIDL +4395.454
1CL + 1PLB +-47.981
1.1TLB - -28.073
1.1BTB -0.225 191.541 -235.439
Min My 30774 1002 1DL 29834
+ 1SIDL +4538.703
1CL + 1PLA +-48.157
1.1TLA - -14.917
1.1BTA -0.395 88.298 -189.583
Max Mz 30774 1005 1DL 29830
+ 1SIDL +4255.434
1CL + 1PLA + 76.421
1PLB + 1.1TLA
-27.53
+ 1.1TLB + -0.217
1.1BTA + 1.1BTB
175.859 240.906
Min Mz 30774 1006 1DL 29830
+ 1SIDL +5230.707
1CL + 1PLA + 1PLB
-89.31+ 1.1TLA
-22.387
+ 1.1TLB - 1.1BTA
-0.445 - 1.1BTB
161.233 -402.404
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30775 1005 1DL 29831
+ 1SIDL + 5214.79
1CL + 1PLA +108.347
1PLB + 1.1TLA
-28.838
+ 1.1TLB + -0.191
1.1BTA + 1.1BTB
186.481 503.349
Min Fx 30775 1004 1DL 29831
+ 1SIDL +3850.613
1CL + 1PLB +-20.349
1.1TLB - -27.154
1.1BTB -0.197 184.035 -8.295
Max Fy 30775 1005 1DL 29831
+ 1SIDL + 5214.79
1CL + 1PLA +108.347
1PLB + 1.1TLA
-28.838
+ 1.1TLB + -0.191
1.1BTA + 1.1BTB
186.481 503.349
Min Fy 30775 1006 1DL 29831
+ 1SIDL +4177.656
1CL + 1PLA +-57.454
1PLB + 1.1TLA
-20.681
+ 1.1TLB - 1.1BTA
-0.433 - 1.1BTB
147.318 -140.524
Max Fz 30775 1002 1DL 29831
+ 1SIDL +3995.394
1CL + 1PLA +-19.741
1.1TLA - -13.999
1.1BTA -0.394 95.72 -4.133
Min Fz 30775 1005 1DL 29831
+ 1SIDL + 5214.79
1CL + 1PLA +108.347
1PLB + 1.1TLA
-28.838
+ 1.1TLB + -0.191
1.1BTA + 1.1BTB
186.481 503.349
Max Mx 30775 1001 1DL 29831
+ 1SIDL +4528.588
1CL + 1PLA + 63.229
1.1TLA + -20.673
1.1BTA 0.123 125.61 318.168
Min Mx 30775 1003 1DL 29831
+ 1SIDL +4354.552
1CL + 1PLB + 62.482
1.1TLB + -28.637
1.1BTB -0.472 193.307 313.278
Max My 30775 1003 1DL 29831
+ 1SIDL +4354.552
1CL + 1PLB + 62.482
1.1TLB + -28.637
1.1BTB -0.472 193.307 313.278
Min My 30775 1002 1DL 29835
+ 1SIDL +3995.394
1CL + 1PLA +-19.741
1.1TLA - -13.999
1.1BTA -0.394 81.721 15.607
Max Mz 30775 1005 1DL 29831
+ 1SIDL + 5214.79
1CL + 1PLA +108.347
1PLB + 1.1TLA
-28.838
+ 1.1TLB + -0.191
1.1BTA + 1.1BTB
186.481 503.349
Min Mz 30775 1006 1DL 29831
+ 1SIDL +4177.656
1CL + 1PLA +-57.454
1PLB + 1.1TLA
-20.681
+ 1.1TLB - 1.1BTA
-0.433 - 1.1BTB
147.318 -140.524
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30776 1006 1DL 29832
+ 1SIDL +5182.681
1CL + 1PLA +-89.254
1PLB + 1.1TLA
11.119
+ 1.1TLB - 1.1BTA
-0.596 - 1.1BTB
-114.111 -401.954
Min Fx 30776 1001 1DL 29832
+ 1SIDL + 3788.68
1CL + 1PLA + 35.308
1.1TLA + 1.1BTA
7.248 0.210 -103.923 88.635
Max Fy 30776 1005 1DL 29832
+ 1SIDL +4140.058
1CL + 1PLA + 76.567
1PLB + 1.1TLA
2.942
+ 1.1TLB + -0.027
1.1BTA + 1.1BTB
-74.781 242.088
Min Fy 30776 1006 1DL 29832
+ 1SIDL +5182.681
1CL + 1PLA +-89.254
1PLB + 1.1TLA
11.119
+ 1.1TLB - 1.1BTA
-0.596 - 1.1BTB
-114.111 -401.954
Max Fz 30776 1002 1DL 29832
+ 1SIDL +4324.569
1CL + 1PLA +-47.672
1.1TLA - 1.1BTA
13.932 -0.465 -133.896 -233.749
Min Fz 30776 1003 1DL 29832
+ 1SIDL +3964.119
1CL + 1PLB + 34.556
1.1TLB + 1.1BTB
-0.711 -0.402 -36.269 83.702
Max Mx 30776 1001 1DL 29832
+ 1SIDL + 3788.68
1CL + 1PLA + 35.308
1.1TLA + 1.1BTA
7.248 0.210 -103.923 88.635
Min Mx 30776 1006 1DL 29832
+ 1SIDL +5182.681
1CL + 1PLA +-89.254
1PLB + 1.1TLA
11.119
+ 1.1TLB - 1.1BTA
-0.596 - 1.1BTB
-114.111 -401.954
Max My 30776 1003 1DL 29832
+ 1SIDL +3964.119
1CL + 1PLB + 34.556
1.1TLB + 1.1BTB
-0.711 -0.402 -36.269 83.702
Min My 30776 1002 1DL 29832
+ 1SIDL +4324.569
1CL + 1PLA +-47.672
1.1TLA - 1.1BTA
13.932 -0.465 -133.896 -233.749
Max Mz 30776 1005 1DL 29832
+ 1SIDL +4140.058
1CL + 1PLA + 76.567
1PLB + 1.1TLA
2.942
+ 1.1TLB + -0.027
1.1BTA + 1.1BTB
-74.781 242.088
Min Mz 30776 1006 1DL 29832
+ 1SIDL +5182.681
1CL + 1PLA +-89.254
1PLB + 1.1TLA
11.119
+ 1.1TLB - 1.1BTA
-0.596 - 1.1BTB
-114.111 -401.954
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30777 1005 1DL 29833
+ 1SIDL +5099.417
1CL + 1PLA +108.201
1PLB + 1.1TLA4.25
+ 1.1TLB + -0.001
1.1BTA + 1.1BTB
-85.402 502.168
Min Fx 30777 1002 1DL 29833
+ 1SIDL + 3781.26
1CL + 1PLA +-20.226
1.1TLA - 1.1BTA
13.014 -0.464 -126.402 -8.124
Max Fy 30777 1005 1DL 29833
+ 1SIDL +5099.417
1CL + 1PLA +108.201
1PLB + 1.1TLA4.25
+ 1.1TLB + -0.001
1.1BTA + 1.1BTB
-85.402 502.168
Min Fy 30777 1006 1DL 29833
+ 1SIDL + 4129.63
1CL + 1PLA +-57.509
1PLB + 1.1TLA
9.414
+ 1.1TLB - 1.1BTA
-0.584 - 1.1BTB
-100.196 -140.975
Max Fz 30777 1002 1DL 29833
+ 1SIDL + 3781.26
1CL + 1PLA +-20.226
1.1TLA - 1.1BTA
13.014 -0.464 -126.402 -8.124
Min Fz 30777 1004 1DL 29833
+ 1SIDL +3926.012
1CL + 1PLB +-20.045
1.1TLB - 1.1BTB
-0.136 -0.268 -38.121 -5.777
Max Mx 30777 1001 1DL 29833
+ 1SIDL +4252.082
1CL + 1PLA + 62.658
1.1TLA + 1.1BTA
7.838 0.224 -108.703 313.48
Min Mx 30777 1006 1DL 29833
+ 1SIDL + 4129.63
1CL + 1PLA +-57.509
1PLB + 1.1TLA
9.414
+ 1.1TLB - 1.1BTA
-0.584 - 1.1BTB
-100.196 -140.975
Max My 30777 1004 1DL 29833
+ 1SIDL +3926.012
1CL + 1PLB +-20.045
1.1TLB - 1.1BTB
-0.136 -0.268 -38.121 -5.777
Min My 30777 1002 1DL 29833
+ 1SIDL + 3781.26
1CL + 1PLA +-20.226
1.1TLA - 1.1BTA
13.014 -0.464 -126.402 -8.124
Max Mz 30777 1005 1DL 29833
+ 1SIDL +5099.417
1CL + 1PLA +108.201
1PLB + 1.1TLA4.25
+ 1.1TLB + -0.001
1.1BTA + 1.1BTB
-85.402 502.168
Min Mz 30777 1006 1DL 29833
+ 1SIDL + 4129.63
1CL + 1PLA +-57.509
1PLB + 1.1TLA
9.414
+ 1.1TLB - 1.1BTA
-0.584 - 1.1BTB
-100.196 -140.975

2.2 Pile Loads

ULS
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 10093 10237 10214 9967


Min Fx -3329 -3525 -3565 -3390
Max Fy -2176 9029 -2027 9179
Min Fy -2712 -3197 -2955 -3058
Max Fz 9866 9764 9891 9642
Min Fz -2914 -3150 -3063 -3153
Max Mx 9811 9985 9669 9697
Min Mx -3125 -3088 -3030 -3120
Max My 9811 9985 9669 9697
Min My -2947 -3184 -3030 -3120
Max Mz -2176 9029 -2027 9179
Min Mz -2712 -3197 -2955 -3058
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

SLS Stress Check


Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 8584 8687 8662 8464


Min Fx -1819 -1976 -2013 -1886
Max Fy -743 6720 -657 6807
Min Fy -1205 -1647 -1403 -1555
Max Fz 8367 8249 8358 8128
Min Fz -1415 -1634 -1530 -1639
Max Mx 8291 8448 8158 8204
Min Mx -1605 -1551 -1518 -1627
Max My 8291 8448 8158 8204
Min My -1427 -1647 -1518 -1627
Max Mz -743 6720 -657 6807
Min Mz -1205 -1647 -1403 -1555

SLS Crack Width Check


Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 5231 5215 5183 5099


Min Fx 3894 3851 3789 3781
Max Fy 4255 5215 4140 5099
Min Fy 5231 4178 5183 4130
Max Fz 4539 3995 4325 3781
Min Fz 4395 5215 3964 3926
Max Mx 4065 4529 3789 4252
Min Mx 3894 4355 5183 4130
Max My 4395 4355 3964 3926
Min My 4539 3995 4325 3781
Max Mz 4255 5215 4140 5099
Min Mz 5231 4178 5183 4130

3.1 Moment at Bottom Face:

Lever arm Z = Pile Centre to column face

Z = 0.80 m

Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or


2.0 m (P1+P2)xZ or (P3+P4)xZ, whichever
column is maximum

P kN
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = 510.276 kN.m
Design Moment, M = M 1 - M2

Case M1 (kN.m) M = (M1 - M2) (kN.m)


ULS 16264.000 15677.182
SLS Stress Check 13816.800 13306.524
SLS Crack Width Check 8356.800 7846.524

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
2
K = Mu/bd fcu = 0.020 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1709.00 mm
Hence, z = 0.95 d = 1623.55 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table
23, pg. 37 of the Design Manual.
Ast = 28458.925 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


29 120 0 0 0 0

= 28716.101 mm2 OK

3.2 Moment at Top Face:

Lever arm Z = Pile Centre to column face

P kN Z = 0.80 m
2.0 m
column Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or
(P1+P2)xZ or (P3+P4)xZ, whichever
is minimum

Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = -510.276 kN.m
Design Moment, M = M 1 + M2

Case M1 (kN.m) M = (M1 + M2) (kN.m)


ULS -5564.000 -6150.818
SLS Stress Check -3119.200 -3629.476
SLS Crack Width Check 0.000 0.000
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
2
K = Mu/bd fcu = 0.008 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1709.00 mm
Hence, z = 0.95 d = 1623.55 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table
23, pg. 37 of the Design Manual.
Ast = 11165.632 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 120 0 0 0 0

= 21357.103 mm2 OK

3.3 Moment Capacity, Stress and Crack Width Check from Oasys

a) Moment Capacity Check:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 15680 17960 0.8727 OK
Minima
1 0.0 15680 17960 0.8727 OK

b) Stress Check:
Permissible stresses
Concrete 0.5fck 25.000 MPa
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
1 8.767 OK 1 43.76 OK
1 8.767 OK 1 43.76 OK
Minima Minima
1 -0.5861 OK 1 -228.8 OK
1 -0.5861 OK 1 -228.8 OK

c) Crack Width Check:


Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.173 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

3.4 Minimum Reinforcement


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3999.06 mm2/m
At bottom face, Provided = 5418 mm2/m
Astprovided > Astmin OK
At top face, Provided = 4030 mm2/m
Astprovided > Astmin OK

4.0 Shear Check


Total pile reaction, V1 = 20330 kN
As per Cl. 3.11.4.3, pg. 82, BS 8110-1: 1997, critical section for shear should be located 20% of the pile diameter inside
the face of the pile.
Distance of critical section for shear check from column face = 0.440 m
Factored weight per unit length due to soil and pile cap = 351.502 kN/m
Hence, downward reaction due to soil and pile cap weight,
V2 = weight per unit length x (length of pile cap - 0.5 x column size - distance of critical section)
V2 = 636 kN
Net reaction, Vu = V1 - V2 = 19694 kN
Width of pile cap available b = 5.300 m
Effective depth of pile cap d = 1.709 m
Area of tensile steel provided As = 28716 mm2
= 0.029 m2
Percentage of tensile steel provided 100As/(b.d) = 0.317 %
Shear stress = Vu /(b.d) = 2174.26 kN/sqm
Grade of concrete = C50
Design shear resistance is calculated as per Cl. 3.11.4.4, pg. 82, BS 8110-1: 1997.
Shear strength of concrete, vc = 0.35 MPa
= 350 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 0.440 m
Therefore, vc,1 = 2.72 MPa
= 2719 kN/sqm
Vus = Vu - vc,1 b d = -4932.87 kN
Requirement of shear reinforcement = Not Required
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

5.0 Check for punching shear


Total pile load = 40511 kN
From section 1.0 above, factored weight of pile cap + earthfill = 1987 kN
Hence, net punching shear force = 38524 kN
Effective depth of pile cap = 1.709 m
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997, punching shear shall be checked at the perimeter of the column.
Shear perimeter = 8.000 m
Shearing Area = 13.672 m2
Punching Shear stress = 2817.748 kN/m2
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997,
Allowable punching shear stress = lesser of 0.8 fcu or 5 N/mm2 = 5.00 N/mm2
= 5000.000 kN/m2
OK
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997, since the pile spacing is not greater than 3 times the pile diameter, no
additional punching shear check is required.
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR COLUMN C-24,C-26,C -28&C-30


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA

Column No. = C-24,C-26,C -28&C-30

No. of piles n = 4
Dia of pile = 1.20 m
Size of Column = 2.00 m x 2.00 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 5.30 m x 5.30 m


2
Area of pile cap = 28.09 m
Depth of pile cap D = 1.80 m
Volume of pile cap = 50.56 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 1264.05 kN

Thickness of Earthfill over pile cap = 1.50 m


Volume of Earthfill over pile cap = 36.14 m3
Density of Earth = 20 kN/cum
Weight of Earthfill = 722.70 kN

Total weight of (Pile cap + Earthfill) = 1986.75 kN

2.0 PILE LOADS

2.1 Summary of Staad Results (Forces at Bottom of Pile Cap)---

LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-


a) ULS Loads
2378, 3131-3178,4101-4132, 5109-5124 & 6109-6124
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31022 2186 1.0DL
30082
+ 1.0SIDL
10213.21
+ 0.3CL + 0.3PLA
959.125+ 0.3PLB
340.028
+ 0.3TLA + 0.3TLB
8.621 - 0.3BTA
1200.673- 0.3BTB
2888.314
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 31022 2107 1.0DL
30082
+ 1.0SIDL
-3645.32
+1SLX + 0.3SLY
-992.723
+ 0.3SLZ
-373.425 -8.046 -1012.806 -3063.44
Max Fy 31022 1452 1.15DL
30078
+ 1.2SIDL
-2296.44
- 1.5COL(-X)-MLC
1187.314 4.032 -3.709 -2.878 4835.752
Min Fy 31022 2186 1.0DL
30078
+ 1.0SIDL
-3168.5
+ 0.3CL -1016.798
+ 0.3PLA + 0.3PLB
-375.1
+ 0.3TLA +-8.096
0.3TLB - 0.3BTA
-1340.97- 0.3BTB
-4154.883
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31022 3154 1.0DL
30082
+ 1.0SIDL
9837.115
+ 0.3CL + 0.3PLA
319.076+ 0.3TLA
983.552
- 0.3BTA 9.171
- 0.3SLX3100.826
- 0.3SLY - 1SLZ948.674
- 1.54NLA
Min Fz 31022 3178 1.0DL
30078
+ 1.0SIDL
-3206.73
+ 0.3CL +-352.805
0.3PLB + -1017.946
0.3TLB - 0.3BTB-8.547
- 0.3SLX -3879.49
- 0.3SLY - 1SLZ
-1476.984
- 1.54NLB
Max Mx 31022 2347 1.0DL
30078
+ 1.0SIDL
9872.798
+ 0.3CL + 0.3PLA
342.054+ 0.3TLA
979.696
+ 0.3BTA9.380
+ 0.3SLX 4118.093
+ 0.3SLY + 1SLZ
1354.756
+ 1.54LLA
Min Mx 31022 2378 1.0DL
30078
+ 1.0SIDL
-3382.57
+ 0.3CL +-352.393
0.3PLB + -1014.597
0.3TLB - 0.3BTB-8.583
- 0.3SLX-3890.662
- 0.3SLY - 1SLZ
-1473.001
- 1.54LLB
Max My 31022 2171 1.0DL
30078
+ 1.0SIDL
9681.357
+ 0.3CL + 0.3PLB
342.529+ 0.3TLB
975.646+ 0.3BTB9.112
+ 0.3SLX4146.411
+ 0.3SLY + 1SLZ
1359.304
Min My 31022 3154 1.0DL
30078
+ 1.0SIDL
-3217.81
+ 0.3CL + 0.3PLA
-352.97+ 0.3TLA
-1005.27
- 0.3BTA-8.476
- 0.3SLX-3940.241
- 0.3SLY - 1SLZ
-1477.866
- 1.54NLA
Max Mz 31022 1452 1.15DL
30078
+ 1.2SIDL
-2296.44
- 1.5COL(-X)-MLC
1187.314 4.032 -3.709 -2.878 4835.752
Min Mz 31022 2186 1.0DL
30078
+ 1.0SIDL
-3168.5
+ 0.3CL -1016.798
+ 0.3PLA + 0.3PLB
-375.1
+ 0.3TLA +-8.096
0.3TLB - 0.3BTA
-1340.97- 0.3BTB
-4154.883
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31023 2195 1.0DL
30079
+ 1.0SIDL
9922.966
+ 0.3CL + 0.3PLA
375.585+ 0.3PLB
976.778
+ 0.3TLA + 0.3TLB
8.711 + 0.3BTA
4148.94
+ 0.3BTB
1579.095
+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 31023 2378 1.0DL
30079
+ 1.0SIDL
-3425.56
+ 0.3CL +-332.434
0.3PLB + -1015.109
0.3TLB - 0.3BTB-7.993
- 0.3SLX-3898.792
- 0.3SLY - 1SLZ
-1308.179
- 1.54LLB
Max Fy 31023 1452 1.15DL
30079
+ 1.2SIDL
8960.105
- 1.5COL(-X)-MLC
1208.772 -10.221 -3.725 112.573 5012.169
Min Fy 31023 2186 1.0DL
30079
+ 1.0SIDL
-3138.56
+ 0.3CL +-993.815
0.3PLA + 0.3PLB
-376.916
+ 0.3TLA +-8.015
0.3TLB - -1361.655
0.3BTA - 0.3BTB
-3965.755
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31023 3154 1.0DL
30083
+ 1.0SIDL
9582.365
+ 0.3CL + 0.3PLA
339.802+ 0.3TLA
984.621
- 0.3BTA 8.603
- 0.3SLX -3103.78
0.3SLY - 1SLZ
1097.471
- 1.54NLA
Min Fz 31023 3178 1.0DL
30079
+ 1.0SIDL
-3249.29
+ 0.3CL +-331.681
0.3PLB + -1018.457
0.3TLB - 0.3BTB-7.951
- 0.3SLX-3887.625
- 0.3SLY - 1SLZ-1302.6
- 1.54NLB
Max Mx 31023 2331 1.0DL
30079
+ 1.0SIDL
9845.762
+ 0.3CL +1015.046
0.3PLA + 0.3TLA
345.025
+ 0.3BTA8.855
+ 1SLX + 0.3SLY
1570.8+ 0.3SLZ
4156.211
+ 1.54LLA
Min Mx 31023 2362 1.0DL
30079
+ 1.0SIDL
-3378.98
+ 0.3CL +-983.578
0.3PLB + -379.771
0.3TLB - 0.3BTB-8.029
- 1SLX --1344.661
0.3SLY - 0.3SLZ
-3930.785
- 1.54LLB
Max My 31023 2171 1.0DL
30079
+ 1.0SIDL
9700.148
+ 0.3CL + 0.3PLB
363.081+ 0.3TLB
976.313
+ 0.3BTB8.560
+ 0.3SLX 4153.25
+ 0.3SLY + 1SLZ
1527.496
Min My 31023 3154 1.0DL
30079
+ 1.0SIDL
-3260.78
+ 0.3CL +-331.787
0.3PLA + -1005.781
0.3TLA - 0.3BTA-7.906
- 0.3SLX-3948.374
- 0.3SLY - 1SLZ
-1302.973
- 1.54NLA
Max Mz 31023 1452 1.15DL
30079
+ 1.2SIDL
8960.105
- 1.5COL(-X)-MLC
1208.772 -10.221 -3.725 112.573 5012.169
Min Mz 31023 2186 1.0DL
30079
+ 1.0SIDL
-3138.56
+ 0.3CL +-993.815
0.3PLA + 0.3PLB
-376.916
+ 0.3TLA +-8.015
0.3TLB - -1361.655
0.3BTA - 0.3BTB
-3965.755
- 1SLX - 0.3SLY - 0.3SLZ
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31024 2186 1.0DL
30084
+ 1.0SIDL
10258.11
+ 0.3CL + 0.3PLA
959.565+ 0.3PLB
365.488
+ 0.3TLA + 0.3TLB
9.303 - 0.3BTA
1060.788- 0.3BTB
2891.536
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 31024 2107 1.0DL
30084
+ 1.0SIDL
-3829.87
+1SLX + 0.3SLY
-992.964
+ 0.3SLZ
-357.124 -8.754 -1174.453 -3065.24
Max Fy 31024 1452 1.15DL
30080
+ 1.2SIDL
-2249.25
- 1.5COL(-X)-MLC
1187.28 11.272 -1.247 -64.121 4835.484
Min Fy 31024 2186 1.0DL
30080
+ 1.0SIDL
-3356.01
+ 0.3CL -1017.035
+ 0.3PLA + 0.3PLB
-355.877
+ 0.3TLA +-8.852
0.3TLB - -1549.316
0.3BTA - 0.3BTB
-4156.879
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31024 3154 1.0DL
30084
+ 1.0SIDL
9959.584
+ 0.3CL + 0.3PLA
319.455+ 0.3TLA
1006.44
- 0.3BTA 9.427
- 0.3SLX2961.265
- 0.3SLY - 1SLZ 951.58
- 1.54NLA
Min Fz 31024 3178 1.0DL
30080
+ 1.0SIDL
-3475.62
+ 0.3CL +-352.976
0.3PLB + -998.635
0.3TLB - 0.3BTB-8.830
- 0.3SLX-4067.593
- 0.3SLY - 1SLZ
-1478.564
- 1.54NLB
Max Mx 31024 2347 1.0DL
30080
+ 1.0SIDL
9904.946
+ 0.3CL + 0.3PLA
342.605+ 0.3TLA
1003.132
+ 0.3BTA9.685
+ 0.3SLX 3954.761
+ 0.3SLY + 1SLZ
1359.433
+ 1.54LLA
Min Mx 31024 2202 1.0DL
30080
+ 1.0SIDL
-3264.45
+ 0.3CL + 0.3PLA
-364.99+ 0.3PLB
-991.408
+ 0.3TLA +-8.868
0.3TLB - -4104.172
0.3BTA - 0.3BTB
-1527.533
- 0.3SLX - 0.3SLY - 1SLZ
Max My 31024 2171 1.0DL
30080
+ 1.0SIDL
9835.851
+ 0.3CL + 0.3PLB
342.757+ 0.3TLB
998.111
+ 0.3BTB9.416
+ 0.3SLX3991.069
+ 0.3SLY + 1SLZ
1361.313
Min My 31024 3154 1.0DL
30080
+ 1.0SIDL
-3471.41
+ 0.3CL +-353.055
0.3PLA + 0.3TLA
-985.986
- 0.3BTA-8.759
- 0.3SLX-4128.119
- 0.3SLY - 1SLZ
-1478.714
- 1.54NLA
Max Mz 31024 1452 1.15DL
30080
+ 1.2SIDL
-2249.25
- 1.5COL(-X)-MLC
1187.28 11.272 -1.247 -64.121 4835.484
Min Mz 31024 2186 1.0DL
30080
+ 1.0SIDL
-3356.01
+ 0.3CL -1017.035
+ 0.3PLA + 0.3PLB
-355.877
+ 0.3TLA +-8.852
0.3TLB - -1549.316
0.3BTA - 0.3BTB
-4156.879
- 1SLX - 0.3SLY - 0.3SLZ
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31025 2195 1.0DL
30081
+ 1.0SIDL
9981.869
+ 0.3CL + 0.3PLA
375.493+ 0.3PLB
998.974
+ 0.3TLA + 0.3TLB
9.043 + 3968.659
0.3BTA + 0.3BTB1580.147
+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 31025 2354 1.0DL
30081
+ 1.0SIDL
-3610.4
+ 0.3CL +-332.398
0.3PLA + 0.3TLA
-992.687
- 0.3BTA-8.224
- 0.3SLX-4082.309
- 0.3SLY - 1SLZ
-1309.993
- 1.54LLA
Max Fy 31025 1452 1.15DL
30081
+ 1.2SIDL
9007.297
- 1.5COL(-X)-MLC
1208.807 25.524 -1.263 -179.563 5012.446
Min Fy 31025 2186 1.0DL
30081
+ 1.0SIDL
-3147.79
+ 0.3CL +-993.655
0.3PLA + 0.3PLB
-353.719
+ 0.3TLA +-8.766
0.3TLB - -1523.072
0.3BTA - 0.3BTB
-3964.958
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31025 3154 1.0DL
30085
+ 1.0SIDL
9657.218
+ 0.3CL + 0.3PLA
339.678+ 0.3TLA
1005.269
- 0.3BTA 8.861
- 0.3SLX2956.611
- 0.3SLY - 1SLZ
1098.628
- 1.54NLA
Min Fz 31025 3178 1.0DL
30081
+ 1.0SIDL
-3470.56
+ 0.3CL +-331.766
0.3PLB + -998.021
0.3TLB - 0.3BTB-8.236
- 0.3SLX-4057.783
- 0.3SLY - 1SLZ
-1305.069
- 1.54NLB
Max Mx 31025 2331 1.0DL
30081
+ 1.0SIDL
9627.801
+ 0.3CL +1014.465
0.3PLA + 0.3TLA
365.083
+ 0.3BTA9.604
+ 1SLX 1376.617
+ 0.3SLY + 0.3SLZ
4151.964
+ 1.54LLA
Min Mx 31025 2186 1.0DL
30081
+ 1.0SIDL
-3147.79
+ 0.3CL +-993.655
0.3PLA + 0.3PLB
-353.719
+ 0.3TLA +-8.766
0.3TLB - -1523.072
0.3BTA - 0.3BTB
-3964.958
- 1SLX - 0.3SLY - 0.3SLZ
Max My 31025 2171 1.0DL
30081
+ 1.0SIDL
9807.026
+ 0.3CL + 0.3PLB
363.11+ 0.3TLB
997.341
+ 0.3BTB8.867
+ 0.3SLX3982.557
+ 0.3SLY + 1SLZ
1529.535
Min My 31025 3154 1.0DL
30081
+ 1.0SIDL
-3466.76
+ 0.3CL +-331.958
0.3PLA + 0.3TLA
-985.372
- 0.3BTA-8.191
- 0.3SLX-4118.313
- 0.3SLY - 1SLZ
-1306.173
- 1.54NLA
Max Mz 31025 1452 1.15DL
30081
+ 1.2SIDL
9007.297
- 1.5COL(-X)-MLC
1208.807 25.524 -1.263 -179.563 5012.446
Min Mz 31025 2186 1.0DL
30081
+ 1.0SIDL
-3147.79
+ 0.3CL +-993.655
0.3PLA + 0.3PLB
-353.719
+ 0.3TLA +-8.766
0.3TLB - -1523.072
0.3BTA - 0.3BTB
-3964.958
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

