Hausland Contruction Corporation Activities

A. In HOUSE ACTIVITIES 1. QUALITY CONTROL MANUAL

a. Manual of Quality Control

Remarks

For further review and approval of management

Suggested to include in this report present practice of Hausland/FCI Engineering Another Chapter
recommended improvement

2. HANIN TOWN

a. Land Development Plans

b. Electrical Systems

- Detailed Design

c. Hanin Septage

d. Hanin Water Supply System

e. Issue

3. TIMOG TRIANGLE

4. TURNOVER of Reports from Engr. Ferdie

5. NEW MANAGER BRIEFING

6. Accomplishment Reports

7. Formworks Innovation

8. Computerization

9. Organizational Chart

- HCC In house activities

- Approval of ERR -Approval of FCI/Hausland -Approval of Atty Ryan - For implementation Issues

B. MOTOR POOL ISSUES

- Inventory of Equipments

- Organizational Charts

- Liquidation Process Issues


- Rental Rates

- Issues

C. CONCRETE PRODUCTS

a. Inventory of Facilities

b. Organizational Charts

c. Products

- CHB

- Batching Plant

- Other Concrete Products d. Issues

Engr Bognot need to present to Hausland Options created for finalization of conceptual design

1. Outsorce to consultants

Needed data from Haulands

- Data from Electric Cooperatives

2. Implementation Part (USS)

Septic Tank Location for Architectural consideration/Accordingly Arch Vhon already outsourced the
project to Waymaker

Septic Tank with Bio Film Reactor proposed by Waymaker

Arch Vhon/Engr Mar to review sewer lines and layout

No lift station/ one major septic tank proposed

Cost of Treatment limited to Bioreactors/ Structure to be constructed by Hausland Submitted to


Hausland Engineering

To review new location of Tank as proposed by Patrict Tan

Discuss with Triland water supply scheme and septic tank treatment for their appreciation Discuss water
requirement to Triland/ will feed back if they cann accommodate wqater requirement

Issue not clear to R Suarez who is leading this project.Arch Rhon of Arch Vhon Handover (QC Report)
Initially to Start on Sept 21 (No report initiated by Engr. Ferdie) QA QC Report

a. Terms of Reference of the Project

b. Plans

c. As Built Plans

d. Water Supply (Hydro testing) - No needed according to Marvin


e. Summarized report to include passed/fail criteria of test results.

f. Engr. Huberit to coordinate with Hausland organization to accept report.

g. Dealine of Signing off 24 October/17 with Hausland Engineering

h. Coordinate with Hausland Engineering and Lazatins for Turnover

i. Project will be turned over to TTMC (Timog Triangle ??) gray area according to Mike Tan

All reports in Google Drive for easy management access

- laptop turnedover and handed to Engr. Mark Engr. Mark Huberit reported last October 3

- Brief about HCC

- about Hausland/FCI/HCC/Targets etc

HCC/Concrete Products/Motorpool for October 2023

Coordinate with Plasform for field work with Hausland Engineers/Value Engineering Engr. M
huberit to prepare report

Engr Huberit submitted initial report/To include ALUFORM

HCC Team fieldwork with Plasform / Submission of report with Engr Huberit and Louie Status
NOAH

Functions already started with Engr Marvin/Motor Pool/Concrete Products

Initiate Manning Duties and Resposiblity/coordinate with ADMIN

Organizational Chart (partial completed for submission to ERR for comment)

Target End of October2023

Target End of November2023 Target December 2023 1st Quarter of 2024 Deadlines Target

Request List and Status

Being Prepared/Submitted by Group and incorporated with Org chart Coordination with

C/o Engr Marvin/Angel for submission to CEO Ryan

Absence of ECC and Mayors Permit for Batching Plant

Being Prepared/Submitted by Group and incorporated with Org chart

To study Targets

To research other products that can be accomodated

a. Need to organize book

b. Unit Cost issue, Stalled along Ms Bynes Office