Review Comments Form


Date: 25-04-2023
Project Title: CORDOBA (PHASE 1) AT BLOOM LIVING
Project No: AD21094-0200S

SUBJECT/TITLE : MS for Backfilling Works ORIGINATOR : ELM


DOCUMENT REF.
: M-DT-MS-033000-OT-009 REVISION NO. : B
NO

Sl.
Comments Contractor Response / Consultant & Engineers Comments
No.
Contractor to provide / incorporate the following and re- submit for approval.
Contractor PMC Lead Design/Engineer Employer

Review Comments Form


Date: 25-04-2023
Project Title: CORDOBA (PHASE 1) AT BLOOM LIVING
Project No: AD21094-0200S

Sl.
Comments Contractor Response / Consultant & Engineers Comments
No.
HSE: Refer to the attached MSRA evaluation form.
Refer to the attached comments sheet Noted
01 Excavated materials should be stockpiled, screened from large size materials to 1. The excavation and backfilling works are going on
achieve homogenous materials, then tested by approved 3rd party to confirm simultaneously and if any case, the backfilling (Excavated
compliance with SPECS and ADQCC requirements. material) is stopped due to any uncertain reason, the ELM
will provide a stockpile on the client designated areas as per
Contractor PMC Lead Design/Engineer Employer

Review Comments Form


Date: 25-04-2023
Project Title: CORDOBA (PHASE 1) AT BLOOM LIVING
Project No: AD21094-0200S

Sl.
Comments Contractor Response / Consultant & Engineers Comments
No.
ADQCC standards.
2. Refer to ADQCC Specification TR-542-1, 3.2.2.3.C
Screening and Mixture of the Materials: stated that
“Screening shall be required for the materials used in
aggregate base courses”. It is noted that the backfilling
around the pumproom and under the slab is not an aggregate
Contractor PMC Lead Design/Engineer Employer

Review Comments Form


Date: 25-04-2023
Project Title: CORDOBA (PHASE 1) AT BLOOM LIVING
Project No: AD21094-0200S

Sl.
Comments Contractor Response / Consultant & Engineers Comments
No.
base course as per the drawings (only the top layer for
pavement purposes as per the drawing). The ELM will
follow the standard practice and ADQCC requirements to
carefully select suitable materials for backfilling by 3 rd party
testing (ACES Lab) (test report for soil is attached) and
remove any surplus, oversized, rubbish, or unsuitable
Contractor PMC Lead Design/Engineer Employer

Review Comments Form


Date: 25-04-2023
Project Title: CORDOBA (PHASE 1) AT BLOOM LIVING
Project No: AD21094-0200S

Sl.
Comments Contractor Response / Consultant & Engineers Comments
No.
materials. This ensures that the backfilled area is restored to
its desired grade, while adhering to ADQCC specification
for waste disposal and environmental best practices.
3. Samples are collected by Arab Centre for testing as per
ADQCC requirements. Please find attached here Test results
for your review.
Contractor PMC Lead Design/Engineer Employer

Review Comments Form


Date: 25-04-2023
Project Title: CORDOBA (PHASE 1) AT BLOOM LIVING
Project No: AD21094-0200S

Sl.
Comments Contractor Response / Consultant & Engineers Comments
No.
Refer to ADQCC Specification TR-542-2, 21.25.5 Fill or
Contractor to provide reference for ADQCC standard application for backfilling
02 Backfill, the samples are collected to testing and determine the
materials to define suitable materials and unsuitable materials.
requirement of the backfilling materials.
The submitted ITP does not include preparation of stockpiles, sampling, approval
03 Noted and revised.
of sample, all to be hold pints.
Contractor PMC Lead Design/Engineer Employer

Review Comments Form


Date: 25-04-2023
Project Title: CORDOBA (PHASE 1) AT BLOOM LIVING
Project No: AD21094-0200S

Sl.
Comments Contractor Response / Consultant & Engineers Comments
No.

04 Formation and backfilling should be holding points in the ITP Noted

Reviewed /Commented by: DATE:


Contractor PMC Lead Design/Engineer Employer

Review Comments Form


Date: 25-04-2023
Project Title: CORDOBA (PHASE 1) AT BLOOM LIVING
Project No: AD21094-0200S