General Report INTRON (Cerpandi Sidabutar)
General Report INTRON (Cerpandi Sidabutar)
Application type:
Application description:
Date of previous inspection:
Inspection date: 22.12.2022
Inspection Number
Rope Info:
Installation date:
Manufacture:
Sertificate №
Rope breaking strength, N
nominal load, N
Diameter, mm: Nominal - 16, Actual-
Construction:
Number of wires
Lay length, mm 0
Overall length, m 0
Inspected length, m 3.48
Instrument Info:
Magnetic head: MH 6-24F S/N 1788
Basic unit: BU 16MB/USB S/N 405591
Date of last calibration
Test condition:
Location of MH
Speed of the rope (MH) during inspection, m/s 0
Direction of the rope motion
MH orientation
Calibration info:
Setting of zero LMA - ;
Setting of known LMA -
Setting of LF -
Resume:
Recommendations:
Fig. 1
DefectPictures