You are on page 1of 1

Subject : Report of Inspection ( Unit G315-01A) Prepared by : Wahyudi M & Laode M.

Fardin ( QC Mechanical JO)

Deepest Height of
Pressure Projection
Size thikness raised Flange Type Of
part Length of Acceptance Status of
NO Description PART Position Mat'l of defect surface thikness Defect
the Defect Criteria Inspection
[inch] Yes/No ( mm ) ( mm ) (mm) (mm)
(mm)

Pitting Asme B16.5


1 Case Drain N4 ( Lower ) Flange 1/2" Yes 0,18 1,22 13.90 9.96 Repair
Corrosion Table 3

Subject : Report of Inspection ( Unit G315-01B) Prepared by : Wahyudi M & Laode M.Fardin( QC Mechanical JO)
Deepest Height of
Pressure
Size thikness raised
part Projection
of defect surface Flange Type Of
Length of Acceptance Status of
NO Description PART Position Mat'l thikness Defect
the Defect Criteria Inspection
[inch] Yes/No ( mm ) ( mm ) (mm) (mm)
(mm)

Pitting Asme B16.5


1 Case Drain N4 ( Lower ) Flange 1/2" Yes 0,46 1,22 13.90 7.74 Repair
Corrosion Table 3

Subject : Report of Inspection ( Unit G315-01C) Prepared by : Wahyudi M & Laode M.Fardin ( QC Mechanical JO)

Deepest Height of
Pressure Projection
Size thikness raised Flange Type Of
part Length of Acceptance Status of
NO Description PART Position Mat'l of defect surface thikness Defect
the Defect Criteria Inspection
[inch] Yes/No ( mm ) ( mm ) (mm) (mm)
(mm)

Pitting Asme B16.5


1 Case Drain N4 ( Lower ) Flange 1/2" Yes 0,41 1,22 13.90 10.06 Repair
Corrosion Table 3

Design Code : ASME B16.5-2020 , Acceptance Criteria : ASME B16.5-2020, Para. 6.4.6 / Table 3 , Dwg Refference : 26071-V1D-G-320-05A/B-30001
Note : See Attachment For Detail Photograph level of imperfections versus the acceptable one as per applicable design and construction codes,Projection Of
gasket to Raised Face Flange and Documentation of During Inspection.