General (Loading Platform)

LIFTING PIPE LIFTING PIPE LIFTING PIPE


SEE DETAIL A BEAM LADDER SEE DETAIL A 1. Gravlock coupler arrangements attached
SEE DETAIL A
A SUPPORT to a horizontal “I beam” steelwork lower
position. This arrangement can also be an
upper position.
KWIKSTAGE STANDARDS 2. Gravlock couplers must be used in
BEAM LADDER BEAM LADDER opposing pairs or box the beam with tube
SUPPORT SUPPORT to prevent movement.
3. Check fittings require to be installed
LEDGER/TRANSOM immediately above the suspension point
GI PIPE 48.6MM DIA. X 2.4MM THK and immediately below the bottom ledger.
TIE TO
(SECURE WITH FIXED COUPLERS) 4. To lengthen a standard, additional
STRUCTURE
standard to be attached to a minimum of 2
horizontal ledger or guardrails within
TIE TO 300mm from the standard. Check clips are
STRUCTURE used above the ledger and below the
B U-HEAD JACK ledger supporting the standard.
5. ‘T bar’ type arrangement can be used
approximately 1.0m below the bottom
ledger for scaffolder to stand or sit on
while the base lift of scaffold is erected
I-BEAM STRUCTURE BELOW I-BEAM STRUCTURE BELOW
(structural checking to carry load is by (structural checking to carry load
and dismantle.
Maincon) is by Maincon) 6. At Least one Diagonal braces shall be
provided at every axis and properly
clamped at both ends.
7. Installation of guardrails, toe boards and
steel ladder shall deem to be included
SECTION A - A SECTION B - B although they may not be shown on
drawings.
8. Single guardrail can be installed to replace
the toe boards should there be frequent
LIFTING PIPE
movement of men and materials.
3 NOS. BEAM LADDER 9. No alternation and modification of the
TIE TO TIE TO TIE TO TIE TO
EXISTING I-BEAM BUNDLED USING BS scaffold structure is allowed. Any
STRUCTURE COUPLERS EVERY 500MM
STRUCTURE STRUCTURE STRUCTURE STRUCTURE day-to-day alternation and modification
1000 1000 1000 must be pre informed to PROEN qualified
1000 3000 MAX. 3000 MAX. 3000 MAX. scaffold supervisor, who shall be
responsible for the work done and verify
LIFTING PIPE safe for use, prior to accessing the
500 500 500 500

CONNECT TO BEAM LADDER DETAIL A scaffold.


LOAD SPACE LOAD SPACE LOAD SPACE
SUPPORT USING BS COUPLERS
BEAM LADDER SUPPORT

LOAD SPACE LOAD SPACE LOAD SPACE

U-HEAD JACK
2000 MAX.

TIE TO
1000 TIE TO TIE TO
STRUCTURE
500

STRUCTURE STRUCTURE
2 NOS. RHS 50X100X 5MM
500 MAX. THK ON TOP OF EXISTING
SECTION C - C I-BEAM STRUCTURE

DETAIL B

CHEM-L ENGINEERING MANDAI CREMATORIUM PROJECT 3-TONLIFTING TOWER


Remarks: If any modification is required, only the Structural scaffold material standard : STK 500, O.D 48.6mm
scaffolding supervisor allowed to modify in accordance with X 2.5mm Thickness (Structure)
the WSH scaffolding regulations. And PE instruction Fittings : BS1139 Couplers (PROEN Brand) MANDAI CREMATORIUM