LC 1001-1190, 2031-2078, 3031-3078, 4001-


b) SLS Loads For Stress check
4032, 5009-5024 & 6009-6024
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31022 1086 1DL 30082
+ 1SIDL +8639.532
0.3CL + 0.3PLA
726.535
+ 0.3PLB256.366
+ 0.3TLA + 0.3TLB
6.656
- 0.3BTA943.891
- 0.3BTB -2179.436
1SLX - 0.3SLY - 0.3SLZ
Min Fx 31022 1007 1DL 30082
+ 1SIDL +-2071.64
1SLX + 0.3SLY
-760.134
+ 0.3SLZ -289.764 -6.081 -756.023 -2354.562
Max Fy 31022 1152 1DL 30078
+ 1SIDL --830.624
1COL(-X)-MLC790.461 -0.978 -2.400 22.104 3211.302
Min Fy 31022 1086 1DL 30078
+ 1SIDL +-1594.83
0.3CL + 0.3PLA
-784.209
+ 0.3PLB-291.438
+ 0.3TLA + 0.3TLB
-6.131
- 0.3BTA
-1000.698
- 0.3BTB -3213.475
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31022 3054 1DL 30082
+ 1SIDL +8308.862
0.3CL + 0.3PLA
240.184
+ 0.3TLA 748.399
- 0.3BTA - 0.3SLX
7.097 - 0.3SLY
2393.959
- 1SLZ - 1.1NLA
705.563
Min Fz 31022 3078 1DL 30078
+ 1SIDL +-1678.48
0.3CL + 0.3PLB
-273.913
+ 0.3TLB-782.794
- 0.3BTB - 0.3SLX
-6.473 - 0.3SLY
-2940.292
- 1SLZ --1155.153
1.1NLB
Max Mx 31022 2047 1DL 30078
+ 1SIDL +8294.304
0.3CL + 0.3PLA
263.28
+ 0.3TLA +745.5 0.3BTA + 0.3SLX
7.296 + 0.3SLY
3175.703+ 1SLZ1034.062
+ 1.1LLA
Min Mx 31022 2078 1DL 30078
+ 1SIDL +-1804.08
0.3CL + 0.3PLB
-273.619
+ 0.3TLB-780.401
- 0.3BTB - 0.3SLX
-6.498 - 0.3SLY
-2948.272
- 1SLZ --1152.307
1.1LLB
Max My 31022 1071 1DL 30078
+ 1SIDL +8146.099
0.3CL + 0.3PLB
263.616
+ 0.3TLB 741.874
+ 0.3BTB + 0.3SLX
7.040 + 0.3SLY
3201.655+ 1SLZ1037.405
Min My 31022 3054 1DL 30078
+ 1SIDL +-1675.55
0.3CL + 0.3PLA
-274.034
+ 0.3TLA-772.877
- 0.3BTA - 0.3SLX
-6.405 - 0.3SLY
-2989.928
- 1SLZ --1155.901
1.1NLA
Max Mz 31022 1152 1DL 30078
+ 1SIDL --830.624
1COL(-X)-MLC790.461 -0.978 -2.400 22.104 3211.302
Min Mz 31022 1086 1DL 30078
+ 1SIDL +-1594.83
0.3CL + 0.3PLA
-784.209
+ 0.3PLB-291.438
+ 0.3TLA + 0.3TLB
-6.131
- 0.3BTA
-1000.698
- 0.3BTB -3213.475
- 1SLX - 0.3SLY - 0.3SLZ
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31023 1095 1DL 30079
+ 1SIDL +8411.011
0.3CL + 0.3PLA
296.739
+ 0.3PLB742.822
+ 0.3TLA + 0.3TLB
6.773
+ 0.3BTA3202.83
+ 0.3BTB1257.935
+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 31023 1015 1DL 30083
+ 1SIDL +-1873.84
0.3SLX + 0.3SLY
-242.263
+ 1SLZ -777.036 -5.991 -2233.811 -701.868
Max Fy 31023 1152 1DL 30079
+ 1SIDL -6671.491
1COL(-X)-MLC809.227 -10.464 -2.408 98.937 3365.585
Min Fy 31023 1086 1DL 30079
+ 1SIDL +-1637.58
0.3CL + 0.3PLA
-761.483
+ 0.3PLB-292.712
+ 0.3TLA + 0.3TLB
-6.067
- 0.3BTA
-1017.427
- 0.3BTB -3026.512
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31023 3054 1DL 30083
+ 1SIDL +8077.546
0.3CL + 0.3PLA
260.996
+ 0.3TLA 749.285
- 0.3BTA - 0.3SLX
6.665 - 0.3SLY
2395.766
- 1SLZ - 1.1NLA
855.191
Min Fz 31023 3078 1DL 30079
+ 1SIDL +-1744.47
0.3CL + 0.3PLB
-252.876
+ 0.3TLB-783.122
- 0.3BTB - 0.3SLX
-6.014 - 0.3SLY
-2947.073
- 1SLZ - 1.1NLB
-981.66
Max Mx 31023 2031 1DL 30079
+ 1SIDL +8301.547
0.3CL + 0.3PLA
782.54
+ 0.3TLA 260.397
+ 0.3BTA + 1SLX
6.896+ 0.3SLY
1228.941
+ 0.3SLZ3215.594
+ 1.1LLA
Min Mx 31023 2062 1DL 30079
+ 1SIDL +-1834.77
0.3CL + 0.3PLB
-751.072
+ 0.3TLB-295.143
- 0.3BTB - 1SLX
-6.070
- 0.3SLY
-1002.801
- 0.3SLZ --2990.167
1.1LLB
Max My 31023 1071 1DL 30079
+ 1SIDL +8188.194
0.3CL + 0.3PLB
284.235
+ 0.3TLB 742.357
+ 0.3BTB + 0.3SLX
6.621 + 0.3SLY
3207.139+ 1SLZ1206.335
Min My 31023 3054 1DL 30079
+ 1SIDL +-1741.69
0.3CL + 0.3PLA-252.9
+ 0.3TLA-773.205
- 0.3BTA - 0.3SLX
-5.966 - 0.3SLY
-2996.706
- 1SLZ - 1.1NLA
-981.594
Max Mz 31023 1152 1DL 30079
+ 1SIDL -6671.491
1COL(-X)-MLC809.227 -10.464 -2.408 98.937 3365.585
Min Mz 31023 1086 1DL 30079
+ 1SIDL +-1637.58
0.3CL + 0.3PLA
-761.483
+ 0.3PLB-292.712
+ 0.3TLA + 0.3TLB
-6.067
- 0.3BTA
-1017.427
- 0.3BTB -3026.512
- 1SLX - 0.3SLY - 0.3SLZ
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31024 1086 1DL 30084
+ 1SIDL +8654.292
0.3CL + 0.3PLA
726.904
+ 0.3PLB281.097
+ 0.3TLA + 0.3TLB
7.168
- 0.3BTA798.996
- 0.3BTB - 1SLX
2182.13
- 0.3SLY - 0.3SLZ
Min Fx 31024 1007 1DL 30084
+ 1SIDL +-2226.05
1SLX + 0.3SLY
-760.303
+ 0.3SLZ -272.733 -6.619 -912.66 -2355.835
Max Fy 31024 1152 1DL 30080
+ 1SIDL --815.124
1COL(-X)-MLC790.461 8.303 -0.757 -55.347 3211.308
Min Fy 31024 1086 1DL 30080
+ 1SIDL + 0.3CL
-1752.2
+ 0.3PLA
-784.374
+ 0.3PLB-271.486
+ 0.3TLA + 0.3TLB
-6.716
- 0.3BTA
-1203.264
- 0.3BTB -3214.874
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31024 3054 1DL 30084
+ 1SIDL +8370.005
0.3CL + 0.3PLA
240.534
+ 0.3TLA 770.872
- 0.3BTA - 0.3SLX
7.289 - 0.3SLY
2251.481
- 1SLZ - 1.1NLA
708.223
Min Fz 31024 3078 1DL 30080
+ 1SIDL +-1886.04
0.3CL + 0.3PLB
-274.056
+ 0.3TLB-763.067
- 0.3BTB - 0.3SLX
-6.692 - 0.3SLY
-3125.052
- 1SLZ --1156.462
1.1NLB
Max Mx 31024 2047 1DL 30080
+ 1SIDL +8288.813
0.3CL + 0.3PLA
263.756
+ 0.3TLA 768.234
+ 0.3BTA + 0.3SLX
7.536 + 0.3SLY
3011.381+ 1SLZ1038.088
+ 1.1LLA
Min Mx 31024 1102 1DL 30080
+ 1SIDL +-1682.18
0.3CL + 0.3PLA
-286.028
+ 0.3PLB-757.22
+ 0.3TLA + 0.3TLB
-6.731
- 0.3BTA
-3156.068
- 0.3BTB -1205.205
- 0.3SLX - 0.3SLY - 1SLZ
Max My 31024 1071 1DL 30080
+ 1SIDL +8253.584
0.3CL + 0.3PLB
263.795
+ 0.3TLB 763.923
+ 0.3BTB + 0.3SLX
7.280 + 0.3SLY
3042.964+ 1SLZ1038.985
Min My 31024 3054 1DL 30080
+ 1SIDL +-1896.46
0.3CL + 0.3PLA
-274.051
+ 0.3TLA-753.179
- 0.3BTA - 0.3SLX
-6.624 - 0.3SLY
-3174.451
- 1SLZ --1156.162
1.1NLA
Max Mz 31024 1152 1DL 30080
+ 1SIDL --815.124
1COL(-X)-MLC790.461 8.303 -0.757 -55.347 3211.308
Min Mz 31024 1086 1DL 30080
+ 1SIDL + 0.3CL
-1752.2
+ 0.3PLA
-784.374
+ 0.3PLB-271.486
+ 0.3TLA + 0.3TLB
-6.716
- 0.3BTA
-1203.264
- 0.3BTB -3214.874
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31025 1095 1DL 30081
+ 1SIDL +8436.359
0.3CL + 0.3PLA
296.635
+ 0.3PLB764.993
+ 0.3TLA + 0.3TLB
7.039
+ 0.3BTA
3022.302
+ 0.3BTB +1258.46
0.3SLX + 0.3SLY + 1SLZ
Min Fx 31025 1015 1DL 30085
+ 1SIDL +-2049.05
0.3SLX + 0.3SLY
-242.372
+ 1SLZ -757.852 -6.188 -2373.864 -704.207
Max Fy 31025 1152 1DL 30081
+ 1SIDL -6686.991
1COL(-X)-MLC809.228 17.788 -0.764 -132.174 3365.585
Min Fy 31025 1086 1DL 30081
+ 1SIDL +-1661.06
0.3CL + 0.3PLA
-761.377
+ 0.3PLB-269.951
+ 0.3TLA + 0.3TLB
-6.648
- 0.3BTA
-1182.282
- 0.3BTB -3026.029
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31025 3054 1DL 30085
+ 1SIDL +8104.527
0.3CL + 0.3PLA
260.842
+ 0.3TLA 769.908
- 0.3BTA - 0.3SLX
6.859 - 0.3SLY
2248.373
- 1SLZ - 1.1NLA
855.635
Min Fz 31025 3078 1DL 30081
+ 1SIDL +-1917.87
0.3CL + 0.3PLB
-252.929
+ 0.3TLB -762.66
- 0.3BTB - 0.3SLX
-6.234 - 0.3SLY
-3116.99
- 1SLZ - -983.443
1.1NLB
Max Mx 31025 2031 1DL 30081
+ 1SIDL +8107.214
0.3CL + 0.3PLA
782.039
+ 0.3TLA 280.606
+ 0.3BTA + 1SLX
7.475+ 0.3SLY
1040.551
+ 0.3SLZ3211.882
+ 1.1LLA
Min Mx 31025 1086 1DL 30081
+ 1SIDL +-1661.06
0.3CL + 0.3PLA
-761.377
+ 0.3PLB-269.951
+ 0.3TLA + 0.3TLB
-6.648
- 0.3BTA
-1182.282
- 0.3BTB -3026.029
- 1SLX - 0.3SLY - 0.3SLZ
Max My 31025 1071 1DL 30081
+ 1SIDL +8261.517
0.3CL + 0.3PLB
284.252
+ 0.3TLB 763.36
+ 0.3BTB + 0.3SLX
6.863 + 0.3SLY
3036.2+ 1SLZ1207.848
Min My 31025 3054 1DL 30081
+ 1SIDL +-1928.44
0.3CL + 0.3PLA
-253.078
+ 0.3TLA-752.772
- 0.3BTA - 0.3SLX
-6.187 - 0.3SLY
-3166.393
- 1SLZ - 1.1NLA
-984.425
Max Mz 31025 1152 1DL 30081
+ 1SIDL -6686.991
1COL(-X)-MLC809.228 17.788 -0.764 -132.174 3365.585
Min Mz 31025 1086 1DL 30081
+ 1SIDL +-1661.06
0.3CL + 0.3PLA
-761.377
+ 0.3PLB-269.951
+ 0.3TLA + 0.3TLB
-6.648
- 0.3BTA
-1182.282
- 0.3BTB -3026.029
- 1SLX - 0.3SLY - 0.3SLZ

c) SLS Loads For crack width check LC 1001-1006


Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31022 1006 1DL 30078
+ 1SIDL +4760.096
1CL + 1PLA +-93.023
1PLB + 1.1TLA
-21.543
+ 1.1TLB - 1.1BTA
0.101 - 1.1BTB
148.791 -417.433
Min Fx 31022 1003 1DL 30078
+ 1SIDL +3417.428
1CL + 1PLB + 36.593
1.1TLB + -26.209
1.1BTB 0.214 172.514 98.57
Max Fy 31022 1005 1DL 30078
+ 1SIDL +3724.316
1CL + 1PLA + 78.418
1PLB + 1.1TLA
-23.617
+ 1.1TLB + 1.1BTA
0.759 + 1.1BTB
150.406 254.878
Min Fy 31022 1006 1DL 30078
+ 1SIDL +4760.096
1CL + 1PLA +-93.023
1PLB + 1.1TLA
-21.543
+ 1.1TLB - 1.1BTA
0.101 - 1.1BTB
148.791 -417.433
Max Fz 31022 1002 1DL 30078
+ 1SIDL +4074.667
1CL + 1PLA + -49.14
1.1TLA - -14.733
1.1BTA 0.385 94.81 -239.012
Min Fz 31022 1003 1DL 30078
+ 1SIDL +3417.428
1CL + 1PLB + 36.593
1.1TLB + -26.209
1.1BTB 0.214 172.514 98.57
Max Mx 31022 1001 1DL 30078
+ 1SIDL +3560.743
1CL + 1PLA + 36.625
1.1TLA + -16.592
1.1BTA 1.021 98.933 97.303
Min Mx 31022 1006 1DL 30078
+ 1SIDL +4760.096
1CL + 1PLA +-93.023
1PLB + 1.1TLA
-21.543
+ 1.1TLB - 1.1BTA
0.101 - 1.1BTB
148.791 -417.433
Max My 31022 1004 1DL 30078
+ 1SIDL +3939.284
1CL + 1PLB +-49.082
1.1TLB - -25.994
1.1BTB 0.192 175.022 -237.427
Min My 31022 1002 1DL 30082
+ 1SIDL +4074.667
1CL + 1PLA + -49.14
1.1TLA - -14.733
1.1BTA 0.385 80.077 -189.872
Max Mz 31022 1005 1DL 30078
+ 1SIDL +3724.316
1CL + 1PLA + 78.418
1PLB + 1.1TLA
-23.617
+ 1.1TLB + 1.1BTA
0.759 + 1.1BTB
150.406 254.878
Min Mz 31022 1006 1DL 30078
+ 1SIDL +4760.096
1CL + 1PLA +-93.023
1PLB + 1.1TLA
-21.543
+ 1.1TLB - 1.1BTA
0.101 - 1.1BTB
148.791 -417.433
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31023 1005 1DL 30079
+ 1SIDL +4709.881
1CL + 1PLA +106.512
1PLB + 1.1TLA
-24.985
+ 1.1TLB + 1.1BTA
0.780 + 1.1BTB
161.514 485.823
Min Fx 31023 1004 1DL 30079
+ 1SIDL +3419.957
1CL + 1PLB +-24.757
1.1TLB - 1.1BTB
-25.16 0.219 168.219 -37.467
Max Fy 31023 1005 1DL 30079
+ 1SIDL +4709.881
1CL + 1PLA +106.512
1PLB + 1.1TLA
-24.985
+ 1.1TLB + 1.1BTA
0.780 + 1.1BTB
161.514 485.823
Min Fy 31023 1006 1DL 30079
+ 1SIDL +3738.376
1CL + 1PLA + 1PLB
-64.6+ 1.1TLA
-19.962
+ 1.1TLB - 1.1BTA
0.114 - 1.1BTB
135.902 -183.782
Max Fz 31023 1002 1DL 30079
+ 1SIDL +3557.092
1CL + 1PLA +-24.124
1.1TLA - 1.1BTA
-13.9 0.389 88.016 -33.36
Min Fz 31023 1003 1DL 30079
+ 1SIDL +3901.238
1CL + 1PLB + 60.743
1.1TLB + -26.849
1.1BTB 0.244 177.704 297.084
Max Mx 31023 1001 1DL 30079
+ 1SIDL +4047.317
1CL + 1PLA + 61.489
1.1TLA + -17.234
1.1BTA 1.031 104.143 301.694
Min Mx 31023 1006 1DL 30079
+ 1SIDL +3738.376
1CL + 1PLA + 1PLB
-64.6+ 1.1TLA
-19.962
+ 1.1TLB - 1.1BTA
0.114 - 1.1BTB
135.902 -183.782
Max My 31023 1003 1DL 30079
+ 1SIDL +3901.238
1CL + 1PLB + 60.743
1.1TLB + -26.849
1.1BTB 0.244 177.704 297.084
Min My 31023 1002 1DL 30083
+ 1SIDL +3557.092
1CL + 1PLA +-24.124
1.1TLA - 1.1BTA
-13.9 0.389 74.116 -9.236
Max Mz 31023 1005 1DL 30079
+ 1SIDL +4709.881
1CL + 1PLA +106.512
1PLB + 1.1TLA
-24.985
+ 1.1TLB + 1.1BTA
0.780 + 1.1BTB
161.514 485.823
Min Mz 31023 1006 1DL 30079
+ 1SIDL +3738.376
1CL + 1PLA + 1PLB
-64.6+ 1.1TLA
-19.962
+ 1.1TLB - 1.1BTA
0.114 - 1.1BTB
135.902 -183.782
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31024 1006 1DL 30080
+ 1SIDL +4684.332
1CL + 1PLA +-92.913
1PLB + 1.1TLA
8.351
+ 1.1TLB - 1.1BTA
-0.061 - 1.1BTB
-96.855 -416.538
Min Fx 31024 1001 1DL 30080
+ 1SIDL +3299.547
1CL + 1PLA + 37.178
1.1TLA + 1.1BTA
7.077 1.122 -95.716 101.836
Max Fy 31024 1005 1DL 30080
+ 1SIDL +3611.105
1CL + 1PLA + 78.578
1PLB + 1.1TLA2.95
+ 1.1TLB + 1.1BTA
0.949 + 1.1BTB
-68.133 256.178
Min Fy 31024 1006 1DL 30080
+ 1SIDL +4684.332
1CL + 1PLA +-92.913
1PLB + 1.1TLA
8.351
+ 1.1TLB - 1.1BTA
-0.061 - 1.1BTB
-96.855 -416.538
Max Fz 31024 1002 1DL 30080
+ 1SIDL + 3840.66
1CL + 1PLA +-48.624
1.1TLA - 1.1BTA
10.6 0.310 -113.399 -234.774
Min Fz 31024 1003 1DL 30080
+ 1SIDL +3474.507
1CL + 1PLB + 36.325
1.1TLB + 1.1BTB
-2.43 0.314 -23.039 96.343
Max Mx 31024 1001 1DL 30080
+ 1SIDL +3299.547
1CL + 1PLA + 37.178
1.1TLA + 1.1BTA
7.077 1.122 -95.716 101.836
Min Mx 31024 1006 1DL 30080
+ 1SIDL +4684.332
1CL + 1PLA +-92.913
1PLB + 1.1TLA
8.351
+ 1.1TLB - 1.1BTA
-0.061 - 1.1BTB
-96.855 -416.538
Max My 31024 1003 1DL 30080
+ 1SIDL +3474.507
1CL + 1PLB + 36.325
1.1TLB + 1.1BTB
-2.43 0.314 -23.039 96.343
Min My 31024 1002 1DL 30080
+ 1SIDL + 3840.66
1CL + 1PLA +-48.624
1.1TLA - 1.1BTA
10.6 0.310 -113.399 -234.774
Max Mz 31024 1005 1DL 30080
+ 1SIDL +3611.105
1CL + 1PLA + 78.578
1PLB + 1.1TLA2.95
+ 1.1TLB + 1.1BTA
0.949 + 1.1BTB
-68.133 256.178
Min Mz 31024 1006 1DL 30080
+ 1SIDL +4684.332
1CL + 1PLA +-92.913
1PLB + 1.1TLA
8.351
+ 1.1TLB - 1.1BTA
-0.061 - 1.1BTB
-96.855 -416.538
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31025 1005 1DL 30081
+ 1SIDL +4596.671
1CL + 1PLA +106.352
1PLB + 1.1TLA4.317
+ 1.1TLB + 1.1BTA
0.970 + 1.1BTB
-79.241 484.524
Min Fx 31025 1002 1DL 30081
+ 1SIDL +3323.086
1CL + 1PLA + -24.64
1.1TLA - 1.1BTA
9.768 0.314 -106.606 -37.598
Max Fy 31025 1005 1DL 30081
+ 1SIDL +4596.671
1CL + 1PLA +106.352
1PLB + 1.1TLA4.317
+ 1.1TLB + 1.1BTA
0.970 + 1.1BTB
-79.241 484.524
Min Fy 31025 1006 1DL 30081
+ 1SIDL +3662.612
1CL + 1PLA + 1PLB
-64.71+ 1.1TLA6.77
+ 1.1TLB - 1.1BTA
-0.048 - 1.1BTB
-83.967 -184.677
Max Fz 31025 1002 1DL 30081
+ 1SIDL +3323.086
1CL + 1PLA + -24.64
1.1TLA - 1.1BTA
9.768 0.314 -106.606 -37.598
Min Fz 31025 1003 1DL 30081
+ 1SIDL +3958.317
1CL + 1PLB + 61.012
1.1TLB + 1.1BTB
-1.791 0.344 -28.228 299.311
Max Mx 31025 1001 1DL 30081
+ 1SIDL +3786.121
1CL + 1PLA + 60.936
1.1TLA + 1.1BTA
7.719 1.132 -100.926 297.161
Min Mx 31025 1006 1DL 30081
+ 1SIDL +3662.612
1CL + 1PLA + 1PLB
-64.71+ 1.1TLA6.77
+ 1.1TLB - 1.1BTA
-0.048 - 1.1BTB
-83.967 -184.677
Max My 31025 1004 1DL 30081
+ 1SIDL +3487.293
1CL + 1PLB +-24.475
1.1TLB - 1.1BTB
-1.387 0.143 -27.274 -35.131
Min My 31025 1002 1DL 30081
+ 1SIDL +3323.086
1CL + 1PLA + -24.64
1.1TLA - 1.1BTA
9.768 0.314 -106.606 -37.598
Max Mz 31025 1005 1DL 30081
+ 1SIDL +4596.671
1CL + 1PLA +106.352
1PLB + 1.1TLA4.317
+ 1.1TLB + 1.1BTA
0.970 + 1.1BTB
-79.241 484.524
Min Mz 31025 1006 1DL 30081
+ 1SIDL +3662.612
1CL + 1PLA + 1PLB
-64.71+ 1.1TLA6.77
+ 1.1TLB - 1.1BTA
-0.048 - 1.1BTB
-83.967 -184.677

