19 ST-0193-08 A-18504 J-dr3 SW 33.4 6.35 OK OK 9/20/2021 WPS/SL/011 W-01 OK NA OK 9/22/2021 Y Y
Unrestricted
45 ST-0193-10 5621M J-c4 SW 21.3 4.78 OK OK 9/24/2021 WPS/SL/011 W-02 OK NA OK 9/25/2021 Y Y
Unrestricted
71 ST-0193-15 E-89475 J-29 BW 141.3 15.88 OK OK 8/25/2021 WPS/SL/011 W-03 OK NA OK 10/10/2021 Y Y
Unrestricted
98 ST-0193-18 E-89475 J-39 BW 141.3 15.88 OK OK 10/5/2021 WPS/SL/011 OK NA OK 10/7/2021 Y Y
FLOW NOZZLE
Unrestricted
123 FN A-18504 J-FN8 SW 33.4 6.35
Unrestricted
Note :- 1. For LTCS/ NACE/ IBR Material Heat Number shall be recorded . 2. For LAS/ SS/ Non- Ferrous material,upon satisfactory PMI,QMD engineer shall sign . 3. In Case of LTCS and NACE welding consumables batch number shall be recorded. 4. During LTCS welding heat input shall be monitored & recorded in
Remarks. 5. Up on acceptance of DPT/MPT on temporary attachment area,QMD engineer shall sign. 6. Internal Cleaning to be checked as per format No: EPCMD-2-QMOO-FMT-PP-011. 7. Before starting 2nd run welding, root weld visual must be cleared for socket weld, any joint for compressor suction line, major pumps,
internally lined pipes, lube oil and control oil lines, sulfuric acid and oxygen line
Name