Project : CONSTRUCTION OF GUARDHOUSE

Location : THE HILL RESIDENCE


S C H E D U L E O F A C T I V I T I E S
O C T O B E R N O V E M B E R
ACTIVITY
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

A. PLASTERING WORKS Target


Actual
Accomplishment %

B. CONCRETING WORKS (BEAMS & COLUMNS) Target


Actual
Accomplishment %

C. ELECTRICAL WORKS Target


Actual
Accomplishment %

D. PLUMBING WORKS Target


Actual
Accomplishment %

E. CEILING WORKS Target


Actual
Accomplishment %

F. TILE WORKS (FLOOR TILES, EXTERIOR WALL TILES) Target


Actual
Accomplishment %

G. INSTALLATION OF CR FIXTURES Target


Actual
Accomplishment %

H. PAINTING WORKS (WALLS, CEILINGS, STEEL FRAMES) Target


Actual
Accomplishment %

I. WELDING WORKS (STEEL FRAMES & GATE) Target


Actual
Accomplishment %

J. ROOFING WORKS (ROOF, FLASHING & GUTTER) Target


Actual
Accomplishment %

Prepared By:

ENGR. JAYVEE ARVIN C. PINEDA