2.2 Pile Loads

ULS
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 10213 9923 10258 9982


Min Fx -3645 -3426 -3830 -3610
Max Fy -2296 8960 -2249 9007
Min Fy -3169 -3139 -3356 -3148
Max Fz 9837 9582 9960 9657
Min Fz -3207 -3249 -3476 -3471
Max Mx 9873 9846 9905 9628
Min Mx -3383 -3379 -3264 -3148
Max My 9681 9700 9836 9807
Min My -3218 -3261 -3471 -3467
Max Mz -2296 8960 -2249 9007
Min Mz -3169 -3139 -3356 -3148
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

SLS Stress Check


Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 8640 8411 8654 8436


Min Fx -2072 -1874 -2226 -2049
Max Fy -831 6671 -815 6687
Min Fy -1595 -1638 -1752 -1661
Max Fz 8309 8078 8370 8105
Min Fz -1678 -1744 -1886 -1918
Max Mx 8294 8302 8289 8107
Min Mx -1804 -1835 -1682 -1661
Max My 8146 8188 8254 8262
Min My -1676 -1742 -1896 -1928
Max Mz -831 6671 -815 6687
Min Mz -1595 -1638 -1752 -1661

SLS Crack Width Check


Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 4760 4710 4684 4597


Min Fx 3417 3420 3300 3323
Max Fy 3724 4710 3611 4597
Min Fy 4760 3738 4684 3663
Max Fz 4075 3557 3841 3323
Min Fz 3417 3901 3475 3958
Max Mx 3561 4047 3300 3786
Min Mx 4760 3738 4684 3663
Max My 3939 3901 3475 3487
Min My 4075 3557 3841 3323
Max Mz 3724 4710 3611 4597
Min Mz 4760 3738 4684 3663

3.1 Moment at Bottom Face:

Lever arm Z = Pile Centre to column face

Z = 0.80 m

Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or


2.0 m (P1+P2)xZ or (P3+P4)xZ, whichever
column is maximum

P kN
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = 510.276 kN.m
Design Moment, M = M 1 - M2

Case M1 (kN.m) M = (M1 - M2) (kN.m)


ULS 16376.800 15789.982
SLS Stress Check 13835.200 13324.924
SLS Crack Width Check 7576.000 7065.724

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
2
K = Mu/bd fcu = 0.020 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1709.00 mm
Hence, z = 0.95 d = 1623.55 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table
23, pg. 37 of the Design Manual.
Ast = 28663.691 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


29 120 0 0 0 0

= 28716.101 mm2 OK

3.2 Moment at Top Face:

Lever arm Z = Pile Centre to column face

P kN Z = 0.80 m
2.0 m
column Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or
(P1+P2)xZ or (P3+P4)xZ, whichever
is minimum

Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = -510.276 kN.m
Design Moment, M = M 1 + M2

Case M1 (kN.m) M = (M1 + M2) (kN.m)


ULS -5980.000 -6566.818
SLS Stress Check -3438.400 -3948.676
SLS Crack Width Check 0.000 0.000
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
2
K = Mu/bd fcu = 0.008 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1709.00 mm
Hence, z = 0.95 d = 1623.55 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table
23, pg. 37 of the Design Manual.
Ast = 11920.801 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 120 0 0 0 0

= 21357.103 mm2 OK

3.3 Moment Capacity, Stress and Crack Width Check from Oasys

a) Moment Capacity Check:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 15790 17970 0.8785 OK
Minima
1 0.0 15790 17970 0.8785 OK

b) Stress Check:
Permissible stresses
Concrete 0.5fck 25.000 MPa
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
1 8.78 OK 1 43.82 OK
1 8.78 OK 1 43.82 OK
Minima Minima
1 -0.5861 OK 1 -229.2 OK
1 -0.5861 OK 1 -229.2 OK

c) Crack Width Check:


Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.148 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

3.4 Minimum Reinforcement


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3999.06 mm2/m
At bottom face, Provided = 5418 mm2/m
Astprovided > Astmin OK
At top face, Provided = 4030 mm2/m
Astprovided > Astmin OK

4.0 Shear Check


Total pile reaction, V1 = 20471 kN
As per Cl. 3.11.4.3, pg. 82, BS 8110-1: 1997, critical section for shear should be located 20% of the pile diameter inside
the face of the pile.
Distance of critical section for shear check from column face = 0.440 m
Factored weight per unit length due to soil and pile cap = 351.502 kN/m
Hence, downward reaction due to soil and pile cap weight,
V2 = weight per unit length x (length of pile cap - 0.5 x column size - distance of critical section)
V2 = 636 kN
Net reaction, Vu = V1 - V2 = 19835 kN
Width of pile cap available b = 5.300 m
Effective depth of pile cap d = 1.709 m
Area of tensile steel provided As = 28716 mm2
= 0.029 m2
Percentage of tensile steel provided 100As/(b.d) = 0.317 %
Shear stress = Vu /(b.d) = 2189.83 kN/sqm
Grade of concrete = C50
Design shear resistance is calculated as per Cl. 3.11.4.4, pg. 82, BS 8110-1: 1997.
Shear strength of concrete, vc = 0.35 MPa
= 350 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 0.440 m
Therefore, vc,1 = 2.72 MPa
= 2719 kN/sqm
Vus = Vu - vc,1 b d = -4791.87 kN
Requirement of shear reinforcement = Not Required
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

5.0 Check for punching shear


Total pile load = 40376 kN
From section 1.0 above, factored weight of pile cap + earthfill = 1987 kN
Hence, net punching shear force = 38389 kN
Effective depth of pile cap = 1.709 m
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997, punching shear shall be checked at the perimeter of the column.
Shear perimeter = 8.000 m
Shearing Area = 13.672 m2
Punching Shear stress = 2807.874 kN/m2
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997,
Allowable punching shear stress = lesser of 0.8 fcu or 5 N/mm2 = 5.00 N/mm2
= 5000.000 kN/m2
OK
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997, since the pile spacing is not greater than 3 times the pile diameter, no
additional punching shear check is required.
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR COLUMN C32


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA

Column No. = C32

No. of piles n = 4
Dia of pile = 1.20 m
Size of Column = 2.00 m x 2.00 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 5.30 m x 5.30 m


2
Area of pile cap = 28.09 m
Depth of pile cap D = 1.80 m
Volume of pile cap = 50.56 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 1264.05 kN

Thickness of Earthfill over pile cap = 1.50 m


Volume of Earthfill over pile cap = 36.14 m3
Density of Earth = 20 kN/cum
Weight of Earthfill = 722.70 kN

Total weight of (Pile cap + Earthfill) = 1986.75 kN

2.0 PILE LOADS

2.1 Summary of Staad Results (Forces at Bottom of Pile Cap)---

LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-


a) ULS Loads
2378, 3131-3178,4101-4132, 5109-5124 & 6109-6124
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31518 2186 1.0DL
30578
+ 1.0SIDL
10369.79
+ 0.3CL + 0.3PLA
948.551+ 0.3PLB
318.939
+ 0.3TLA +10.800
0.3TLB - 0.3BTA
1044.676 - 0.3BTB
2839.761
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 31518 2107 1.0DL
30578
+ 1.0SIDL
-3238.21
+1SLX + 0.3SLY
-995.493
+ 0.3SLZ
-318.349 -8.330 -962.056 -3078.697
Max Fy 31518 1452 1.15DL
30574
+ 1.2SIDL
-1569.9
- 1.5COL(-X)-MLC
1169.427 -35.438 -4.159 160.496 4740.398
Min Fy 31518 2186 1.0DL
30574
+ 1.0SIDL
-2766.03
+ 0.3CL -1020.295
+ 0.3PLA + 0.3PLB
-320.14
+ 0.3TLA +-8.306
0.3TLB - -1269.143
0.3BTA - 0.3BTB
-4176.528
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31518 3154 1.0DL
30578
+ 1.0SIDL
9939.386
+ 0.3CL + 0.3PLA
313.564+ 0.3TLA
940.892
- 0.3BTA14.352
- 0.3SLX2839.411
- 0.3SLY - 1SLZ918.922
- 1.54NLA
Min Fz 31518 3178 1.0DL
30574
+ 1.0SIDL
-2763.86
+ 0.3CL +-360.426
0.3PLB + -940.643
0.3TLB - 0.3BTB
-11.814
- 0.3SLX-3675.704
- 0.3SLY - 1SLZ
-1517.738
- 1.54NLB
Max Mx 31518 3171 1.0DL
30574
+ 1.0SIDL
9759.334
+ 0.3CL + 0.3PLB
336.455+ 0.3TLB
938.526
+ 0.3BTB14.384
+ 0.3SLX3778.397
+ 0.3SLY + 1SLZ
1321.485
+ 1.54NLB
Min Mx 31518 3178 1.0DL
30574
+ 1.0SIDL
-2763.86
+ 0.3CL +-360.426
0.3PLB + -940.643
0.3TLB - 0.3BTB
-11.814
- 0.3SLX-3675.704
- 0.3SLY - 1SLZ
-1517.738
- 1.54NLB
Max My 31518 3147 1.0DL
30574
+ 1.0SIDL
9894.273
+ 0.3CL + 0.3PLA
336.09+ 0.3TLA
925.177
+ 0.3BTA 13.257
+ 0.3SLX 3821.302
+ 0.3SLY + 1SLZ
1318.894
+ 1.54NLA
Min My 31518 3154 1.0DL
30574
+ 1.0SIDL
-2818.18
+ 0.3CL +-360.177
0.3PLA + 0.3TLA
-921.055
- 0.3BTA-10.667
- 0.3SLX-3762.781
- 0.3SLY - 1SLZ
-1516.558
- 1.54NLA
Max Mz 31518 1452 1.15DL
30574
+ 1.2SIDL
-1569.9
- 1.5COL(-X)-MLC
1169.427 -35.438 -4.159 160.496 4740.398
Min Mz 31518 2186 1.0DL
30574
+ 1.0SIDL
-2766.03
+ 0.3CL -1020.295
+ 0.3PLA + 0.3PLB
-320.14
+ 0.3TLA +-8.306
0.3TLB - -1269.143
0.3BTA - 0.3BTB
-4176.528
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31519 2179 1.0DL
30575
+ 1.0SIDL
10219.65
+ 0.3CL +1018.923
0.3PLA + 0.3PLB
314.465
+ 0.3TLA +11.261
0.3TLB + 1317.078
0.3BTA + 0.3BTB
4169.385
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 31519 2362 1.0DL
30575
+ 1.0SIDL
-3129.3
+ 0.3CL +-985.343
0.3PLB + -316.526
0.3TLB - 0.3BTB-8.678
- 1SLX --1214.564
0.3SLY - 0.3SLZ
-3940.513
- 1.54LLB
Max Fy 31519 1452 1.15DL
30575
+ 1.2SIDL
9692.944
- 1.5COL(-X)-MLC
1195.336 -49.856 -4.097 277.326 4953.351
Min Fy 31519 2186 1.0DL
30575
+ 1.0SIDL
-2875.92
+ 0.3CL +-996.106
0.3PLA + 0.3PLB
-314.22
+ 0.3TLA +-8.733
0.3TLB - -1229.233
0.3BTA - 0.3BTB
-3977.966
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31519 3154 1.0DL
30579
+ 1.0SIDL
9776.159
+ 0.3CL + 0.3PLA
338.417+ 0.3TLA
939.417
- 0.3BTA15.773
- 0.3SLX -2827.14
0.3SLY - 1SLZ
1099.369
- 1.54NLA
Min Fz 31519 3178 1.0DL
30575
+ 1.0SIDL
-2855.12
+ 0.3CL +-338.523
0.3PLB + 0.3TLB
-938.81
- 0.3BTB
-13.284
- 0.3SLX-3664.332
- 0.3SLY - 1SLZ
-1338.549
- 1.54NLB
Max Mx 31519 3171 1.0DL
30575
+ 1.0SIDL
9869.023
+ 0.3CL + 0.3PLB
361.085+ 0.3TLB
936.644
+ 0.3BTB15.810
+ 0.3SLX3767.429
+ 0.3SLY + 1SLZ
1524.861
+ 1.54NLB
Min Mx 31519 3178 1.0DL
30575
+ 1.0SIDL
-2855.12
+ 0.3CL +-338.523
0.3PLB + 0.3TLB
-938.81
- 0.3BTB
-13.284
- 0.3SLX-3664.332
- 0.3SLY - 1SLZ
-1338.549
- 1.54NLB
Max My 31519 3147 1.0DL
30575
+ 1.0SIDL
10003.92
+ 0.3CL + 0.3PLA
361.209+ 0.3TLA
923.294
+ 0.3BTA 14.710
+ 0.3SLX 3810.342
+ 0.3SLY + 1SLZ
1526.276
+ 1.54NLA
Min My 31519 3154 1.0DL
30575
+ 1.0SIDL
-2907.95
+ 0.3CL +-338.335
0.3PLA + 0.3TLA
-919.223
- 0.3BTA-12.177
- 0.3SLX-3751.398
- 0.3SLY - 1SLZ
-1337.836
- 1.54NLA
Max Mz 31519 1452 1.15DL
30575
+ 1.2SIDL
9692.944
- 1.5COL(-X)-MLC
1195.336 -49.856 -4.097 277.326 4953.351
Min Mz 31519 2186 1.0DL
30575
+ 1.0SIDL
-2875.92
+ 0.3CL +-996.106
0.3PLA + 0.3PLB
-314.22
+ 0.3TLA +-8.733
0.3TLB - -1229.233
0.3BTA - 0.3BTB
-3977.966
- 1SLX - 0.3SLY - 0.3SLZ
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31520 2186 1.0DL
30580
+ 1.0SIDL
10247.84
+ 0.3CL + 0.3PLA
948.845+ 0.3PLB
338.248
+ 0.3TLA +11.322
0.3TLB - 0.3BTA
829.15
- 0.3BTB2842.12
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 31520 2107 1.0DL
30580
+ 1.0SIDL
-3031.19
+1SLX + 0.3SLY
-995.751
+ 0.3SLZ
-290.911 -8.901 -1084.05 -3080.764
Max Fy 31520 1452 1.15DL
30576
+ 1.2SIDL
-1953.15
- 1.5COL(-X)-MLC
1170.017 -24.535 -1.729 69.167 4745.203
Min Fy 31520 2186 1.0DL
30576
+ 1.0SIDL +-2564
0.3CL -1020.545
+ 0.3PLA + 0.3PLB
-289.827
+ 0.3TLA +-8.925
0.3TLB - -1430.581
0.3BTA - 0.3BTB
-4178.771
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31520 3154 1.0DL
30580
+ 1.0SIDL
9942.887
+ 0.3CL + 0.3PLA
314.983+ 0.3TLA
962.696
- 0.3BTA14.538
- 0.3SLX2657.938
- 0.3SLY - 1SLZ929.853
- 1.54NLA
Min Fz 31520 3178 1.0DL
30576
+ 1.0SIDL
-2679.32
+ 0.3CL +-361.818
0.3PLB + -915.361
0.3TLB - 0.3BTB
-12.049
- 0.3SLX-3855.831
- 0.3SLY - 1SLZ
-1529.78
- 1.54NLB
Max Mx 31520 3171 1.0DL
30576
+ 1.0SIDL
9850.602
+ 0.3CL + 0.3PLB
337.649+ 0.3TLB
959.926
+ 0.3BTB14.617
+ 0.3SLX3574.761
+ 0.3SLY + 1SLZ
1331.926
+ 1.54NLB
Min Mx 31520 3178 1.0DL
30576
+ 1.0SIDL
-2679.32
+ 0.3CL +-361.818
0.3PLB + -915.361
0.3TLB - 0.3BTB
-12.049
- 0.3SLX-3855.831
- 0.3SLY - 1SLZ
-1529.78
- 1.54NLB
Max My 31520 3147 1.0DL
30576
+ 1.0SIDL
9715.835
+ 0.3CL + 0.3PLA
337.772+ 0.3TLA
946.577
+ 0.3BTA 13.489
+ 0.3SLX3617.67
+ 0.3SLY + 1SLZ
1333.337
+ 1.54NLA
Min My 31520 3154 1.0DL
30576
+ 1.0SIDL
-2628.67
+ 0.3CL +-361.621
0.3PLA + 0.3TLA
-895.783
- 0.3BTA-10.901
- 0.3SLX-3942.831
- 0.3SLY - 1SLZ --1529
1.54NLA
Max Mz 31520 1452 1.15DL
30576
+ 1.2SIDL
-1953.15
- 1.5COL(-X)-MLC
1170.017 -24.535 -1.729 69.167 4745.203
Min Mz 31520 2186 1.0DL
30576
+ 1.0SIDL +-2564
0.3CL -1020.545
+ 0.3PLA + 0.3PLB
-289.827
+ 0.3TLA +-8.925
0.3TLB - -1430.581
0.3BTA - 0.3BTB
-4178.771
- 1SLX - 0.3SLY - 0.3SLZ
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31521 2179 1.0DL
30577
+ 1.0SIDL
10356.42
+ 0.3CL +1018.622
0.3PLA + 0.3PLB
344.893
+ 0.3TLA +11.872
0.3TLB + 1155.742
0.3BTA + 0.3BTB
4166.527
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 31521 2338 1.0DL
30577
+ 1.0SIDL
-3140.72
+ 0.3CL + 0.3PLA
-984.94+ 0.3TLA
-297.419
- 0.3BTA-9.364
- 1SLX --1459.455
0.3SLY - 0.3SLZ
-3937.012
- 1.54LLA
Max Fy 31521 1452 1.15DL
30577
+ 1.2SIDL
9309.692
- 1.5COL(-X)-MLC
1194.748 -10.118 -1.668 -47.654 4948.556
Min Fy 31521 2186 1.0DL
30577
+ 1.0SIDL
-2921.81
+ 0.3CL +-995.835
0.3PLA + 0.3PLB
-295.723
+ 0.3TLA +-9.347
0.3TLB - -1470.107
0.3BTA - 0.3BTB
-3975.387
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31521 3154 1.0DL
30581
+ 1.0SIDL
9817.685
+ 0.3CL + 0.3PLA
336.932+ 0.3TLA
964.164
- 0.3BTA15.953
- 0.3SLX2670.084
- 0.3SLY - 1SLZ
1087.389
- 1.54NLA
Min Fz 31521 3178 1.0DL
30577
+ 1.0SIDL
-2808.6
+ 0.3CL +-337.065
0.3PLB + -917.186
0.3TLB - 0.3BTB
-13.513
- 0.3SLX-3867.079
- 0.3SLY - 1SLZ
-1325.461
- 1.54NLB
Max Mx 31521 3171 1.0DL
30577
+ 1.0SIDL
9998.313
+ 0.3CL + 0.3PLB
359.825+ 0.3TLB
961.8
+ 0.3BTB16.038
+ 0.3SLX3585.605
+ 0.3SLY + 1SLZ
1513.373
+ 1.54NLB
Min Mx 31521 3178 1.0DL
30577
+ 1.0SIDL
-2808.6
+ 0.3CL +-337.065
0.3PLB + -917.186
0.3TLB - 0.3BTB
-13.513
- 0.3SLX-3867.079
- 0.3SLY - 1SLZ
-1325.461
- 1.54NLB
Max My 31521 3147 1.0DL
30577
+ 1.0SIDL
9863.499
+ 0.3CL + 0.3PLA
359.46+ 0.3TLA
948.451
+ 0.3BTA 14.938
+ 0.3SLX 3628.506
+ 0.3SLY + 1SLZ
1510.786
+ 1.54NLA
Min My 31521 3154 1.0DL
30577
+ 1.0SIDL
-2756.46
+ 0.3CL +-336.824
0.3PLA + 0.3TLA
-897.606
- 0.3BTA-12.405
- 0.3SLX-3954.089
- 0.3SLY - 1SLZ
-1324.348
- 1.54NLA
Max Mz 31521 1452 1.15DL
30577
+ 1.2SIDL
9309.692
- 1.5COL(-X)-MLC
1194.748 -10.118 -1.668 -47.654 4948.556
Min Mz 31521 2186 1.0DL
30577
+ 1.0SIDL
-2921.81
+ 0.3CL +-995.835
0.3PLA + 0.3PLB
-295.723
+ 0.3TLA +-9.347
0.3TLB - -1470.107
0.3BTA - 0.3BTB
-3975.387
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

