Professional Documents
Culture Documents
Education:
Name of Education Institution Date attended Degree(s)/Diploma(s)
obtained
Federal University of Technology, 2018 B.Engr in Civil Engineering
Minna, Niger State.
Other Training:
Defensive Driving - TRIMING 2022
Fire Safety and Managing Fire Hazards at Workplace – TRIMING 2021
Workshop on Work Stress Management/Occupational Health & Safety TRIMING-
2020
Computer Skills:
General Certificate in Computing (GCC).
AutoCAD, CSC Orion/Prota Structure.
Page 1 of 4
Period Employing Country Summary of activities performed relevant
organization and to the Assignment
your title/position.
Contact info for
references
2019 Havana College, Nigeria Project: Youth Service
Kano. Mathematics, Chemistry and Physics
Corp Member teacher at Senior secondary class level
Contact: Principal Provide guidance and counsel to Students
Havana College, Kano
Language Skills:
Page 2 of 4
Adequacy for the Assignment:
Detailed Tasks References to Prior Work/Assignments that Best Illustrates
Assigned on Capability to Handle the Assigned Tasks:
Consultant’s
Team Experts:
PROJECT: Rehabilitation and Expansion of Kano River Irrigation
Scheme (KRIS) and Dam Safety Remedial Works at Tiga Dam, Ruwan
Kanya Dam and Challawa Gorge Dam Under the TRIMMING Project.
LOT 1
Year: 2019-2023
Location: Kano State
CLIENT: Transforming Irrigation Management in Nigeria
(TRIMING)
POSITION HELD: Quantity Surveyor
Activities Performed: Supervision of Rehabilitation and
Expansion of the Irrigation Scheme and Dam Safety Remedial
Works.
The project includes:
Supervision of Dam safety Remedial work at Tiga dam,
Ruwan Kanya Dam and Challawa Gorge Dam.
Supervision of Rehabilitation and Expansion of 44 Irrigation
sectors (14,444.24ha)
Supervision of Repairs and Rehabilitation of Main Canal
(17km)
Supervision of Repairs and Rehabilitation of the Gayere
Branch Canal (2.8km), East Branch Canal (24km) and West
Branch Canal (8km)
Supervision of Re-excavation and desilting of field drains
and collector drains to specified dimensions and invert
levels.
Evaluation of payment Certificates
Preparation of Monthly progress reports
Check and approve design drawings by the Contractor
Construction Material Quantity Assessments and Cost
Evaluation
Giving technical advice to both the Client and the Contractor
Offered contractual guides to Client and Contractor.
Partake in Progress meetings
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV
correctly describes myself, my qualifications, and my experience, and I am available
to undertake the assignment in case of award. I understand that any misstatement
Page 3 of 4
or misrepresentation described herein may lead to my disqualification or dismissal
by the Client, and/or sanctions by the Bank.
Page 4 of 4