Professional Documents
Culture Documents
GS-SMPP-001 On Load Testing Oct 3, 2023 Genset
GS-SMPP-001 On Load Testing Oct 3, 2023 Genset
Power
Gen.Gen.ReactPower:
Total Current
|Gen. Freq:
Gen. |Gen.
Ave: Gen. Reserve: P.
Nominal:
Load%: Actual: P. Genset
P. #: TIME: ACTUAL
LOAD:TOTAL
LOAD: MVSG
Conducted TIME:
|DATE:
TRIP: by:START
Diesel
Level:
Tank
Gen-set
Energy:
no-posenergy
Gen-setStarts: Pressure:
of Water
No. Hours Temp: Oil
Votage:
Battery |Current
Line 3Line 2Line 1 Line 1
Line 3Line 2Voltage Gen.Power:
Engine
Speed: Appar
Ave
Preparedby: Operation:
positive Ph-ph
Power:
volt
active
energy
AVPCCI Mr.
Robert
Supervisor
M. \b-323
Laxamana 235-8
|
SMPP
12
A
283
Approvedby:
Notedby:
TIME:
END
S226\ 2r 2341
23
\38
Engr.
Lester
Engr. D.
Dela \
Baby \o
23 \
Pena
EOM Jean RE
/
B. Engr.
Ramirez
Edzel
D.
Dayrit \d
Diesel
Gen-set
Energy:
no-posenergy Starts:
No.Hours
Gen-setOperation: Pressure:
of Water
Temp: |Oif
Voitage:
Battery 3
Line Line Current
|2Line 1 Line 3Line Line
2Voltage
1 Engine Power
Gen.
Gen.React
Power:
Appar Total
Gen. Freq:
|Gen.Power:Power: |GCurrent
en. Gen.
Ave: Gen. Reserve: P.
Nomninal:
Load %:Actual: P. |Genset
P. #: ACTUAL
LOAD:TOTAL TRIP:
LOAD:MVSG START DATE:
TIME:SUBIECT:
Speed:Factor: TIME: Conductedby:
Ave
Preparedby: Level:
Tank positive Ph-ph
active volt
energy
AVPCCI Mr.
Robert
Supervisor
M.
Laxamana
SMPP |
23s2
Approvedby:
Notedby:
TIME:
END
Engr.
Lester
D.
Dela
Pena
Engr. /Engr.
Baby Edzei
EOM Jean RED.
B. Dayrit/
Ramirez
Engr.
Marc
Hawks
S.
Dimacali