LC 1001-1190, 2031-2078, 3031-3078, 4001-


b) SLS Loads For Stress check
4032, 5009-5024 & 6009-6024
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31518 1086 1DL 30578
+ 1SIDL +8824.127
0.3CL + 0.3PLA
716.98
+ 0.3PLB244.207
+ 0.3TLA + 0.3TLB
8.555
- 0.3BTA
812.034
- 0.3BTB -2135.278
1SLX - 0.3SLY - 0.3SLZ
Min Fx 31518 1007 1DL 30578
+ 1SIDL +-1692.55
1SLX + 0.3SLY
-763.922
+ 0.3SLZ -243.617 -6.085 -729.414 -2374.214
Max Fy 31518 1152 1DL 30574
+ 1SIDL --280.211
1COL(-X)-MLC777.106 -23.305 -2.487 114.704 3139.359
Min Fy 31518 1086 1DL 30574
+ 1SIDL +-1220.37
0.3CL + 0.3PLA
-788.724
+ 0.3PLB-245.408
+ 0.3TLA + 0.3TLB
-6.060
- 0.3BTA
-961.89
- 0.3BTB - -3240.53
1SLX - 0.3SLY - 0.3SLZ
Max Fz 31518 3054 1DL 30578
+ 1SIDL +8452.521
0.3CL + 0.3PLA
234.582
+ 0.3TLA719.64
- 0.3BTA - 11.232
0.3SLX - 0.3SLY
2182.18
- 1SLZ - 1.1NLA
676.112
Min Fz 31518 3078 1DL 30574
+ 1SIDL + 0.3CL
-1277
+ 0.3PLB
-281.444
+ 0.3TLB -719.39
- 0.3BTB - 0.3SLX
-8.695 - 0.3SLY
-2802.15
- 1SLZ - 1.1NLB
-1196.1
Max Mx 31518 3071 1DL 30574
+ 1SIDL +8272.481
0.3CL + 0.3PLB
257.474
+ 0.3TLB 717.273
+ 0.3BTB +11.264
0.3SLX + 0.3SLY
2904.843+ 1SLZ +999.847
1.1NLB
Min Mx 31518 3078 1DL 30574
+ 1SIDL + 0.3CL
-1277
+ 0.3PLB
-281.444
+ 0.3TLB -719.39
- 0.3BTB - 0.3SLX
-8.695 - 0.3SLY
-2802.15
- 1SLZ - 1.1NLB
-1196.1
Max My 31518 1071 1DL 30574
+ 1SIDL +8307.543
0.3CL + 0.3PLB
257.357
+ 0.3TLB 711.175
+ 0.3BTB +10.822
0.3SLX + 0.3SLY
2928.912+ 1SLZ 999.139
Min My 31518 3054 1DL 30574
+ 1SIDL +-1303.29
0.3CL + 0.3PLA
-281.288
+ 0.3TLA-704.68
- 0.3BTA - 0.3SLX
-7.901 - 0.3SLY
-2869.972
- 1SLZ --1195.487
1.1NLA
Max Mz 31518 1152 1DL 30574
+ 1SIDL --280.211
1COL(-X)-MLC777.106 -23.305 -2.487 114.704 3139.359
Min Mz 31518 1086 1DL 30574
+ 1SIDL +-1220.37
0.3CL + 0.3PLA
-788.724
+ 0.3PLB-245.408
+ 0.3TLA + 0.3TLB
-6.060
- 0.3BTA
-961.89
- 0.3BTB - -3240.53
1SLX - 0.3SLY - 0.3SLZ
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31519 1079 1DL 30575
+ 1SIDL +8709.979
0.3CL + 0.3PLA
787.291
+ 0.3PLB241.056
+ 0.3TLA + 0.3TLB
8.921
+ 0.3BTA
1020.104
+ 0.3BTB3232.816
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 31519 2062 1DL 30575
+ 1SIDL + 0.3CL
-1575.7
+ 0.3PLB
-753.561
+ 0.3TLB-242.666
- 0.3BTB - 1SLX
-6.334- 0.3SLY
-920.029
- 0.3SLZ --3002.674
1.1LLB
Max Fy 31519 1152 1DL 30575
+ 1SIDL -7230.905
1COL(-X)-MLC799.428 -32.924 -2.451 192.638 3322.842
Min Fy 31519 1086 1DL 30575
+ 1SIDL +-1366.24
0.3CL + 0.3PLA
-764.474
+ 0.3PLB-240.811
+ 0.3TLA + 0.3TLB
-6.393
- 0.3BTA-932.26
- 0.3BTB -3041.398
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31519 3054 1DL 30579
+ 1SIDL +8297.289
0.3CL + 0.3PLA
259.122
+ 0.3TLA 718.559
- 0.3BTA - 12.313
0.3SLX - 0.3SLY
2172.546
- 1SLZ - 1.1NLA
854.068
Min Fz 31519 3078 1DL 30575
+ 1SIDL +-1376.26
0.3CL + 0.3PLB
-259.228
+ 0.3TLB-717.952
- 0.3BTB - 0.3SLX
-9.824 - 0.3SLY
-2793.849
- 1SLZ --1014.126
1.1NLB
Max Mx 31519 3071 1DL 30575
+ 1SIDL +8390.167
0.3CL + 0.3PLB
281.789
+ 0.3TLB 715.787
+ 0.3BTB +12.350
0.3SLX + 0.3SLY
2896.946+ 1SLZ1200.438
+ 1.1NLB
Min Mx 31519 3078 1DL 30575
+ 1SIDL +-1376.26
0.3CL + 0.3PLB
-259.228
+ 0.3TLB-717.952
- 0.3BTB - 0.3SLX
-9.824 - 0.3SLY
-2793.849
- 1SLZ --1014.126
1.1NLB
Max My 31519 1071 1DL 30575
+ 1SIDL +8424.908
0.3CL + 0.3PLB
281.775
+ 0.3TLB 709.689
+ 0.3BTB +11.921
0.3SLX + 0.3SLY
2921.014+ 1SLZ1200.558
Min My 31519 3054 1DL 30575
+ 1SIDL +-1401.31
0.3CL + 0.3PLA
-259.051
+ 0.3TLA-703.244
- 0.3BTA - 0.3SLX
-9.061 - 0.3SLY
-2861.661
- 1SLZ --1013.317
1.1NLA
Max Mz 31519 1152 1DL 30575
+ 1SIDL -7230.905
1COL(-X)-MLC799.428 -32.924 -2.451 192.638 3322.842
Min Mz 31519 1086 1DL 30575
+ 1SIDL +-1366.24
0.3CL + 0.3PLA
-764.474
+ 0.3PLB-240.811
+ 0.3TLA + 0.3TLB
-6.393
- 0.3BTA-932.26
- 0.3BTB -3041.398
- 1SLX - 0.3SLY - 0.3SLZ
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31520 1086 1DL 30580
+ 1SIDL + 8739.55
0.3CL + 0.3PLA
717.21
+ 0.3PLB264.836
+ 0.3TLA + 0.3TLB
8.941
- 0.3BTA
605.268
- 0.3BTB -2137.121
1SLX - 0.3SLY - 0.3SLZ
Min Fx 31520 1007 1DL 30580
+ 1SIDL + 1SLX
-1522.9
+ 0.3SLY
-764.116
+ 0.3SLZ -217.498 -6.520 -860.167 -2375.765
Max Fy 31520 1152 1DL 30576
+ 1SIDL --525.179
1COL(-X)-MLC777.503 -10.997 -0.867 12.382 3142.592
Min Fy 31520 1086 1DL 30576
+ 1SIDL +-1055.71
0.3CL + 0.3PLA
-788.91
+ 0.3PLB-216.414
+ 0.3TLA + 0.3TLB
-6.544
- 0.3BTA
-1133.544
- 0.3BTB -3242.198
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31520 3054 1DL 30580
+ 1SIDL +8449.205
0.3CL + 0.3PLA
235.702
+ 0.3TLA 741.864
- 0.3BTA - 11.368
0.3SLX - 0.3SLY
2003.504
- 1SLZ - 1.1NLA
684.729
Min Fz 31520 3078 1DL 30576
+ 1SIDL +-1185.65
0.3CL + 0.3PLB
-282.537
+ 0.3TLB-694.529
- 0.3BTB - 0.3SLX
-8.879 - 0.3SLY
-2985.533
- 1SLZ --1205.541
1.1NLB
Max Mx 31520 3071 1DL 30576
+ 1SIDL +8356.932
0.3CL + 0.3PLB
258.368
+ 0.3TLB 739.094
+ 0.3BTB +11.447
0.3SLX + 0.3SLY
2704.462+ 1SLZ1007.687
+ 1.1NLB
Min Mx 31520 3078 1DL 30576
+ 1SIDL +-1185.65
0.3CL + 0.3PLB
-282.537
+ 0.3TLB-694.529
- 0.3BTB - 0.3SLX
-8.879 - 0.3SLY
-2985.533
- 1SLZ --1205.541
1.1NLB
Max My 31520 1071 1DL 30576
+ 1SIDL +8322.652
0.3CL + 0.3PLB
258.352
+ 0.3TLB 732.997
+ 0.3BTB +11.005
0.3SLX + 0.3SLY
2728.517+ 1SLZ1007.793
Min My 31520 3054 1DL 30576
+ 1SIDL +-1162.44
0.3CL + 0.3PLA
-282.353
+ 0.3TLA-679.828
- 0.3BTA - 0.3SLX
-8.084 - 0.3SLY
-3053.289
- 1SLZ --1204.675
1.1NLA
Max Mz 31520 1152 1DL 30576
+ 1SIDL --525.179
1COL(-X)-MLC777.503 -10.997 -0.867 12.382 3142.592
Min Mz 31520 1086 1DL 30576
+ 1SIDL +-1055.71
0.3CL + 0.3PLA
-788.91
+ 0.3PLB-216.414
+ 0.3TLA + 0.3TLB
-6.544
- 0.3BTA
-1133.544
- 0.3BTB -3242.198
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31521 1079 1DL 30577
+ 1SIDL +8825.128
0.3CL + 0.3PLA
787.06
+ 0.3PLB270.163
+ 0.3TLA + 0.3TLB
9.397
+ 0.3BTA
848.515
+ 0.3BTB3230.612
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 31521 1007 1DL 30581
+ 1SIDL +-1582.95
1SLX + 0.3SLY
-741.943
+ 0.3SLZ -221.674 -6.849 -888.095 -2215.45
Max Fy 31521 1152 1DL 30577
+ 1SIDL -6985.938
1COL(-X)-MLC799.033 -1.38 -0.832 -65.546 3319.614
Min Fy 31521 1086 1DL 30577
+ 1SIDL +-1390.52
0.3CL + 0.3PLA
-764.273
+ 0.3PLB-220.992
+ 0.3TLA + 0.3TLB
-6.872
- 0.3BTA
-1162.879
- 0.3BTB -3039.472
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31521 3054 1DL 30581
+ 1SIDL +8322.902
0.3CL + 0.3PLA
257.951
+ 0.3TLA 742.938
- 0.3BTA - 12.444
0.3SLX - 0.3SLY
2013.042
- 1SLZ - 1.1NLA
844.648
Min Fz 31521 3078 1DL 30577
+ 1SIDL +-1313.83
0.3CL + 0.3PLB
-258.084
+ 0.3TLB -695.96
- 0.3BTB --10.004
0.3SLX - 0.3SLY
-2993.738
- 1SLZ --1003.885
1.1NLB
Max Mx 31521 3071 1DL 30577
+ 1SIDL +8503.546
0.3CL + 0.3PLB
280.844
+ 0.3TLB 740.574
+ 0.3BTB +12.529
0.3SLX + 0.3SLY
2712.264+ 1SLZ1191.798
+ 1.1NLB
Min Mx 31521 3078 1DL 30577
+ 1SIDL +-1313.83
0.3CL + 0.3PLB
-258.084
+ 0.3TLB -695.96
- 0.3BTB --10.004
0.3SLX - 0.3SLY
-2993.738
- 1SLZ --1003.885
1.1NLB
Max My 31521 1071 1DL 30577
+ 1SIDL +8468.946
0.3CL + 0.3PLB
280.73
+ 0.3TLB 734.478
+ 0.3BTB +12.099
0.3SLX + 0.3SLY
2736.319+ 1SLZ1191.104
Min My 31521 3054 1DL 30577
+ 1SIDL +-1289.39
0.3CL + 0.3PLA
-257.935
+ 0.3TLA-681.258
- 0.3BTA - 0.3SLX
-9.240 - 0.3SLY
-3061.504
- 1SLZ --1003.328
1.1NLA
Max Mz 31521 1152 1DL 30577
+ 1SIDL -6985.938
1COL(-X)-MLC799.033 -1.38 -0.832 -65.546 3319.614
Min Mz 31521 1086 1DL 30577
+ 1SIDL +-1390.52
0.3CL + 0.3PLA
-764.273
+ 0.3PLB-220.992
+ 0.3TLA + 0.3TLB
-6.872
- 0.3BTA
-1162.879
- 0.3BTB -3039.472
- 1SLX - 0.3SLY - 0.3SLZ

c) SLS Loads For crack width check LC 1001-1006


Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31518 1006 1DL 30574
+ 1SIDL +5031.545
1CL + 1PLA -101.936
+ 1PLB + 1.1TLA
-5.402
+ 1.1TLB - 1.1BTA
1.268 - 1.1BTB
82.102 -467.147
Min Fx 31518 1003 1DL 30574
+ 1SIDL +3676.425
1CL + 1PLB + 27.418
1.1TLB + 1.1BTB
-6.832 1.306 93.03 47.794
Max Fy 31518 1005 1DL 30574
+ 1SIDL +4007.097
1CL + 1PLA + 65.505
1PLB + 1.1TLA
0.119
+ 1.1TLB + 1.1BTA
1.578 + 1.1BTB
53.521 185.209
Min Fy 31518 1006 1DL 30574
+ 1SIDL +5031.545
1CL + 1PLA -101.936
+ 1PLB + 1.1TLA
-5.402
+ 1.1TLB - 1.1BTA
1.268 - 1.1BTB
82.102 -467.147
Max Fz 31518 1001 1DL 30574
+ 1SIDL +3806.725
1CL + 1PLA + 27.283
1.1TLA + 1.1BTA
7.006 1.720 3.198 45.652
Min Fz 31518 1004 1DL 30574
+ 1SIDL +4175.819
1CL + 1PLB +-56.233
1.1TLB - 1.1BTB
-7.368 1.519 98.515 -278.029
Max Mx 31518 1001 1DL 30574
+ 1SIDL +3806.725
1CL + 1PLA + 27.283
1.1TLA + 1.1BTA
7.006 1.720 3.198 45.652
Min Mx 31518 1002 1DL 30574
+ 1SIDL + 4331.78
1CL + 1PLA +-56.507
1.1TLA - 1.1BTA
2.021 1.197 26.294 -280.882
Max My 31518 1004 1DL 30574
+ 1SIDL +4175.819
1CL + 1PLB +-56.233
1.1TLB - 1.1BTB
-7.368 1.519 98.515 -278.029
Min My 31518 1001 1DL 30574
+ 1SIDL +3806.725
1CL + 1PLA + 27.283
1.1TLA + 1.1BTA
7.006 1.720 3.198 45.652
Max Mz 31518 1005 1DL 30574
+ 1SIDL +4007.097
1CL + 1PLA + 65.505
1PLB + 1.1TLA
0.119
+ 1.1TLB + 1.1BTA
1.578 + 1.1BTB
53.521 185.209
Min Mz 31518 1006 1DL 30574
+ 1SIDL +5031.545
1CL + 1PLA -101.936
+ 1PLB + 1.1TLA
-5.402
+ 1.1TLB - 1.1BTA
1.268 - 1.1BTB
82.102 -467.147
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31519 1005 1DL 30575
+ 1SIDL +5017.305
1CL + 1PLA + 96.289
1PLB + 1.1TLA
-1.417
+ 1.1TLB + 1.1BTA
1.548 + 1.1BTB
66.025 438.304
Min Fx 31519 1004 1DL 30575
+ 1SIDL +3679.705
1CL + 1PLB +-29.685
1.1TLB - 1.1BTB
-6.645 1.505 92.635 -59.764
Max Fy 31519 1005 1DL 30575
+ 1SIDL +5017.305
1CL + 1PLA + 96.289
1PLB + 1.1TLA
-1.417
+ 1.1TLB + 1.1BTA
1.548 + 1.1BTB
66.025 438.304
Min Fy 31519 1006 1DL 30575
+ 1SIDL +4035.042
1CL + 1PLA +-71.091
1PLB + 1.1TLA
-3.952
+ 1.1TLB - 1.1BTA
1.246 - 1.1BTB
70.309 -213.551
Max Fz 31519 1001 1DL 30575
+ 1SIDL +4316.536
1CL + 1PLA + 54.569
1.1TLA + 1.1BTA
6.232 1.679 9.5 269.995
Min Fz 31519 1003 1DL 30575
+ 1SIDL +4183.161
1CL + 1PLB + 53.973
1.1TLB + 1.1BTB
-7.6 1.293 99.293 266.104
Max Mx 31519 1001 1DL 30575
+ 1SIDL +4316.536
1CL + 1PLA + 54.569
1.1TLA + 1.1BTA
6.232 1.679 9.5 269.995
Min Mx 31519 1002 1DL 30575
+ 1SIDL +3837.731
1CL + 1PLA +-29.153
1.1TLA - 1.1BTA
2.74 1.165 20.442 -55.991
Max My 31519 1003 1DL 30575
+ 1SIDL +4183.161
1CL + 1PLB + 53.973
1.1TLB + 1.1BTB
-7.6 1.293 99.293 266.104
Min My 31519 1001 1DL 30575
+ 1SIDL +4316.536
1CL + 1PLA + 54.569
1.1TLA + 1.1BTA
6.232 1.679 9.5 269.995
Max Mz 31519 1005 1DL 30575
+ 1SIDL +5017.305
1CL + 1PLA + 96.289
1PLB + 1.1TLA
-1.417
+ 1.1TLB + 1.1BTA
1.548 + 1.1BTB
66.025 438.304
Min Mz 31519 1006 1DL 30575
+ 1SIDL +4035.042
1CL + 1PLA +-71.091
1PLB + 1.1TLA
-3.952
+ 1.1TLB - 1.1BTA
1.246 - 1.1BTB
70.309 -213.551
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31520 1006 1DL 30576
+ 1SIDL +5055.991
1CL + 1PLA -101.889
+ 1PLB + 1.1TLA
26.846
+ 1.1TLB - 1.1BTA
1.090 - 1.1BTB
-182.885 -466.745
Min Fx 31520 1001 1DL 30576
+ 1SIDL +3732.541
1CL + 1PLA + 27.646
1.1TLA + 33.155
1.1BTA 1.804 -211.832 48.664
Max Fy 31520 1005 1DL 30576
+ 1SIDL +4071.094
1CL + 1PLA + 1PLB
65.5+ 1.1TLA
29.373
+ 1.1TLB + 1.1BTA
1.744 + 1.1BTB
-187.089 185.192
Min Fy 31520 1006 1DL 30576
+ 1SIDL +5055.991
1CL + 1PLA -101.889
+ 1PLB + 1.1TLA
26.846
+ 1.1TLB - 1.1BTA
1.090 - 1.1BTB
-182.885 -466.745
Max Fz 31520 1001 1DL 30576
+ 1SIDL +3732.541
1CL + 1PLA + 27.646
1.1TLA + 33.155
1.1BTA 1.804 -211.832 48.664
Min Fz 31520 1003 1DL 30576
+ 1SIDL +3869.539
1CL + 1PLB + 27.036
1.1TLB + 1.1BTB
19.336 1.390 -122.15 44.663
Max Mx 31520 1001 1DL 30576
+ 1SIDL +3732.541
1CL + 1PLA + 27.646
1.1TLA + 33.155
1.1BTA 1.804 -211.832 48.664
Min Mx 31520 1006 1DL 30576
+ 1SIDL +5055.991
1CL + 1PLA -101.889
+ 1PLB + 1.1TLA
26.846
+ 1.1TLB - 1.1BTA
1.090 - 1.1BTB
-182.885 -466.745
Max My 31520 1003 1DL 30580
+ 1SIDL +3869.539
1CL + 1PLB + 27.036
1.1TLB + 1.1BTB
19.336 1.390 -102.814 17.627
Min My 31520 1001 1DL 30576
+ 1SIDL +3732.541
1CL + 1PLA + 27.646
1.1TLA + 33.155
1.1BTA 1.804 -211.832 48.664
Max Mz 31520 1005 1DL 30576
+ 1SIDL +4071.094
1CL + 1PLA + 1PLB
65.5+ 1.1TLA
29.373
+ 1.1TLB + 1.1BTA
1.744 + 1.1BTB
-187.089 185.192
Min Mz 31520 1006 1DL 30576
+ 1SIDL +5055.991
1CL + 1PLA -101.889
+ 1PLB + 1.1TLA
26.846
+ 1.1TLB - 1.1BTA
1.090 - 1.1BTB
-182.885 -466.745
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31521 1005 1DL 30577
+ 1SIDL +5081.302
1CL + 1PLA + 96.294
1PLB + 1.1TLA
30.908
+ 1.1TLB + 1.1BTA
1.714 + 1.1BTB
-199.592 438.322
Min Fx 31521 1002 1DL 30577
+ 1SIDL +3718.783
1CL + 1PLA +-29.578
1.1TLA - 1.1BTA
28.949 1.077 -195.084 -59.506
Max Fy 31521 1005 1DL 30577
+ 1SIDL +5081.302
1CL + 1PLA + 96.294
1PLB + 1.1TLA
30.908
+ 1.1TLB + 1.1BTA
1.714 + 1.1BTB
-199.592 438.322
Min Fy 31521 1006 1DL 30577
+ 1SIDL +4059.488
1CL + 1PLA +-71.138
1PLB + 1.1TLA
25.397
+ 1.1TLB - 1.1BTA
1.068 - 1.1BTB
-171.092 -213.955
Max Fz 31521 1001 1DL 30577
+ 1SIDL +4242.353
1CL + 1PLA + 54.206
1.1TLA + 33.929
1.1BTA 1.763 -218.134 266.983
Min Fz 31521 1004 1DL 30577
+ 1SIDL +3878.031
1CL + 1PLB +-29.293
1.1TLB - 1.1BTB
19.573 1.417 -122.963 -56.552
Max Mx 31521 1001 1DL 30577
+ 1SIDL +4242.353
1CL + 1PLA + 54.206
1.1TLA + 33.929
1.1BTA 1.763 -218.134 266.983
Min Mx 31521 1006 1DL 30577
+ 1SIDL +4059.488
1CL + 1PLA +-71.138
1PLB + 1.1TLA
25.397
+ 1.1TLB - 1.1BTA
1.068 - 1.1BTB
-171.092 -213.955
Max My 31521 1004 1DL 30581
+ 1SIDL +3878.031
1CL + 1PLB +-29.293
1.1TLB - 1.1BTB
19.573 1.417 -103.389 -27.259
Min My 31521 1001 1DL 30577
+ 1SIDL +4242.353
1CL + 1PLA + 54.206
1.1TLA + 33.929
1.1BTA 1.763 -218.134 266.983
Max Mz 31521 1005 1DL 30577
+ 1SIDL +5081.302
1CL + 1PLA + 96.294
1PLB + 1.1TLA
30.908
+ 1.1TLB + 1.1BTA
1.714 + 1.1BTB
-199.592 438.322
Min Mz 31521 1006 1DL 30577
+ 1SIDL +4059.488
1CL + 1PLA +-71.138
1PLB + 1.1TLA
25.397
+ 1.1TLB - 1.1BTA
1.068 - 1.1BTB
-171.092 -213.955

