You are on page 1of 1

Triangle Oilfield Services Co.

Inspection Report System


MAGNETIC PARTICLE INSPECTION REPORT
Customer: SINOTHARWA Date of inspection: 28/07/2020
Job no: NDT 2020 Inspection report no : 022/2020
Inspected in accordance with : ASTM E709-08 CATIII Revision: Triangle MT procedure no 2020
Description: Dead line anchor Inspection location: RIG ST # 29
Equipment : DC-Yoke (No.21564) Serial no: L1208
Inspection Method :-
Magnetizing Current : Alternating (AC)  Direct (DC) 
Magnetic Particles : Wet  Dry  Visible  Fluorescent 
Equipment Background
DC Yoke  DC Coil  Permanent Magnet  UV Light  Other  Non-treated 
No:21564 No: No: No: No:
Ground  White 
Surface Condition :
Cleaned to Base Metal
Specification
API  Edition:2008 DSL  ASME  AWS  ASTM  Other 
RESULT
MPI: was carried out for the Above Description on (Welding & Critical ) areas ,
Found Free From Surface Crack At Time Of Inspection ( ACCEPTED )
Note :-Next Inspection on :27-01-2021

INSPECTION SUPERVISOR : TRIANGLE INSPECTOR LEVEL II :


Ali Haggag Ahmed Salah & Ahmed El-Gazar

You might also like