PTO - Demolition - Roofing

CHECKPOINTS CHECK

1. Proper methodology determined?


2. Required PPE: hard hat, safety boots, PVC/leather gloves, ear protection, eye/face protection &
harnesses (when req)?
3. Load bearing points identified?

4. Sufficient propping, support work etc in place when required?

5. Props being checked on a daily basis?

6. Safe scaffolding erected as per SANS 10085 code?

7. Services identified i.e. water, AC, electricity and required precautions taken?

8. Demolition area suitably identified and demarcated?

9. Sufficient safety measure considered i.e. crash decks, catch nets etc?

10. Rubble properly lowered and regularly removed?

11. Equipment being used in good condition?

12. Plant being used – safe and trained operators etc?

13. Demolition being conducted as per method statement and risk assessment?

OK All in order.
X A fault was found.
N/A Not applicable.

Person(s) Being Observed

Comments

Recommendations

Worker(s): Sign Date

Observer: Sign Date