2.2 Pile Loads

ULS
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 10370 10220 10248 10356


Min Fx -3238 -3129 -3031 -3141
Max Fy -1570 9693 -1953 9310
Min Fy -2766 -2876 -2564 -2922
Max Fz 9939 9776 9943 9818
Min Fz -2764 -2855 -2679 -2809
Max Mx 9759 9869 9851 9998
Min Mx -2764 -2855 -2679 -2809
Max My 9894 10004 9716 9863
Min My -2818 -2908 -2629 -2756
Max Mz -1570 9693 -1953 9310
Min Mz -2766 -2876 -2564 -2922
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

SLS Stress Check


Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 8824 8710 8740 8825


Min Fx -1693 -1576 -1523 -1583
Max Fy -280 7231 -525 6986
Min Fy -1220 -1366 -1056 -1391
Max Fz 8453 8297 8449 8323
Min Fz -1277 -1376 -1186 -1314
Max Mx 8272 8390 8357 8504
Min Mx -1277 -1376 -1186 -1314
Max My 8308 8425 8323 8469
Min My -1303 -1401 -1162 -1289
Max Mz -280 7231 -525 6986
Min Mz -1220 -1366 -1056 -1391

SLS Crack Width Check


Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 5032 5017 5056 5081


Min Fx 3676 3680 3733 3719
Max Fy 4007 5017 4071 5081
Min Fy 5032 4035 5056 4059
Max Fz 3807 4317 3733 4242
Min Fz 4176 4183 3870 3878
Max Mx 3807 4317 3733 4242
Min Mx 4332 3838 5056 4059
Max My 4176 4183 3870 3878
Min My 3807 4317 3733 4242
Max Mz 4007 5017 4071 5081
Min Mz 5032 4035 5056 4059

3.1 Moment at Bottom Face:

Lever arm Z = Pile Centre to column face

Z = 0.80 m

Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or


2.0 m (P1+P2)xZ or (P3+P4)xZ, whichever
column is maximum

P kN
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = 510.276 kN.m
Design Moment, M = M 1 - M2

Case M1 (kN.m) M = (M1 - M2) (kN.m)


ULS 16494.400 15907.582
SLS Stress Check 14052.000 13541.724
SLS Crack Width Check 8109.600 7599.324

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
2
K = Mu/bd fcu = 0.021 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1709.00 mm
Hence, z = 0.95 d = 1623.55 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table
23, pg. 37 of the Design Manual.
Ast = 28877.172 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


29 115 0 0 0 0

= 29935.909 mm2 OK

3.2 Moment at Top Face:

Lever arm Z = Pile Centre to column face

P kN Z = 0.80 m
2.0 m
column Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or
(P1+P2)xZ or (P3+P4)xZ, whichever
is minimum

Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = -510.276 kN.m
Design Moment, M = M 1 + M2

Case M1 (kN.m) M = (M1 + M2) (kN.m)


ULS -5093.600 -5680.418
SLS Stress Check -2615.200 -3125.476
SLS Crack Width Check 0.000 0.000
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
2
K = Mu/bd fcu = 0.007 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1709.00 mm
Hence, z = 0.95 d = 1623.55 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table
23, pg. 37 of the Design Manual.
Ast = 10311.711 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 115 0 0 0 0

= 22264.331 mm2 OK

3.3 Moment Capacity, Stress and Crack Width Check from Oasys

a) Moment Capacity Check:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 15910 18780 0.8472 OK
Minima
1 0.0 15910 18780 0.8472 OK

b) Stress Check:
Permissible stresses
Concrete 0.5fck 25.000 MPa
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
1 8.755 OK 1 43.91 OK
1 8.755 OK 1 43.91 OK
Minima Minima
1 -0.5863 OK 1 -224.1 OK
1 -0.5863 OK 1 -224.1 OK

c) Crack Width Check:


Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.159 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

3.4 Minimum Reinforcement


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3999.06 mm2/m
At bottom face, Provided = 5648 mm2/m
Astprovided > Astmin OK
At top face, Provided = 4201 mm2/m
Astprovided > Astmin OK

4.0 Shear Check


Total pile reaction, V1 = 20618 kN
As per Cl. 3.11.4.3, pg. 82, BS 8110-1: 1997, critical section for shear should be located 20% of the pile diameter inside
the face of the pile.
Distance of critical section for shear check from column face = 0.440 m
Factored weight per unit length due to soil and pile cap = 351.502 kN/m
Hence, downward reaction due to soil and pile cap weight,
V2 = weight per unit length x (length of pile cap - 0.5 x column size - distance of critical section)
V2 = 636 kN
Net reaction, Vu = V1 - V2 = 19982 kN
Width of pile cap available b = 5.300 m
Effective depth of pile cap d = 1.709 m
Area of tensile steel provided As = 29936 mm2
= 0.030 m2
Percentage of tensile steel provided 100As/(b.d) = 0.331 %
Shear stress = Vu /(b.d) = 2206.05 kN/sqm
Grade of concrete = C50
Design shear resistance is calculated as per Cl. 3.11.4.4, pg. 82, BS 8110-1: 1997.
Shear strength of concrete, vc = 0.36 MPa
= 360 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 0.440 m
Therefore, vc,1 = 2.80 MPa
= 2797 kN/sqm
Vus = Vu - vc,1 b d = -5348.49 kN
Requirement of shear reinforcement = Not Required
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

5.0 Check for punching shear


Total pile load = 41194 kN
From section 1.0 above, factored weight of pile cap + earthfill = 1987 kN
Hence, net punching shear force = 39207 kN
Effective depth of pile cap = 1.709 m
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997, punching shear shall be checked at the perimeter of the column.
Shear perimeter = 8.000 m
Shearing Area = 13.672 m2
Punching Shear stress = 2867.704 kN/m2
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997,
Allowable punching shear stress = lesser of 0.8 fcu or 5 N/mm2 = 5.00 N/mm2
= 5000.000 kN/m2
OK
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997, since the pile spacing is not greater than 3 times the pile diameter, no
additional punching shear check is required.
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR COLUMN C34


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA

Column No. = C34

No. of piles n = 4
Dia of pile = 1.20 m
Size of Column = 2.00 m x 2.00 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 5.30 m x 5.30 m


2
Area of pile cap = 28.09 m
Depth of pile cap D = 1.80 m
Volume of pile cap = 50.56 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 1264.05 kN

Thickness of Earthfill over pile cap = 1.50 m


Volume of Earthfill over pile cap = 36.14 m3
Density of Earth = 20 kN/cum
Weight of Earthfill = 722.70 kN

Total weight of (Pile cap + Earthfill) = 1986.75 kN

2.0 PILE LOADS

2.1 Summary of Staad Results (Forces at Bottom of Pile Cap)---

LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-


a) ULS Loads
2378, 3131-3178,4101-4132, 5109-5124 & 6109-6124
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30338 2186 1.0DL
29386
+ 1.0SIDL
9834.069
+ 0.3CL + 0.3PLA
924.659+ 0.3PLB
326.298
+ 0.3TLA +10.646
0.3TLB - 0.3BTA
1023.868 - 0.3BTB
2749.005
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 30338 2107 1.0DL
29386
+ 1.0SIDL
-3401.96
+1SLX + 0.3SLY
-960.225
+ 0.3SLZ
-317.992 -8.718 -974.001 -2934.346
Max Fy 30338 1452 1.15DL
29382
+ 1.2SIDL
-1808.51
- 1.5COL(-X)-MLC
1146.115 -40.025 -3.830 173.252 4628.668
Min Fy 30338 2186 1.0DL
29382
+ 1.0SIDL
-2983.57
+ 0.3CL +-983.531
0.3PLA + 0.3PLB
-318.152
+ 0.3TLA +-8.728
0.3TLB - -1295.762
0.3BTA - 0.3BTB
-3988.474
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30338 3171 1.0DL
29382
+ 1.0SIDL
9225.828
+ 0.3CL + 0.3PLB
332.926+ 0.3TLB
910.901
+ 0.3BTB14.164
+ 0.3SLX3603.861
+ 0.3SLY + 1SLZ
1308.884
+ 1.54NLB
Min Fz 30338 3178 1.0DL
29382
+ 1.0SIDL
-2934.78
+ 0.3CL +-346.348
0.3PLB + -901.948
0.3TLB - 0.3BTB
-12.310
- 0.3SLX-3558.126
- 0.3SLY - 1SLZ
-1444.386
- 1.54NLB
Max Mx 30338 3154 1.0DL
29386
+ 1.0SIDL
9403.152
+ 0.3CL + 0.3PLA
311.599+ 0.3TLA
910.112
- 0.3BTA14.294
- 0.3SLX2717.012
- 0.3SLY - 1SLZ916.327
- 1.54NLA
Min Mx 30338 3178 1.0DL
29382
+ 1.0SIDL
-2934.78
+ 0.3CL +-346.348
0.3PLB + -901.948
0.3TLB - 0.3BTB
-12.310
- 0.3SLX-3558.126
- 0.3SLY - 1SLZ
-1444.386
- 1.54NLB
Max My 30338 3147 1.0DL
29382
+ 1.0SIDL
9386.188
+ 0.3CL + 0.3PLA
332.62+ 0.3TLA
893.702
+ 0.3BTA 13.078
+ 0.3SLX 3661.684
+ 0.3SLY + 1SLZ
1306.454
+ 1.54NLA
Min My 30338 3154 1.0DL
29382
+ 1.0SIDL
-3016.33
+ 0.3CL +-346.035
0.3PLA + 0.3TLA
-884.451
- 0.3BTA-10.865
- 0.3SLX-3630.402
- 0.3SLY - 1SLZ
-1442.641
- 1.54NLA
Max Mz 30338 1452 1.15DL
29382
+ 1.2SIDL
-1808.51
- 1.5COL(-X)-MLC
1146.115 -40.025 -3.830 173.252 4628.668
Min Mz 30338 2186 1.0DL
29382
+ 1.0SIDL
-2983.57
+ 0.3CL +-983.531
0.3PLA + 0.3PLB
-318.152
+ 0.3TLA +-8.728
0.3TLB - -1295.762
0.3BTA - 0.3BTB
-3988.474
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30339 2179 1.0DL
29383
+ 1.0SIDL
9946.24
+ 0.3CL + 0.3PLA
990.455+ 0.3PLB
322.383
+ 0.3TLA +11.029
0.3TLB + 1294.145
0.3BTA + 0.3BTB
4026.466
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 30339 2362 1.0DL
29383
+ 1.0SIDL
-3521.55
+ 0.3CL +-952.343
0.3PLB + -312.804
0.3TLB - 0.3BTB-9.068
- 1SLX --1250.816
0.3SLY - 0.3SLZ
-3782.786
- 1.54LLB
Max Fy 30339 1452 1.15DL
29383
+ 1.2SIDL
9465.82
- 1.5COL(-X)-MLC
1170.121 -54.709 -3.761 292.302 4825.965
Min Fy 30339 2186 1.0DL
29383
+ 1.0SIDL
-3360.65
+ 0.3CL + 0.3PLA
-963.21+ 0.3PLB
-312.355
+ 0.3TLA +-9.077
0.3TLB - -1257.599
0.3BTA - 0.3BTB
-3821.778
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30339 3171 1.0DL
29383
+ 1.0SIDL
9397.207
+ 0.3CL + 0.3PLB
355.159+ 0.3TLB
909.109
+ 0.3BTB15.452
+ 0.3SLX3593.109
+ 0.3SLY + 1SLZ
1492.885
+ 1.54NLB
Min Fz 30339 3178 1.0DL
29383
+ 1.0SIDL
-3095.9
+ 0.3CL +-327.157
0.3PLB + -900.129
0.3TLB - 0.3BTB
-13.660
- 0.3SLX-3547.601
- 0.3SLY - 1SLZ
-1287.794
- 1.54NLB
Max Mx 30339 3154 1.0DL
29387
+ 1.0SIDL
9298.189
+ 0.3CL + 0.3PLA
333.995+ 0.3TLA
908.748
- 0.3BTA15.584
- 0.3SLX2704.721
- 0.3SLY - 1SLZ 1079.4
- 1.54NLA
Min Mx 30339 3178 1.0DL
29383
+ 1.0SIDL
-3095.9
+ 0.3CL +-327.157
0.3PLB + -900.129
0.3TLB - 0.3BTB
-13.660
- 0.3SLX-3547.601
- 0.3SLY - 1SLZ
-1287.794
- 1.54NLB
Max My 30339 3147 1.0DL
29383
+ 1.0SIDL
9557.468
+ 0.3CL + 0.3PLA
355.427+ 0.3TLA
891.91
+ 0.3BTA 14.402
+ 0.3SLX 3650.932
+ 0.3SLY + 1SLZ
1495.143
+ 1.54NLA
Min My 30339 3154 1.0DL
29383
+ 1.0SIDL
-3176.08
+ 0.3CL +-327.047
0.3PLA + 0.3TLA
-882.633
- 0.3BTA-12.251
- 0.3SLX-3619.868
- 0.3SLY - 1SLZ-1287.7
- 1.54NLA
Max Mz 30339 1452 1.15DL
29383
+ 1.2SIDL
9465.82
- 1.5COL(-X)-MLC
1170.121 -54.709 -3.761 292.302 4825.965
Min Mz 30339 2186 1.0DL
29383
+ 1.0SIDL
-3360.65
+ 0.3CL + 0.3PLA
-963.21+ 0.3PLB
-312.355
+ 0.3TLA +-9.077
0.3TLB - -1257.599
0.3BTA - 0.3BTB
-3821.778
- 1SLX - 0.3SLY - 0.3SLZ
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30340 2186 1.0DL
29388
+ 1.0SIDL
9679.723
+ 0.3CL + 0.3PLA
924.781+ 0.3PLB
343.268
+ 0.3TLA +11.172
0.3TLB - 0.3BTA
827.917
- 0.3BTB
2750.176
- 1SLX - 0.3SLY - 0.3SLZ
Min Fx 30340 2107 1.0DL
29388
+ 1.0SIDL
-3096.57
+1SLX + 0.3SLY
-960.41
+ 0.3SLZ
-293.15 -9.275 -1079.949 -2935.938
Max Fy 30340 1452 1.15DL
29384
+ 1.2SIDL
-2262.6
- 1.5COL(-X)-MLC
1146.811 -31.391 -1.461 100.611 4634.332
Min Fy 30340 2186 1.0DL
29384
+ 1.0SIDL
-2685.47
+ 0.3CL + 0.3PLA
-983.69+ 0.3PLB
-290.842
+ 0.3TLA +-9.330
0.3TLB - -1436.287
0.3BTA - 0.3BTB
-3990.006
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30340 3171 1.0DL
29384
+ 1.0SIDL
9319.124
+ 0.3CL + 0.3PLB
333.78+ 0.3TLB
929.696
+ 0.3BTB14.395
+ 0.3SLX3419.174
+ 0.3SLY + 1SLZ
1316.656
+ 1.54NLB
Min Fz 30340 3178 1.0DL
29384
+ 1.0SIDL
-2786.53
+ 0.3CL +-347.468
0.3PLB + -879.039
0.3TLB - 0.3BTB
-12.527
- 0.3SLX-3716.295
- 0.3SLY - 1SLZ
-1454.296
- 1.54NLB
Max Mx 30340 3154 1.0DL
29388
+ 1.0SIDL
9410.54
+ 0.3CL + 0.3PLA
312.643+ 0.3TLA
929.307
- 0.3BTA14.482
- 0.3SLX -2552.03
0.3SLY - 1SLZ924.694
- 1.54NLA
Min Mx 30340 3178 1.0DL
29384
+ 1.0SIDL
-2786.53
+ 0.3CL +-347.468
0.3PLB + -879.039
0.3TLB - 0.3BTB
-12.527
- 0.3SLX-3716.295
- 0.3SLY - 1SLZ
-1454.296
- 1.54NLB
Max My 30340 3147 1.0DL
29384
+ 1.0SIDL
9162.372
+ 0.3CL + 0.3PLA
334.034+ 0.3TLA
912.51
+ 0.3BTA 13.309
+ 0.3SLX 3476.889
+ 0.3SLY + 1SLZ
1318.802
+ 1.54NLA
Min My 30340 3154 1.0DL
29384
+ 1.0SIDL
-2707.91
+ 0.3CL +-347.352
0.3PLA + 0.3TLA
-861.549
- 0.3BTA-11.082
- 0.3SLX-3788.514
- 0.3SLY - 1SLZ
-1454.153
- 1.54NLA
Max Mz 30340 1452 1.15DL
29384
+ 1.2SIDL
-2262.6
- 1.5COL(-X)-MLC
1146.811 -31.391 -1.461 100.611 4634.332
Min Mz 30340 2186 1.0DL
29384
+ 1.0SIDL
-2685.47
+ 0.3CL + 0.3PLA
-983.69+ 0.3PLB
-290.842
+ 0.3TLA +-9.330
0.3TLB - -1436.287
0.3BTA - 0.3BTB
-3990.006
- 1SLX - 0.3SLY - 0.3SLZ
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30341 2179 1.0DL
29385
+ 1.0SIDL
10203.54
+ 0.3CL + 0.3PLA
990.32+ 0.3PLB
350.428
+ 0.3TLA +11.639
0.3TLB + 1158.239
0.3BTA + 0.3BTB 4024.81
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 30341 2107 1.0DL
29389
+ 1.0SIDL
-3590.75
+1SLX + 0.3SLY
-941.756
+ 0.3SLZ
-298.809 -9.619 -1120.485 -2800.825
Max Fy 30341 1452 1.15DL
29385
+ 1.2SIDL
9011.749
- 1.5COL(-X)-MLC
1169.426 -16.709 -1.383 -18.429 4820.299
Min Fy 30341 2186 1.0DL
29385
+ 1.0SIDL
-3459.34
+ 0.3CL +-963.017
0.3PLA + 0.3PLB
-296.926
+ 0.3TLA +-9.676
0.3TLB - -1479.078
0.3BTA - 0.3BTB
-3819.695
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30341 3171 1.0DL
29385
+ 1.0SIDL
9604.981
+ 0.3CL + 0.3PLB
354.189+ 0.3TLB
931.587
+ 0.3BTB15.679
+ 0.3SLX3431.329
+ 0.3SLY + 1SLZ
1483.256
+ 1.54NLB
Min Fz 30341 3178 1.0DL
29385
+ 1.0SIDL
-3062.14
+ 0.3CL + 0.3PLB
-325.92+ -880.956
0.3TLB - 0.3BTB
-13.872
- 0.3SLX-3728.223
- 0.3SLY - 1SLZ
-1276.019
- 1.54NLB
Max Mx 30341 3154 1.0DL
29389
+ 1.0SIDL
9420.06
+ 0.3CL + 0.3PLA
332.834+ 0.3TLA
930.77
- 0.3BTA15.767
- 0.3SLX2565.735
- 0.3SLY - 1SLZ
1069.164
- 1.54NLA
Min Mx 30341 3178 1.0DL
29385
+ 1.0SIDL
-3062.14
+ 0.3CL + 0.3PLB
-325.92+ -880.956
0.3TLB - 0.3BTB
-13.872
- 0.3SLX-3728.223
- 0.3SLY - 1SLZ
-1276.019
- 1.54NLB
Max My 30341 3147 1.0DL
29385
+ 1.0SIDL
9448.148
+ 0.3CL + 0.3PLA
353.896+ 0.3TLA
914.401
+ 0.3BTA 14.628
+ 0.3SLX 3489.044
+ 0.3SLY + 1SLZ
1480.93
+ 1.54NLA
Min My 30341 3154 1.0DL
29385
+ 1.0SIDL
-2982.17
+ 0.3CL +-325.613
0.3PLA + 0.3TLA
-863.465
- 0.3BTA-12.462
- 0.3SLX-3800.452
- 0.3SLY - 1SLZ
-1274.32
- 1.54NLA
Max Mz 30341 1452 1.15DL
29385
+ 1.2SIDL
9011.749
- 1.5COL(-X)-MLC
1169.426 -16.709 -1.383 -18.429 4820.299
Min Mz 30341 2186 1.0DL
29385
+ 1.0SIDL
-3459.34
+ 0.3CL +-963.017
0.3PLA + 0.3PLB
-296.926
+ 0.3TLA +-9.676
0.3TLB - -1479.078
0.3BTA - 0.3BTB
-3819.695
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

