Assignment Number 01.

Compute the number of 40kg cement, gravel, sand, and water for the given
concrete works. Provide a 50-mm gravel bedding at the bottom of your footing. Compute the volume
of water if 6 gallons of water is equivalent to one bag of your cement.

6 meters O.C.

5.5 m
n
4 meters O.C.

W E
Bin 0.30m x 0.45m BEAM

0.50m x 0.50m x 4.50m COLUMN


1.60m x 1.60m x 0.50m FOOTING
No Given Class use Default ClassA 1 2 4
Step 1 Footing slab solve for volume
Y L X WX H
i fam x t.am X 05m
1 1.28m3
110.5m Total Footing volume
1am I 1.28m3 4 5 12m3
1 i am
Columns
step 2

y L W

1 125m3
Total
Ethan ME m3
05m
y g
Step 3 Beams solve for Volume
Y L X WX H
0.45m x 0.3m43.5M

Total Beam1 volume


j 04725m 2 0.945m

3.5m

É
solve for Volume
Y L X WX H
0.45m x 0.3m45.5M

yjao.gg
mysrowm 0

jpg
a 7425m3 2 1485m3
Step 4 Find the amount of gravel bedding
for volume

Myo.o
Solve

i.am m
V L X WX H
fam x I 6m x0.05m
0128 m3
1 ram Total Biggs118592m3

Step 5 MultiplyConcrete Proportions


Table 1 2 p 6 simplified Estimate by Fajardo
Totalvolume of concreteworks 12.05m3 Add 51 for wastage
12.05m3 1.05 12 6525m3

L
For 40kg bag 95 12.6525m3 g bags 1138725 114 bags
Why
sand m3
12.6525 10 5 6.326 m3
126525 m3 I 0512m3 13 1645ms
qq.GEymgt

Water bags ggatag ratio Amount of water


using 0.4ratio
273.6 gallons
6,9 10.41
114 bags