LC 1001-1190, 2031-2078, 3031-3078, 4001-


b) SLS Loads For Stress check
4032, 5009-5024 & 6009-6024
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30338 1086 1DL 29386
+ 1SIDL +8325.476
0.3CL + 0.3PLA
700.407
+ 0.3PLB +250.76
0.3TLA + 0.3TLB
8.377
- 0.3BTA
790.702
- 0.3BTB -2073.825
1SLX - 0.3SLY - 0.3SLZ
Min Fx 30338 1007 1DL 29386
+ 1SIDL +-1893.37
1SLX + 0.3SLY
-735.973
+ 0.3SLZ -242.454 -6.449 -740.835 -2259.166
Max Fy 30338 1152 1DL 29382
+ 1SIDL --517.537
1COL(-X)-MLC762.75 -25.643 -2.327 119.433 3071.661
Min Fy 30338 1086 1DL 29382
+ 1SIDL +-1474.98
0.3CL + 0.3PLA
-759.279
+ 0.3PLB-242.615
+ 0.3TLA + 0.3TLB
-6.458
- 0.3BTA
-987.153
- 0.3BTB -3089.103
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30338 3071 1DL 29382
+ 1SIDL +7782.471
0.3CL + 0.3PLB
255.998
+ 0.3TLB 697.266
+ 0.3BTB +11.017
0.3SLX + 0.3SLY
2763.794+ 1SLZ +997.311
1.1NLB
Min Fz 30338 3078 1DL 29382
+ 1SIDL +-1491.43
0.3CL + 0.3PLB
-269.421
+ 0.3TLB-688.313
- 0.3BTB - 0.3SLX
-9.164 - 0.3SLY
-2718.059
- 1SLZ --1132.813
1.1NLB
Max Mx 30338 3054 1DL 29386
+ 1SIDL +7959.792
0.3CL + 0.3PLA
234.669
+ 0.3TLA 696.477
- 0.3BTA - 11.147
0.3SLX - 0.3SLY
2085.362
- 1SLZ - 1.1NLA
681.517
Min Mx 30338 3078 1DL 29382
+ 1SIDL +-1491.43
0.3CL + 0.3PLB
-269.421
+ 0.3TLB-688.313
- 0.3BTB - 0.3SLX
-9.164 - 0.3SLY
-2718.059
- 1SLZ --1132.813
1.1NLB
Max My 30338 3047 1DL 29382
+ 1SIDL +7906.776
0.3CL + 0.3PLA
255.787
+ 0.3TLA 685.243
+ 0.3BTA + 10.323
0.3SLX + 0.3SLY
2802.197+ 1SLZ + 995.51
1.1NLA
Min My 30338 3054 1DL 29382
+ 1SIDL +-1536.92
0.3CL + 0.3PLA
-269.202
+ 0.3TLA-675.992
- 0.3BTA - 0.3SLX
-8.110 - 0.3SLY
-2770.915
- 1SLZ --1131.697
1.1NLA
Max Mz 30338 1152 1DL 29382
+ 1SIDL --517.537
1COL(-X)-MLC762.75 -25.643 -2.327 119.433 3071.661
Min Mz 30338 1086 1DL 29382
+ 1SIDL +-1474.98
0.3CL + 0.3PLA
-759.279
+ 0.3PLB-242.615
+ 0.3TLA + 0.3TLB
-6.458
- 0.3BTA
-987.153
- 0.3BTB -3089.103
- 1SLX - 0.3SLY - 0.3SLZ
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30339 1079 1DL 29383
+ 1SIDL +8412.192
0.3CL + 0.3PLA
765.881
+ 0.3PLB248.122
+ 0.3TLA + 0.3TLB
8.684
+ 0.3BTA
995.466
+ 0.3BTB3124.358
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 30339 1007 1DL 29387
+ 1SIDL + 1SLX
-1965.3
+ 0.3SLY
-717.402
+ 0.3SLZ -238.358 -6.721 -713.558 -2125.368
Max Fy 30339 1152 1DL 29383
+ 1SIDL -7000.692
1COL(-X)-MLC783.233 -35.431 -2.288 198.782 3240.022
Min Fy 30339 1086 1DL 29383
+ 1SIDL + 0.3CL
-1826.6
+ 0.3PLA
-738.636
+ 0.3PLB-238.094
+ 0.3TLA + 0.3TLB
-6.732
- 0.3BTA
-958.919
- 0.3BTB - -2919.67
1SLX - 0.3SLY - 0.3SLZ
Max Fz 30339 3071 1DL 29383
+ 1SIDL +7946.399
0.3CL + 0.3PLB
277.889
+ 0.3TLB 695.854
+ 0.3BTB +11.995
0.3SLX + 0.3SLY
2756.002+ 1SLZ1178.213
+ 1.1NLB
Min Fz 30339 3078 1DL 29383
+ 1SIDL +-1645.09
0.3CL + 0.3PLB
-249.886
+ 0.3TLB-686.874
- 0.3BTB --10.203
0.3SLX - 0.3SLY
-2710.494
- 1SLZ - -973.121
1.1NLB
Max Mx 30339 3054 1DL 29387
+ 1SIDL +7847.385
0.3CL + 0.3PLA
256.722
+ 0.3TLA 695.493
- 0.3BTA - 12.127
0.3SLX - 0.3SLY
2075.621
- 1SLZ - 1.1NLA
841.802
Min Mx 30339 3078 1DL 29383
+ 1SIDL +-1645.09
0.3CL + 0.3PLB
-249.886
+ 0.3TLB-686.874
- 0.3BTB --10.203
0.3SLX - 0.3SLY
-2710.494
- 1SLZ - -973.121
1.1NLB
Max My 30339 3047 1DL 29383
+ 1SIDL +8070.854
0.3CL + 0.3PLA
278.135
+ 0.3TLA 683.831
+ 0.3BTA + 11.326
0.3SLX + 0.3SLY
2794.406+ 1SLZ1180.155
+ 1.1NLA
Min My 30339 3054 1DL 29383
+ 1SIDL +-1689.46
0.3CL + 0.3PLA
-249.755
+ 0.3TLA-674.555
- 0.3BTA - 0.3SLX
-9.175 - 0.3SLY
-2763.343
- 1SLZ - 1.1NLA
-972.713
Max Mz 30339 1152 1DL 29383
+ 1SIDL -7000.692
1COL(-X)-MLC783.233 -35.431 -2.288 198.782 3240.022
Min Mz 30339 1086 1DL 29383
+ 1SIDL + 0.3CL
-1826.6
+ 0.3PLA
-738.636
+ 0.3PLB-238.094
+ 0.3TLA + 0.3TLB
-6.732
- 0.3BTA
-958.919
- 0.3BTB - -2919.67
1SLX - 0.3SLY - 0.3SLZ
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30340 1086 1DL 29388
+ 1SIDL + 8224.37
0.3CL + 0.3PLA
700.497
+ 0.3PLB268.961
+ 0.3TLA + 0.3TLB
8.768
- 0.3BTA
603.347
- 0.3BTB -2074.703
1SLX - 0.3SLY - 0.3SLZ
Min Fx 30340 1007 1DL 29388
+ 1SIDL +-1641.22
1SLX + 0.3SLY
-736.127
+ 0.3SLZ -218.842 -6.871 -855.379 -2260.465
Max Fy 30340 1152 1DL 29384
+ 1SIDL --801.755
1COL(-X)-MLC763.203 -15.396 -0.746 34.086 3075.353
Min Fy 30340 1086 1DL 29384
+ 1SIDL +-1230.12
0.3CL + 0.3PLA
-759.406
+ 0.3PLB-216.534
+ 0.3TLA + 0.3TLB
-6.926
- 0.3BTA
-1137.548
- 0.3BTB -3090.314
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30340 3071 1DL 29384
+ 1SIDL +7875.322
0.3CL + 0.3PLB
256.63
+ 0.3TLB 716.504
+ 0.3BTB +11.200
0.3SLX + 0.3SLY
2582.651+ 1SLZ1003.084
+ 1.1NLB
Min Fz 30340 3078 1DL 29384
+ 1SIDL +-1342.73
0.3CL + 0.3PLB
-270.317
+ 0.3TLB-665.847
- 0.3BTB - 0.3SLX
-9.332 - 0.3SLY
-2879.772
- 1SLZ --1140.724
1.1NLB
Max Mx 30340 3054 1DL 29388
+ 1SIDL +7966.736
0.3CL + 0.3PLA
235.491
+ 0.3TLA 716.115
- 0.3BTA - 11.287
0.3SLX - 0.3SLY
1923.471
- 1SLZ - 1.1NLA
688.09
Min Mx 30340 3078 1DL 29384
+ 1SIDL +-1342.73
0.3CL + 0.3PLB
-270.317
+ 0.3TLB-665.847
- 0.3BTB - 0.3SLX
-9.332 - 0.3SLY
-2879.772
- 1SLZ --1140.724
1.1NLB
Max My 30340 3047 1DL 29384
+ 1SIDL +7753.625
0.3CL + 0.3PLA
256.865
+ 0.3TLA 704.492
+ 0.3BTA + 10.506
0.3SLX + 0.3SLY
2620.971+ 1SLZ1004.939
+ 1.1NLA
Min My 30340 3054 1DL 29384
+ 1SIDL +-1299.17
0.3CL + 0.3PLA
-270.184
+ 0.3TLA-653.53
- 0.3BTA - 0.3SLX
-8.278 - 0.3SLY
-2932.596
- 1SLZ --1140.289
1.1NLA
Max Mz 30340 1152 1DL 29384
+ 1SIDL --801.755
1COL(-X)-MLC763.203 -15.396 -0.746 34.086 3075.353
Min Mz 30340 1086 1DL 29384
+ 1SIDL +-1230.12
0.3CL + 0.3PLA
-759.406
+ 0.3PLB-216.534
+ 0.3TLA + 0.3TLB
-6.926
- 0.3BTA
-1137.548
- 0.3BTB -3090.314
- 1SLX - 0.3SLY - 0.3SLZ
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30341 1079 1DL 29385
+ 1SIDL +8629.426
0.3CL + 0.3PLA
765.786
+ 0.3PLB274.776
+ 0.3TLA + 0.3TLB
9.161
+ 0.3BTA848.48
+ 0.3BTB3123.152
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fx 30341 1007 1DL 29389
+ 1SIDL +-2016.64
1SLX + 0.3SLY
-717.222
+ 0.3SLZ -223.157 -7.140 -886.256 -2123.645
Max Fy 30341 1152 1DL 29385
+ 1SIDL -6716.489
1COL(-X)-MLC782.781 -5.61 -0.700 -45.256 3236.328
Min Fy 30341 1086 1DL 29385
+ 1SIDL +-1885.23
0.3CL + 0.3PLA
-738.483
+ 0.3PLB-221.274
+ 0.3TLA + 0.3TLB
-7.197
- 0.3BTA
-1169.32
- 0.3BTB -2918.036
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30341 3071 1DL 29385
+ 1SIDL +8127.542
0.3CL + 0.3PLB
277.169
+ 0.3TLB 717.992
+ 0.3BTB +12.174
0.3SLX + 0.3SLY
2591.515+ 1SLZ1171.021
+ 1.1NLB
Min Fz 30341 3078 1DL 29385
+ 1SIDL + 0.3CL
-1584.7
+ 0.3PLB-248.9
+ 0.3TLB-667.361
- 0.3BTB --10.367
0.3SLX - 0.3SLY
-2888.409
- 1SLZ - -963.784
1.1NLB
Max Mx 30341 3054 1DL 29389
+ 1SIDL +7942.623
0.3CL + 0.3PLA
255.811
+ 0.3TLA 717.174
- 0.3BTA - 12.262
0.3SLX - 0.3SLY
1934.292
- 1SLZ - 1.1NLA
833.8
Min Mx 30341 3078 1DL 29385
+ 1SIDL + 0.3CL
-1584.7
+ 0.3PLB-248.9
+ 0.3TLB-667.361
- 0.3BTB --10.367
0.3SLX - 0.3SLY
-2888.409
- 1SLZ - -963.784
1.1NLB
Max My 30341 3047 1DL 29385
+ 1SIDL +8006.006
0.3CL + 0.3PLA
276.967
+ 0.3TLA705.98
+ 0.3BTA + 11.505
0.3SLX + 0.3SLY
2629.833+ 1SLZ1169.302
+ 1.1NLA
Min My 30341 3054 1DL 29385
+ 1SIDL +-1540.03
0.3CL + 0.3PLA
-248.684
+ 0.3TLA-655.044
- 0.3BTA - 0.3SLX
-9.339 - 0.3SLY
-2941.24
- 1SLZ - 1.1NLA
-962.691
Max Mz 30341 1152 1DL 29385
+ 1SIDL -6716.489
1COL(-X)-MLC782.781 -5.61 -0.700 -45.256 3236.328
Min Mz 30341 1086 1DL 29385
+ 1SIDL +-1885.23
0.3CL + 0.3PLA
-738.483
+ 0.3PLB-221.274
+ 0.3TLA + 0.3TLB
-7.197
- 0.3BTA
-1169.32
- 0.3BTB -2918.036
- 1SLX - 0.3SLY - 0.3SLZ

c) SLS Loads For crack width check LC 1001-1006


Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30338 1006 1DL 29382
+ 1SIDL +4523.838
1CL + 1PLA + 1PLB
-91.64+ 1.1TLA
3.476
+ 1.1TLB - 1.1BTA
0.897 - 1.1BTB
34.628 -408.826
Min Fx 30338 1003 1DL 29382
+ 1SIDL +3259.795
1CL + 1PLB + 30.664
1.1TLB + 1.1BTB
5.152 0.716 31.608 68.758
Max Fy 30338 1005 1DL 29382
+ 1SIDL +3512.538
1CL + 1PLA + 1PLB
64.85+ 1.1TLA
10.353
+ 1.1TLB + 1.1BTA
1.259 + 1.1BTB
0.792 187.606
Min Fy 30338 1006 1DL 29382
+ 1SIDL +4523.838
1CL + 1PLA + 1PLB
-91.64+ 1.1TLA
3.476
+ 1.1TLB - 1.1BTA
0.897 - 1.1BTB
34.628 -408.826
Max Fz 30338 1005 1DL 29382
+ 1SIDL +3512.538
1CL + 1PLA + 1PLB
64.85+ 1.1TLA
10.353
+ 1.1TLB + 1.1BTA
1.259 + 1.1BTB
0.792 187.606
Min Fz 30338 1002 1DL 29382
+ 1SIDL +3905.303
1CL + 1PLA +-47.571
1.1TLA - 1.1BTA
2.696 1.129 20.655 -230.695
Max Mx 30338 1001 1DL 29382
+ 1SIDL +3380.435
1CL + 1PLA + 30.747
1.1TLA + 1.1BTA
8.961 1.698 -6.971 67.936
Min Mx 30338 1003 1DL 29382
+ 1SIDL +3259.795
1CL + 1PLB + 30.664
1.1TLB + 1.1BTB
5.152 0.716 31.608 68.758
Max My 30338 1004 1DL 29386
+ 1SIDL +3746.227
1CL + 1PLB +-47.508
1.1TLB - 1.1BTB
4.54 0.922 42.358 -181.535
Min My 30338 1001 1DL 29382
+ 1SIDL +3380.435
1CL + 1PLA + 30.747
1.1TLA + 1.1BTA
8.961 1.698 -6.971 67.936
Max Mz 30338 1005 1DL 29382
+ 1SIDL +3512.538
1CL + 1PLA + 1PLB
64.85+ 1.1TLA
10.353
+ 1.1TLB + 1.1BTA
1.259 + 1.1BTB
0.792 187.606
Min Mz 30338 1006 1DL 29382
+ 1SIDL +4523.838
1CL + 1PLA + 1PLB
-91.64+ 1.1TLA
3.476
+ 1.1TLB - 1.1BTA
0.897 - 1.1BTB
34.628 -408.826
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30339 1005 1DL 29383
+ 1SIDL +4526.205
1CL + 1PLA + 92.098
1PLB + 1.1TLA
8.774
+ 1.1TLB + 1.1BTA
1.211 + 1.1BTB
13.656 411.646
Min Fx 30339 1004 1DL 29383
+ 1SIDL +3236.185
1CL + 1PLB +-24.069
1.1TLB - 1.1BTB
5.352 0.888 31.194 -36.324
Max Fy 30339 1005 1DL 29383
+ 1SIDL +4526.205
1CL + 1PLA + 92.098
1PLB + 1.1TLA
8.774
+ 1.1TLB + 1.1BTA
1.211 + 1.1BTB
13.656 411.646
Min Fy 30339 1006 1DL 29383
+ 1SIDL +3506.487
1CL + 1PLA +-64.553
1PLB + 1.1TLA
5.041
+ 1.1TLB - 1.1BTA
0.861 - 1.1BTB
21.875 -186.116
Max Fz 30339 1005 1DL 29383
+ 1SIDL +4526.205
1CL + 1PLA + 92.098
1PLB + 1.1TLA
8.774
+ 1.1TLB + 1.1BTA
1.211 + 1.1BTB
13.656 411.646
Min Fz 30339 1002 1DL 29383
+ 1SIDL +3397.039
1CL + 1PLA +-23.411
1.1TLA - 1.1BTA
3.507 1.098 14.042 -32.06
Max Mx 30339 1001 1DL 29383
+ 1SIDL +3888.179
1CL + 1PLA + 54.927
1.1TLA + 1.1BTA
8.199 1.655 -0.77 266.745
Min Mx 30339 1003 1DL 29383
+ 1SIDL +3764.761
1CL + 1PLB + 54.244
1.1TLB + 1.1BTB
4.393 0.681 37.787 262.633
Max My 30339 1003 1DL 29387
+ 1SIDL +3764.761
1CL + 1PLB + 54.244
1.1TLB + 1.1BTB
4.393 0.681 42.18 208.389
Min My 30339 1001 1DL 29383
+ 1SIDL +3888.179
1CL + 1PLA + 54.927
1.1TLA + 1.1BTA
8.199 1.655 -0.77 266.745
Max Mz 30339 1005 1DL 29383
+ 1SIDL +4526.205
1CL + 1PLA + 92.098
1PLB + 1.1TLA
8.774
+ 1.1TLB + 1.1BTA
1.211 + 1.1BTB
13.656 411.646
Min Mz 30339 1006 1DL 29383
+ 1SIDL +3506.487
1CL + 1PLA +-64.553
1PLB + 1.1TLA
5.041
+ 1.1TLB - 1.1BTA
0.861 - 1.1BTB
21.875 -186.116
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30340 1006 1DL 29384
+ 1SIDL +4572.776
1CL + 1PLA +-91.581
1PLB + 1.1TLA
32.059
+ 1.1TLB - 1.1BTA
0.737 - 1.1BTB
-200.236 -408.314
Min Fx 30340 1001 1DL 29384
+ 1SIDL +3358.909
1CL + 1PLA + 30.994
1.1TLA + 32.125
1.1BTA 1.785 -197.46 69.997
Max Fy 30340 1005 1DL 29384
+ 1SIDL +3615.971
1CL + 1PLA + 64.836
1PLB + 1.1TLA
36.028
+ 1.1TLB + 1.1BTA
1.420 + 1.1BTB
-210.393 187.531
Min Fy 30340 1006 1DL 29384
+ 1SIDL +4572.776
1CL + 1PLA +-91.581
1PLB + 1.1TLA
32.059
+ 1.1TLB - 1.1BTA
0.737 - 1.1BTB
-200.236 -408.314
Max Fz 30340 1005 1DL 29384
+ 1SIDL +3615.971
1CL + 1PLA + 64.836
1PLB + 1.1TLA
36.028
+ 1.1TLB + 1.1BTA
1.420 + 1.1BTB
-210.393 187.531
Min Fz 30340 1002 1DL 29384
+ 1SIDL +3818.965
1CL + 1PLA +-47.229
1.1TLA - 1.1BTA
27.316 1.056 -181.69 -227.862
Max Mx 30340 1001 1DL 29384
+ 1SIDL +3358.909
1CL + 1PLA + 30.994
1.1TLA + 32.125
1.1BTA 1.785 -197.46 69.997
Min Mx 30340 1006 1DL 29384
+ 1SIDL +4572.776
1CL + 1PLA +-91.581
1PLB + 1.1TLA
32.059
+ 1.1TLB - 1.1BTA
0.737 - 1.1BTB
-200.236 -408.314
Max My 30340 1003 1DL 29388
+ 1SIDL +3479.236
1CL + 1PLB + 30.323
1.1TLB + 1.1BTB
28.307 0.803 -130.5 35.658
Min My 30340 1005 1DL 29384
+ 1SIDL +3615.971
1CL + 1PLA + 64.836
1PLB + 1.1TLA
36.028
+ 1.1TLB + 1.1BTA
1.420 + 1.1BTB
-210.393 187.531
Max Mz 30340 1005 1DL 29384
+ 1SIDL +3615.971
1CL + 1PLA + 64.836
1PLB + 1.1TLA
36.028
+ 1.1TLB + 1.1BTA
1.420 + 1.1BTB
-210.393 187.531
Min Mz 30340 1006 1DL 29384
+ 1SIDL +4572.776
1CL + 1PLA +-91.581
1PLB + 1.1TLA
32.059
+ 1.1TLB - 1.1BTA
0.737 - 1.1BTB
-200.236 -408.314
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30341 1005 1DL 29385
+ 1SIDL +4629.627
1CL + 1PLA + 92.112
1PLB + 1.1TLA
37.606
+ 1.1TLB + 1.1BTA
1.372 + 1.1BTB
-223.257 411.726
Min Fx 30341 1002 1DL 29385
+ 1SIDL +3310.699
1CL + 1PLA +-23.753
1.1TLA - 1.1BTA
26.505 1.025 -175.077 -34.894
Max Fy 30341 1005 1DL 29385
+ 1SIDL +4629.627
1CL + 1PLA + 92.112
1PLB + 1.1TLA
37.606
+ 1.1TLB + 1.1BTA
1.372 + 1.1BTB
-223.257 411.726
Min Fy 30341 1006 1DL 29385
+ 1SIDL +3555.419
1CL + 1PLA +-64.612
1PLB + 1.1TLA
30.494
+ 1.1TLB - 1.1BTA
0.700 - 1.1BTB
-187.484 -186.626
Max Fz 30341 1005 1DL 29385
+ 1SIDL +4629.627
1CL + 1PLA + 92.112
1PLB + 1.1TLA
37.606
+ 1.1TLB + 1.1BTA
1.372 + 1.1BTB
-223.257 411.726
Min Fz 30341 1002 1DL 29385
+ 1SIDL +3310.699
1CL + 1PLA +-23.753
1.1TLA - 1.1BTA
26.505 1.025 -175.077 -34.894
Max Mx 30341 1001 1DL 29385
+ 1SIDL +3866.648
1CL + 1PLA + 54.68
1.1TLA + 32.887
1.1BTA 1.744 -203.66 264.686
Min Mx 30341 1006 1DL 29385
+ 1SIDL +3555.419
1CL + 1PLA +-64.612
1PLB + 1.1TLA
30.494
+ 1.1TLB - 1.1BTA
0.700 - 1.1BTB
-187.484 -186.626
Max My 30341 1004 1DL 29389
+ 1SIDL + 3465.93
1CL + 1PLB +-23.705
1.1TLB - 1.1BTB
28.335 0.814 -129.462 -9.652
Min My 30341 1005 1DL 29385
+ 1SIDL +4629.627
1CL + 1PLA + 92.112
1PLB + 1.1TLA
37.606
+ 1.1TLB + 1.1BTA
1.372 + 1.1BTB
-223.257 411.726
Max Mz 30341 1005 1DL 29385
+ 1SIDL +4629.627
1CL + 1PLA + 92.112
1PLB + 1.1TLA
37.606
+ 1.1TLB + 1.1BTA
1.372 + 1.1BTB
-223.257 411.726
Min Mz 30341 1006 1DL 29385
+ 1SIDL +3555.419
1CL + 1PLA +-64.612
1PLB + 1.1TLA
30.494
+ 1.1TLB - 1.1BTA
0.700 - 1.1BTB
-187.484 -186.626

2.2 Pile Loads

ULS
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 9834 9946 9680 10204


Min Fx -3402 -3522 -3097 -3591
Max Fy -1809 9466 -2263 9012
Min Fy -2984 -3361 -2685 -3459
Max Fz 9226 9397 9319 9605
Min Fz -2935 -3096 -2787 -3062
Max Mx 9403 9298 9411 9420
Min Mx -2935 -3096 -2787 -3062
Max My 9386 9557 9162 9448
Min My -3016 -3176 -2708 -2982
Max Mz -1809 9466 -2263 9012
Min Mz -2984 -3361 -2685 -3459
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

SLS Stress Check


Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 8325 8412 8224 8629


Min Fx -1893 -1965 -1641 -2017
Max Fy -518 7001 -802 6716
Min Fy -1475 -1827 -1230 -1885
Max Fz 7782 7946 7875 8128
Min Fz -1491 -1645 -1343 -1585
Max Mx 7960 7847 7967 7943
Min Mx -1491 -1645 -1343 -1585
Max My 7907 8071 7754 8006
Min My -1537 -1689 -1299 -1540
Max Mz -518 7001 -802 6716
Min Mz -1475 -1827 -1230 -1885

SLS Crack Width Check


Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -

Max Fx 4524 4526 4573 4630


Min Fx 3260 3236 3359 3311
Max Fy 3513 4526 3616 4630
Min Fy 4524 3506 4573 3555
Max Fz 3513 4526 3616 4630
Min Fz 3905 3397 3819 3311
Max Mx 3380 3888 3359 3867
Min Mx 3260 3765 4573 3555
Max My 3746 3765 3479 3466
Min My 3380 3888 3616 4630
Max Mz 3513 4526 3616 4630
Min Mz 4524 3506 4573 3555

3.1 Moment at Bottom Face:

Lever arm Z = Pile Centre to column face

Z = 0.80 m

Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or


2.0 m (P1+P2)xZ or (P3+P4)xZ, whichever
column is maximum

P kN
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = 510.276 kN.m
Design Moment, M = M 1 - M2

Case M1 (kN.m) M = (M1 - M2) (kN.m)


ULS 16120.000 15533.182
SLS Stress Check 13632.800 13122.524
SLS Crack Width Check 7362.400 6852.124

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
2
K = Mu/bd fcu = 0.020 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1709.00 mm
Hence, z = 0.95 d = 1623.55 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table
23, pg. 37 of the Design Manual.
Ast = 28197.520 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


29 120 0 0 0 0

= 28716.101 mm2 OK

3.2 Moment at Top Face:

Lever arm Z = Pile Centre to column face

P kN Z = 0.80 m
2.0 m
column Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or
(P1+P2)xZ or (P3+P4)xZ, whichever
is minimum

Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = -510.276 kN.m
Design Moment, M = M 1 + M2

Case M1 (kN.m) M = (M1 + M2) (kN.m)


ULS -5690.400 -6277.218
SLS Stress Check -3185.600 -3695.876
SLS Crack Width Check 0.000 0.000
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
2
K = Mu/bd fcu = 0.008 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1709.00 mm
Hence, z = 0.95 d = 1623.55 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table
23, pg. 37 of the Design Manual.
Ast = 11395.087 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 120 0 0 0 0

= 21357.103 mm2 OK

3.3 Moment Capacity, Stress and Crack Width Check from Oasys

a) Moment Capacity Check:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 15530 17950 0.8654 OK
Minima
1 0.0 15530 17950 0.8654 OK

b) Stress Check:
Permissible stresses
Concrete 0.5fck 25.000 MPa
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
1 8.639 OK 1 43.14 OK
1 8.639 OK 1 43.14 OK
Minima Minima
1 -0.5862 OK 1 -224.9 OK
1 -0.5862 OK 1 -224.9 OK

c) Crack Width Check:


Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.143 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

3.4 Minimum Reinforcement


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3999.06 mm2/m
At bottom face, Provided = 5418 mm2/m
Astprovided > Astmin OK
At top face, Provided = 4030 mm2/m
Astprovided > Astmin OK

4.0 Shear Check


Total pile reaction, V1 = 20150 kN
As per Cl. 3.11.4.3, pg. 82, BS 8110-1: 1997, critical section for shear should be located 20% of the pile diameter inside
the face of the pile.
Distance of critical section for shear check from column face = 0.440 m
Factored weight per unit length due to soil and pile cap = 351.502 kN/m
Hence, downward reaction due to soil and pile cap weight,
V2 = weight per unit length x (length of pile cap - 0.5 x column size - distance of critical section)
V2 = 636 kN
Net reaction, Vu = V1 - V2 = 19514 kN
Width of pile cap available b = 5.300 m
Effective depth of pile cap d = 1.709 m
Area of tensile steel provided As = 28716 mm2
= 0.029 m2
Percentage of tensile steel provided 100As/(b.d) = 0.317 %
Shear stress = Vu /(b.d) = 2154.39 kN/sqm
Grade of concrete = C50
Design shear resistance is calculated as per Cl. 3.11.4.4, pg. 82, BS 8110-1: 1997.
Shear strength of concrete, vc = 0.35 MPa
= 350 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 0.440 m
Therefore, vc,1 = 2.72 MPa
= 2719 kN/sqm
Vus = Vu - vc,1 b d = -5112.87 kN
Requirement of shear reinforcement = Not Required
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Station Prepared Varun
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

5.0 Check for punching shear


Total pile load = 39664 kN
From section 1.0 above, factored weight of pile cap + earthfill = 1987 kN
Hence, net punching shear force = 37677 kN
Effective depth of pile cap = 1.709 m
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997, punching shear shall be checked at the perimeter of the column.
Shear perimeter = 8.000 m
Shearing Area = 13.672 m2
Punching Shear stress = 2755.797 kN/m2
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997,
Allowable punching shear stress = lesser of 0.8 fcu or 5 N/mm2 = 5.00 N/mm2
= 5000.000 kN/m2
OK
As per Cl. 3.11.4.5, pg. 83, BS 8110-1: 1997, since the pile spacing is not greater than 3 times the pile diameter, no
additional punching shear check is required.
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUP PG2B


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA


DESIGN OF PILE CAP FOR COLUMN C38
Pile Group = PG2B

No. of piles n = 2
Dia of pile = 1.00 m
Centre to centre distance of pile = 3.22 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 1.500 m x 4.720 m


Area of pile cap = 7.08 m2
Depth of pile cap D = 1.50 m
Volume of pile cap = 10.62 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 265.50 kN

Thickness of Earthfill over pile cap = 0.00 m

Total weight of (Pile cap + Earthfill) = 265.50 kN

2.1 Moment in Longitudinal Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 1655.380
ODE Seismic 1183.512
Static 936.245

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.004 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1412.50 mm
Hence, z = 0.950 d = 1341.875 mm
As = Mu / (fy z)
Ast = 3163 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 125 0 0 0 0

= 18237 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 1655. 9499. 0.1743 OK
Minima
1 0.0 1655. 9499. 0.1743 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
3.49 OK
3.49 OK
Minima
-3.408 OK
-3.408 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Concrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 0.4998 OK 2 2.761 OK
2 0.4998 OK 2 2.761 OK
Minima Minima
2 -0.5001 OK 2 -2.696 OK
2 -0.5001 OK 2 -2.696 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.007 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.3 Moment in Transverse Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 6782.886
ODE Seismic 5819.006
Static 3352.349

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.046 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1405.00 mm
Hence, z = 0.946 d = 1329.4123 mm
As = Mu / (fy z)
Ast = 13082 mm2
Astprovided = Dia Spacing Dia Spacing Dia Spacing
40 100 0 0 0 0

= 17392 mm2 OK

2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 6783. 8341. 0.8132 OK
Minima
1 0.0 6783. 8341. 0.8132 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
72.81 OK
72.81 OK
Minima
-258 OK
-258 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 8.461 OK 2 41.84 OK
2 8.461 OK 2 41.84 OK
Minima Minima
2 -0.6119 OK 2 -139.1 OK
2 -0.6119 OK 2 -139.1 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.216 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.5 Minimum reinforcement on tension face


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3305.25 mm2/m
In longitudinal direction, Provided = 3864 mm2/m
Astprovided > Astmin OK
In transverse direction, Provided = 11595 mm2/m
Astprovided > Astmin OK

3.0 Top Reinforcement


Top Reinforcement should be 0.234% of cross-sectional area.
Required Steel = 3305.25 mm2/m
In longitudinal direction,
Dia 25 Spacing 125 Provided = 3864 mm2/m
OK
In transverse direction,
Dia 25 Spacing 100 = 4578 mm2/m
Provided
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

4.2 Shear Check in Transverse Direction


Shear force from STAAD Vu = 5461 kN
Width of pile cap available b = 1.500 m
Effective depth of pile cap d = 1.405 m
Area of tensile steel provided As = 17392 mm2
0.017 m2
Percentage of tensile steel provided 100As/(b.d) = 0.825
Shear stress = Vu /(b . d) = 2591.22 kN/sqm
Grade of concrete = 50
Shear strength of concrete, vc = 0.51 MPa
510 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 1.387 m
Therefore, vc,1 = 1.03 MPa
1033 kN/sqm
Vus = Vu - vc b d = 4386.18 kN
Requirement of shear reinforcement = Required
From Table 3.16, pg. 46, BS 8110-1: 1997,
For minimum links, Vus,min = 0.4 b d = 843.00 kN
Dia of stirrup 16 mm
No. of legs 6
As per Table 3.16, pg. 46, BS 8110-1: 1997, spacing required,
sv = 0.87 fyv Asv d / Vus 131 mm
Provided spacing 125 mm
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUP PG2C


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA


DESIGN OF PILE CAP FOR COLUMN C39
Pile Group = PG2C

No. of piles n = 2
Dia of pile = 1.00 m
Centre to centre distance of pile = 3.22 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 1.500 m x 4.720 m


Area of pile cap = 7.08 m2
Depth of pile cap D = 1.50 m
Volume of pile cap = 10.62 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 265.50 kN

Thickness of Earthfill over pile cap = 0.00 m

Total weight of (Pile cap + Earthfill) = 265.50 kN

2.1 Moment in Longitudinal Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 1727.043
ODE Seismic 1295.937
Static 850.218

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.004 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1412.50 mm
Hence, z = 0.950 d = 1341.875 mm
As = Mu / (fy z)
Ast = 3300 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 125 0 0 0 0

= 18237 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 1727. 9508. 0.1816 OK
Minima
1 0.0 1727. 9508. 0.1816 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
3.821 OK
3.821 OK
Minima
-3.732 OK
-3.732 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Concrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 0.4539 OK 2 2.507 OK
2 0.4539 OK 2 2.507 OK
Minima Minima
2 -0.4541 OK 2 -2.449 OK
2 -0.4541 OK 2 -2.449 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.006 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.3 Moment in Transverse Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 5117.370
ODE Seismic 4521.495
Static 3109.521

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.034 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1407.00 mm
Hence, z = 0.950 d = 1336.65 mm
As = Mu / (fy z)
Ast = 9817 mm2
Astprovided = Dia Spacing Dia Spacing Dia Spacing
36 100 0 0 0 0

= 14128 mm2 OK

2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 5117. 8332. 0.6142 OK
Minima
1 0.0 5117. 8332. 0.6142 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
56.53 OK
56.53 OK
Minima
-195.4 OK
-195.4 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 7.825 OK 2 38.78 OK
2 7.825 OK 2 38.78 OK
Minima Minima
2 -0.6121 OK 2 -127.4 OK
2 -0.6121 OK 2 -127.4 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.222 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.5 Minimum reinforcement on tension face


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3305.25 mm2/m
In longitudinal direction, Provided = 3864 mm2/m
Astprovided > Astmin OK
In transverse direction, Provided = 9419 mm2/m
Astprovided > Astmin OK

3.0 Top Reinforcement


Top Reinforcement should be 0.234% of cross-sectional area.
Required Steel = 3305.25 mm2/m
In longitudinal direction,
Dia 25 Spacing 125 Provided = 3864 mm2/m
OK
In transverse direction,
Dia 25 Spacing 100 = 4578 mm2/m
Provided
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

4.2 Shear Check in Transverse Direction


Shear force from STAAD Vu = 5461 kN
Width of pile cap available b = 1.500 m
Effective depth of pile cap d = 1.407 m
Area of tensile steel provided As = 14128 mm2
0.014 m2
Percentage of tensile steel provided 100As/(b.d) = 0.669
Shear stress = Vu /(b . d) = 2587.54 kN/sqm
Grade of concrete = 50
Shear strength of concrete, vc = 0.47 MPa
470 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 1.497 m
Therefore, vc,1 = 0.88 MPa
883 kN/sqm
Vus = Vu - vc b d = 4469.07 kN
Requirement of shear reinforcement = Required
From Table 3.16, pg. 46, BS 8110-1: 1997,
For minimum links, Vus,min = 0.4 b d = 844.20 kN
Dia of stirrup 16 mm
No. of legs 6
As per Table 3.16, pg. 46, BS 8110-1: 1997, spacing required,
sv = 0.87 fyv Asv d / Vus 129 mm
Provided spacing 125 mm
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUP PG2D


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA


DESIGN OF PILE CAP FOR COLUMN C47
Pile Group = PG2D

No. of piles n = 2
Dia of pile = 1.00 m
Centre to centre distance of pile = 3.20 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 1.500 m x 4.700 m


Area of pile cap = 7.05 m2
Depth of pile cap D = 1.50 m
Volume of pile cap = 10.58 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 264.38 kN

Thickness of Earthfill over pile cap = 0.00 m

Total weight of (Pile cap + Earthfill) = 264.38 kN

2.1 Moment in Longitudinal Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 2051.964
ODE Seismic 1548.946
Static 374.176

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.004 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1412.50 mm
Hence, z = 0.950 d = 1341.875 mm
As = Mu / (fy z)
Ast = 3921 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 125 0 0 0 0

= 18158 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 2052. 9484. 0.2164 OK
Minima
1 0.0 2052. 9484. 0.2164 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
4.584 OK
4.584 OK
Minima
-4.479 OK
-4.479 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Concrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 0.2006 OK 2 1.108 OK
2 0.2006 OK 2 1.108 OK
Minima Minima
2 -0.2007 OK 2 -1.082 OK
2 -0.2007 OK 2 -1.082 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.003 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.3 Moment in Transverse Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 6660.255
ODE Seismic 5513.627
Static 2179.673

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.045 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1405.00 mm
Hence, z = 0.947 d = 1330.8596 mm
As = Mu / (fy z)
Ast = 12832 mm2
Astprovided = Dia Spacing Dia Spacing Dia Spacing
40 125 0 0 0 0

= 14165 mm2 OK

2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 6660. 7096. 0.9386 OK
Minima
1 0.0 6660. 7096. 0.9386 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
72.19 OK
72.19 OK
Minima
-285.2 OK
-285.2 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 5.76 OK 2 28.34 OK
2 5.76 OK 2 28.34 OK
Minima Minima
2 -0.6116 OK 2 -96.62 OK
2 -0.6116 OK 2 -96.62 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.224 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.5 Minimum reinforcement on tension face


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3305.25 mm2/m
In longitudinal direction, Provided = 3863 mm2/m
Astprovided > Astmin OK
In transverse direction, Provided = 9443 mm2/m
Astprovided > Astmin OK

3.0 Top Reinforcement


Top Reinforcement should be 0.234% of cross-sectional area.
Required Steel = 3305.25 mm2/m
In longitudinal direction,
Dia 25 Spacing 125 Provided = 3863 mm2/m
OK
In transverse direction,
Dia 25 Spacing 125 = 3728 mm2/m
Provided
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

4.2 Shear Check in Transverse Direction


Shear force from STAAD Vu = 5461 kN
Width of pile cap available b = 1.500 m
Effective depth of pile cap d = 1.405 m
Area of tensile steel provided As = 14165 mm2
0.014 m2
Percentage of tensile steel provided 100As/(b.d) = 0.672
Shear stress = Vu /(b . d) = 2591.22 kN/sqm
Grade of concrete = 50
Shear strength of concrete, vc = 0.47 MPa
470 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 2.089 m
Therefore, vc,1 = 0.63 MPa
632 kN/sqm
Vus = Vu - vc b d = 4470.48 kN
Requirement of shear reinforcement = Required
From Table 3.16, pg. 46, BS 8110-1: 1997,
For minimum links, Vus,min = 0.4 b d = 843.00 kN
Dia of stirrup 16 mm
No. of legs 6
As per Table 3.16, pg. 46, BS 8110-1: 1997, spacing required,
sv = 0.87 fyv Asv d / Vus 129 mm
Provided spacing 125 mm
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUP PG2E


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA


DESIGN OF PILE CAP FOR COLUMN C48
Pile Group = PG2E

No. of piles n = 2
Dia of pile = 1.00 m
Centre to centre distance of pile = 3.20 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 1.500 m x 4.700 m


Area of pile cap = 7.05 m2
Depth of pile cap D = 1.50 m
Volume of pile cap = 10.58 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 264.38 kN

Thickness of Earthfill over pile cap = 0.00 m

Total weight of (Pile cap + Earthfill) = 264.38 kN

2.1 Moment in Longitudinal Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 2088.577
ODE Seismic 1545.557
Static 528.957

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.004 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1412.50 mm
Hence, z = 0.950 d = 1341.875 mm
As = Mu / (fy z)
Ast = 3991 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 125 0 0 0 0

= 18158 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 2089. 9510. 0.2196 OK
Minima
1 0.0 2089. 9510. 0.2196 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
4.574 OK
4.574 OK
Minima
-4.469 OK
-4.469 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Concrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 0.2836 OK 2 1.567 OK
2 0.2836 OK 2 1.567 OK
Minima Minima
2 -0.2837 OK 2 -1.53 OK
2 -0.2837 OK 2 -7 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.004 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.3 Moment in Transverse Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 6855.305
ODE Seismic 5775.684
Static 2721.030

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.046 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1405.00 mm
Hence, z = 0.946 d = 1328.5561 mm
As = Mu / (fy z)
Ast = 13231 mm2
Astprovided = Dia Spacing Dia Spacing Dia Spacing
40 100 0 0 0 0

= 17392 mm2 OK

2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 6855. 8336. 0.8224 OK
Minima
1 0.0 6855. 8336. 0.8224 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
72.26 OK
72.26 OK
Minima
-255.9 OK
-255.9 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 6.806 OK 2 33.89 OK
2 6.806 OK 2 33.89 OK
Minima Minima
2 -0.6125 OK 2 -108.8 OK
2 -0.6125 OK 2 -108.8 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.249 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.5 Minimum reinforcement on tension face


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3305.25 mm2/m
In longitudinal direction, Provided = 3863 mm2/m
Astprovided > Astmin OK
In transverse direction, Provided = 11595 mm2/m
Astprovided > Astmin OK

3.0 Top Reinforcement


Top Reinforcement should be 0.234% of cross-sectional area.
Required Steel = 3305.25 mm2/m
In longitudinal direction,
Dia 25 Spacing 125 Provided = 3863 mm2/m
OK
In transverse direction,
Dia 25 Spacing 100 = 4578 mm2/m
Provided
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

4.2 Shear Check in Transverse Direction


Shear force from STAAD Vu = 5461 kN
Width of pile cap available b = 1.500 m
Effective depth of pile cap d = 1.405 m
Area of tensile steel provided As = 17392 mm2
0.017 m2
Percentage of tensile steel provided 100As/(b.d) = 0.825
Shear stress = Vu /(b . d) = 2591.22 kN/sqm
Grade of concrete = 50
Shear strength of concrete, vc = 0.51 MPa
510 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 1.949 m
Therefore, vc,1 = 0.74 MPa
735 kN/sqm
Vus = Vu - vc b d = 4386.18 kN
Requirement of shear reinforcement = Required
From Table 3.16, pg. 46, BS 8110-1: 1997,
For minimum links, Vus,min = 0.4 b d = 843.00 kN
Dia of stirrup 16 mm
No. of legs 6
As per Table 3.16, pg. 46, BS 8110-1: 1997, spacing required,
sv = 0.87 fyv Asv d / Vus 131 mm
Provided spacing 125 mm
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUP PG2F


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA


DESIGN OF PILE CAP FOR COLUMN C49
Pile Group = PG2F

No. of piles n = 2
Dia of pile = 1.00 m
Centre to centre distance of pile = 3.20 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 1.500 m x 4.700 m


Area of pile cap = 7.05 m2
Depth of pile cap D = 1.50 m
Volume of pile cap = 10.58 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 264.38 kN

Thickness of Earthfill over pile cap = 0.00 m

Total weight of (Pile cap + Earthfill) = 264.38 kN

2.1 Moment in Longitudinal Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 1745.030
ODE Seismic 1269.287
Static 627.911

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.004 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1412.50 mm
Hence, z = 0.950 d = 1341.875 mm
As = Mu / (fy z)
Ast = 3334 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 125 0 0 0 0

= 18158 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 1745. 9486. 0.184 OK
Minima
1 0.0 1745. 9486. 0.184 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
3.742 OK
3.742 OK
Minima
-3.685 OK
-3.685 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Concrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 0.3362 OK 2 1.857 OK
2 0.3362 OK 2 1.857 OK
Minima Minima
2 -0.3371 OK 2 -1.818 OK
2 -0.3371 OK 2 -1.818 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.005 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.3 Moment in Transverse Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 5416.212
ODE Seismic 4640.406
Static 2545.851

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.037 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1405.00 mm
Hence, z = 0.950 d = 1334.75 mm
As = Mu / (fy z)
Ast = 10405 mm2
Astprovided = Dia Spacing Dia Spacing Dia Spacing
40 125 0 0 0 0

= 14165 mm2 OK

2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 5416. 7096. 0.7633 OK
Minima
1 0.0 5416. 7096. 0.7633 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
60.74 OK
60.74 OK
Minima
-235.7 OK
-235.7 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 6.795 OK 2 33.19 OK
2 6.795 OK 2 33.19 OK
Minima Minima
2 -0.6111 OK 2 -117.2 OK
2 -0.6111 OK 2 -117.2 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.204 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.5 Minimum reinforcement on tension face


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3305.25 mm2/m
In longitudinal direction, Provided = 3863 mm2/m
Astprovided > Astmin OK
In transverse direction, Provided = 9443 mm2/m
Astprovided > Astmin OK

3.0 Top Reinforcement


Top Reinforcement should be 0.234% of cross-sectional area.
Required Steel = 3305.25 mm2/m
In longitudinal direction,
Dia 25 Spacing 125 Provided = 3863 mm2/m
OK
In transverse direction,
Dia 25 Spacing 125 = 3728 mm2/m
Provided
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

4.2 Shear Check in Transverse Direction


Shear force from STAAD Vu = 5461 kN
Width of pile cap available b = 1.500 m
Effective depth of pile cap d = 1.405 m
Area of tensile steel provided As = 14165 mm2
0.014 m2
Percentage of tensile steel provided 100As/(b.d) = 0.672
Shear stress = Vu /(b . d) = 2591.22 kN/sqm
Grade of concrete = 50
Shear strength of concrete, vc = 0.47 MPa
470 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 1.822 m
Therefore, vc,1 = 0.72 MPa
725 kN/sqm
Vus = Vu - vc b d = 4470.48 kN
Requirement of shear reinforcement = Required
From Table 3.16, pg. 46, BS 8110-1: 1997,
For minimum links, Vus,min = 0.4 b d = 843.00 kN
Dia of stirrup 16 mm
No. of legs 6
As per Table 3.16, pg. 46, BS 8110-1: 1997, spacing required,
sv = 0.87 fyv Asv d / Vus 129 mm
Provided spacing 125 mm
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUP PG2G


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA


DESIGN OF PILE CAP FOR COLUMN C50
Pile Group = PG2G

No. of piles n = 2
Dia of pile = 1.00 m
Centre to centre distance of pile = 3.20 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 1.500 m x 4.700 m


Area of pile cap = 7.05 m2
Depth of pile cap D = 1.50 m
Volume of pile cap = 10.58 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 264.38 kN

Thickness of Earthfill over pile cap = 0.00 m

Total weight of (Pile cap + Earthfill) = 264.38 kN

2.1 Moment in Longitudinal Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 1859.832
ODE Seismic 1360.960
Static 772.003

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.004 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1412.50 mm
Hence, z = 0.950 d = 1341.875 mm
As = Mu / (fy z)
Ast = 3554 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 125 0 0 0 0

= 18158 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 1860. 9509. 0.1956 OK
Minima
1 0.0 1860. 9509. 0.1956 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
4.029 OK
4.029 OK
Minima
-3.935 OK
-3.935 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Concrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 0.4138 OK 2 2.286 OK
2 0.4138 OK 2 2.286 OK
Minima Minima
2 -0.414 OK 2 -2.232 OK
2 -0.414 OK 2 -2.232 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.006 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.3 Moment in Transverse Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 6206.933
ODE Seismic 5364.354
Static 3007.410

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.042 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1405.00 mm
Hence, z = 0.950 d = 1334.75 mm
As = Mu / (fy z)
Ast = 11924 mm2
Astprovided = Dia Spacing Dia Spacing Dia Spacing
40 125 0 0 0 0

= 14165 mm2 OK

2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 6207. 7095. 0.8749 OK
Minima
1 0.0 6207. 7095. 0.8749 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
70.24 OK
70.24 OK
Minima
-276.7 OK
-276.7 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 8.097 OK 2 39.28 OK
2 8.097 OK 2 39.28 OK
Minima Minima
2 -0.6106 OK 2 -143.3 OK
2 -0.6106 OK 2 -143.3 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.233 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.5 Minimum reinforcement on tension face


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3305.25 mm2/m
In longitudinal direction, Provided = 3863 mm2/m
Astprovided > Astmin OK
In transverse direction, Provided = 9443 mm2/m
Astprovided > Astmin OK

3.0 Top Reinforcement


Top Reinforcement should be 0.234% of cross-sectional area.
Required Steel = 3305.25 mm2/m
In longitudinal direction,
Dia 25 Spacing 125 Provided = 3863 mm2/m
OK
In transverse direction,
Dia 25 Spacing 125 = 3728 mm2/m
Provided
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

4.2 Shear Check in Transverse Direction


Shear force from STAAD Vu = 5461 kN
Width of pile cap available b = 1.500 m
Effective depth of pile cap d = 1.405 m
Area of tensile steel provided As = 14165 mm2
0.014 m2
Percentage of tensile steel provided 100As/(b.d) = 0.672
Shear stress = Vu /(b . d) = 2591.22 kN/sqm
Grade of concrete = 50
Shear strength of concrete, vc = 0.47 MPa
470 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 1.828 m
Therefore, vc,1 = 0.72 MPa
722 kN/sqm
Vus = Vu - vc b d = 4470.48 kN
Requirement of shear reinforcement = Required
From Table 3.16, pg. 46, BS 8110-1: 1997,
For minimum links, Vus,min = 0.4 b d = 843.00 kN
Dia of stirrup 16 mm
No. of legs 6
As per Table 3.16, pg. 46, BS 8110-1: 1997, spacing required,
sv = 0.87 fyv Asv d / Vus 129 mm
Provided spacing 125 mm
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUP PG2H


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA


DESIGN OF PILE CAP FOR COLUMN C51
Pile Group = PG2H

No. of piles n = 2
Dia of pile = 1.00 m
Centre to centre distance of pile = 3.20 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 1.500 m x 4.700 m


Area of pile cap = 7.05 m2
Depth of pile cap D = 1.50 m
Volume of pile cap = 10.58 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 264.38 kN

Thickness of Earthfill over pile cap = 0.00 m

Total weight of (Pile cap + Earthfill) = 264.38 kN

2.1 Moment in Longitudinal Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 1892.573
ODE Seismic 1396.022
Static 684.193

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.004 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1412.50 mm
Hence, z = 0.950 d = 1341.875 mm
As = Mu / (fy z)
Ast = 3616 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 125 0 0 0 0

= 18158 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 1893. 9501. 0.1992 OK
Minima
1 0.0 1893. 9501. 0.1992 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
4.133 OK
4.133 OK
Minima
-4.036 OK
-4.036 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Concrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 0.367 OK 2 2.028 OK
2 0.367 OK 2 2.028 OK
Minima Minima
2 -0.3666 OK 2 -1.976 OK
2 -0.3666 OK 2 -1.976 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.005 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.3 Moment in Transverse Direction:

Case Moment from STAAD (kN.m)


MDE Seismic 5299.536
ODE Seismic 4540.364
Static 2317.965

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.036 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1405.00 mm
Hence, z = 0.950 d = 1334.75 mm
As = Mu / (fy z)
Ast = 10181 mm2
Astprovided = Dia Spacing Dia Spacing Dia Spacing
40 125 0 0 0 0

= 14165 mm2 OK

2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction

a) Moment Capacity Check for MDE Seismic:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 5300. 7096. 0.7469 OK
Minima
1 0.0 5300. 7096. 0.7469 OK

b) Reinforcement Stress Check for ODE Seismic:


Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2
Oasys Results
Case Stress
[N/mm²]
Maxima
59.42 OK
59.42 OK
Minima
-230 OK
-230 OK

c) Stress Check for Static Case:


Permissible stresses from Table 2, pg. 8, BS 5400-4: 1990
Concrete 0.5fck 25.000 MPa (due to bending)
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 6.151 OK 2 30.17 OK
2 6.151 OK 2 30.17 OK
Minima Minima
2 -0.6114 OK 2 -104.4 OK
2 -0.6114 OK 2 -104.4 OK

d) Crack Width Check:


From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structures subjected to severe environment,
Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.230 mm OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

2.5 Minimum reinforcement on tension face


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3305.25 mm2/m
In longitudinal direction, Provided = 3863 mm2/m
Astprovided > Astmin OK
In transverse direction, Provided = 9443 mm2/m
Astprovided > Astmin OK

3.0 Top Reinforcement


Top Reinforcement should be 0.234% of cross-sectional area.
Required Steel = 3305.25 mm2/m
In longitudinal direction,
Dia 25 Spacing 125 Provided = 3863 mm2/m
OK
In transverse direction,
Dia 25 Spacing 125 = 3728 mm2/m
Provided
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rajesh
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

4.2 Shear Check in Transverse Direction


Shear force from STAAD Vu = 5461 kN
Width of pile cap available b = 1.500 m
Effective depth of pile cap d = 1.405 m
Area of tensile steel provided As = 14165 mm2
0.014 m2
Percentage of tensile steel provided 100As/(b.d) = 0.672
Shear stress = Vu /(b . d) = 2591.22 kN/sqm
Grade of concrete = 50
Shear strength of concrete, vc = 0.47 MPa
470 kN/sqm
As per Cl. 3.11.4.4, pg. 82, BS 8110-1:1997,
Enhanced shear strength of concrete, say vc,1 = 2.d.vc /av
av = 1.838 m
Therefore, vc,1 = 0.72 MPa
719 kN/sqm
Vus = Vu - vc b d = 4470.48 kN
Requirement of shear reinforcement = Required
From Table 3.16, pg. 46, BS 8110-1: 1997,
For minimum links, Vus,min = 0.4 b d = 843.00 kN
Dia of stirrup 16 mm
No. of legs 6
As per Table 3.16, pg. 46, BS 8110-1: 1997, spacing required,
sv = 0.87 fyv Asv d / Vus 129 mm
Provided spacing 125 mm
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUPS PG1, PG1B, PG1C, PG1D & PG1E
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA

Pile Groups = PG1, PG1B, PG1C, PG1D & PG1E

No. of piles n = 1
Dia of pile = 1.00 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Depth of pile cap D = 1.50 m

Thickness of Earthfill over pile cap = 1.50 m

2.0 Bottom Reinforcement


Bottom Reinforcement should be 0.06% of cross-sectional area.
Required Steel = 850.2 mm2/m
Dia 16 Spacing 225 Provided = 894 mm2/m
OK

3.0 Top Reinforcement


Top Reinforcement should be 0.06% of cross-sectional area.
Required Steel = 850.2 mm2/m
Dia 16 Spacing 225 Provided = 894 mm2/m
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Cipete Raya Prepared Nikhil
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUP PG1A


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Cipete Raya Prepared Nikhil
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA

Pile Group = PG1A

No. of piles n = 1
Dia of pile = 1.20 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Depth of pile cap D = 1.80 m

Thickness of Earthfill over pile cap = 1.50 m

2.0 Bottom Reinforcement


Bottom Reinforcement should be 0.06% of cross-sectional area.
Required Steel = 1030.2 mm2/m
Dia 16 Spacing 175 Provided = 1149 mm2/m
OK

3.0 Top Reinforcement


Top Reinforcement should be 0.06% of cross-sectional area.
Required Steel = 1030.2 mm2/m
Dia 16 Spacing 175 Provided = 1149 mm2/m
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Bushra
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUP PG4A


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Bushra
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA

Pile Group = PG4A

No. of piles n = 4
Dia of pile = 1.00 m
Centre to centre distance of pile = 3.00 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 4.50 m x 4.50 m


Area of pile cap = 20.25 m2
Depth of pile cap D = 1.50 m
Volume of pile cap = 30.38 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 759.38 kN

Thickness of Earthfill over pile cap = 0.00 m

Total weight of (Pile cap + Earthfill) = 759.38 kN

2.1 Moment in Longitudinal Direction:

Case Moment from STAAD (kN.m)


ULS 18116.258
SLS Stress Check 11895.971
SLS Crack Width Check 1977.863

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.041 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1407.00 mm
Hence, z = 0.950 d = 1336.65 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table 23, pg. 37
of the Design Manual.
Ast = 39945 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


36 100 0 100 0 100

= 44685 mm2 OK

2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction

a) Moment Capacity Check:


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Bushra
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 18120 2228 0.813 OK
Minima
1 0.0 18120 2228 0.813 OK

b) Stress Check:
Permissible stresses
Concrete 0.5fck 25.000 MPa
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
1 9.453 OK 1 46.97 OK
1 9.453 OK 1 46.97 OK
Minima Minima
1 -0.5991 OK 1 -179.7 OK
1 -0.5991 OK 1 -179.7 OK

c) Crack Width Check:


Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.128 mm OK

2.3 Moment in Transverse Direction:

Case Moment from STAAD (kN.m)


ULS 18116.258
SLS Stress Check 11895.971
SLS Crack Width Check 1977.863

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.041 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1407.00 mm
Hence, z = 0.950 d = 1336.65 mm
As = Mu / (0.87fy z)
Ast = 39945 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


36 100 0 0 0 0

= 44685 mm2 OK

2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction

a) Moment Capacity Check:


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Bushra
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 18120 2228 0.813 OK
Minima
1 0.0 18120 2228 0.813 OK

b) Stress Check:
Permissible stresses
Concrete 0.5fck 25.000 MPa
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
1 9.453 OK 1 46.97 OK
1 9.453 OK 1 46.97 OK
Minima Minima
1 -0.5991 OK 1 -179.7 OK
1 -0.5991 OK 1 -179.7 OK

c) Crack Width Check:


Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.128 mm OK

2.5 Minimum reinforcement on tension face


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 3292.38 mm2/m
In longitudinal direction, Provided = 9930 mm2/m
Astprovided > Astmin OK
In transverse direction, Provided = 9930 mm2/m
Astprovided > Astmin OK

3.0 Top Reinforcement


Top Reinforcement should be 0.234% of cross-sectional area.
Required Steel = 3292.38 mm2/m
In longitudinal direction,
Dia 36 Spacing 100 Provided = 9930 mm2/m
OK
In transverse direction,
Dia 36 Spacing 100 = 9930 mm2/m
Provided
OK

4.1 Shear Check in Longitudinal Direction


Shear force from STAAD Vu = 2938 kN
Width of pile cap available b = 4.500 m
Effective depth of pile cap d = 1.407 m
Area of tensile steel provided As = 44685 mm2
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Bushra
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant

= 0.045 m2
Percentage of tensile steel provided 100As/(b.d) = 0.706 %
Shear stress = Vu /(b . d) = 463.97 kN/sqm
Grade of concrete = C50
Design shear resistance is calculated as per Cl. 3.11.4.4, pg. 82, BS 8110-1: 1997.
Shear strength of concrete, vc = 0.48 MPa
480 kN/sqm
Vus = Vu - vc b d = -101.52 kN
Requirement of shear reinforcement = Not Required

4.2 Shear Check in Transverse Direction


Shear force from STAAD Vu = 2898 kN
Width of pile cap available b = 4.500 m
Effective depth of pile cap d = 1.407 m
Area of tensile steel provided As = 44685 mm2
0.045 m2
Percentage of tensile steel provided 100As/(b.d) = 0.706
Shear stress = Vu /(b . d) = 457.68 kN/sqm
Grade of concrete = 50
Shear strength of concrete, vc = 0.48 MPa
480 kN/sqm
Vus = Vu - vc b d = -141.30 kN
Requirement of shear reinforcement = Not Required
1 2 3 4 5 6 7 8 9

A1

COLUMN LAYOUT AT GROUND LEVEL SCHEDULE OF COLUMNS

SCHEDULE OF BEAM
NOTES

IN CONJUNCTION WITH THIS DRAWING NO.

STRUCTURE REFERENCE DRAWING:

NORTH

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
COLUMN LAYOUT PLAN
PRESIDENT DIRECTOR
VERIFIED BY

DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3001 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3001-4.DWG
FATMAWATI STATION
10 11 12 13 14 15 16 17

A1
SCHEDULE OF COLUMNS
COLUMN LAYOUT AT GROUND LEVEL

NOTES SCHEDULE OF BEAM

IN CONJUNCTION WITH THIS DRAWING NO.

STRUCTURE REFERENCE DRAWING:

NORTH

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
COLUMN LAYOUT PLAN
PRESIDENT DIRECTOR
VERIFIED BY

DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3002 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3002-4.DWG
1 2 3 4 5 6 7 8 9

STAIRCASE
FUTURE L1S01
ESCALATOR 1 FEATURE WALL

200 THK.
RCC WALL
(TYP) ESCALATOR PIT

STAIRCASE L2S01 STAIRCASE L2S03

STAIRCASE L2S04

STAIRCASE L1S02

STAIRCASE L2S02 ESCALATOR PIT

A1
FEATURE WALL
4
IN CONJUNCTION WITH LATEST REVISION OF:
FRAMING PLAN AT CONCOURSE AT +45.90M ( T.O.C. ) LEVEL
SCHEDULE OF BEAM SCHEDULE OF COLUMNS
STRUCTURE REFERENCE DRAWING:

4
NOTES:-

NORTH

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
FRAMING PLAN AT CONCOURSE LEVEL
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 1 OF 2)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3003 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3003-4.DWG
A
FATMAWATI STATION
10 11 12 13 14 15 16 17

STAIRCASE L1S03
OPENING FOR
ESCALATOR

ESCALATOR PIT

C
17

STAIRCASE L2S03 STAIRCASE L2S05

ESCALATOR PIT L2E02


STAIRCASE L2S04 STAIRCASE L2S06

A 17

TANK-1
TANK-2
OPENING FOR
ESCALATOR

A1
STAIRCASE L1S04
FEATURE WALL
4 FRAMING PLAN AT CONCOURSE AT +45.90M ( T.O.C. ) LEVEL
SCHEDULE OF COLUMNS

SCHEDULE OF BEAM
IN CONJUNCTION WITH THIS DRAWING NO.

STRUCTURE REFERENCE DRAWING: 4

NOTES:-
4

4
NORTH

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
FRAMING PLAN AT CONCOURSE LEVEL
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 2 OF 2)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3004 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3004-4.DWG
SCHEDULE OF COLUMNS
1 2 3 4 5 6 7 8 9 10

BEAM SCHEDULE
B

A
4

PIER CAP TOP LVL.

A1

FRAMING PLAN AT TRACK SLAB AT +50.


FRAMING PLAN AT TRACK SLAB AT +50.050M ( T.O.C. ) LEVEL
11 12 13 14 15 16 17

NORTH

A1

FRAMING PLAN AT TRACK SLAB AT +50.050M ( T.O.C. ) LEVEL SECTION A-A

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
FRAMING PLAN AT TRACK LEVEL
PRESIDENT DIRECTOR
VERIFIED BY

DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3005 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3005-4.DWG
SCHEDULE OF COLUMNS
1 2 3 4 5 6 7 8 9 10

4
B SCHEDULE OF BEAM

STEEL ROOF

A1
FRAMING PLAN AT PLATFORM LEVEL TOC +51.650

11 12 13 14 15 16 17 FATMAWATI STATION

C 4

4 STRUCTURE REFERENCE DRAWING:

STEEL ROOF

A1

FRAMING PLAN AT PLATFORM LEVEL TOC 51.650

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
FRAMING PLAN AT PLATFORM LEVEL
PRESIDENT DIRECTOR
VERIFIED BY

DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3006 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3006-4.DWG
4

NOTES:-

ARCHITECTURAL REFERENCE DRAWING:

STRUCTURE REFERENCE DRAWING:


IN CONJUNCTION WITH THIS DRAWING NO.

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
LONGITUDINAL SECTION
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 1 OF 3)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3007 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3007-4.DWG
NOTES:-

ARCHITECTURAL REFERENCE DRAWING:

IN CONJUNCTION WITH THIS DRAWING NO.

STRUCTURE REFERENCE DRAWING:

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
LONGITUDINAL SECTION
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 2 OF 3)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3008 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3008-4.DWG
4

NOTES:-

ARCHITECTURAL REFERENCE DRAWING:

IN CONJUNCTION WITH THIS DRAWING NO.

STRUCTURE REFERENCE DRAWING:

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
LONGITUDINAL SECTION
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 3 OF 3)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3009 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3009-4.DWG
A B C

4
4

A1 A B C ARCHITECTURAL REFERENCE DRAWING:

LEGENDS:-

STRUCTURE REFERENCE DRAWING:

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
TRANSVERSE SECTION
PRESIDENT DIRECTOR
VERIFIED BY

DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3010 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3010-4.DWG
1 2 3 4 5 6 7 8 9 10 11

1 2 1 2 1 2 1 2 1 2 1 2
B 3 4 3 4 3 4 3 4 3 4 3 4

3
A

A1

PILE GROUP LAYOUT

1 1 2 2

PG1 PILE LAYOUT PLAN PG1A PILE LAYOUT PLAN


1 2

3 3

3 4

PG4 PILE LAYOUT PLAN SECTION 3-3

SECTION 1-1 SECTION 2-2


NOTES:-

STRUCTURE REFERENCE DRAWINGS:


IN CONJUNCTION WITH THIS DRAWING NO.

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE LAYOUT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 1 OF 4)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3016 3 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3016-3.DWG
12 13 14 15 16 17

5 5

4 4 PG1B PILE LAYOUT PLAN

C PG4A PILE LAYOUT PLAN

1 2 1 2 1 2
B 3 4 3 4 3 4

A
SECTION 5-5

3
SECTION 4-4

A1

PILE GROUP LAYOUT


1

IN CONJUNCTION WITH THIS DRAWING NO. 6 6

PG2A PILE LAYOUT PLAN

SECTION 6-6

STRUCTURE REFERENCE DRAWING: NOTES:-

NORTH

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE LAYOUT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 2 OF 4)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3017 3 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3017-3.DWG
15
4 5 13 14

1 2 3 4 6
1
1 1 1 1 1

A
A A
A
SECTION 7-7
1 2 3 4 6
PLAN SHOWING PILES LAYOUT PLAN SHOWING PILES LAYOUT PLAN SHOWING PILES LAYOUT PLAN SHOWING PILES LAYOUT PLAN SHOWING PILES LAYOUT
FOR PILE GROUP PG2B FOR PILE GROUP PG2C FOR PILE GROUP PG2D FOR PILE GROUP PG2E FOR PILE GROUP PG2F

SECTION 1-1 SECTION 2-2 SECTION 3-3 SECTION 4-4

NOTES:-
11

5 1 5
A
STRUCTURE REFERENCE DRAWING:

7
PG1F PILE LAYOUT PLAN
PLAN SHOWING PILE LAYOUT
SECTION 5-5 SECTION 6-6 FOR PILE GROUP PG1C

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101
IN CONJUNCTION WITH THIS DRAWING NO.
APPROVED BY NOTICED BY NAME SIGNATURE
01 LEBAK BULUS STATION
PILE LAYOUT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 3 OF 4)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3018 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3018-1.DWG
16 17 12
9 / 10

1 2 4
3
1
1 1
A1
A

3
4
PLAN SHOWING PILE LAYOUT
A A
FOR PILE GROUP PG1D PLAN SHOWING PILE LAYOUT
FOR PILE GROUP PG1E

1 2
PLAN SHOWING PILES LAYOUT PLAN SHOWING PILES LAYOUT
FOR PILE GROUP PG2G FOR PILE GROUP PG2H

SECTION 3-3 SECTION 4-4


SECTION 1-1 SECTION 2-2

IN CONJUNCTION WITH THIS DRAWING NO. STRUCTURE REFERENCE DRAWING: NOTES:-

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE LAYOUT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 4 OF 4)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3019 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3019-1.DWG
A

REINFORCEMENT DETAILS OF PILE


COLUMN / PILE GROUP BAR MARKED
MARKED

1 1

** DEPTH OF PILE CAP


2 2

ANCHORAGE LENGTH
FOR SINGLE BARS

3 3

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 1 OF 5)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3021 5 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3021-5.DWG
REINFORCEMENT DETAILS OF PILE
A COLUMN / PILE GROUP BAR MARKED
MARKED

1 1

2 2

ANCHORAGE LENGTH
FOR SINGLE BARS
** DEPTH OF PILE CAP
5

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 2 OF 5)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3022 5 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3022-5.DWG
REINFORCEMENT DETAILS OF PILE
COLUMN / PILE GROUP BAR MARKED
MARKED

1 1

2 2

3 3

4 4

6 6
5 5

ANCHORAGE LENGTH ANCHORAGE LENGTH


FOR SINGLE BARS FOR 2 BUNDLE BARS

2
2

** DEPTH OF PILE CAP

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 3 OF 5)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3023 2 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3023-2.DWG
A

REINFORCEMENT DETAILS OF PILE


COLUMN / PILE GROUP BAR MARKED
MARKED

1 1

2 2

3 3

5 5

4 4

ANCHORAGE LENGTH
FOR 2 BUNDLE BARS
** DEPTH OF PILE CAP
1

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 4 OF 5)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3024 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3024-1.DWG
REINFORCEMENT DETAILS OF PILE
A COLUMN / PILE GROUP BAR MARKED
MARKED

1 1

ANCHORAGE LENGTH
** DEPTH OF PILE CAP FOR 2 BUNDLE BARS

4 4

2 2

3 3
1
1

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 5 OF 5)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3025 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3025-1.DWG
2
B

LONGITUDINAL
AXIS

1 1 LONGITUDINAL 3
1 AXIS
A A
2

PG1 PILE LAYOUT PLAN

SECTION 1-1

SECTION 2-2

LEGEND :

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 1 OF 10)
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3026 3 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3026-3.DWG
B
2

LONGITUDINAL
AXIS
LONGITUDINAL
1 2 AXIS
1 1

3 4

A A
2

PG4 PILE LAYOUT PLAN

B 3

C C

3
SECTION 1-1

LEGEND :

SECTION 2-2

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 2 OF 10)
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3027 3 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3027-3.DWG
2
B

LONGITUDINAL
AXIS

1 1 LONGITUDINAL
1 AXIS
A A
2

PG1B PILE LAYOUT PLAN


3

SECTION 1-1

SECTION 2-2

LEGEND :

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 3 OF 10)
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3028 3 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3028-3.DWG
2 B

LONGITUDINAL
AXIS 3
LONGITUDINAL
1 1 AXIS
1
A A
2

PG1A PILE LAYOUT PLAN

SECTION 1-1

LEGEND :

SECTION 2-2

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY SHEET 4 OF 10)
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3029 3 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3029-3.DWG
1 1

PG2A PILE LAYOUT PLAN

SECTION 1-1

LEGEND :

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 5 OF 10)
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3030 3 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3030-3.DWG
2

1 1

2
PG4A PILE LAYOUT PLAN

SECTION 1-1
1

LEGEND :

1
SECTION 2-2 1

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 6 OF 10)
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3031 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3031-1.DWG
14 B
4

LONGITUDINAL
1 AXIS
1 1

A A A

PLAN SHOWING PILES LAYOUT PLAN SHOWING PILES LAYOUT


FOR PILE GROUP PG2B FOR PILE GROUP PG2E 1

1
1

PLAN SHOWING PILES LAYOUT


FOR PILE GROUP PG2C

LEGEND :

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 7 OF 10)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3032 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3032-1.DWG
13 16
B

1
LONGITUDINAL
1 1 AXIS

A
A A

PLAN SHOWING PILES LAYOUT


PLAN SHOWING PILES LAYOUT FOR PILE GROUP PG2G
FOR PILE GROUP PG2D
1

15 17

1 1 1 B

A A

PLAN SHOWING PILES LAYOUT PLAN SHOWING PILES LAYOUT


FOR PILE GROUP PG2F FOR PILE GROUP PG2H

1
LEGEND :

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 8 OF 10)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3033 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3033-1.DWG
B

2 2 1 1

LONGITUDINAL 1

PLAN SHOWING PILES LAYOUT PLAN SHOWING PILES LAYOUT AXIS


FOR PILE GROUP PG1D FOR PILE GROUP PG1C A A

SECTION 2-2 SECTION 1-1


1

3
PLAN SHOWING PILE LAYOUT
FOR PILE GROUP PG1E

LEGEND :
SECTION 3-3

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 9 OF 10)
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3034 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3034-1.DWG
2 B

LONGITUDINAL
AXIS

1 1

A A
2

PLAN SHOWING PILE LAYOUT PG1B

SECTION 1-1

NOTES:-

LEGEND :
SECTION 2-2

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 10 OF 10)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3035 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3035-1.DWG